Excavator Safety
DIG TESS
Texas Administrative Texas Administrative Code Title 16Code Title 16
Chapter 18Chapter 18 Underground Pipeline Underground Pipeline
Damage PreventionDamage Prevention
Excavator Safety
DIG TESS
Doug Meeks, CHSTDoug Meeks, CHST
• 25 years experience in underground utility construction/maintenance
• 15 years experience in occupational safety
Damage Prevention ManagerDIG-TESS
Excavator Safety
DIG TESS
Chapter 18Chapter 18Damage Prevention BrochuresDamage Prevention Brochures
• Overview of Chapter 18 requirements;
• Provide information on how to file a TDRF report.
Are now available online:
www.rrc.state.tx.us
Excavator Safety
DIG TESS
Excavator BrochureExcavator Brochure
Excavator Safety
DIG TESS
Excavator BrochureExcavator Brochure
Excavator Safety
DIG TESS
REQUEST LOCATESREQUEST LOCATES
• At least 48 hours in advance;
• Not more than 14 working days prior to beginning the work.
In The Field - Call 811811
From The Office – Online With GeoRemoteGeoRemote
One-Call tickets One-Call tickets expireexpire after after 14 working days!14 working days!
Excavator Safety
DIG TESS
After The Call: After The Call: Before Your Start DateBefore Your Start Date
1.Respond by fax or e-mail that their pipeline is “All Clear”; or
2.Mark the approximate location of the pipeline with the appropriate APWA marking color; or
3.Arrange for a meeting or communicate any special instructions.
You should expect “Positive Response” by the pipeline operator within 48 hours. The operator will either:
Excavator Safety
DIG TESS
AT THE JOBSITEAT THE JOBSITE
One-call ticket?
–On site or produce it within 1 hour;
–Refresh ticket if the job lasts more than 14 working days.
White line the work area?
Required meeting at the site?
Excavator Safety
DIG TESS
SITE ASSESSMENTSITE ASSESSMENT
– Pipeline ROW markers or old paint markings;– Valve boxes, meters, risers, or regulators;– Street cuts or ditchlines;
• If pipelines are not marked or cleared within 48 hours, submit a 2nd request for facility locates.
• The pipeline operator has 4 hours to respond to a second request.
• Should you dig without locates?
Observe for indications of an unmarked pipeline in the area. Examples include:
Excavator Safety
DIG TESS
Avoiding DamageAvoiding Damage
• Protect and preserve locate markings;
• Request relocates as necessary;
• No mechanized excavation equipment within 18” either side of the pipeline;
• Proper backfill and compaction.
Excavator must exercise reasonable care to prevent damage to the pipeline. This typically requires:
Excavator Safety
DIG TESS
What Is “Damage”What Is “Damage”
• Cracked or chipped coating• Dents or scrapes• Displacement• Tracer wire• Valve boxes• Anodes
The Obvious:The Obvious: Puncturing or severing the pipeline.
Excavator Safety
DIG TESS
BLOWING GAS?BLOWING GAS?
• Keep people and vehicles out of the area;• Eliminate ignition sources;• Evacuate if necessary; • Wait for the fire department and facility
operator; • Do not attempt to repair!• Do not cover it up!
Abandon equipment in place and Abandon equipment in place and call 911call 911
Excavator Safety
DIG TESS
REQUIRED REPORTINGREQUIRED REPORTING
• You damage a pipeline;
• The pipeline operator fails to provide a “Positive Response” within 48 hours; or
• The pipeline operator fails to respond within 4 hours of 2nd notice.
File an electronic report on-line at ww.rrc.state.tx.us within 10 days if:
Excavator Safety
DIG TESS
REQUIRED REPORTINGREQUIRED REPORTING
• $1000 fine per violation for non-compliance;
• They need your side of the story to ensure a complete investigation.– The Top Ten Root Causes provided through
the TDRF system as of yet depicts only part of the story.
Why should you file?Why should you file?
Excavator Safety
DIG TESS
Facility marking or location not sufficient
14%
Facility was not located or marked
11%
Failure to maintain the marks
3%
Notification to One-Call Center made but not
sufficient 3%
Failure to use hand tools where required
5%
No notification made to One-Call Center
45%
Failure to maintain clearance
9%
Excavation practices not sufficient
10%
Yellow areas show damages caused by possible EXCAVATOR violations to Chapter 18 Rules - about 75%
Orange areas show damages caused by possible PIPELINE OPERATOR violations to Chapter 18 Rules - about 25%
June 2008
TOP TEN TOP TEN Damages by Root CauseDamages by Root Cause
Excavator Safety
DIG TESS
For reporting questions:For reporting questions:
www.rrc.state.tx.us
Call 512-475-0512
Excavator Safety
DIG TESS
www.onecalltexas.comwww.digtess.orgwww.rrc.state.tx.