128
Towering – Powering – Energising – Innovating

Eversendai Corporate Brochure

Embed Size (px)

Citation preview

Page 1: Eversendai Corporate Brochure

Towering – Powering – Energising – Innovating

MANAGEMENTSYSTEMS

Page 2: Eversendai Corporate Brochure

2

Page 3: Eversendai Corporate Brochure

EXECUTIVE CHAIRMAN & GROUP MANAGING DIRECTOR’s MEssAGE

TAN sRI A K NATHAN

Moving To New Frontiers The history of Eversendai goes back to 1984 and after three decades of unparalleled experience, technical expertise and a strong network across various countries, Eversendai is recognised as a leading global organisation in undertaking turnkey contracts; delivering projects for high rise buildings, power plants, Oil & Gas upstream and downstream including process and industrial plants as well as infrastructure and composite structures in the Asian and Middle Eastern regions.

We have a dedicated workforce of over 10,000 people and an impressive portfolio of more than 300 accomplished projects in over 14 different countries with 7 fabrication facilities located in Malaysia, Dubai, Sharjah, Ras Al Khaimah, Qatar, India and Thailand with an annual capacity of over 222,000 metric tonnes. With our state-of-the-art steel fabrication factories, we have constructed some of the world’s most iconic landmark structures. These include the Burj Khalifa in Dubai, Petronas Tower 2 in Malaysia, Khalifa Olympic Stadium in Qatar, Kingdom Centre in Saudi Arabia and Republic Plaza in Singapore.

Our expansion plans, including our foray into the engineering, construction, procurement, fabrication and installation services for the Oil & Gas industry which is very much integral to our core operations, will also see us venture into new markets Today, we have the capability of handling total integrated multi-disciplinary construction packages involving all phases of construction work which include civil and building, structural and steel fabrication and erection, mechanical piping, tankage, process equipment erection and electrical and instrumentation works.

As we move to new frontiers, we will be able to provide our clients the certainty and comfort of knowing that their projects are in capable and experienced hands. These developments will complement our vision, mission and core values. This will simultaneously allow us to remain one of the most successful organisations in the Asian and Middle Eastern regions and beyond with corresponding efficiency and reliability. The successful and timely completion of our projects accompanied by soaring innovation, creativity and our aspiration to move to new frontiers have been the key drivers for achieving continuous growth through the years. We remain committed to these values and we believe, this stamps our firm intent to dominate the various industries which we are involved in and also marks the next phase in our development to be amongst the undisputed global market leaders.

Our strength lies in our resilient workforce whose skills, commitment and dedication serve the needs of our clients. An established management which overlooks the areas of planning, procurement, HSE and execution, combined with experienced managers, engineers alongside our workforce has made Eversendai a leading and innovative global organisation.

We are pleased to realise our aspirations of growing our business and we shall continually seek opportunities to globally expand our existing scope of operations.

This is just the beginning

3

Page 4: Eversendai Corporate Brochure

4

OUR CORE VAlUEs

OUR MIssION

OUR VIsIONTO MAInTAIn OuR CORE vAluES AnD COnTInuOuSly InnOvATE AS WE MOvE TO nEW fROnTIERS

Compliance to sAFETy• Conformance to qUAlITy

• Adherence to sCHEDUlE • Consistent ClIENT sATIsFACTION

To excel in delivering our commitment to our clients

while strengthening and forging new ties. We

endeavour to maintain and enhance our consistent

performance, work culture and standards. We

strongly believe in maximising the value of human

capital and aligning it with company initiatives as a

fundamental element of our business objective

Page 5: Eversendai Corporate Brochure

5

DuBAISHARjAH

ABu DHABIQATAR

SAuDI ARABIA

InDIA

RAS Al KHAIMAH

AzERBAIjAn

OMAn

OuR GlOBAl nETWORK

MAlAySIA

THAIlAnD

SRI lAnKA

SInGAPORE

EVER

sEND

AI C

ORP

ORA

TIO

N BE

RHAD

Subsidiary company

● Eversendai Engineering llC (Baku, Azerbaijan)

● Eversendai Engineering llC (Dubai, uAE)

● EVs Construction llC (Dubai, uAE)

● Eversendai Engineering llC (Abu Dhabi, uAE)

● Eversendai Engineering FZE (Sharjah, uAE)

● Eversendai Engineering saudi llC (Saudi Arabia)

● Eversendai Construction (s) Pte ltd (Singapore)

● Eversendai Technics Pte ltd (Singapore)

● Eversendai Energia sdn Bhd (Malaysia) (formerly known as Shineversendai Engineering (M) Sdn Bhd)

● Eversendai Offshore sdn Bhd (Malaysia)

● ECB Properties sdn Bhd (Malaysia)

● Perisai Kuasa sdn Bhd (Malaysia)

● Eversendai Constructions (M) sdn Bhd (Malaysia)

● Eversendai Frontiers Pvt ltd (Mumbai, India)

● Eversendai Engineering (Pvt) ltd (Sri lanka)

● Eversendai Oil & Gas (M) sdn Bhd (Malaysia)

● Eversendai Offshore RMC FZE (Ras Al Khaimah, uAE)

● Eversendai Engineering Pte ltd (Singapore)

● Eversendai Construction Pvt ltd (Chennai, India)

● Eversendai Engineering qatar Wll (Qatar)

● Eversendai s-Con Engineering Co. ltd. (Thailand)

Page 6: Eversendai Corporate Brochure

ENGINEERING

6

structural, Connection Design & shop DrawingEversendai Corporation’s Offices in India, Dubai and Qatar provide technical services for all types of structures: -

• We are equipped with state of the art design and detailing software, with 3D modeling capabilities for structural design, connection design, temporary erection engineering for high-rise, industrial buildings & equipment support structures, shopping malls, convention centers and infrastructure projects.

