Expansion of Hong KongInternational Airport into aThree-Runway SystemSubmission of Management Organisations
May 2020
355482 06/09 6https://mottmac.sharepoint.com/teams/pj-c8123/do/06 Deliverables/09 EP Condition 2.4 -Management Organizations/7th Revision/20191104 Submission of ManagementOrganisations Version 7.docxMott MacDonald
3/F International Trade Tower348 Kwun Tong RoadKowloonHong Kong
T +852 2828 5757F +852 2827 1823mottmac.hk
Expansion of Hong KongInternational Airport into aThree-Runway SystemSubmission of Management Organisations
May 2020
This Submission of Management Organizations
has been reviewed and certified by
the Environmental Team Leader (ETL) in accordance with
Condition 2.4 of Environmental Permit No. EP-489/2014.
Certified by: Terence Kong
Environmental Team Leader (ETL) Mott MacDonald Hong Kong Limited
Date 5 May 2020
AECOM
8/F, Grand Central Plaza, Tower
2, 138 Shatin Rural Committee
Road, Shatin, Hong Kong
香港新界沙田鄉事會路 138 號新城
市中央廣場第 2 座 8 樓
www.aecom.com
+852 3922 9000 tel
+852 2317 7609 fax
Our Ref : 60440482/C/JCHL200506
By Email
Airport Authority Hong Kong
HKIA Tower, 1 Sky Plaza Road
Hong Kong International Airport
Lantau, Hong Kong
Attn: Mr. Lawrence M L Tsui, Principal Manager
6 May 2020
Dear Sir,
Contract No. 3102
3RS Independent Environmental Checker Consultancy Services
Management Organizations
Reference is made to the ET’s submission of updated Management Organizations under Condition 2.4
of the Environmental Permit No. EP-489/2014 certified by the ET Leader on 5 May 2020.
We would like to inform you that we have no comment on the captioned submission. Therefore we write
to verify the captioned submission in accordance with the requirement stipulated in Condition 2.4 of
EP-489/2014.
Should you have any query, please feel free to contact the undersigned at 3922 9376.
Yours faithfully,
AECOM Asia Co. Ltd.
Jackel Law
Independent Environmental Checker
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System
355482 | 06/09 | 6 | May 2020
Contents
1 Introduction 1
2 Management Organisation of the Main Construction Companies 22.1 Advanced Works Contract 22.2 Deep Cement Mixing (DCM) Works Contracts 22.3 Main Reclamation Works Contract 22.4 Airfield Works Contracts 22.5 Third Runway Concourse and Integrated Airport Centres Works Contract 22.6 Terminal 2 Expansion Works Contracts 32.7 Automated People Mover Works Contracts 32.8 Baggage Handling System Works Contract 32.9 Airport Support Infrastructure and Logistic Works Contract 3
3 Management Organisation of the Environmental Team 7
4 Management Organisation of the Independent Environmental Checkerand His Team 8
Attachment 9
A. Organisation Chart of the Works Contracts 10
B. Organisation Chart of the ET and IEC 29
TablesTable 1: Contact Information of Key Personnel 4Table 2: Contact Information of ET 7Table 3: Contact Information of IEC 8
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 1
EP Condition 2.4 – Management Organisations
1 Introduction
The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-185/2014) preparedfor the “Expansion of Hong Kong International Airport into a Three-Runway System” (the Project)has been approved by the Director of Environmental Protection, and an Environmental Permit(EP) (Permit No.: EP-489/2014) has been issued for the project under the Environmental ImpactAssessment Ordinance.
The purpose of this updated Management Organisations is to provide the latest information basedon the recent contracts awarded under this project. This updated Management Organsationsincludes the following information:
a) the management organisation of the main construction companies and/or any form ofjoint ventures associated with the construction of the Project (in Section 2);
b) the management organisation of the Environmental Team (ET) (in Section 3);c) the management organisation of the Independent Environmental Checker (IEC) and his
team (in Section 4); andd) organisation charts, names of responsible persons and their contact details.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 2
EP Condition 2.4 – Management Organisations
2 Management Organisation of the MainConstruction Companies
2.1 Advanced Works ContractLangfang Huayuan Mechanical and Electrical Engineering Co., Ltd. (Contract P560(R)) is thecontractor appointed to undertake the diversion of the existing submarine aviation fuel pipelines.
