ROBERTO PRESAOffshore Project Director
FABRICATION EXPERIENCES WINDAR
Oportunidades empresariales asociadas a la innovación en el sector eléctrico
EXPERIENCIA Y CASOS DE EXITO
WINDAR is an international company belonging to a industrial group 100% private, owned and under the control of GrupoDaniel Alonso whose headquarters are in the north-west of Spain (Asturias region).
The Group was founded by Mr. Daniel Alonso Rodríguez, who is currently the Honorary President.
Windar Renovables is founded in 2007.
Global Leader on the manufacturing of WTG towers
and offshore foundations.
Who we are?
350 miEUR revenue
1.500 employees
60 years experience
FABRICATION EXPERIENCES WINDAR
Who we are?
FABRICATION EXPERIENCES WINDAR
WINDARMEXAltamira (Tamaulipas)720 sections/year
WINDAR RENEWABLE ENERGYHalol (Gujarat)Nellore (Andhra Pradesh)1680 sections/year
TORREBRASCamaçarí (Bahía)
720 sections/year
AEMSA SANTANALinares (Andalucía)720 sections/year
APOYOS METALICOSOlazagutía (Navarra)528 sections/year
WINDAR OFFSHOREFene (Galicia)
1 Jacket/week
WINDAR WIND SERVICESGijón (Asturias)
720 sections/year
TADARSA EÓLICA TAE 2 & TAE 3Avilés (Asturias)2190 sections/year
WINDAR OFFSHORETAE 1 & TAE 4
Avilés (Asturias)2 TP/week
WINDAR RENOVABLESCentral OfficesAvilés (Asturias)
Presence
WRS TOWERSTanganrog (Rostov)
400 sections/year
FABRICATION EXPERIENCES WINDAR
WINDAR opens new
plant in INDIA
WINDAR opens new plantin BRASIL
OpensWINDAR
WIND SERVICES
Agreementfor a JV
WINDAR opensTAE3
WINDAR opensTAE4
WINDAR opens new
plant in MEXICO
WINDAR-IDESAJoint Venture
1st Offshore Project
ANHOLT Jacket for OSS
2009 2010 2012
1st Offshore TowersBORKUM RIFFGRUND (Alemania)
BORKUM RIFFGAT (Alemania)WEST OF DUDDON SANDS (UK)
BELWIND (Bélgica)+63 Towers
2013 2015
4
3
6
5
4
WINDARorganizeits plants
WINDARfoundation
2007
Windar foundation(On-shore
towers)
2016 2018
2nd Offshoreproject
WIKINGER 29 Jackets
116 piles
3th project: HYWIND5 Floating foundations
4th project:NISSUM BREDNING4 Jackets
7th project:DEBU 31 TPs
20112008 2014
7
8
5th project:MERKUR 66 TPs
6th project:EA0142 Jackets138 piles
WINDAR opens new
plant in RUSSIA
9
JV
10
8th project:WINDFLOAT1 Floatingfoundation
1st American OWFBLOCK ISLAND
5 Tower
Co
mp
any
Pro
ject
s
2017
FABRICATION EXPERIENCES WINDAR
Towers vs Foundations
EXPERIENCES TOWERS FABRICATION OFFSHORE FOUNDATIONS
ONSHORE AND OFFSHORE WIND MARKET OUTLOOK
ONSHORE Towers:
• Mature and steady/growing market in EU.
• Competitive tenders (Renewable) being developed in some countries.
• Big emerging markets (Russia, KSA, Mexico, Argentina, Morocoo,etc).
• Some countries with strict Local Content Requirements
• Lack of long term visibility as the projects are usually awarded on “fast track” (specially in Europe)
OFFSHORE Towers: same trend than for the offshore foundations.
OFFSHORE MARKET
• Growing market in EU and promising pipeline in Taiwan and USA.
• Dramatic drop of the electricity Price over the last years.
• Market extremely driven by technology: bigger WTGs; foundation design; Installation vessels; etc.
• Some countries planning to develop long term programs to support sustainability: Netherlands, Germany, UK ,Denmark…
• Relatively good visibility of the Project pipeline.
FABRICATION EXPERIENCES WINDAR
EXPERIENCES TOWERS FABRICATION OFFSHORE FOUNDATIONS
PROJECT FEATURES
Onshore tower
• Fast awarding process based on costs and capacity availability.
• Very short lead-times
• Limited implication on the design
• Scope of Works normally reduced tofabrication
• Low level of monitorization from clients
• Limited risks and liabilities
• Mature product design which allows veryreliable and tight schedules.
