13
Appellant's Exhibit 90 (as referenced in June 30, 2017 Appellant WPDC Cleveland LLC's Witness and Exhibit List)

Exhibit 90 - Redmond

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Appellant's Exhibit 90

(as referenced in June 30, 2017

Appellant WPDC Cleveland LLC's Witness and Exhibit List)

redtnond.gov/BuildlngPernrtitsmof Occupancy

TVPF OF work: Office Use Only2016'-09a02natet 12/9/2016 BLOG-,□ AccesEOi t structure □ Addition □ Exterior

□ Garage II Modular □ New □ Portable \□ Remodel □ Residential Remodel □ Wireless Comm. Facility□ Awning r_l Dock □ Fence □ Rack Storage □ Re-roof□ Retainini Wall □ Stormwater Vault □ Pool □ Tank_____^

201.6 — 02092AcceotedfavrCii {PCHi HTA

Green Certification Level

LEED: □ Silver □ Gold □ PlatinumN/ALender Information

Lender name;__Mailing address;City:__________Phone;________

VtLUt Of CousmucirjN 8.King CouNir As.sF.ssoRs Improvcmlni V/iiiif*

25,100 Zip:State;Value of Cortstfuction: S.

KC Aiseisot; Improvement Value: i npprnised vnlue $250,000

Fax:Site Location E-mail;

Appuc ANT. Information

Project narje: T / f jfP 4^.----------

Tenant: _________!------------------------------------- -----------

Property osjmer: ________________Mailing4'D-^AV^.^ _■ ______

.Stale;. \A/A 7.p:^

Tax parcel number; SeTin MillerContact person; Company name: Mailing address:

Andorra Ventures

3061 E Lake SammniTiisli Pjrkw,iy NE

SonipyiPinl'i^aty;State: wa phone: zosss 11309

Crty:^CrXl/g_______Phone: II-06 4^-^

Fax:[email protected]:

IPEtAiLED Description of work

Change of Occupancy - Origins - Construction incItirJes Tl to divide the building into multiple retail suites, storage and offices, including the construction of a new 2nd story (459 sq ft) mezzanine. Total area of construction = 3268 sq ft.

a □ Design ProfessionalO OwnerApplicantWho is paying for the permit?

Please enter information below if different.

□ Contractor

„Addres^Name

Architect □ EngineerDesigned ByGENERAI CtONIRACTOR INFORMATION TWl _______ _Moms AWMrt^.^ IHCl

Mailing address:. ^ gV'fTg L

Ig ... . - ^

Contact person;.Company name: 'J~- IP ■ Mailing add ‘ess:_____________ Company name:

Zip:,State:aty:

City:Fax;Phone:Zip:State;.State contractor's license #:

phone;Expiration date;_______________________ _

aty of Redmond business license REDOOQ.

E-mail: _______________________________

Fax:

E-matl;

;.i.i6425.556.2473Development Services Center, 15670 NE 85th St, Redmond, WA 98052

Appellant WPDC Cleveland's Exhibit 90 - Page 1 of 12

Building Information

^ Yes □ No□ Yes ^ No Alarm

□ Yes ^ No Hazardous Materials□ Yes No Basement□ Yesj^No Change of Occupancy

Certificate of Otcupancy Required Smoke Control**

If Yes, design and construction documents shall be submitted as a separate Fire Installation permit in conjunction M/itb Building Permit Application.

Automalic Sprinkler Required Automatic Sprinkler Provided Quick Response Throughout Quick Response per Occupant Number of Stories Special Conditions*

’If Yes, pi ease explain_________

n Yes W No QYcs ^No VJ Yes □ NoTlZ^Yes □ No

□ Yes ^ □ Yes [3^-NoNo

Building Information for Proposed Work Per IBCType of

ConstructionProposed

OccupancyNon-separatedInterior Remodel New/Added # of occupantsLocatior use?(SF) (SF)

A mmk M. Xmfioye^ /4-3> I'Z-m i/f

y3'//( Lzhn.Li£l B3vyA-IO Ikn M

Le. B, S-1, E, M, etc.) and by floor or suite number.’Enter locapon by occupancy type

Existing Building Information

Locate the sulkling history and enter the information below. Form can be found at http://gi5.rodmond.gov/pv/ft/MapVlew. If one Is no available the Information will be venfied during plan review.