Names of the responsible persons and their contact details are set out in Table 1 below.
2.2 Deep Cement Mixing (DCM) Works ContractsPenta-Ocean-China State-Dong-Ah Joint Venture (Contract 3201), Samsung-Build King JointVenture (Contract 3202), Sambo E&C Co., Ltd. (Contract 3203), China Road and Bridge-SamboJoint Venture (Contract 3204) and Bachy Soletanche-Sambo Joint Venture (Contract 3205) arethe contractors appointed to undertake the DCM ground improvement works. Construction worksof Contracts 3201, 3202, 3203 and 3204 have been completed.
Names of the responsible persons and contact details of Contract 3205 are set out in Table 1below.
2.3 Main Reclamation Works ContractZhen Hua Engineering Company Ltd.-China Communications Construction Company Ltd.-CCCCDredging (Group) Company Ltd. (ZHEC-CCCC-CDC) Joint Venture (Contract 3206) is thecontractor appointed to undertake the main reclamation works.
Names of the responsible persons and their contact details are set out in Table 1 below.
2.4 Airfield Works ContractsFujita Corporation-China Harbour Engineering Company Ltd.-Zhen Hua Engineering CompanyLtd. (FJT-CHEC-ZHEC) Joint Venture (Contract 3301) is the contractor appointed to undertakethe construction works for the north runway crossover taxiway.
China Road and Bridge Corporation (Contract 3302) is the contractor appointed to undertakeadvance works for the eastern vehicular tunnel.
Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, Paul Y.Construction Company Limited, and Rock-One Engineering Company Limited (SAPR) JointVenture (Contract 3303) is the contractor appointed to undertake the construction works for thenew runway, taxiways, and associated works.
Names of the responsible persons and their contact details are set out in Table 1 below.
2.5 Third Runway Concourse and Integrated Airport Centres Works ContractWing Hing Construction Co., Ltd. (Contract 3402) is the contractor appointed to undertakeenabling works for the new Integrated Airport Centres.
Sun Fook Kong Construction Limited (Contract 3403) is the contractor appointed to undertakebuilding and civil works for the new Integrated Airport Centres.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 3
EP Condition 2.4 – Management Organisations
China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., LtdJoint Venture (Contract 3405) is the contractor appointed to undertake foundation andsubstructure works for the Third Runway Concourse.
Names of the responsible persons and their contact details are set out in Table 1 below.
2.6 Terminal 2 Expansion Works ContractsBuild King Construction Ltd. (Contract 3501) is the contractor appointed to undertake theconstruction works for antenna farm and sewage pumping station.
Build King Construction Ltd. (Contract 3502) is the contractor appointed to undertake Terminal 2(T2) automated people mover (APM) depot modification works. Construction works of Contract3502 have been completed.
Leighton–Chun Wo Joint Venture (Contract 3503) is the contractor appointed to undertake T2foundation and substructure works.
Names of the responsible persons and their contact details of Contracts 3501 and 3503 are setout in Table 1 below.
2.7 Automated People Mover Works ContractsCRRC Puzhen Bombardier Transportation Systems Ltd. and CRRC Nanjing Puzhen Co., Ltd.(PBTS – CRRC PZ) consortium (Contract 3601) is the contractor appointed to undertake worksfor the new APM system (TRC Line).
Niigata Transys Company Ltd. (Contract 3602) is the contractor appointed to undertake theexisting APM system modification works.
Names of the responsible persons and their contact details are set out in Table 1 below.
2.8 Baggage Handling System Works ContractVanderlande Industries Hong Kong Limited and Shun Hing Systems Integration Company Limited(Contract 3603) is the contractor appointed to undertake the construction works of baggagehandling system (BHS).
