1 5 th April 2013 Company Announcements Platform Australian Securities Exchange Diamond Drilling Commences at Sorpresa Gold Project Fifield NSW - Parallel RC Drill program also begins The new programs for Diamond Drilling (approx. 1,300m) and RC Percussion Drilling (approx. 2,500m) have now commenced at the Sorpresa Project, Fifield NSW. This is the first Diamond Drilling program to be conducted at Sorpresa and also the deepest planned drilling to date at the project. Diamond drilling commenced on schedule 4 th April The first hole, Dia4, has commenced drilling, to a notional depth of 150m at Trench 31 Area 3 locations in all have been selected for the diamond drilling program Trench 31, Boundary Gate (SE) and Roadside locations The total diamond program is notionally 1,300m The core should give structural and geological information, and also provide a view of the mineralization in greater context * note this hole is subject to change, as information is gathered on precursor holes The Next Stage RC Percussion Drilling at Sorpresa has also commenced This includes RC holes ranging 60m~150m depths in step out delineation drilling extensions Locations include Roadside, Boundary Gate and Trench 31 areas Approx. 2,500m in total drilling is planned See Appendices for all details. JOHN KAMINSKY Executive Chairman The information in the report to which this statement is attached that relates to Exploration Results is compiled by Mr Colin Plumridge, who is a Member of The Australian Institute of Mining and Metallurgy, with over 40 years experience in the mineral exploration and mining industry. Mr Plumridge is employed by Plumridge & Associates Pty. Ltd. and is a consulting geologist to the Company. He has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration and to the activity, which is being undertaken to qualify as Competent Persons as defined in the 2004 edition of the “Australian Code for Reporting of Mineral Resources and Ore reserves”. Mr Plumridge consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Diamond Hole Program Sorpresa Project Planned Diamond Hole North East Depth Dip Azimuth Dia1 6368733 543105 250 -50 334 Dia2 6368505 543175 300 -60 300 Dia3 6369225 543165 150 -50 180 Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower Suite 411 530 Little Collins Street Melbourne Victoria Australia. 3000 Telephone 61 3 9620 5866 Facsimile 61 3 9620 5822 e-mail: [email protected] website: www.rimfire.com.au Dia4 underway at Trench 31 area For personal use only

Exchange Tower Suite 411 530 Little Collins Street ... · Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Exchange Tower Suite 411 530 Little Collins Street ... · Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower

1

5th April 2013 Company Announcements Platform Australian Securities Exchange

Diamond Drilling Commences at Sorpresa Gold Project Fifield NSW - Parallel RC Drill program also begins

The new programs for Diamond Drilling (approx. 1,300m) and RC Percussion Drilling (approx. 2,500m) have now commenced at the Sorpresa Project, Fifield NSW. This is the first Diamond Drilling program to be conducted at Sorpresa and also the deepest planned drilling to date at the project.

Diamond drilling commenced on schedule 4th April The first hole, Dia4, has commenced drilling, to a notional depth of 150m at Trench 31 Area 3 locations in all have been selected for the diamond drilling program

Trench 31, Boundary Gate (SE) and Roadside locations The total diamond program is notionally 1,300m The core should give structural and geological information, and also provide a view of the mineralization in

greater context

* note this hole is subject to change, as information is gathered on precursor holes

The Next Stage RC Percussion Drilling at Sorpresa has also commenced This includes RC holes ranging 60m~150m depths in step out delineation drilling extensions Locations include Roadside, Boundary Gate and Trench 31 areas Approx. 2,500m in total drilling is planned

See Appendices for all details.

JOHN KAMINSKY Executive Chairman

The information in the report to which this statement is attached that relates to Exploration Results is compiled by Mr Colin Plumridge, who is a Member of The Australian Institute of Mining and Metallurgy, with over 40 years experience in the mineral exploration and mining industry. Mr Plumridge is employed by Plumridge & Associates Pty. Ltd. and is a consulting geologist to the Company. He has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration and to the activity, which is being undertaken to qualify as Competent Persons as defined in the 2004 edition of the “Australian Code for Reporting of Mineral Resources and Ore reserves”. Mr Plumridge consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Diamond Hole Program Sorpresa Project

Planned Diamond Hole North East Depth Dip Azimuth

Dia1 6368733 543105 250 -50 334

Dia2 6368505 543175 300 -60 300

Dia3 6369225 543165 150 -50 180

Dia4 6368266 542483 150 -50 165

Dia5* 6368450 543295 450 -60 270

rimfire pacific mining nl a.c.n. 006 911 744

Exchange Tower Suite 411 530 Little Collins Street Melbourne Victoria Australia. 3000 Telephone 61 3 9620 5866 Facsimile 61 3 9620 5822 e-mail: [email protected] website: www.rimfire.com.au

Dia4 underway at Trench 31 area

For

per

sona

l use

onl

y

Page 2: Exchange Tower Suite 411 530 Little Collins Street ... · Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower

2

APPENDIX 1

Diamond Drill Hole Locations Sorpresa – Shown on Integrated Gravity Survey

3km

June 2012 - Fi 160

14m @ 21.9g/t Au from 34m

AND

6m @ 94g/t Ag from 34m

Feb 2013 - Fi 275

30m @ 2.39g/t Au from 10m

Oct 2010 – Trench 31

9m @ 4.9g/t Au at 2m

(channel sample)

Oct 2012 - Fi 212

14m @ 24.4g/t Au from 26m

AND

26m @ 155g/t Ag from 14m

Dia 4

Dia 5

Dia 2

Dia 1

Dia 3

For

per

sona

l use

onl

y

Page 3: Exchange Tower Suite 411 530 Little Collins Street ... · Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower

3

APPENDIX 2

Plan View Drilling Collar Hole Locations at “Roadside” and “Boundary Gate North” - Sorpresa Project

(Recently drilled holes and new planned RC holes (ResDev) are shown)

300m

For

per

sona

l use

onl

y

Page 4: Exchange Tower Suite 411 530 Little Collins Street ... · Dia4 6368266 542483 150 -50 165 Dia5* 6368450 543295 450 -60 270 rimfire pacific mining nl a.c.n. 006 911 744 Exchange Tower

4

Appendix 3

Sorpresa District Geological Concept Model – Syncline Rift Basin in Plan View

(Note that the IP survey chargeable response at approx. 100m depth is overlaid)

Dec 2012 - Fi 221

10m @ 0.67g/t Au from 24m

AND

12m @ 394g/t Ag from 24m

Dec 2012 - Fi 241

10m @ 1.01g/t Au from 70m

AND

10m @ 535g/t Ag from 70m

Boundary Gate North

Feb 2013 - Fi 275

30m @ 2.39g/t Au from 10m