Code YearSquare FootageOccupancyGISff Construction Type

IkAdditional Applicants Please add additional applicants below that need access to the plans via the online portal

Company:Name:Company:

s must already be a contSa Tn dtir permitting system. If not provide separate contact r^tstration lomt per ap^iwntrName:’•Appitcah

•Value of Co rtstruction: Tlie value of constniction shall be based on the value of the work (hat is perfom^ The total wplue of work shall include ma^rials and labor for which the permit is being sought for. For the construction of new buildings, the building valuation data table located on w ww.redmond.gov/permitfees shall be used for new square footage based off of type of construction and occupancy.•King County Assessor Value can be found at htto://www5.kttigcountv.KQv/parceJyLe.wer/vie>^r/kinBcQu.n.ty/yig^.3^. Search by address or \ larcel. View the property report, and Input the Appraised Improvements (Imps) Value for the current year.Expiration ol Plan Hevfew; AppUcations for which no permit is issued within 180 days following the date irfapplic^on shall expire ai^ all ^d shall be forfeited. Upon written request of the applicant, the Building Official may grants IM-day^jwlan to Plan timeas «>ec-^ed in ScHU n 105.3.2 oF^e IBC. No plication shall be extended for a period of more than 180 days. See the Fee Schedule (or extension fee Information.

Building Owner or Authorized Agent

to be true and correct, and I am authorized to apply for thisI hereby certf ythatt have read and examined this oppffcotion and know the permit.

Print Nofne^Signafurs:

same

Dat6ri2.8-i6Sean Miller

7.1.16

Appellant WPDC Cleveland's Exhibit 90 - Page 2 of 12

« r\/>■‘:r''.f.'.

*0M h xr• iX<■.

? :t^'•Tkj' AIm "Ci4 :rif. ,S-■/J v^.Tr' m■<■

i

wwwsredmbnd.gov/BuHdingPermlts■V!. WB•»:

CityofRedmondWAB HtKOTOh

PROJECT Information

Office Use OnlyBUILDING f ERMir NUMBER:______SITE APPglSS: <yPLANS EX/^ MINER:______________PUNNER: ____________________

Approved by:. Date;______[ggfiW^Must be approved prior to Building Permit Issuance

Type OF Work Applicant/Owner Information

PropertyOwiwApplicant,

. New C ammeictaVMylfi-FamllyfMIxed-Uio Addition

.Comm jrcial/Muilf-Fomily/Mixed-Use Alteration Commt rclol/Mulli-Famlly/Mixed-Ltse Rack Storage . Re+ool Ing .Tartonl Improvement

. Other_______________________________________

Property Owner.

PRIMARY CONTACT PERSON:V Name:JMlikWtti±__________: f? intc^/A. nEmotl

PROVIDE; Site Plan(s) showing patldng plan

Temporary Construction Parking; Location/ # of Stalls

# of Employees on SiteConstruction Stage

JExcavation Date;.

JFoundation (Date;.

JFraming: (D rte:.

JFinish: (Date;.removal of any on-street parking within the boundaries of Redmond's Downtown on-street parking area due to construction will ,The temporary

require the pur :hase of monthly on-street permits for the duration of the project. The number of monthly permits punhased shall be equal to the number of on-s treet parking spaces displaced throughout the project. One monthly permit per space removed is required to be purchased. Permits can be porchas :d by calling Diamond Parking at 425-556-2433 option 1. The Downtown on-street parking map is available at Redmond.gov/parking. NOTE:

Em pig re«/sub-CBnliactor* are required to park in the area aiiprowed for coostnKtioo parting for this project• Efnpic lees/sgb-conttactors are nBtotowedtnBort on the street or at transit center. (King County manages Park & Ride, and violators will be towed at

vchkk owners expense)site Si porintcntiunt contact information to be provided to Kim Keeling Xhkcelinegiredfrtund.itov a25-55e-?.451 at beginning of project Hesou!