• Long Project negotiations
• Early involvment with designer (but limited)
• Management of sub-contractors and sub-suppliers
• High involvment from clients (certifiers, QC inspectors, manufacturing experts)
• High profile risks: warranty, LDs, liabilities
• Lot of change orders which has impact on theProject Schedule
• Project costs mainly driven by raw material prices and logistics.
Towers vs Foundations
FABRICATION EXPERIENCES WINDAR
EXPERIENCES TOWERS FABRICATION OFFSHORE FOUNDATIONS
STAKEHOLDERS
CLIENTS: • OEMs
COMPETITORS:• Experienced european suppliers and
growing pressure from Asian suppliersalso for the offshore towers
• Specialised fabricators with lot of yearsof experience.
SUPPLY-CHAIN:• Worldwide supplies for Steel plates and
flanges.
CLIENTS: • Utilities• EPCI contractors• Big consortiums: Pension founds, Fund
Management…
COMPETITORS:• (So far) Almost limited to european fabrication• Fabricators from other industries joining wind
market.• Only a few fabricatiors but very specialised for
each foundation type.
SUPPLY-CHAIN:• Mostly european suppliers (lead-times, anti-
dumping, service).
Towers vs Foundations
FABRICATION EXPERIENCES WINDAR
EXPERIENCES TOWERS FABRICATION OFFSHORE FOUNDATIONS
PRODUCT SPECIFICATION & FABRICATION
• Very mature product: structuraly very similar from designer to designer (difference on theinternals)
• Standard specifications and formats definedby the designer to fit most of the Steel mil capabilities
• Same specifications for all the tower types (foreach client)
• Perfect match between Design and Fabrication Tolerances
• Quality requirements (usually) clearly statedand well align between fabricator and client.
• Design “ad-hoc” for each Project
• Lack of standarization on some of theelements
• Fast development: difficult to incorporateleassons learnt on time before new projectsare initiated.
• Very limited and late cooperation withfabricators and/or the whole supply chain.
• Some requirements are not clearly specifiedand affecting the Project Flow.
• Fabrication tolerances too restrictive and difficult to control by standard procedures.
Towers vs Foundations
FABRICATION EXPERIENCES WINDAR
EXPERIENCES TOWERS FABRICATION OFFSHORE FOUNDATIONS
ROLE OF HEAVY PLATES FABRICATION & SUPPLY
• Lot of pressure from Asian market due tocheap labour and Steel prices (manyeuropean projects awarded to assianfabricators)
• Improve the delivery times and reliabilityto have a competitive advantage onrelation to the assian suppliers.
• Quality and formats “easy” to achieve bymost of the Steel mills.
• Steel Price having a big share on the total costsof any foundation type.
• Much more strict quality requirements on top of the standard norms.
• Technical support from early phases to avoidunnecesarry requirements which makes theproduct more expensive and sometimesimposible to achieve.
• Commercial support and commitments duringthe tender process to keep the risks undercontrol.
• Quality and formats, not achievable by manymills.
• Final quality of the Steel delivered, extremelycritical during fabrication (very strict foundationfabrication requirements, hihg focus from endcustomer).
Towers vs Foundations
FABRICATION EXPERIENCES WINDAR
11
FABRICATION EXPERIENCES WINDAR
Offshore wind floating solutions
REF. OFFSHORE COUNTRY MANUFACTURER CLIENT SUPPLY DESCRIPTION YEAR
WINDFLOAT JV WINDAR-NAVANTIA EDP 1 Floating Foundation 2018
DEUSTCHE BUTCH JV WINDAR-IDESA VAN OORD 31 MTPs Offshore foundations 2017-2018
NISSUM BREDNING JV WINDAR-NAVANTIA SIEMENS 4 X 4 Leg Jacket 2017
EAST ANGLIA ONE JV WINDAR-NAVANTIA IBERDROLA 42 x 3 Leg Jacket 2017-2018
MERKUR JV WINDAR-IDESA GEOSEA 66 MTPs Offshore foundations 2017
HYWIND JV WINDAR-NAVANTIA STATOIL 5 x Spar Floating Foundations 2016-2017
WIKINGER JV WINDAR-NAVANTIA IBERDROLA 29 x 4 Leg Jacket + 106 Piles 2015-2016
ANHOLT WINDAR PIHL-ZUBLIN 1 Transformer Substation Jacket 2012
12
76 Jackets 5 SPAR 97 TPs +200 Offshore Towers
FABRICATION EXPERIENCES WINDAR
Offshore wind experience
13
Offshore Tower
Onshore Tower
Offshore foundation
FABRICATION EXPERIENCES WINDAR
FABRICATION EXPERIENCES WINDAR
WIKINGER
HYWIND
ANHOLT
MERKUR, DEBU
NISSUM
EA01
FABRICATION EXPERIENCES WINDAR
Manufacturer WINDAR
Year 2012
Client
LocationOWF erected in the Kattegat sea between Grenå and the Island of Anholt (Denmark).
