Exercise, Training Oversight Panel (ETOP)October 31, 2006
By
Christopher Voss
ETOP Chair
ETOP – Who We Are
Voss, Chris (DC) – Chair Bass, C. Douglas (EM Chair representative) Christina Crue (MD State) Clemens, Michael (MD Local) Elliott Grollman (RESF 13 liaison) Jerry Barnhill (VA State) Mark Penn (VA Local) James Talbert (DC) Local and State Exercise and Training Support
ETOP Objectives
Create an NCR five year exercise schedule and coordinate exercises that engage the entire region, including Federal Departments, Agencies and capabilities.
Elect a jurisdiction or capable entity to manage an exercise project contract with management input from ETOP. This exercise project will follow this Program Plan, as written or updated by ETOP, and will be funded using the available exercise line item in ETOP’s annual budget
Integrate training standards and approaches across the NCR to reflect National and NCR strategy requirements
Create a consistent methodology to document lessons learned from actual emergency events and exercises in order to incorporate these lessons into training standards and operations protocols.
Exercises
Contract Vehicle in Place Accepting Exercise Requests on a rolling Basis –
Overlapping with the 5 year plan Spring Function Exercise
– The exercise seminar will be held on November 2, 2006 from 1000-1:00 at the COG Board Room (Third Floor).
Interoperable Communications Community Preparedness and Participation Critical Resource Logistics and Distribution Citizen Protection Mass Care
Long Term Exercise PlanYear Discipline Concentration Exercises
Objectives to correlate with the following:
NCR Strategic Plan Initiative Priority Target Capability*
2006
Fire/Rescue/EMS CBRNE Communications DrillIC
Communications NIMS IND CPX 4.1.2 IC
Health Pandemic Pandemic Influenza DrillIC, MP
2007
Public WorksNIMS
Hurricane FSE/CPX2.1.1, 2.2.1, 4.1.3, 4.3.3, 4.3.1
IC, CPP, CI, RL, CP, MC
Law EnforcementResponse and investigation of a terrorist incident Evacuation TTX (RDD)
2.2.1, 3.1.1, 4.3.1, 4.3.32.1.1, 2.2.1
CPP, IS, LE, CD, CI, RL, W/H, CP, RM
Transportation Evacuation
2008
Emergency Management
Mass Care Power Outage (IED) TTX4.2.3, 2.1.1, 2.2.1, 3.2.1, 4.3.1
LE, CI, RL, ED, W/H, MS, MC
Energy Mass FatalityBioterror (FSE)
2.1.1, 3.2.1, 4.1.3, 4.3.1, 4.3.3
IC, MS, MP, MC
Mass Care Resource Support
2009
Long Term Recovery Mass Fatality Chemical Attack2.1.1, 2.2.1, 3.2.1, 4.1.2, 4.1.3, 4.3.3
CD, LE, MS, W/H, CP, MC, RL, P
Health CBRNEMass-Transit Weapons (Planes, Trains, Cargo)
2.1.1, 2.2.1, 3.2.1, 4.1.2, 4.2.3, 4.3.1, 4.3.3
IS, CD, LE, MS, IC, MC, CI, RL, P
Law EnforcementFederal Asset Integration
2010
Public Information Resource and Logistics Cyber Attack 2.1.1, 2.2.1, 3.2.1, 4.2.3 LE, IC, CI, MC, RL
Emergency Management
COOP/EvacuationIND
2.1.1, 3.2.1, 4.1.2, 4.1.3, 4.2.3, 4.3.3
IS, CD, LE, W/H, ED, IC, CPP, CP, CIP, RL, P, RM
Communications Mitigation
Training
Webeoc Training – contract approved, class schedule will be released shortly throughout the region
NIMS Training Managing Metro Emergencies COOP Training Incident Management Team Training NCR Radio Cache Team Training RESF 8 Training - HICS and NIMS : Core Curriculum
The Approval Process
Proposals are submitted to the ETOP liaison supporting the respective R-ESF submitter. A proposal shall consist of:
• Applicant profile• Budget• RESF chair endorsement letter or e-mail • Project description
• Example training: training course name, course description, course duration, estimated number of attendees, target audience for training, training location if known and estimated timeframe or period of performance for the training:
• Example exercises: Type of exercise, exercise objectives, type of scenario if known, exercise description, exercise duration, estimated number of attendees, target audience for exercise, exercise location if known and estimated timeframe or period of performance for the exercise.
The project description should not be a full proposal. One or two pages are adequate. If additional information is needed, ETOP will contact the submitter.
Next Step
Complete ETOP Website Promote 5-year Exercise Plan Support NIMS Training across the Region Provide Webeoc training Promote Regional Training initiatives Develop a corrective action program, which
identifies “Regional Issues
Next Step – Funding Approval Process
Vigilant Shield Exercise (RESF - 4) ACAMS Training (CIWG) NIMS Training (NIMS Compliance Officers) RESF 16 Exercise Hospital Disaster Life Support (RESF 8)