Rev. March ZOlpcos arc available at Go Redmond www.Spaedmend.Mm for vanpoollne. carpooling, transit and free one month transit passes

Appellant WPDC Cleveland's Exhibit 90 - Page 3 of 12

FIRE DEPr: ANSWER THE QUESTIONS BELOW WITH A YES OR NO. A SEPARATE FIRE INSTALLATION PERMIT MAY BE REQUIRED FOR ITEMS THAT ARE CHECKED YES. PLEASE CONTACT RFD AT 425.406.0865 FOR ADDITIONAL INFO

YES NOnFlammable/Combustible Liquids

n 0Hazardous Materials

High Piled Storage

□ 0HPM Facilities

D ^n EF

LP Gas Store/Handle/Use/Dispense

Places of Assembly nRefrigerabon Equipment for Heating and Cooling n mSprayings Dipping n mBattery Systems

[S]Compressed Gases □ 0Cryogenics □ MIndustrial Ovens □Private Fire Hydrants

□ mSmoke Control Systems/Stair Pressurization **Flre Installation permit application required at time of Building permit application

If yes—Item and description

PLANNING DEPARTMENT INFORMATION; ANSWER THE QUESTIONS BELOW WITH A YES OR NO. PLEASE CONTACT 425.556.2494 FOR ADDITIONAL INFORMATION OR QUESTIONS

NOYESnExterior Modifications to Building?

Change of Land Use? (RZG) i.e. warehouse to gym*

Sensitive areas on or near site? □Is permit a PRD/MPRD/PCD/MPCD?

lElBuilding generates noise above 35dBA

□Tree removal proposed?

Additional building square footage proposed?

0Change in number of existing parking stalls?

Reducing landscaping square footage proposed? El□nReroofing?

If yes - Item and description

’When change of land use intensifies, a Traffic Trip Generation Study may be required. Contact Min Uio 425-S56-2881Udated 7.1,2016Page 4/4

Appellant WPDC Cleveland's Exhibit 90 - Page 4 of 12

eomond.gov/BuildingrermitsI

^(^ii^ruction Parking Form Cityof RedmondW ft

j: LLJ-Qi:;mo/e construction workers.

PROJECT Information

Office Use OnlyApproved by:. Date;______

BUILDING PERMIT NUMBER:,

SITE ADDRESS-___________PLANS EXAMINER:________PLANNER:_______________

Must be approved prior to Building Permitissuance

Applicant/Owner InformationType of Work

Applicanl_____

Property Owner,. New Commercial/Mulli-Family/Mixed-Use Addllion . Commercial/Multl-Family/Mixed-Use Alteration Commercial/Multi-Family/MixecPUse Rack Storage , Re-roofIng , Tenant Improvement

. Other______ __ ______________________________

Properly Oivoer.

PRIMARY CONTACT PERSON:

Name:

Errioii;.

Phone;. PROVIDE: Site Plan|s) showing parking plon

Temporary Construction Parking: Location/ # of Stalls

tt of Employees on SiteConstruction Stage

Excavation (Date;.

Foundation (Date:.

Framing: (Date:.

Finish: (Date:.

The temporary removal of any on-street parking.within the boundaries of Redmond's Downtown on-street parking area due to construction will require the purchase of monthly on-street permits for the duration of the project. The number of monthly permits purchased shall be equal to the number of on-street parking spaces displaced throughout the project, One monthly permit per space removed is required to be purchased. Permits

be purchased by calling Diamond Parking at 425-B56-2433 option 1. The Downtown on-street parking map is available at Redmond.gov/parking.canNOTE;

Employees/sub-contractors are required to park in the area approved for construction parking for this projectEmployees/sub-contractors are net affpwed ro anefc on the street or at transit center. (King County manages Park & Ride^ and violators will be towed at vehicle owners expense)Site Superintendent contact information to be provided to Kim Keeling khkeelliiK<aredmond.fiOV 425-556-2451 at beginning of project Resources are available at Go Redmond w ww. GnR net tt loori .ci'im for vanpooling, carpooling, transit and free one month transit passes

