EXECUT IVE   SUMMARY  O F   POLOKWANE  I NTERNAT IONAL   CONVENT ION   C ENTRE  

F EA S I B I L I TY   S TUDY  Prepared  for:   POLOKWANE  MUNICIPALITY  (PUBLIC  PARTICIPATION)  

 

 PREPARED  BY:

Genial Shelter Architect

Page 2: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  1  

TABLE OF CONTENT 1. INTRODUCTION AND BACKGROUND .................................................. 2 2. MUNICIPAL NEED ............................................................................ 2 3. MUNICIPAL OBJECTIVE .................................................................... 2 4. PREVIOUS FEASIBILITY STUDY ......................................................... 3 5. CURRENT STUDY ............................................................................ 4 6. OUTPUTS ....................................................................................... 4 7. CURRENT AVAILABLE FACILITIES ...................................................... 7 8. SOLUTION OPTION ANALYSIS ........................................................... 8

Technical Availability .......................................................................... 8 9. PREFFERED OPTION ANALYSIS ....................................................... 11 10. LEGAL DUE DILIGENCE ................................................................. 11

Site ............................................................................................... 11 Lapsed Title Deed Conditions ............................................................. 12 Current Land Use ............................................................................. 12 Minerals, Water and Heritage ............................................................ 13

11. LEGAL ISSUES ............................................................................. 14 12. TECHNICAL ISSUES ..................................................................... 14 13. DUE DILIGENCE: SOCIO-ECONOMIC STATUS .................................. 15

Municipal Socio-Economic Objectives .................................................. 15 14. ECONOMIC EVALUATION .............................................................. 16

International Tourism Base Analysis ................................................... 16 Provincial Tourism Analysis ............................................................... 17

15. POLOKWANE CONFERENCE AND ACCOMMODATION SUPPLY .............. 18 16. ACCOMODATION DEMAND ANALYSIS ............................................. 18 17. LOCAL ECONOMIC BENEFITS ......................................................... 19                                                

Page 3: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  2  

1. INTRODUCTION AND BACKGROUND

The City of Polokwane(CoP) has a vision objective of becoming a smart city

by the year 2030. The vision of the municipality is “The ultimate in innovation

and sustainable development”.A number of anchor projects were identified

that would ensure economic development.

The Polokwane International Convention Centre (PICC) was identified as one

of the anchor projects to be undertaken.

It is Important that the development of the PICC , is aligned with the CoP

strategic Objectives. The PICC will do so by accelerating higher economic

growth and development of CoP. The development will create temporal and

permanent job opportunities;

Promote viable economic atmosphere by establishing a PICC in order to

enhance economic opportunities with social, cultural and economic

development that enable celebration of diversity and foster inclusion.

2. MUNICIPAL NEED

To promote the optimal use of a municipal asset in the form of land, in order

to bring about economic growth within the municipal area through the

establishment of an international convention centre

3. MUNICIPAL OBJECTIVE

• Development of a facility that would cater for the need of having

adequate facilities to host delegates in access of 1500

• To investigate and select a procurement choice that will bring about

value for money, risk transfer and affordability in delivering the

International convention centre

• To attract investment for the construction, operations and maintenance

of the ICC

• To create economic empowerment opportunities for local small,

medium and micro enterprises (SMME)

• To promote job creation for local

Page 4: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  3  

• To promote environmental conservation

• To ensure compliance with all legislation related to PPPs

4. PREVIOUS FEASIBILITY STUDY

The overall need of the municipality was defined as to stimulate economic

growth and development by attracting investment through the design and

building of an international convention center. Generally this is perceived to

bring more investment. The feasibility study conducted by the municipality in

2004, was favorable towards the building of an ICC. These were the findings

as per sub-section 8.2. Of the Feasibility study report: 2004.Ouputs of

previous study are below:

Page 5: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  4  

5. CURRENT STUDY

Architectural Simulations Figure 1 Architectural Simulation

Site Plan Figure 2 Site Plan

6. OUTPUTS

 ü Building Specifications

Page 6: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  5  

� Capacity to hold 3000 people, 2 000 in plenary, and 1 500 in

break-away rooms with average capacity of 50 pax and the

1 500 in exhibition rooms

� Ablution facilities:

o 60 male

o 45 female

o 10

� Air conditioning in all the meeting rooms (standard and spec)

� Disability accessible points into the building and in the meeting

rooms

� SHEQ compliant.

� Entrance and exit points: the complex will have maximum of 3

entrance and exit points

� Emergency exits must be provided within the building

� Fire and evacuation corridors must be provided.

