20
EVLA Advisory Committee Meeting June 11, 2002 Frazer Owen EVLA Phase II NMA and E-array Progress

EVLA Phase II

  • Upload
    melody

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

EVLA Phase II. NMA and E-array Progress. People. Aaron Cohen Steve Durand Leonia Kogan Bob Tacker Cam Wade Craig Walker. NMA Puzzle. Combine UV Coverage, Land Availability, Power Availability and Fiber Optics Network into a practical Array Design. Criteria for now. - PowerPoint PPT Presentation

Citation preview

Page 1: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

EVLA Phase II

NMA and E-array Progress

Page 2: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

People

• Aaron Cohen

• Steve Durand

• Leonia Kogan

• Bob Tacker

• Cam Wade

• Craig Walker

Page 3: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA Puzzle

Combine UV Coverage,

Land Availability,

Power Availability and

Fiber Optics Network

into a practical Array Design

Page 4: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Criteria for now

• Fiber --- Find Sites Near Existing, Available

Fibers.

• Power --- Find Sites with minimum distance

from 3-phase power.

• Land --- Find sites with multiple acceptable

land options.

Page 5: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Criteria for now

• Stay away from sensitive environmental

areas, population concentrations, potential

interference, etc

• In some cases add, somewhat longer

runs of fiber or power to fill out uv coverage.

• Current array is likely to be modified later.

Page 6: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA Sites

Page 7: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA - Milagro

Page 8: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA - Separ

Page 9: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Fidelity “100km”

Page 10: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Fidelity Full Resolution

Page 11: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA Sites

Page 12: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

NMA Issues

• What is An Acceptable Configuration ?

• What should happen in 2003 ?Should we continue full speed ahead(at some expense to phase I)

or should we “mothball” NMA until we get real funding ?

Page 13: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E-array

Goal:

Better Fidelity and

Surface Brightness

Sensitivity at minimum

Cost.

Page 14: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E UV-coverage

Page 15: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E-array

• However, E array beam-shape, shadowing

become a problem in the south (e.g. –30d)

• To image well in the south we need

a stretched E-array.

Page 16: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E + E-30

Page 17: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Shadowing

Regular E Array E-30 Array

Page 18: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E-30 UV-coverage

Page 19: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

Simulations

Plan for the phase II completion

document is for full mosaic simulations

(including GBT) to test E and

E-30 performance using AIPS++.

Page 20: EVLA Phase II

EVLA Advisory Committee MeetingJune 11, 2002

Frazer Owen

E-array Issues

• How much simulation for E should we

do ?

• Do we want E-30 ?