EWB-MAP Water Tank Project Construction Progress June 5-12,
2012
Slide 2
Map of Las Delicias Water System DOWNHILL
Slide 3
260 Homes Served by Tanque 3 33 Homes Served by Tanque 2 291
Homes Served by Tanque 1 DOWNHILL Map of current Las Delicias Water
System from ADESCO with approx house locations indicated
Slide 4
117 Homes Served by Tanque 3 33 Homes Served by Tanque 2 154
Homes Served by Tanque 1 Proposed Water Distribution System 280
Homes Served by New Tank DOWNHILL
Slide 5
Map of Current Water System (section relevant for EWB-MAP
modifications) RED lines supply lines to tank (uphill by pump) BLUE
lines distributions lines by gravity DOWNHILL New 17,000 gallon
tank Exisiting 11,000 gallon tank
Slide 6
Proposed update to Water System (section relevant for EWB-MAP
modifications) RED lines supply lines to tank (uphill by pump) BLUE
lines distributions lines by gravity NEW SUPPLY LINE 1 NEW
DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE
2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe
connections 3.Pipeline Plans 4.Distribution of Work
Slide 7
DAY 1 June 5, 2012
Slide 8
Slide 9
Photos
Slide 10
Day 2 Wednesday June 6, 9 AM
Slide 11
Day 2 3 PM
Slide 12
Daniel Rivera (Engineer from Rotary) Miguel Delgado
(driver/handyman) from FIAT) Miguel Martinez (Supervisor) Holman
(driver from FIAT) Sergio (LD ADESCO member) Mario (LD
resident)
Slide 13
Day 3 Thursday June 7, 9 AM
Slide 14
Day 4 Friday June 10, 11 AM
Slide 15
Slide 16
Slide 17
Day 5 Saturday June 9, noon
Slide 18
Day 6 June 11: noon
Slide 19
Day 7 June 12 noon
Slide 20
Day 7 4 PM mesita complete
Slide 21
Schedule for Completion of Tank 1.Wed June 13: start laying
rocks/sand for base of foundation 2.Thur June 14: continue laying
rocks/sand for base of foundation 3.Fri June 15 Tue June 19:
cut/tie rebar and prepare form for foundation 4.Wed June 20: pour
foundation 5.Rain could delay these tasks
Slide 22
Photos
Slide 23
Ordered tubing and fittings from local supply store in San
Salvador
Slide 24
Proposed update to Water System (section relevant for EWB-MAP
modifications) RED lines supply lines to tank (uphill by pump) BLUE
lines distributions lines by gravity NEW SUPPLY LINE 1 NEW
DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE
2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe
connections 3.Pipeline Plans 4.Distribution of Work
Slide 25
Proposed update to Water System (section relevant for EWB-MAP
modifications) RED lines supply lines to tank (uphill by pump) BLUE
lines distributions lines by gravity NEW SUPPLY LINE 1 NEW
DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F
DOWNHILL
Slide 26
Photos along Pipeline Path Area of Connection to Tubo Madre NEW
SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D
Slide 27
Photos along Pipeline Path (location of valve box?) NEW SUPPLY
LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D
Slide 28
Photos along Pipeline Path (location of valve box?) NEW SUPPLY
LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D
Slide 29
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 30
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 31
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 32
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 33
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 34
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 35
Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION
LINE 2b NEW TANK A B C D
Slide 36
Meeting with Mayor to discuss installation of pipeline Alcalde
(Mayor) Ingeniero Romeo Jose Barillas ([email protected],
2331-3001)[email protected] Travelled to Alcaldia (Mayors
office) with Alfredo Torres (member of LD ADESCO) on Tuesday June
12, 2012) Got on waiting list at 8:30 & met with Mayor at 10:45
Requested help digging trench and installing PVC tubing. Alfredo
had official letter from ADESCO Mayor knew about project (had been
contacted by Ana Maria de Keene honorary consul of El Salvador in
Philadelphia) and agreed to help with everything including
supplying the 4 (supply) and 2 (distribution) pipes. Questions from
mayor: Is 160 PSI PVC acceptable? Do you want cemented PVC or rapid
connection? Will send an engineer to evaluate poject. Other
questions (from RAC) Location of valve boxes, air bleeds, Ts,
cleanouts Should prepare detailed plan to send to mayor ASAP
Slide 37
Distribution of Work EWB-MAP Overall project management and
communication between parties Updating design verifying that work
meets design specs. Long term planning FIAT (Sister Gloria)
Purchase of last minute supplies, order trucks of materials,
submission of receipts to Rotary for reimbursement. Storage of
supplies. Organizing volunteers, hiring one mason Las Delicias
ADESCO Organizing community labor (each house volunteers 1 day or
pays $6 for another person to do the work) Ensuring secure storage
of supplies Communication with Alcaldia Daniel Rivera (Rotary San
Salvador) Purchase of supplies (1 week notice): rebar, concrete
Payment of supervisor and mason (hire one mason) Local project
management and oversight of supervisor (Miguel Martinez) Alcaldia
San Juan Opico Installation of two lines (4 supply and 2
distribution) of tubing in the same trench between Calle Principal
and Tanks.
Slide 38
Project Expenses (Thru June 11)
Slide 39
Contacts FIAT guest house: 2-226-7610 Miguel Delgado (FIAT
driver/helper) cell: 7- 570-8675 Rene (LD President): 7-458-4150
Miguel Martinez (Supervisor on work site): 7- 465-0654 Alcalde
(Mayor) Ingeniero Romeo Jose Barillas ([email protected],
2-331-3001)[email protected]