Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all contributors In particular: K.Fuchsberger, S.Fartoukh, V.Mertens, J.Uythoven, M.Barnes, E. Carlier, W.Bartmann, C.Hessler, L.Jensen, R.Jones, M.Lamont, R.Giachino, G.Mueller, S.Redaelli, W.Herr, F.Schmidt, OP crews on shift…

Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Embed Size (px)

Citation preview

Page 1: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

1

LHC Injection and transfer lines

Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger

On behalf of all contributorsIn particular: K.Fuchsberger, S.Fartoukh, V.Mertens, J.Uythoven, M.Barnes, E. Carlier, W.Bartmann, C.Hessler, L.Jensen, R.Jones, M.Lamont, R.Giachino, G.Mueller, S.Redaelli, W.Herr, F.Schmidt, OP crews on shift…

Page 2: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

2

Scope

1. LHC transfer lines – 2009 optics studies• Trajectory• Dispersion• Kick response• Aperture

2. Injection regions• Injection steering• MKI wave form• Injection protection• Injection aperture

3. List of subjects to follow-up

Page 3: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

3

1- LHC Transfer line

Transfer line BPMs:

- calibration performed and included in the measurements -Rhodri, Lars and team + essential data from kick response measurements (Kajetan)

- request for additional BPMs upstream of TT60 – hidden trajectory bump – available for 2011 start-up

- more robust dispersion measurements in TI 8 thanks to the dual plane reading and the additional BPMs in the LHC injection area in TI 2, same improvements will be available for the 2011 start-up – BI teams

Main outcomes from all transfer line beam time measurements – trajectory, kick response and dispersion measurements:

Page 4: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

4

Trajectory examples

TI 8 bare trajectory

TI 8 corrected trajectory -few correctors, <20 rad

Page 5: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

5

Transfer line magnetic model: • TT60 MBE CC switched to MBB – vertical bare trajectory as expected• MQIs DK/K = ~1.006

• MQI measurements by magnet group• MBI sext. component of ~ -4.5e-4 @ r=25mm (idea from S.Fartoukh)

• Confirmed by magnet group from 2D calculations• MBI quad. component of ~1.35e-4 @ r=25mm

• Feed-down from systematic horizontal offset in MBI

NominalIdem + Dk/k+b2+b3

Idem + initial cdts

Rematched optics with b2,b3 componentsanduse new MQI CC

Page 6: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

6

Kick response measurements – TI 8 - V plane – Before rematching~ 0.7% over-focussing in vertical plane apparent cf model

Kick response measurements – TI 8 - V plane – After rematching

Courtesy: Kajetan

Page 7: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

7

TI 8 1st and 2nd order dispersion

with rematched optics

Dx

D’x

Page 8: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

8

TI 2 and TI 8 aperture studies

- Momentum aperture: +/- 0.35 to 0.4%, as expected.

- Physical aperture explored in both lines in H and V, at different phases, 30 deg intervals, using on-line model and dedicated knobs

Page 9: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

9

0

5

10

15

20

25

0 60 120 180 240 300 360Measurement phase [deg]

50%

tran

smis

sion

[si

gma]

.

T I2 aperture V [s]

T I2 aperture H [s]

In both planes in both lines:

-No bottlenecks Note: aperture restriction between P8 MSI and Q5 solved after re-alignments

- Measured aperture ≥10 nominal

Few phases in TI 2 to complete

Page 10: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

10

2- Injection region

• Injection steering• Injection region aperture• Kick response – dispersion measurements• MKI waveform• TDI and TCLIA/B setting up around orbit, LHCb BeamCdtMonitor, setup of TDIs to

golden orbit – see Wolfgang’s talk• Checked losses on TDI & IR8 for MKI off/over-injecting – see Christos’ talk• Tests of injection and matching with xing/sep bumps on – see Werner’s talk• Injection kicker timing in• Injection of multiple bunches• …

Much injection checks and setting-up work performed through the LHC beam commissioning

Page 11: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

11

TI 2-TI 8 Steering

11

TI 2+S23 and TI 8+S78 selections of the steering display now by default:

o TL trajectory

o Ring First turn - Closed orbit = injection oscillation

Closed orbit is estimated from average of 50 first turns

>> ensures that TL steering always brings beam onto the CO

FT-COTrajectory

Page 12: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

12

Injection Autopilot

12

Feedback tools inside steering program to correct injection oscillations:

o Same tool used for SPS injection oscillations & SPS target steering.

o Manually activated.

o Algorithm can be configured (DB). Presently:

Fit a betatron oscillation to the ring FT-CO

(in H subtract dp/p error).