� Entrance and exit points: the buiding will have 3 entrances &

Exit point

o Combined Entrace and exit point

o Conference entrance and exit point

o Hotel entrance and exit point

o Support spaces as follows:

o 2 Projection rooms;

o 2 equipment Storage;

o 2 Rear Projection rooms

o 1 Conference Reception with capacity of 500;

o 1 Break Lounge/Pre-function with capacity of 100;

o 1 Outdoor Event Space with capacity of 100;

o 2 Smoking areas with capacity of 10;

o 1 praying area with capacity of 10;

o Kitchens/Dining spaces as follows:

o 1 Large

o 1 Small

o 1 Dining area A with capacity of 500 delegates;

o 1 Dining area B with capacity of 200 delegates;

o 1 Dry Store

Page 7: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  6  

o 1 Cold store

ü General Infrastructure:

• Land: 249 828 sq. meters available for development

• Equipment: AV equipment, Interpretation services equipment,

presentation equipment

• Water capacity: 600 000 litres of water per day

• Sewer Capacity: sewerage flow of 30 litres per second

• Drainage: HY- 8

• Electrical Capacity: 47 000 000 KwH for both ICC and hotel

o Back-up generator and Uninterrupted power supply

• Holding Capacity: 3000 pax

• IT capacity: To be based on the latest technology in place.

• Ecological requirements: energy conserving methods with lighting,

lifts, escalators, flushing systems, natural light optimisation

ü Parking requirements:

• Basement Parking with 300 bays

• Surface Parking with 750 bays

• Parking for people living with disability 55

ü Access points: Entrance and exits to the PICC from road network

• Two entrance and exit points into the PICC site for public

• One entrance and one exit point into the PICC for suppliers and

deliveries

• 2 designated loading zones

o One For the Kitchen

o One Day to day deliveries

ü Operational Outputs

Conference and Convention

• Core Conference Services:

o Meeting, exhibition and conference co-ordination

o Physical security system: access control, security guards,

security booths in meeting rooms with a capacity more

than 100.

o Ventilation: heating and air conditioning

o Environmentally friendly lighting

Page 8: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  7  

o Audio and visual equipment

o Parking: access and management of parking spaces

o Emergency services

o Food aid and catering

ü Supporting Services:

o Utilities: maintenance of water and lights

o IT system including the set-up of a business room with at

least 5 computers, 1 printer and access to Wi-Fi

o Cleaning service

o Pest control service

o Waste management service

o Landscape and garden

o Audio and visual equipment

o Interpretation

o Lifts and escalators maintenance service

o Vending machines

o Car Wash

o Professional fees:

ü Non-negotiable

o No labour broking services

o Fire and medical services

o Disaster Management

ü Financial services

o Foreign exchange businesses

o Bank facilities.

7. CURRENT AVAILABLE FACILITIES

Figure 3 Available Facilities

Name of Facility Capacity

Page 9: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  8  

Jack Botes Hall 1200

Nirvana Hall 600

Westenburg Hall 600

Ngoako Ramahlodi Sport Complex 4270

Mankweng Hall 400

Moletjie Hall 100

Polokwane Show Ground 10 000

Chuene resort 200

New Peter Mokaba Stadium 45 000

New Peter Mokaba Stadium Press Theatre 140

New Peter Mokaba Stadium Executive Lounge 500

 

8. SOLUTION OPTION ANALYSIS

Technical Availability  

1. Ngwako Ramahlodi Sporting Facility.

2. Site next to GAAL airport

3. Site next to New Peter Mokaba Stadium

4. Southern Gateway Extension 1.

NGWAKO RAMAHLODI SPORTING FACILITY

Advantages Disadvantages

Page 10: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  9  

• Existing Facility with services

• Located in the township, it will bridge

the spatial divide

• Brings economic activity to the township

• Low CapEx, as it will only be extended

• Safety of international delegates

• Minimal building capacity to expand

• Bulk infrastructure may be burdened

• Limited parking space

• The refurbishment to meet international

convention centers may inflate the CapEx

to as much as that of a green field

• The facility used as an ICC may replace the

need of the local youth for a sporting

facility

SITE NEXT TO GAAL AIRPORT

The site is next to the airport; therefore easily access the mall of the north,

as it is just 15 minutes away. This means that restaurants, financial services,

and other amenities are also easily accessible.

Advantages Disadvantages

• Located in the industrial precinct

• Will promote movement of people between

the airport, ICC and Mall of the North,

thereby increasing economic activity in that

spatial node

• Township establishment process still

needs to be done

• Un-serviced land, with no priority in

infrastructure plans

• Land is owned by the provincial DPW

• The process to get land transferred to

municipality might be lengthy and delay

the project implementation.

