26
Experience the Difference 2017

Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Experience the Difference

2017

Page 2: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

DECRA Villa Tile Panel – Detail

2017

Page 3: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

DECRA Villa Tile Roof – Detail

DECRA Villa Tile Panel

DECRA Villa Tile Panel Vent

Tile End Cap

Villa Bird Stop-Ridge (both sides of ridge)

Villa Channel (at rake and roof-to-wall)

Side Flashing Flat Sheet

DECRA Ridge Vent

Villa Valley

Villa Underpan

Tile Hip & Ridge (at hips and ridges)

Villa Channel (both sides of hip)

Villa Bird Stop-Eave

2017

Page 4: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Measuring & Cutting Panels

Measurements are made on roofand panels are marked and usuallycut on the ground.

Panels may be cut with a tin snipsor circular saw with metal cuttingblade.

A hand bender is used to bend thecut edge of the panel for hips,ridges, and valleys.

Safety equipment should be wornduring the installation process.

2017

Page 5: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Deck Preparation – Roof Over Asphalt

Villa Tile may be installed over existingasphalt shingle. Cut shingles back 8” fromeaves and rakes/gable edges.

Can be installed over 2 layers of shingle,heck local code.

Remove existing hip and ridge materials.

Underlayment shall comply with ASTM D226, Type I or Type II, ASTM D 4869, Type Ior II or ASTM D 1970 – or greater ifrequired by local code.

2017

Page 6: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Install Stacked 2 X 2’s

Over prepared deck, position twostacked 2 x 2s flush alongrake/gables, up the center of thehips and along ridges.

2017

Page 7: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

1 x 4 at First Course

Install the front edge of a 1x4 15-½”from the edge of the fascia.

Fasten this to the deck using screwsthat will fit flush to the 1x4 and longenough to penetrate the deck securely.

2017

Page 8: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Villa Valley

Valley pieces should overlapminimum 6” – fastenersshould be positioned outsidethe last rib on either side –paint the valley beforeinstalling panels.

Use Villa Valley or standardconcrete valley metal –minimum 26 gauge pre-finished aluminum-zinc alloycoated steel, minimum 16”wide with a minimum 3-1/4”center upstand.

Ices and Water Shieldrecommended for freeze/thawconditions.

2017

Page 9: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Villa Channel

Install Villa Channel at rake/gable, roof-to-wall, and along bothsides of the 2 x 2s at the hip.

2017

Page 10: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Installation

First course of panels will befastened at the back of thepanel. The nose of the panelwill be fastened during BirdStop – Eave Installation.

Lay out panels and fasten asyou go along - start at thefascia and work towards theridge.

Driving Screws straight downperpendicular to the deck willensure a tight finish and astraight alignment.

2017

Page 11: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Installation

Start at fascia and work up to the ridge. Start the first coursewith a full panel and the second course with a cut panelmeasuring 24.5”.

Measure panels and make cuts so the cut edge starts or ends invalley or channel metal.

Panels can be laid right to left or left to right – overlap area mustbe covered by overlapping panel.

Periodically check alignment by snapping a chalk line at 14-1/2”intervals.

2017

Page 12: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Fastening Panels

Attach second and subsequent courses of panels by locking thefront of each panel into the back of the panel below.

Drive screws straight down into the deck to draw panels tight.

Fasteners: Minimum #9 Hex (1/4” diameter) x 1.5” Long.

2017

Page 13: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Villa Bird Stop - Eave

Install and fasten Villa Bird Stop –Eave after installing a minimum oftwo courses above the eave.(Required along the fascia)

Villa Bird Stop – Eave must benotched where it terminates into theVilla Channel – fasteners placedevery 10”. Right and left edgesnotched in the same manner.

2017

Page 14: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Eave Fastening

Fasteners will go through thenose of the panel and the VillaBird Stop – Eave into the deck.

Ensure the Villa Bird Stop – Eavefits tight to the first course ofpanels without gaps.

2017

Page 15: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Installation - Roof-to-Wall

Install panels up to the wall cuttingthe back of the last course so it fitstight – install Bird Stop – Ridge.