Names of the responsible persons and their contact details are set out in Table 1 below.
2.9 Airport Support Infrastructure and Logistic Works ContractChina State Construction Engineering (Hong Kong) Ltd. (Contract 3721) is the contractor appointed toundertake the construction support infrastructure works up to the completion of the 3RS Project.
Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract3722) is the contractor appointed to undertake works for construction support facilities in westernsupport area.
China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) is the contractor appointed toundertake the construction works of APM and BHS tunnels on existing airport island.
Gammon Construction Limited (Contract 3901B) is the licensee appointed to establish, operate, andmaintain the concrete batching facility at the Project site.
Names of the responsible persons and their contact details are set out in Table 1 below.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 4
EP Condition 2.4 – Management Organisations
Table 1: Contact Information of Key PersonnelParty Position Name Telephone EmailContract P560(R)Aviation FuelPipeline DiversionWorks(Langfang HuayuanMechanical andElectrical EngineeringCo., Ltd.)
Project Manager Wei Shih 2117 0566 [email protected]
EnvironmentalOfficer
Lyn Liu 5172 6543 [email protected]
Contract 3205DCM (Package 5)(Bachy Soletanche-Sambo Joint Venture)
Deputy ProjectDirector
Min Park 9683 0765 [email protected]
EnvironmentalOfficer
William Chan 5408 3045 [email protected]
Contractor 3206Main ReclamationWorks(ZHEC-CCCC-CDCJoint Venture)
Project Manager Kim Chuan Lim 3763 1509 [email protected]
EnvironmentalOfficer
Kwai Fung Wong 3763 1452 [email protected]
Contract 3301North RunwayCrossover Taxiway(FJT-CHEC-ZHECJoint Venture)
Deputy ProjectDirector
Kin Hang Chung 9800 0048 [email protected]
EnvironmentalOfficer
Joe Wong 6182 0351 [email protected]
Contract 3302Eastern VehicularTunnel AdvanceWorks(China Road andBridge Corporation)
Project Manager Wan Cheung Lee 6100 6075 [email protected]
EnvironmentalOfficer
Dennis Ho 5645 0563 [email protected]
Contract 3303Third Runway andAssociated Works(SAPR Joint Venture)
Project Manager Andrew Keung 6277 6628 [email protected]
EnvironmentalOfficer
Max Chin 6447 5707 [email protected]
Contract 3402New IntegratedAirport CentresEnabling Works(Wing HingConstruction Co., Ltd.)
Contract Manager Michael Kan 9206 0550 [email protected]
EnvironmentalOfficer
Lisa He 5374 3418 [email protected]
Contract 3403New IntegratedAirport CentresBuilding and CivilWorks(Sun Fook KongConstruction Ltd.)
Project Manager Alice Leung 9220 3162 [email protected]
EnvironmentalOfficer
Alpha Chia 9626 1114 [email protected]
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 5
EP Condition 2.4 – Management Organisations
Party Position Name Telephone EmailContract 3405Third RunwayConcourseFoundation andSubstructure Works(China Road andBridge Corporation –Bachy SoletancheGroup Limited – LTSambo Co., Ltd. JointVenture.)
Project Manager Francis Choi 9423 3469 [email protected]
EnvironmentalOfficer
K M Lui 5113 8223 [email protected]
Contract 3501Antenna Farm andSewage PumpingStation(Build KingConstruction Ltd.)
Contracts Manager Vincent Kwan 9833 1313 [email protected]
EnvironmentalOfficer
Edward Tam 9287 8270 [email protected]
Contract 3503T2 Foundation andSubstructure Works(Leighton–Chun WoJoint Venture)
Project Manager Eric Wu 3973 1718 [email protected]
EnvironmentalOfficer
Malcolm Leung 3973 0850 [email protected]
Contract 3601New APM System(TRC Line)(CRRC PuzhenBombardierTransportationSystems Limited andCRRC Nanjing PuzhenCo., Ltd. Joint Venture)
Project Manager Hongdan Wei 158 61809450
EnvironmentalOfficer
K F Li 9086 1793 [email protected]
Contract 3602Existing APM SystemModification Works(Niigata Transys Co.,Ltd.)