• The site is next to Defence Force, which might be seen to compromise the security of the state.

• Due to the site being adjacent to GAAL,

the development might interfere with

the Aviation authority and not comply

with certain regulations as per aviation

authority.

SITE NEXT TO NEW PETER MOKABA STADIUM

According to the municipality there is no available site next to the new Peter

Page 11: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  10  

Mokaba Stadium. This is a sports precinct that falls under SDA 3 of the

municipality and has the following developments underway and in existence.

There is currently the following developments within the area:

ü Peter Mokaba Stadium

ü Virgin Active Gym

ü Municipal Airport

ü Hotel under Construction

ü Municipal Golf Course

SOUTHERN GATEWAY EXT.1

• Barren land, preferably owned by municipality

• Availability of bulk infrastructure

• Site readily available and accessible by road and air

• In close proximity with shopping and other amenities

• Capacity to combine both convention and exhibition

• Promote environmental conservation with existence of green belts or

buffer zones

• Meets overall strategic objectives of the municipality of spatial planning

and socio-economic development

ADVANTAGES DISADVANTAGES

• Site is owned by municipality

• Township establishment already done

• Site zoned for 1 ICC, hotel and green belt

• Budget of R2 000 000 spent on township

establishment and related studies

• Existing bulk services

• Site at strategic position to place iconic

building of international standards for

easier marketing.

• EIA and record of decision obtained

• Site within SDA 2 and development

corridor prioritized by municipality

• Corner Prominence

Geotech, Record of decision and traffic impact

study conducted in 2005, need for review in

2015

Page 12: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  11  

9. PREFFERED OPTION ANALYSIS

After Technical studies and capacity, land use and ownership, as well as

socio-economic and BBEEE targets,The most suitable Site for Development is

the is Southern Gateway Extension 1 on the follwing basis :

o Socio economic and BBBEE target rating are medium for all

other options while Southern Gateway rates high.

o The strategic Objective for the other options is also medium with

southern gateway with high ranking.

o The risks are high in other options with medium risks at

southern Gateway.

o The overall rating was good at

Township establishment already done at Southern Gate

10. LEGAL DUE DILIGENCE

Site  The site was proclaimed as an approved township in terms of Chapter IV of

the Town-Planning and Ordinance No. 15 of 1986

The CoP now holds ownership of the proposed site by virtue of CCT No. T

043899/10

� Site Issues

o The site consist Of Erf 3 zoned for the Convention

centre;Erf 4 zoned for the Hotel and Erf 5 zoned as

public park;

o Cureently vacant;

o The Land Currently Valued at R6,9 Million;

o Owned by the City of Polokwane;

� A servitude of a right of way in favour of the general

public is created against Erf 3 and Erf 4;

� There is no land claim lodged against the identified site ;

� The identified site is not mortgaged

Page 13: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  12  

Lapsed Title Deed Conditions Figure 4 Lapsed Title Deeds Condition

� All the conditions in respect of the Portions 408 to 412, which may

have hampered the constructions of the PICC on the identified site,

were lapsed on the 25th day of July 2010 in terms of the provisions of

Section 6 of the Agricultural Holdings Act No 22 of 1919 read with

section 36 of Ordinance 20 of 1957.

� Safe to state that, our investigation revealed that there are no existing

conditions which may hamper the construction of the PICC on the

identified site, it is not necessary, for the purpose of this study, to

repeat all the conditions contains in the Title Deeds of Portions 408 to

412 herein. For the full description of the lapsed conditions see copies

of the Title Deeds of Portions 408 to 412 marked as Appendix “A”

Current Land Use  

� Currently being used an illegal dumping site.

� The waste that is being dumped on the site does not appear to cause

any extensive contamination to the site, which may be classified as

high risk, in terms of The National Environmental Management: Waste

Act 59 of 2008,to necessitate that a site assessment be undertaken.

Page 14: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  13  

� Furthermore, as it appears on Figure 5 below , there seems to be no

waste or substance dumped on the site which may affect the

environment or affect the use of the site for the construction of the

proposed PICC

Figure 5 Current Land Use

Minerals, Water and Heritage • Mineral rights have not been severed from the ownership of the identified

site In accordance with the Mineral and Petroleum Resources Development

Act [ MPRDA] (Act 28 of 2002) mineral rights are no longer relevant to

the establishment of a township and any development on a proclaimed

township

Comment

• The CoP needs to revisit it’s Township Planning Scheme, 2007 and amends

it accordingly to be in compliance with the Amendment to the Deeds

Registries Act as discussed above.

• Given the amendments to the Deeds Registries Act mineral rights it is very

unlikely that the proposed development of the PICC may be affected by

any possible exploration of mineral rights.