If wall flashing is present, tuck VillaChannel behind existing flashing –cut panel into the Channel.

2017

Page 16: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Installation – Valley & Hip

Be sure to paint Villa Channelprior to installing panels.

On Both sides of the hips orvalley, cut panels to fit into theVilla Channel.

Fit the panels into place andscrew down.

2017

Page 17: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Installation - Ridge

Install panels up to the 2 x 2s at theridge – cut the back of last course soit fits tight against the stacked 2 x 2s– use a hand bender to turn up thepan portion.

Install the Villa Bird Stop-Ridge bylining up with the back of the cutpanel and attaching it to the stacked2 x 2s – overlapping the last course.

2017

Page 18: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Hip & Ridge

Install Hip and Ridge pieces along the rake/gables, hips and ridges.Overlap and fasten through top down into stacked 2x2s.

Use a Tile End Cap to cover open end of Hip & Ridge pieces atfascia/Villa Bird Stop – Eave.

2017

Page 19: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Ridge Venting

If a vented ridge is desired, stack 2 x 2 battens and install alongthe length of the ridge, number of 2 x 2s will be determined byroof pitch. Use DECRA Ridge Vent and fasten to both sides ofbattens along the length of the ridge.

Install Villa Bird Stop – Ridge along the ridge and attach to 2 x 2sfastening through the Ridge Vent material. Attach DECRA RidgeVent along the top of Villa Bird Stop – Ridge.

Cover the ridge with Tile Hip & Ridge.

2017

Page 20: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Panel Vent - Installation

Install DECRA Villa Tile panels until you reach the approximatepanel vent location. Carefully measure, mark and cut a rectanglehole 29” x 5” in the roof deck to match the opening of theunderside of the DECRA Villa Tile Panel Vent. Install the panelvents as you would normal DECRA Villa Tile panels.

2017

Page 21: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Penetrations

Roof penetrations should be flashed with standard roof jacks overa Villa Underpan which drains over the panel immediately below.

Cut the Villa Underpan to fit tightly around penetration. Fit thepipe flashing apron to the underpan applying roofing gradesealant to both sides.

Finish by measuring and cutting panel to fit tight over flashing.align panel and seal around base. Use touch up kit as needed.

2017

Page 22: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Chimney, Skylights & Dormers

Starting below the chimney, CutPanels to fit the area. Bend up andfasten panels – See RidgeInstallation. Use Bird Stop Ridge atthe back of the cut panels below thechimney.

Use Villa Channel both sides andcounter flash with side flashing orexisting flashing.

Area above the chimney must beflashed and counter flashed. Use achimney saddle bent to fit around thechimney.

2017

Page 23: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Additional Installation Details

Where possible, Roofing Grade (Polyurethane)sealant / adhesive should be covered by roofingmaterials or by a matching stone granules.

Sealant should not be used to refinisheddamaged panel surfaces.

After Installation is completed, be sure toclean off ALL debris, ESPECIALLY any metalshavings.

DECRA Touch Up Kits are available in allmatching colors and should be used where itis necessary to touch up or repair panelfinishes.

2017

Page 24: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

DECRA Villa Tile Capri Clay DECRA Villa Tile Amalfi Sand

DECRA Villa Tile Pompeii Ash DECRA Villa Tile Venetian Gold

2017

Page 25: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Helpful Tools

Download literature & specs at bestbuymetals.com

Request a free aerial quote from your rep using only your address

Includes drawing and material quotation

2017

Page 26: Experience the Difference · Use a Tile End Cap to cover open end of Hip & Ridge pieces at fascia/Villa Bird Stop – Eave. 2017. Ridge Venting If a vented ridge is desired, stack

Tips & Tricks

Alternate installation direction every other course.

Install panels from the middle out for long runs.

Use a stitch screw at back flange overlap to “draw up” panel.

Work into valleys and hips.

Lower batten build up and notch Hip & Ridge at high points so thebarrel fits tighter at low points.

Weave jack in with paper when using Underpan.

When cutting panel, cut through the back first – metal to stonecoating.

2017