Project Manager Kunihiro Tatecho 9755 0351 [email protected]
EnvironmentalOfficer
Yolanda Gao 5399 3509 [email protected]
Contract 3603Baggage HandlingSystem(VanderlandeIndustries Hong KongLtd. and Shun HingSystems IntegrationCo., Ltd.)
Project Manager K C Ho 9272 9626 [email protected]
EnvironmentalOfficer
Eric Ha 9215 3432 [email protected]
Contract 3721ConstructionSupportInfrastructure Works(China StateConstructionEngineering (HongKong) Ltd.)
Site Agent Thomas Lui 9011 5340 [email protected]
EnvironmentalOfficer
Xavier Lam 9493 2944 [email protected]
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 6
EP Condition 2.4 – Management Organisations
Party Position Name Telephone EmailContract 3722Western SupportArea – ConstructionSupport Facilities(Tapbo ConstructionCompany Limited andKonwo Modular HouseLtd. Joint Venture.)
Deputy ProjectDirector
Philip Kong 9049 3161 [email protected]
EnvironmentalOfficer
Sampson Lo 9752 9118 [email protected]
Contract 3801APM and BHSTunnels on ExistingAirport Island(China StateConstructionEngineering (HongKong) Ltd.)
Project Manager Tony Wong 9642 8672 [email protected]
Federick Wong 9842 2703 [email protected]
Contract 3901BConcrete BatchingFacility(GammonConstruction Ltd.)
Senior ProjectManager
Gabriel Chan 2435 3260 [email protected]
EnvironmentalOfficer
Rex Wong 2695 6319 [email protected]
Attachment A presents the organisation charts of all the above-mentioned contractors required under EP Condition 2.4.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 7
EP Condition 2.4 – Management Organisations
3 Management Organisation of theEnvironmental Team
The management organisation of the Environmental Team (ET), including names of the ETLeader and Deputy ET Leaders and their contact details are set out in Table 2 below:
Table 2: Contact Information of ETName Position Telephone EmailTerence Kong ET Leader 2828 5919 [email protected]
Heidi Yu Deputy ET Leader 2828 5704 [email protected]
Daniel Sum Deputy ET Leader 2585 8495 [email protected]
Attachment B presents an organisation chart of the ET (together with that for the IEC, as de-scribed in Section 4 below) required under EP Condition 2.4.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 8
EP Condition 2.4 – Management Organisations
4 Management Organisation of theIndependent Environmental Checker and HisTeam
The management organisation of the Independent Environmental Checker (IEC), includingnames of the IEC and Deputy IEC are set out in Table 3 below:
Table 3: Contact Information of IECName Position Telephone EmailJackel Law IEC 3922 9376 [email protected]
Roy Man Deputy IEC 3922 9141 [email protected]
Attachment B presents an organisation chart of the IEC required under EP Condition 2.4.
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 9
EP Condition 2.4 – Management Organisations
Attachment
A. Organisation Chart of the Works Contracts 10B. Organisation Chart of the ET and IEC 29
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 10
EP Condition 2.4 – Management Organisations
A. Organisation Chart of the WorksContracts
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 11
EP Condition 2.4 – Management Organisations
Project Director
Zhanhua Shi
Project Manager
Wei Shih
Deputy Project Manager
ProcurementTeam
Aviation FuelSystem
ConstructionTeam
HorizontalDirectional
DrillingConstruction
Team
EnvironmentalManagement
Team
Environmental Officer:
Lyn Liu
Safety
Team
QA/QC
Team
Organisation Chart of Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd (Contract P560(R)) for the Aviation FuelPipeline Diversion Works
Project Manager
Feng Shi
DesignSupport
Consultants
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 12
EP Condition 2.4 – Management Organisations
Project Director
Derek Yung
Administrative& HR Dept.