Rev. March 2016

Appellant WPDC Cleveland's Exhibit 90 - Page 5 of 12

THE CITY OF REDMONDSTATEMENT OF SPECIAL INSPECTIONS GUIDELINES

CUyarRcdmond

In accordance with Chapter 17 of the current adopted International Building Code (IBC), the owner, or the registered design professional in responsible charge acting as the owner's agent, is required to hire an independent testing/inspection agency to perform required special inspections.

The independent agency hired to perform the duties of special inspection is required to be a registered agency with Washington Association of Building Officials (WABO), under the Special Inspection Registration Program (SIRP) Standard No. 1701 or most current adopted special inspection standard published by WABO.

The design professional shall complete the attached forms and submit them to the Building Department prior to issuance of the building permit. For projects requiring continuous inspection, the preparer shall submit the name and qualifications of the individual(s) assigned to the project. The inspectors assigned to any project within the Jurisdiction shall be currently registered with WABO, and certified for the disciplines assigned.

A. Contractor's Responsibilities1. Notify the agency

The contractor is responsible for notifying the inspection agency in sufficient time for scheduling personnel to perform required inspections.

2. Provide written statement of responsibilityThe contractor shall provide a written statement of responsibility as required in section 1704 for construction of designated main-wind or seismic force resisting system.

3. Provide access to Jurisdiction approved plansThe approved plans shall be readily accessible at the job site.

4. Provide access to workThe contractor shall provide reasonable access to all work requiring special inspection.

5. Retaining special inspection reports at the job siteThe contractor is also responsible for retaining at the job site all special inspection records submitted by the special inspector, and providing these records for review by the Building Department's inspector upon request.

6. Notify Jurisdiction of special inspections prior to scheduled inspection time.

B. Duties of the Special Inspector1. Observe the work

The inspector shall observe the work for compliance with the Jurisdiction approved plans, specifications, and applicable provisions of the IBC. The architect/engineer’s reviewed shop drawings, and/or placement drawings, may be used only as an aid to inspections.• Continuous Special Inspection - The full-time observation of work requiring special inspection by an

approved special inspector who is present in the area where the work is being performed.• Periodic Special Inspection - The part-time or intermittent observation of work requiring special inspection by

an approved special inspector who is present in the area where the work is being performed and at the completion of the work.

2. Report non-conforming itemsThe inspector shall bring non-conforming items to the immediate attention of the contractor, and note all such items in the daily report. If any item is not resolved in a timely manner and is about to be incorporated in the work, the special inspector shall immediately notify the Building Department, the engineer or architect, his/her office.

3. Furnish daily reportsThe special inspector shall complete a daily report for each day’s inspections. The daily reports shall remain at the job site with the contractor for the Building Department's inspector. The reports shall include the following:

Name of special inspector with WABO certification number and certification type, date, time, temperature and weather conditions.

b. Description of the inspections, with locations and tests performed.c. Listing any non-conforming items.d. Include how items were resolved or unresolved.

List any changes or corrections to non-conforming Issues authorized by the engineer, architect, or Jurisdiction's building inspectors.

a.

e.

Rev. July 1, 2016

1

Appellant WPDC Cleveland's Exhibit 90 - Page 6 of 12

4. Furnish weekly reportsThe inspection agency shall furnish weekly reports of the tests and inspections performed directly to the Building Department, project engineer, architect, and/or others as designated.

5. Furnish final reportThe Inspection agency shall submit a final signed report to the Building Department stating that all items requiring special inspections and testing were fulfilled, all discrepancies were corrected or resolved, and all work requiring special inspections is in conformance with the approved design drawings and specifications.• Any items unresolved or discrepancies in coverage (i.e., missed inspections, periodic inspections when

continuous was required, etc.) shall be specifically itemized in this report.