• National Water Act No. 36 of 1998; Section 144 of the Act: A layout

plan, duly certified by a professional engineer, reflecting the flood lines

may be required for compliance with the provisions of the National Water

Act if it was not submitted when the township was established in 2010.

Page 15: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  14  

• National Heritage Resources Act No.25 of 1999: No signs that it was once

a graveyard or a stone-age village. Enviro Xcellence Consulting

Geohydrological & Environmental Scientists in their 2005 Scoping Report.

Limpopo Provincial Heritage Resources Authority (LIHRA) must be advised

of the intended development.

o The National Building Regulations and Building Standard Act 103

of 1977 [The NBRBSA]:construction of a building must take

place within the confines of the zoning that is applicable to the

Erf to be developed

11. LEGAL ISSUES

• Removal and/or replacement of Eskom Power line: there are Eskom

line crossing the identified site

• Geotechnical investigation: In the light of the fact that the

proposed PICC is a more than one storey building, a revised geo-

technical investigation may be necessary to determine the relevant

NHBRC site classification

• Land Claims: No land Claims on identified site

• Road networks: Roads must be proclaimed by LM

• Water And Sewer: All water networks should be constructed to the

satisfaction of the CoP, at the expense of the PP

12. TECHNICAL ISSUES

 • Geological overview: medium-grained, yellowish, laminated sandstone

of the Makgabeng formation of the Waterberg Group. Additional

investigation will have to be carried to the depth of 15.0m to confirm site-

specific conditions.

• Subsoil condition: The site generally slopes gently in the NW direction

along its entire width. This implies that during construction phase, the

amount of earth works will be reduced since less ground leveling will be

required. This will reduce on damage to the environment

Page 16: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  15  

• Road network:corner prominence allowing for high visibility and access

to and from the N1 and efficient traffic flow through the existing Lawton

road and other auxiliary roads. Need to upgrade some master plan roads

like Dawson and Cross road in terms of upgrading the road class from

gravel to paved road. It is proposed that side roads will be introduced for

approach traffic from N 1. Dawson and Cross road will have to be

upgraded to a main street to accommodate larger volumes of traffic.

• Transport: Polokwane has various forms of transport ranging from road,

railway and Air transport. Public transport amenities e.g. taxi- bus railway

facilities, Airport facilities can be enhanced with establishment of links

between the taxi/bus terminals, the railway station, Polokwane

International Airport and BRT system

• Drainage: sufficient existing drainage for storm water and drains at the

existing roads

• Water Supply: As per the Final AR water 2014, there is a water mains

running along Lawton road. A proposed water line shall be extended to

run along Dawson road, with various connections into the proposed ICC

area

• Sanitation: there is a 150mm diameter sewer line along Lawton road

and a 250mm diameter running across Holding 78/0. A sewer network will

be installed a cross the site and connect to the 250mm diameter sewer

line

• Power Supply: The site has existing 3 Phase lines that run through in

some parts of the land. Once the design is finalized, it will be necessary to

relocate such lines

• Building structure: It is envisage that the structure can have maximum

of 6 levels inclusive of the basement.

13. DUE DILIGENCE: SOCIO-ECONOMIC STATUS

Municipal Socio-Economic Objectives

o To increase the quality of communities by providing sufficient

stimulation, assistance and creating liveable cities

Page 17: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  16  

o To reverse the current outflow of youth after the age of 24 by

providing real opportunities to kick start long term careers within

Polokwane and to create a healthy and balance society

o To create an environment in which there is stimulation for the

youth to develop and prosper

o To facilitate the integration of women into the labour market and

to ensure a transfer of skills and knowledge

o To adopt and effectively implement a strategic health care

infrastructure development plan

o To contribute to the maintenance and refurbishment of educational

infrastructure

o To establish and monitor a safe, secure and accessible CBD.

� Youth development: retain at least 10% of young people migrating

annually

� Women Empowerment: to empower at least 20% of local women

� Socio-economic infrastructure: to upgrade and refurbish at least 50%

of existing social infrastructure.

� Skills Development: to empower 5% of unskilled labour especially

local, black youth and women

� SMME development:

o to train at least 60% of SMMEs on the municipality’s database

o to provide 10% of the registered SMMEs with access to economic

opportunities

� Black Broad Based Economic Empowerment (BBBEE): to promote

preferential procurement for black owned SMMEs and other larger block

owned enterprises

14. ECONOMIC EVALUATION

International Tourism Base Analysis � Tourism has the highest Multiplier Effect due to its strong linkages with

socio-economic development of the society .Development of the industry

not only enhances revenue growth but has a direct influence on Job

creation. Furthermore as tourism development is integrated it also injects

Page 18: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  17  

in sectors like, hotel, Power, Water, Transportation, Agriculture and Allied,

Small-Scale sectors and etc.

o South African Tourism-Although international tourism has

grown, the domestic tourism market has become less predictable,

with a growing black middle class having disposable income yet

relatively limited interest on domestic tourism.

o International Tourism-Since 1994, tourist arrivals increased

by over 120%, averaging growth of at least 8% per annum.