IMS Department
Organisation Chart of Bachy Soletanche-Sambo Joint Venture (Contract 3205) for Deep Cement Mixing Works (Package 5)
EngineeringDept.
Quality/ GeotechnicalManager
Deputy Project Director
Min Park
AccountDept.
ProgramDept.
OperationsDept.
CostControlDept.
CommercialDept.
Environmental OfficerWilliam Chan
Safety Manager
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 13
EP Condition 2.4 – Management Organisations
Project Director
Heng Liang
Stone ColumnTeam
EnvironmentalManager
Organisation Chart of ZHEC-CCCC-CDC Joint Venture (Contract 3206) for Main Reclamation Works
PVD & VibroFlotation Team
Project Manager
Kim Chuan Lim
ReclamationTeam
DCMTeam
Seawall &OutfallTeam
Environmental OfficerKwai Fung Wong
Deputy Project Managers
EnvironmentalSupervisors
EnvironmentalConsultant
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 14
EP Condition 2.4 – Management Organisations
Project Director
Makoto Fujii
Deputy Project Director
Kin Hang Chung
Construction Manager
Alan Lam
Organisation Chart of FJT-CHEC-ZHEC Joint Venture (Contract 3301) for North Runway Crossover Taxiway
Environmental Officer
Joe Wong
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 15
EP Condition 2.4 – Management Organisations
Project Director
Yan Hua Wang
Construction Manager
Organisation Chart of China Road and Bridge Corporation (Contract 3302) for Eastern Vehicular Tunnel Advance Works
Deputy Project Director
William Kwok
Project Manager
Wan Cheung Lee
Safety, Health &Environmental Manager
Calvin Ho
Engineers SuperintendentEnvironmental Officer
Dennis Ho
EnvironmentalSupervisors
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 16
EP Condition 2.4 – Management Organisations
Project Director
Yazhang Xie
Chief Construction Manager
Organisation Chart of SAPR Joint Venture (Contract 3303) for Third Runway and Associated Works
Deputy Project Director
Wyllie FungZhiqiang Zhan
Zhongpan Wang
Project Manager
Andrew Keung
Safety, Health &Environmental Manager
CY Yeung
Engineers Superintendent
Environmental Officer
Max Chin
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 17
EP Condition 2.4 – Management Organisations
Contract Manager
Michael Kan
Coordination Manager
Jerry Tam
Organisation Chart of Wing Hing Construction Co., Ltd. (Contract 3402) for New Integrated Airport Centres Enabling Works
Environmental Officer
Lisa He
Foremen
Environmental Supervisor
Kelvin Wong
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 18
EP Condition 2.4 – Management Organisations
Project Manager
Alice Leung
Site Agent
Chow Chong Kei
Organisation Chart of Sun Fook Kong Construction Limited (Contract 3403) for New Integrated Airport Centres Building and CivilWorks
Environmental Officer
Alpha Chia
Environmental SupervisorConstruction Supervisor
Ko Chuen Ho
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 19
EP Condition 2.4 – Management Organisations
Project DirectorYan Hua Wang
Project ManagerFrancis Choi
QualityManagement
Team
Deputy Project Managers
Organisation Chart of China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd. Joint Venture(Contract 3405) for Third Runway Concourse Foundation and Substructure Works
AdministrationTeam
EngineeringTeam
Interfacing andCoordination
Team
Safety Officer Environmental OfficerKam Man Lui
Environmental Supervisor
Planning andProgramme
Team
RiskManagement
Team
Occupational Health &Safety and
EnvironmentalManagement Team
Senior Construction Managers
CommercialManagement
Team
SurveyTeam
Safety andEnvironmental
Manager
Deputy Project Directors
ConstructionTeam
LogisticTeam
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 20
EP Condition 2.4 – Management Organisations
Project Director
Simon Liu
Deputy Project Director
C. K. Chan
QA Team
Contracts Manager/Contractor’s Representative
Vincent Kwan
Organisation Chart of Build King Construction Ltd. (Contract 3501) for Antenna Farm and Sewage Pumping Station
SafetyTeam
E&M Team
Environmental Officer
Edward Tam
EnvironmentalTeam
Project Team CommercialTeam