C. Jurisdiction's Responsibilities1. To verify compliance

The Jurisdiction is required to oversee the implementation of Structural Tests and Special Inspection requirements found in IBC Chapter 17 and the WABO - SIRP Standards 1701.

2. Review special inspectionsThe Building Department shall review all special inspectors and special inspection requirements.

3. Monitor special inspectionsWork requiring special inspections, and the performance of special inspectors, shall be monitored by the Building Department's inspector. The jurisdiction’s approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector.

4. Issue Certificate of OccupancyThe Building Department will only issue a Certificate of Occupancy after all special inspection reports and the final special inspection report, have been submitted and accepted.

D. Owner ResponsibilitiesThe owner, the design professional in responsible charge acting as the owner's agent, shall fund special inspection services. The owner is responsible for seeing that these requirements are met.

E. Registered Design Professional Responsibilities1. The registered design professional in responsible charge (engineer, or architect), shall include special inspection

requirements and speciRcalions on the plans.2. Provide structural observation Per IBC Section 1704 as amended by the State of Washington requirements and

specifications on the plans.3. Prepare the Statement of Special Inspections in accordance with IBC section 1704 and identify Structural Testing

for Seismic Resistance per IBC section 1705 (When required). The statement of special inspections shall identify items fabricated on the premises of an approved fabricator where special inspections are not required by section 1704.2.5

4. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans.

ACKNOWLEDGMENTS

I have read and understand my responsibilities regarding special inspections.

Owner/Agent

Date:Signature:Company:.Name:

Contractor

Date:,Signature:Company:Name:

Inspection Agency

Date:Signature:Company:.Name:

Registered Design Professional in Resp. Charge

Company:______ Date:Signature:.Name:

Rev. July 1,2016

2

Appellant WPDC Cleveland's Exhibit 90 - Page 7 of 12

STATEMENT OF SPECIAL INSPECTION FORM

PERMIT#DATE___PHONE#, CITY____

PROJECT__________ADDRESS__________INSPECTION AGENCY

ADDRESS__________ ZIP

AGENCY CONTACT PERSONDESIGN PROFESSIONAL___

ADDRESS________________

COMPANYZIPCITY

Check Required Special Inspections - per International Building Code, Section 1704/1705:Seismic Force Resisting Systems requiring inspection (IBC 1705):,

Sprayed Fire-Resistant Materials (1705.14) Mastic and Intumescent Coatings (1705.15) Ext. insui. and Fin. System-EiFS (1705.16) Expansion and Adhesive Anchors (1705.3) Smoke Control/Stair Pressurization (1705.18) Weiding for Seismic Resistance (AISC 341) Structural Wood (1705.11.1)Fire-Resistant Penetrations (1705.17)Storage Racks (1705.12.7)Architectural Components. (1705.12.5)Mech. and Elec. Components (1705.12.6)

Other inspections as required by the Design Professional or the Building Official (1705.1).

12.Structural Welding (Steel AISC 360)High Strength Bolting (Steel AISC 360) Structural Concrete and Reinf. Steel (1705.3) Anchor Bolts in Concrete (1705.3)Prestressed Concrete and PT tendons (1705.3)

1.13.2.14.3.15.4.16.5.17.Shotcrete (1705.3)

Masonry (1705.4)High Load Diaphragms (Wood 1705.5) Grading, excavation, and filling (Soils 1705.6) Driven Deep Foundations (1705.7) Cast-in-place Deep Foundations (1705.8)

6.18.7.19.8.20.9.21.10.22.11.

23.

Items by an approved Fabricator (1704.2.5)

Specify Structural Testing for Seismic Resistance below flBC 1705.12 when required)

24.

