BEFORE AFTER Kennedy’s repair of malfunctioning pumps at the Mount Clemens Wastewater Treatment Plant, provides immediate relief from constant influent events and safety hazards. PROBLEM: The three main pumps for the Mount Clemens Wastewater Treatement Plant were not operating properly. All three pumps failed to work at the same time, leaving the city vulnerable to infulent events. Even when running, the pumps operated at half capacity and clogged constantly. Their frequent failure created operational and safety issues, not too mention added costs and inconvenience. The city needed relief from their pain, and fast. SOLUTION: Mount Clemens engaged Kennedy’s repair team for a full evaluation. Upon inspection, it was determined virtually every wetted part needed to be replaced or reworked. The Kennedy team not only restored the pump to design condition, but assisted in the start up of the repaired pump. As a result, Mount Clemens has made plans to send the remaining pumps to Kennedy for repair. Kennedy Industries • 4925 Holtz Drive, Wixom, MI 48393 • 7425 Clyde Park Avenue, Suite G, Byron Center, MI 49315 Phone 248-684-1200 or 616-490-1023 BEFORE: The volute and wear plate contributed to the reduction in efficiency. Registers of volute and wear ring are oversized by ½”. AFTER: Volute registers were machined for stainless steel inserts to restore registers. Repaired to OEM specifications, the final assembly increased flow almost 50%. PROJECT REPORT: EXPERT WWTP PUMP REPAIR DECEMBER 2018 Expert Pump Repair Eases Pain for Mount Clemens WWTP

Expert Pump Repair Eases Pain for Mount Clemens WWTP

  • Upload
    others

  • View
    3

  • Download
    4

Embed Size (px)

Citation preview

BEFORE AFTER

Kennedy’s repair of malfunctioning pumps at the Mount Clemens Wastewater Treatment Plant, provides immediate relief from constant influent events and safety hazards.

PROBLEM:The three main pumps for the Mount Clemens Wastewater Treatement Plant were not operating properly. All three pumps failed to work at the same time, leaving the city vulnerable to infulent events. Even when running, the pumps operated at half capacity and clogged constantly. Their frequent failure created operational and safety issues, not too mention added costs and inconvenience. The city needed relief from their pain, and fast.

SOLUTION: Mount Clemens engaged Kennedy’s repair team for a full evaluation. Upon inspection, it was determined virtually every wetted part needed to be replaced or reworked. The Kennedy team not only restored the pump to design condition, but assisted in the start up of the repaired pump. As a result, Mount Clemens has made plans to send the remaining pumps to Kennedy for repair.

Kennedy Industries • 4925 Holtz Drive, Wixom, MI 48393 • 7425 Clyde Park Avenue, Suite G, Byron Center, MI 49315 • Phone 248-684-1200 or 616-490-1023

BEFORE: The volute and wear plate contributed to the reduction in efficiency. Registers of volute and wear ring are oversized by ½”.

AFTER: Volute registers were machined for stainless steel inserts to restore registers. Repaired to OEM specifications, the final assembly increased flow almost 50%.