SurveyingTeam
Environmental Supervisor
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 21
EP Condition 2.4 – Management Organisations
Project Director
QA & EnvironmentalManager
Project Manager
Eric Wu
Organisation Chart of Leighton – Chun Wo Joint Venture (Contract 3503) for Terminal 2 Foundation and Substructure Works
Zone One SectionManager
Environmental Officer
Malcolm Leung
Zone Two SectionManager
Zone Three SectionManager
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 22
EP Condition 2.4 – Management Organisations
Project Manager
Hong Dan Wei
Organisation Chart of PBTS – CRRC PZ Consortium (Contract 3601) for New Automated People Mover System (TRC Line)
E&M and APMConstruction
Manager
APM SystemDesign Manager
Senior QuantitySurveyor
AdministrationOfficer
Civil WorksConstruction
Manager
Environmental Officer
Kim Fai LiHealth & Safety Officer
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 23
EP Condition 2.4 – Management Organisations
Project Director
S. Yasuda
Project Manager
Kunihiro Tatecho
Organisation Chart of Niigata Transys Co., Ltd. (Contract 3602) for Existing Automated People Mover System Modification Works
EnvironmentalOfficer
Yolanda Gao
Risk Manager Administrator EngineeringManager/ Site
Manager
Procurement QA / QC
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 24
EP Condition 2.4 – Management Organisations
Project Director
Project Manager
K C Ho
Organisation Chart of Vanderlande Industries Hong Kong Ltd. and Shun Hing Systems Integration Company Ltd. (Contract 3603)for Baggage Handling System Works
Environmental Officer
Eric Ha
EnvironmentalSupervisors
Construction Manager
Site Engineers/Supervisors
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 25
EP Condition 2.4 – Management Organisations
Site Agent
Thomas Lui
Organisation Chart of China State Construction Engineering (Hong Kong) Ltd. (Contract 3721) for Construction SupportInfrastructure Works
Environmental Officer
Xavier Lam
EnvironmentalSupervisors
Section Agents
Project Director
Victor Wu
Deputy Site Agent
Gary Yeung
Foremen
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 26
EP Condition 2.4 – Management Organisations
Deputy Project Director
Philip Kong
Organisation Chart of Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract 3722) forWestern Support Area – Construction Support Facilities
Project Director
Billy Lo
Construction ManagerQuality/ Safety/Environmental Manager
Design/ MethodManager(SupportFacilities)
CommercialManager
MaintenanceTeam
Environmental Officer
Sampson Lo
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 27
EP Condition 2.4 – Management Organisations
Project DirectorVictor Wu
Project ManagerTony Wong
Airport SystemCoordinator
Site Manager
Organisation Chart of China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) for Automated People Mover andBaggage Handling System Tunnels on Existing Airport Island
AdministrationTeam
CommercialTeam
Risk &NECTeam
Safety Officer
Assistant SafetyOfficer
Environmental OfficerFederick Wong
Environmental Supervisors
PlanningTeam
ConstructionTeam
Safety & EnvironmentalTeam
Site Agent
Assistant Site Manager
E&MTeam
QualityAssurance& Control
Team
LandSurveyTeam
DesignTeam
Safety Manager
Eric Lai
Safety Supervisor
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 28
EP Condition 2.4 – Management Organisations
Senior Project Manager
Gabriel Chan
Organisation Chart of Gammon Construction Limited (Contract 3901B) for Concrete Batching Facility
General Manager
Herbert Zheng
Environmental Officer
Rex WongSenior Plant Supervisor
Senior EnvironmentalManager
Plant Foremen/ Operators
Subcontractors and otheremployees
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 29
355482 | 06/09 | 6 | May 2020EP Condition 2.4 – Management Organisations
B. Organisation Chart of the ET and IEC
Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 30
355482 | 06/09 | 6 | May 2020EP Condition 2.4 – Management Organisations
Roy Man3922 9141
Daniel Sum2585 8495