A. Structural Steel (IBC 1705.13.1)

Test Description _______________________________ _____________________

Frequency_________________________________________________________B. Non-Structurai Components (IBC 1705.13.2)

Test Description_____________________________________________________Frequency _____________ ____________________________________________C. Other Testing Required by Design Professional or Building Official (IBC 1705.13.1)

Test Description_____________________________________________________

Frequency _____________ _____________________________________________

Section 1704.5-Structural Observations (List requirements);___________________

Rev. July 1,2016

3

Appellant WPDC Cleveland's Exhibit 90 - Page 8 of 12

&wwwfredmWd.gov/LandUseromisi^

This worksheet is to verify data provided to the City during the entitlement phase of the project; which was used to issue a SEPA threshold determination and collect Greenhouse Gas data. Verification is required to ensure that there are no significant changes to the project which would impact the SEPA threshold determination issued by the City or the calculation of Greenhouse Gas impacts. If you have questions about completing this form, please contact your Project Planner or 425-556-2494 to speak to the Planner on Call.

Building Permit #:

Reiated Land-use Permit #:

Project Name:__________

Project Address/Parcel #:

GHG Data TableResidentiai Uses Table:

Use or Principal Activity Number of Dwelling Units New Pavement Sauare FootageNew Single-Family HomeMulti-Family Unit in Large Building (More than 5 units)Multi-Family Unit in Small Building (Less than 5 units) Mobile Home

Non-Residential Uses Table:New Building Square Footage New Pavement Square FootageUse or Principal Activity

EducationFood SalesFood ServiceHealth Care InpatientHealth Care OutpatientLodgingRetail (Other Than Mall)OfficePublic AssemblyPublic Order and SafetyReligious WorshipServiceWarehouse and StorageOther;Vacant

Use or Principal Activity: Select the Use or Principal Activity which classifies your project. This should match what was listed on the submitted SEPA checklist.# of Dwelling Units: Include the number of dwelling units for residential or mixed-use projects with a residential component.New Building Square Footage: include the new building square footage to be constructed for all non-residential uses. Do not provide square footage of residential units,New Pavement Square footage: Include the new pavement area being added for the project. Calculation should include all new impervious area being added such as driveways, parking outside of the building's footprint within the property line.Mixed Use Buildings: Report the number of dwelling units in the residential uses table and the square footage of primary non- residential uses, such as retail, in the non-residential uses table. Non-residential square footage does not include square footage associated with residential units.

Appellant WPDC Cleveland's Exhibit 90 - Page 9 of 12

B BIrf>

reSmmtd.'gov/BulldlrigPermlts■.v7T.Tm-i,y]

illi ApplicrdtionrsAuIn"KupiUv lI Mixed Use D Change of Occupancy

r.--

aType of Work: Office Use Only

_______ BLDG;_______ BPLNl

DDte:_____Accepted by;

□ Accessory Structure □ Addition □ Exterior Alteration□ Garage □ Modular □ New □ Portable DTI□ Remodel □ Residential Remodel □ Wireless Comm. Facility□ Awning □ Dock □ Fence □ Rack Storage □ Re-roof□ Retaining Watl □ Stormwater Vault D Pool □ Tank______

Green Certification Level

lEED: O Silver □ Gold □ Platinum■ N/ALender Information

Lender name:_Mailing address:City:_________Phone:_______

Value oe Construction 8,King County Assessors Improvement Value*

Value of Construction: J________

KC Assessors Improvement Value: 1Zip:State:

Fax: _ E-mail:Site Location

Site address:. Applicant InformationTax parcel number;

Project name:____

Tenant:_________

Contact person: Company name; Mailing address:City:_________State;_________Phone:_______Fax;__________E-mail;_______

Property owner:.^ Mailing address:.

City:__________

Phone; ______

mZip:.State:.

Detailed Description of work

□ Contractor □ Applicant □ Owner □ Design ProfessionalWho is paying for the permit?

Please enter information below if different.

