Upload
vandung
View
217
Download
0
Embed Size (px)
Citation preview
Experiences in Developing iNDC in Indonesia
Syamsidar Thamrin Deputy Director for Weather and Climate
National Development Planning Ministry (BAPPENAS)
Durban Forum on Capacity Building Part II session
Monday, 8 June 2015, Bonn
Presentation Structure
1. INDC preparation
2. Multi Stakeholders’ Engagement Process
3. The Way Forward
1.
2.
3.
Linkages between National Mitigation Action Plan (RAN-GRK ) and iNDC
RAN GRK 2010-2020
Review process of RAN - GRK
(Jan-Aug 2015)
UPDATED RAN - GRK 2010-2020-
2045
Indonesia INDC
New National Mid-Term Development Plan
2015-2019
Assessments of new baseline and future policy intervention
Indonesia INDC Submission to
UNFCCC
Revised Presidential
Regulation on RAN-GRK
Current RAN-GRK Review Process Document Outputs High Level Decisions
Indonesia iNDC is a by-product of Indonesia Mitigation Policy (RAN-GRK) Review Process. • Using existing Legal base for iNDC development
Technocratic Process
Political Process
THE PROGRAM
RAN-GRK, 33 RAD GRK, AND
RAN-API UNDER REVIEW
New Action Plan for MITIGATION AND ADAPATION
INDC • 4 YEARS OF EMPIRICAL EXPERIENCES • EXCLUDED/INCLUDED ACTIVITIES • MORE CAPACITY AND KNOWLEDGE ,
KNOWHOW • COMMUNITY AND PRIVATE SECTOR NAMA
Institutional Arrangment
6
BappenasBappenas
Bappenas
UNFCCC
Focal Point to International
Steering Committee for INDC – chaired by
BAPPENAS
Min. of Energy Min . Of Industry
Min . Of Transport
Min of Public Works
Min. of Environment and
ForestryMin. of Agriculture Min. of Finance
Chamber of Commerce
Otherstakeholders
Otherstakeholders
Otherstakeholders
Working Group for ENERGy & WASTE Working Group for LAND-BASED Working Group for Economic and Finance
Secretariat of RAN GRK
iNDCs process using existing Working Groups for Climate Change Coordination
Why System Dynamics for RAN-GRK Review?
• Support policy makers to understand and assess complex relationships between parameters (feedback relationship) among the RAN-GRK sectors.
• Allow policy makers to overview the implications of policy scenarios being designed over time. find leverage policies and avoid counter intuitive policy impacts.
• Allow policy makers to put some constrains/ limitations (for example carrying capacity) into policy scenario exercises.
• Provide policy makers a ‘room’ to communicate each other on policy design exercises.
• Easy to understand without using too many complex mathematical equations.
• Accommodate qualitative parameters.
Meetings for iNDC (November 2014-May2015)
9
Coordination
Meeting 25
November
2014, Jakarta
Coordination
Meeting 15
Januari 2015,
Jakarta
24-26 of February
2015
Basic training
for system dynamics approach
4-6 of March 2015
Development of model
structure for
reviewing GHG
baseline in waste and
IPPU sectors
5 of March
Internal Coordination for Energy Sector
18-20 of March 2015
Development of model
structure for
reviewing GHG
baseline in energy sector
31 of March-2 of April 2015
Development of model
structure for
reviewing GHG
baseline in land-based
sector
28-29 of April
Internal Coordination for Energy Sector
May 5 2015 FGD for RAN-
GRK review
and preparation of iNDC
May 6 - 8 2015
Developing dynamic
model for Land base
sector, Energy sector,
industry sector and
waste manageme
nt sector
May 26 - 28 2015 Finalized of system dynamics
model
1 2 3 4 5 6 7 8 9 10 11
Multi Stakeholders’ Engagement
10
FGD with Line-Ministries, Modellers and International
consultant
FGD with Line-Ministries & Modellers
FGD with Line-Ministries & Modellers
FGD with Line-Ministries & Modellers
FGD with CSO & Modellers
Focus Group Discussions Informal meetings Resource persons: international &
national Using national modellers from ITB Involve line-ministries since the
beginning Wide stakelholders’ engegament
including CSO, Business Community & Local Governments
Using existing data & information Attenting international iNDC workshops
& seminars Budget support from Indonesian
Government and Development Partners
Next Agenda for iNDC Process
12
15 of June:
model
validation
First week
of July:
Draft of
iNDC
August: Report
to the
President
23 of June: High
Level Meetings
and
stakeholders consultations
Last week of
July:
Ministrial
Approval
Mid-
September:
Submission
of iNDC
4 5 5 5 6 6
4
5
5 6
5 6
month 2015
Thank You Terima Kasih
13
Contacts: [email protected]
http://ranradgrk.bappenas.go.id/rangrk/ http://www.icctf.or.id