Interpolate fit to a virtual start point (pos + angle).

If pos/angle out of tolerance, correct

with 2 correctors at end of line.

>> tested & works well !

May need to tune algorithm because of TL collimation.

o Global MICADO (towards ref) better?

>> need more experience !

Page 13: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

13

Kick response measurements -1

Data in very good agreement with model. All measurements were done at deltap/p = - 0.5 permil. Figures show a comparison between measurements (blue) and model (red). Beam from left.

H plane

V plane

Courtesy Kajetan

Page 14: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

14

H+V response of horizontal kicker MCIAH.80204 for TI8 and LHC sector 78.

Kick response measurements -2

H+V response for vertical kicker MCIAV.80704 for TI8 and LHC sector 78. Vertical (blue background) couples to horizontal (red background)

Courtesy Kajetan

Page 15: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

15

Point 2 / 8 TDI and TCLIA/B setting up

• Transfer line protection devices: setting up partially done

• TDI / TCDI : done– See Wolfgang Bartmann presentation

Page 16: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

16

MKI 2 and 8 waveform measured

Looks OK except for 2% overshoot, both MKI2 and 8 – being corrected

Courtesy M.Barnes

MKI8%

-10

0

10

20

30

40

50

60

70

80

90

100

110

65000

66000

67000

68000

69000

70000

71000

72000

73000

74000

75000

76000

77000

78000

79000

80000

81000

82000

83000

84000

85000

Delay (ns)D

efle

ctio

n (

%) MKI8%

97.0

97.5

98.0

98.5

99.0

99.5

100.0

100.5

101.0

101.5

102.0

102.5

103.0

75000

76000

77000

78000

79000

80000

81000

82000

83000

84000

85000

Delay (ns)

Def

lect

ion

(%

)

Page 17: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

17

Injection kicker timing in

Beam1 Beam2

• Both beams timed in– Adjusted with OASIS signals

– Configured for abort gap keeper

– Checked beam injected OK with acceptable oscillations

– Need to check the fine timing to fit full SPS batch

Page 18: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

18

Multiple bunch injection (and fixes)

• 4 bunch injection sequences worked after timing in MKI and MKD

• Need to be aware that injecting near to abort gap needs consideration – bunch is always at the head of the injection kicker

pulse – always 11 s gap as result after last bunch– may need to reorder some injection sequences,

especially with ‘trailing pilot’ – may need to change order of injection for some

bunches.• Setting up of protection devices to (re)do for high

intensity

Page 19: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

19

• Transfer lines: Importance of:– Regular survey checks and re-alignment– Steering with minimum corrector number and strength– Accurate characterisation of the main magnets– Noise on QPS from TF pulsing? Worry about other EMC sources

around ring?

• Injection region:– FT-CO evaluation is presently based on FIFO acquisition:

• Works only when injecting into EMPTY ring.– To be able to work on ANY injection (also with circ. beam):

• FT-CO from capture data. Code written – needs testing.• Capture data must be automatically configured and enabled to trigger

on the buckets corresponding to the injected bunches (>> injection sequencer).

– ‘Interference’ with PC interlocks of TLs:• Corrector interlock margin presently +- 10 rad (from CNGS

experience).• Must find a compromise between protection (small tol.) and steering

flexibility (larger tol.). Note that shift crews have the right to change the corrector reference settings (not the tolerance).

3- List of subjects to follow-up

Page 20: Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all

Evian LHC BC workshop 19-20 January 2010

20

• Injection region (cont’d):

– Still investigate how to over-inject without interlocking• Puzzle of losses in P8 on MQX – issue of BLM range

– Fine synchronisation of injection kicker pulse to bucket 1

– Setting up of TCDIs and TCLIA/Bs

– Losses on TCDQ/TCSG for B1 at injection– (more) checks to make

– BQM information for IQC – to be made operational

– Injection sequences to revisit with ‘trailing pilot’ • May need to change order of injection for some bunches.

• Need adequate (re)commissioning time