^Address.Name

E-mail,

Designed By □architeci □ EngineerGeneral Contractor Information

Contact person:.Company name:

Mailing address: Company name;

Mailing address:Zip;,State:City:

City:Phone: Fax:

Zip:State;,State contractor's license #:

Phone:Expiration date:_____________________

City of Redmond business license REDOOO,

E-mail:____________________________

Fax:

E-mail:

7.1.16Development Services Center, 15670 NE 85th St, Redmond, WA 98052 425 556 2473

Appellant WPDC Cleveland's Exhibit 90 - Page 10 of 12

Building Information

□ Yes □ No□ Yes □ No

□ Yes □ No□ Yes □ No

□ Yes □ No D Yes □ No

Alarm

Hazardous Materials Basement

Change of Occupancy Certificate of Occupancy Required Smoke Control

If Yes, design and construction documents shall be submitted as a separate Fire Installation permit in conjunction with Building Permit Application.

□ Yes D No CH Yes D No U Yes □ No□ Yes □ No

Automatic Sprinkler Required Automatic Sprinkler Provided Quick Response Throughout Quick Response per Occupant Number of Stories Special Conditions*

*lf Yes, please explain__________

□ Yes □ No ****

PER IBCBuilding Information for Proposed Work

Non-separateduse?

ProposedOccupancy

Type of Construction

New/AddedInterior Remodel # of occupantsLocation* (SF)(SF)

Totali.e. B, S-1, E, M, etc.) and by floor or suite number.♦Enter location by occupancy type

Existing Building Information

Locate the building history and enter the information below. Form can be found at http;//gis-redriTond.jtov/pv/ff/tviapVigw. If one is not available the information will be verified during plan review. ______

Code YearSquare FootageOccupancyConstruction TypeGISft

Please add additional applicants below that need access to the plans via the online portalAdditional Applicants

Company;Name:_____ : Company; _______________________♦’Applicants must already be a contact in our permitting system, it not provide separate contact registration form per appiicanf.”

•Value of Construction; The value of construcb'on shall be based on the value of the work that is being performed. The total value of work shall Include materials and labor for which the permit is being sought for. For the construction of new buildings, the building valuation data table located on www.redmond.gov/permitfees shall be used for new square footage based off of type of construcbon and occupancy.♦King County Assessor Value can be found at 11 hj~> ■ // www ITi n ly o 11 n r v. a n v/t i .n-cr i v i r ■ we r/vi e w i ■; / M n e.c o u n t v/v r i ■ w e r, a a ft- Search by address or parcel. View the property report, and input the Appraised Improvements (Imps) Value for the current year.Expiration of Plan Review Applications for which no permit is issued within 180 days following the date of applieabon shall expire and all fees paid shall be forfeited. Upon written request of the applicant, the Building Official may grant a ISO-day extension to the Plan Review tinie as spec­ified in Secbon 105.3.Z of the IBC. No application shall be extended fora period of more than 130 days. See the Fee Schedule for extension tee inform abon.

Name:

Building Owner or Authorized Agent

I hereby certify that I have read ar)d examined this application and know the same to be true and correct, and I am authorized to apply for this permit.

Date:Print Name:

Signature:

7.1.16

Appellant WPDC Cleveland's Exhibit 90 - Page 11 of 12

RCW 64,55Moisture Protection Law for

Multi-Unit Residential Buildings

■ New requirements for new multi-unit residential buildings with more than two units and most multi-unit residential buildings being rehabilitated will apply to building permits issued on or after August 1,2005:

■ Plans, details and specifications for the construction of the building enclosure shall be stamped by a licensed engineer or architect and shall be submitted prior to issuance of the building permit.

■ The design professional of record shall submit a statement affirming that the building enclosure documents satisfy the requirements of RCW 64.55 which shall be submitted prior to issuance of the building permit.

■ A third-party, qualified inspector shall inspect the building enclosure during the course of construction for compliance with the building enclosure design.

■ The third-party inspector shall submit a signed letter of certification prior to building final regarding the inspection and substantial compliance of the building with the building envelope enclosure design documents.

Please note that City of Redmond staff will not:

m Review or approve the building enclosure details during plan review or field inspection.

■ Review the qualifications of the third-party inspector.

■ Issue permits without the documentation noted above or perform a final building inspection without the letter of certification.

To obtain more information, visit the Washington State website at http://www.access.wa.gov

19of 19Updated 02/15

Appellant WPDC Cleveland's Exhibit 90 - Page 12 of 12