Foreign tourism peaked in 2008 then dipped temporarily in

response to the global recession and economic meltdown of

2009-2011.

o Source Markets-Africa and the Middle East account for the

largest share of international visitors to South Africa, with 75% of

all foreign arrivals with North and South America, Asia, and

Australasia constitute less than 5%.

o Purpose of Travel-Prior to 2008, holidays were cited as the

main reason for visiting South Africa. However this is no longer

the case as business travel is a growing market segment for

travel in the international arena.

o Expenditure-Foreign tourists spend an average R8,350 per trip

in South Africa. 2010 had higher than normal expenditure due to

world cup.

Provincial Tourism Analysis � Gauteng remained the most visited with 39% of tourist arrivals in 2014,

which indicated a negative growth of 4,8% from 2013.

� Limpopo, the second most visited province, realised growth of 8% in

tourist arrivals in the period 2013-2014

� Limpopo is one of the three provinces that showed the highest increase in

tourist visits to the province.

� Limpopo’s tourism revenue from foreign receipts grew by 0,5%. Although

Limpopo is the second most visited province in the country it does not

seem to capture proportional tourism revenue and its share of bed nights.

Page 19: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  18  

15. POLOKWANE CONFERENCE AND ACCOMMODATION SUPPLY

� There are at least 41 conference and meeting venues with estimated

78 167 in carrying capacity of space dedicated for conferences and

banqueting. Peter Mokaba and Polokwane Show Ground contribute 70% of

the total capacity contributing 45000 and 10000 respectively.

� Accomodation Supply- According to the Limpopo Tourism, there are

135 lodging establishments, with a total room supply of about 3112 and a

total of 5377 number of beds. The CoP is under-supplied as its accounts

for 24% of province’s tourism flow.

o Guest houses and Bed and Breakfasts holding 65%, 1897 rooms

and 3321 beds

o 6 Hotels holding 4%, with a total of 823 beds and 515 rooms

o Lodges, motels and resorts being the balance holding 30%, with

622 of the rooms and 1068

16. ACCOMODATION DEMAND ANALYSIS

� International standards of hotel operation recommend an average

occupancy level of at least 62.5% or higher.The CoP currently has average

hotel occupancy rate of about 48.1% amongst its 515 hotel rooms which

translates to about 187 975 room-nights per annum representing only

48%, which is an under-performance.

� In order to meet the international target, CoP would need to increase

occupancies amongst its existing hotels by 14.4%, representing 26 316

room-nights per year.

o Leisure Market Base: Hotel demand within the Regional Hotel

Market Area is driven primarily by leisure markets, as described in

the preceding sections on the region’s tourism base analysis. An

increase of 32% to 5,6 million visitors, making it the most visited

province domestically in 2014.

o Sports-and Event-Based Tourism: Events are another source of

room night demand in the Market Area. Mapungubwe and other

cultural and sports events hosted within the region bring about a

Page 20: EXECUTIVESUMMARY(OF(POLOKWANE … · 2016-09-01 · Municipal Golf Course SOUTHERN GATEWAY EXT.1 • Barren land, preferably owned by municipality • Availability of bulk infrastructure

  19  

demand for accommodation. According to the Mapungubwe Socio-

Economic Impact study conducted by Limpopo tourism indicated

that only 3% of the attendees of the festival stayed in overnight

accommodation and hotels, the rest stayed with family and friends

or were just day visitors.

17. LOCAL ECONOMIC BENEFITS

� Conventions and exhibitions have direct economic benefits for the

hotels, restaurants, travel agents and professional conference

organizers in terms of arrangements for accommodation, transport,

food, sight-seeing and shopping.

� By hosting MICE events, CoP would be creating employment

opportunities not only for those in the hospitality industry but also

for students and volunteers who are required for the various related

coordination activities.

� Hosting a MICE event is a high impact opportunity for CoP to

showcase and market the entire gamut of its soft power which

includes various facets like, art and culture, literature, history,

education, media, traditional fashion and cuisines.

� Participants in international conventions provide an environment for

exploring the possibilities of Foreign Direct Investment (FDI),

technology transfers and joint ventures.