DescriptionManufacture of 4-Legs Jacket foundation for the Anholt transformer substation (Anholt Project)
Foundation
Height: 15 m
Total weight: 800 Tons
Max. Thickness: 60 m
The Gravity Based Foundation for the transformer station was a concrete caisson construction with a total weight of 4,000 tn which has been constructed in a dry dock near Copenhagen.
OW Project: ANHOLT
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV WINDAR-NAVANTIA
Year 2015-2016
Client
LocationExclusive economic zone (Baltic-WestlichAdlergrund). Baltic Sea. Germany
DescriptionFoundation by the Joint Venture in Spain.Piles by WINDAR sent by barge directly to Sassnitz.
Foundation
Jackets (4-Leg). Include: 29 TPs, 116 Nodes
- Jacket height: 50 m- Jacket weight (without piles): >762 Tn- Max. diameter: 6 m- Max.Thickness: 70 mm- Quality material: S355NL+Z35
116 Piles for 29 Jackets
- Piles height: 59 m- Piles weight (Jacket+piles) >1429 Tn- Max. diameter: 2,7 m
OW Project: WIKINGER
Manufacturer
JV WINDAR-NAVANTIA
Year 2016-2017
Client
LocationFloating OWF located near Buchan Deep (Scotland), approx. 25-30 km from thecoast.
Description5 SPAR Floating Foundations Manufactured by the Joint Venture in Spain (Feneshipyard).
Foundation
Foundation lenght: 90M
Foundation weight: 2.200 TN
Max. diameter: 14,5 m
Mat. thickness: 80 mm
Material quality: NV36D
OW Project: HYWIND
17
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV WINDAR-IDESA
Year 2017
Client
LocationLocated approximately 45km north of the islands of Borkum, Germany, in the North Sea.
Description66 x TP´s. Manufacturing in Avilés at thefacilicities of Windar and Idesa. Verticalization and outfitting at Aviles port.
Foundation
Weight = 290 Tm
Length = 24,5m
Wall thickness = 90mm
Diameter = 6300 mm
OW Project: MERKUR
18
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV WINDAR-NAVANTIA
Year 2017
Client
LocationLocated in the North Sea close to the port of Thyborøn.
Description
Demonstration Project developed by SWP using the innovative gravity-jacketfoundation (concrete TP) concept and thenew 7MW turbine
Foundation
• Weight = 150 Tm• Wall thickness = 65mm• Height = 9m • Piles: L= 64m/ W= 89 Tm/ D=1,4m
OW Project: NISSUM BREDNING
19
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV WINDAR-NAVANTIA
Year 2017-2018
Client
LocationLocated approximately 36 kilometres from the town of Lowestoft, in an area of 209 km2.
DescriptionFoundation by the Joint Venture in Spain.Piles by WINDAR sent by barge directly to destiny.
Foundation
42 jackets (3-leg) + 126 Pin –Piles
Weight = 801 Tm Wall thickness = 85mm Height = 65m Piles: L=58m/W=200Tm/ D=2,5m
OW Project: EAST ANGLIA ONE
20
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV WINDAR-IDESA
Year 2018-2019
Client
LocationLocated approximately 95 kilometres west of Borkum in the German Exclusive Zone
Description31 TP´s. Manufacturing in Avilés at thefacilicities of Windar and Idesa. Verticalization and outfitting at Aviles port.
Foundation
Weight = 290 Ton
Length = 25m
Wall thickness = 90mm
Diameter = 6.700 mm
OW Project: DEUTSCHE BUCHT
21
FABRICATION EXPERIENCES WINDAR
Manufacturer
JV NAVANTIA-WINDAR
Year 2018-2019
Client
LocationLocated off the north coast of Portugal some 20 km from Viana do Castelo
DescriptionConstruction of 1 offshore floatingfoundation for a windfarm with three 3foundations cutting-edge wind turbines
Foundation
Foundation lenght: ---
Foundation weight: ---
Max. diameter: ---
Mat. thickness: ---
Material quality: ---
OW Project: WINDFLOAT
22
Photo correspond to WindFloat 1 Demo Project
FABRICATION EXPERIENCES WINDAR
THANKS FOR YOUR ATTENTION