1/22
CU EWB-USAMorocco Program
Art of EngineeringMarch 1, 2013
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
2/22
About Ait Bayoud
Community of 2,500 people HaHa region of Essaouira
Province
Mostly subsistence farming,plus few cash crops
Largely Berber-influencedculture, speak Tashleheit
Consists of 19 dwars orneighborhoods
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
3/22
Community Map
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
4/22
Project Details
Tagawowt River flash floodsseverely during winter 3-
month rainy season Inhabitants of the north bank
(~1,800) are cut off forweeks at a time
South bank has access to twomarket towns (via road), two
schools, and clinic
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
5/22
Previous Trips
Summer 2012 - initial assessment Winter 2012 - bridge assessment Summer 2012 - initial bridge implementation Winter 2013 - bridge inspection, bridge and water assessment
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
6/22
Summer 2011
Preliminary survey ofexisting crossings
Lunches with communitymembers
Water quality testing
Community Meeting
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
7/22
Summer 2011
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
8/22
Winter 2012
Confirmed final bridge site
Performed site surveying,geotechnical review
Looked into local contractingand supplies
Community meetings
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
9/22
Spring 2012
Design
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
10/22
Spring 2012
Funding
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
11/22
Summer 2012
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
12/22
Summer 2012
Completed Foundations andTowers
Installed Cables Fabricated Wood Decking
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
13/22
Summer 2012
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
14/22
Winter 2013
Bridge in very good condition overall Slight water damage to approach
Full inspection and photo documentation Located and drilled tie-in point for cablepulling Decking installation tests
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
15/22
Winter 2013
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
16/22
IlzgouarenWater Projects
Hikes along river to inspect current infrastructure Hike to Ilzgouaren, comprised of two separate settlements on different
plateaus
Community discussions
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
17/22
Current water source isspring at the base of the
plateau
Plan for 30 houses, 60Leach
Solution- pump water fromspring to top of plateau
IlzgouarenWater Projects
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
18/22
350 ft
IlzgouarenWater Projects
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
19/22
2km
1.5km
Overview
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
20/22
Ilzgo #2
0.5 km
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
21/22
This Semester
Design decking installationsystem to implement this summer
Gondola prototype Research foundation types for
second bridge
Research possible sources ofunderwater springs in Izgouaren
Design water distribution system Source water testing materials
for future sanitation projects
U d l
7/29/2019 EWB Morocco Art of Engineering Presentation 2013
22/22
Underclassmen
Involvement
Public Relations Website Design cuewb.org/morocco Grants and funding
Design and Construction
Exposure to engineering development work Encouraged to travel!