Experience in Developing Sustainable Financial Instruments in Latvia Aleksejs Kanejevs Altum 24.01.2019

Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Experience in Developing

Sustainable Financial

Instruments in

Latvia

Aleksejs Kanejevs

Altum

24.01.2019

Page 2: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

REDUCE

COSTSReduced energy

consumption

Sustainable Financial Instruments

ENVIRON-

MENT CO2 reduction

NEW

MARKETS Sertification

DEVELOP-

MENTIntroduction of

innovations, long-term plans

LOWER

RISKS Costs and

availability ofenergy

SOCIETYBrand recognition

/ engagement

Page 3: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Loans for Increase of Energy Efficiency

Page 4: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Loan Terms

Loan amount – up to 2,85 MEUR

No collateral required

Own financing requirement 10-15%

Maturity up to 7 years

For SMEs and large companies

Loan repayment is ensured by extra cash flow from reduced energy bill.

Page 5: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

20MEUR

GREEN BONDS

BUSINESS LOANS ESCO LOANS

Lightening

Solar panels

Energy efficienttechnologies

for energy efficiency

+4 MEUR

COSME GUARANTEES

Page 6: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

RENEWABLE ENERGY

� Wind� Sun

� Bio energy

ENERGY EFFICIENCY

� District heating based on renewables

� Energy recovery projects

� Non-fossil technologies/

manufacturing

� Non-fossil energy consumption reduction

GREEN BUILDINGS

� Passive and nearly zero energybuildings

� Construction of new buiildings / major renovations

SUSTAINABLE

TRANSPORTATION

Solutions / systems based on non-fossil fuel and supporting infrastructure

Types of Supported Projects

Page 7: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Progress

• Loans approved – 18 projects, including 3 ESCO

• Total loan amount – 6.8 million. EUR

• Technical assistance project has been started (financed from ELENA programme)

• Limited number of projects in sustainable transportation and bio-energysectors

Page 8: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Grants, Guarantees and Loans for Increase of Energy Efficiency

in Residential Multiappartment Buildings

Page 9: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Main Principles

Max 50% non-residential premises

Min 5 apartments

Max 30 years payback period

Max 90 kWh/m2 per year energy

consumption

(for heating)

Grant 50% (35% if Altum loan

provided)

Page 10: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Gra

nt

ad

va

nce

Grant

Loan

Technical documentation

Loa

ng

ua

ran

tee

Implementation Model

Page 11: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Procurement

Consultancy

(~ 6m)

Grant decision

(~ 2m)

Grant disbursement

(~ 8m)

Technical

documentation

Application

Grant

application

Līgumi

Renovation

Contracts

On-site

check

Process

Page 12: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Progress

436

36

167

87

9

78.5

6.1

30.1

12.5

1.6

0 50 100 150 200 250 300 350 400 450 500

Project applications

(technical documentation)

Grant applications

under consideration

Approved grants

Approved loan guarantees

Approved Altum loans

Project applications

(technical

documentation)

Grant applications

under considerationApproved grants

Approved loan

guaranteesApproved Altum loans

Total volume

(mln EURO)78.5 6.1 30.1 12.5 1.6

Number

of projects436 36 167 87 9

66.9% of available budget

Page 13: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

Some considerations

• Increase in construction costs affected pay-back period of investments (Cabinet of Ministers Regulations had been amended accordingly – from 20 to 30 years)

• Grant approval / disbursement process is rather complex

• Authorized persons have very different level of experience in project management

• Appartment owners tend to prefer relatively short-term loans (10-12 years)

Average energy consumption for heating before renovation kWh per sq.m. 134.12

Planned energy consumption for heating after renovation kWh per sq.m. 54.61

Average costs or renovation EUR per sq.m. 151.35

Average size of building, sq.m 2621

number of apartments 38

Page 14: Experience in Developing SustainableFinancial ...cija... · Progress 436 36 167 87 9 78.5 6.1 30.1 12.5 1.6 0 50 100 150 200 250 300 350 400 450 500 Project applications (technical

FUNDING

COMPETENCE CENTEREvaluation of solutions, attraction of partners,

consultations in preparation of the project

FINANCIAL EXPERTSSupport in project structuring

€Mr. Aleksejs Kanejevs

JSC “Attīstības finanšu institūcija Altum”

Deputy HeadProgramme Development Department

[email protected]+371 67774091