Examen Final_presupuesto

Embed Size (px)

DESCRIPTION

COSTOS

Citation preview

Sheet1ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)001ESTRUCTURAS12,070.67001.01OBRAS PROVISIONALES12,070.67001.01.01Cartel de Obra de 1.80x2.40glb1.001,134.771,134.77001.01.02Cerco Perimetrico Provisionalml145.0075.4210,935.90002ARQUITECTURA10,175.97002.01ALBAILERIA10,175.97002.01.01CONTRAZOCALOS538.39002.01.01.01Contrazocalo De cemento sin colorear H=10 cm. Pulido538.39002.01.01.01.01S.H. Minusvalidoml7.9068.15538.39002.01.02ZOCALOS9,637.58002.01.02.01De ceramico de 0,20 x 0,30 m.9,637.58002.01.02.01.01camerinom270.3256.743,989.96002.01.02.01.02ss.hh.m256.8899.295,647.62003INSTALACIONES ELECTRICAS1,281.22003.01INSTALACIONES ELECTRICAS1,281.22003.01.01Salida de Tomacorrientes Bipolar Simple a prueba de agua (PVC)und13.0095.381,239.94003.01.02Caja de paso en Paredund8.005.1641.28004INSTALACIONES SANITARIAS3,110.80004.01SISTEMA DE DESAGUE3,110.80004.01.01Salida de desague3,110.80004.01.01.01Salida de desague en PVC 2"pto19.00111.102,110.90004.01.01.02Salida de desague en PVC 3"pto9.00111.10999.90