• Shop drawings for structural steel and rebar engineering.

• Value engineering for member sizing, connections and innovative erection methodologies tailored to meet the project and the clients’ requirements.

• Complete 3 Dimensional model of structures and connections, exporting the nested cutting plans to various CnC machines directly using 3D model software to ensure accuracy in fabrication and erection of myriad of bolted joints.

• Structural steel erection engineering determining centre of gravity for intricate assemblies to assist in complex heavy lifts including in some of the tallest structures.

• Temporary structures as part of the model to eliminate fouling of members and cables during site assembly and erection.

• Complete material list, bolt list, stud bolt list extracted from model in advance for early and bulk procurement and effective site management.

Page 7: Eversendai Corporate Brochure

7

Eversendai is equipped with software such as STAADPRO, ETABS, fASTRAK, DESCOn and ROBOT for Structural Design and custom made spread sheets for Connections and TEKlA STRuCTuRES, BOCAD, REvIT, RC-CAD and ACAD for Structural Steel and Rebar Detailing.

We carry out our own Research and Development, seeking new methodologies to improve deliverables, work processes, automation and procedures to enhance the engineering and fabrication drawing output using cutting edge 3D model technology.

Eversendai has a team of experienced design engineers and detailing personnel including experienced 3D structural model creators and checkers.

The majority of the projects for design and detailing conform to British, EuRO Standards and American Standards and our experienced team of people have

versatility in addition to the standards from uBC, IBC, jIS, Canada, Australia, Europe and India.

We have the expertise to deal with pipe profile structures, unfolding drawings with 3D uni-Planar and Multi planar joints.

Eversendai has been awarded with prestigious awards, such as the Golden Award as well as many Global BIM Awards for Best and Complex Models from Tekla Structures for various projects.

We provide electronic communications with a dedicated 24 hours, 7 days a week fTP server with high speed internet connections and voice over internet protocol (vOIP) and WebEx services across the different regions. Our engineering capability with almost three decades of experience in our chosen field of products and services ensure that our clients and customers are offered one-stop shop service to meet their varying needs.

Page 8: Eversendai Corporate Brochure

FABRICATION FACIlITIEs

8

In keeping with Eversendai Corporation’s objective to enhance its premier position in the business through engineering excellence and specialist construction services, the company has further developed its fabrication capacity to accommodate Eversendai’s growing number of projects, boasting a combined annual fabrication capacity of over 150,000 metric tonnes.

Eversendai produces high quality fabricated structures and has the accreditation and certification from ASME Boiler and Pressure Code u, u2, S and the R Symbol from the national Board of Boilers and Pressure vessel Inspectors, for our facility at Hamriyah free zone, Sharjah, u.A.E .

All our fabrication factories are strategically located and have the capability and the capacity to fabricate and export high quality fabricated structures to any parts of the world on time.

Eversendai Corporation has fabrication factories at: -

Open yard Area : 40,761 sq metres fabrication Capacity : 24,000 tonnes

Total Area : 65,412 sq metres Total Building Area : 24,651 sq metres

Rawang Malaysia

Industrial Area Doha QatarTotal Area : 39,479 sq metresTotal Building Area : 16,128 sq metres

Open yard Area : 18,720 sq metres fabrication Capacity : 24,000 tonnes

Page 9: Eversendai Corporate Brochure

Al Qusais Industrial DubaiOpen yard Area : 4,000 sq metres fabrication Capacity : 12,000 tonnes

Total Area : 12,000 sq metres Total Building Area : 8,000 sq metres

Chacherngsao, ThailandTotal Area : 78,400 sq metresTotal Building Area : 7,800 sq metres

Open yard Area : 7,800 sq metres fabrication Capacity : 12,000 tonnes

9

Page 10: Eversendai Corporate Brochure

Hamriyah free zone Sharjah

Unit 1

Unit 2

Total Area : 211,168 sq metres

Total Building Area : 63,781 sq metres

Open yard Area : 147,387 sq metres

fabrication Capacity : 60,000 tonnes

10

Page 11: Eversendai Corporate Brochure

11

Page 12: Eversendai Corporate Brochure

12

Trichy IndiaTotal Area : 156,335 sq metresTotal Building Area : 9,040 sq metres

Open yard Area : 147,294 sq metresfabrication Capacity : 30,000 tonnes

Page 13: Eversendai Corporate Brochure

Total Warehouse & Storage : 16,956 sq metresAssembly Area : 82,720 sq metresTotal Covered fabrication Area : 27,920 sq metresWater Depth : 7 metres

Total land Area : 200,000 sq metresQuayside : 550 metresOpen yard : 82,720 sq metresTonnage : 60,000

Rak Maritime City Ras Al Khaimah

13

Page 14: Eversendai Corporate Brochure

All our fabrication facilities are certified with global standards and fabrication works are being carried out in accordance with the internationally recognized ISO 9001-2008 OHSAS 18001-2007 and ISO 14001-2004 standards under an Integrated Management System to maintain the highest global standards for Quality, Health & Safety and Environmental Management systems.

The factories are equipped with the latest state-of-the-art CnC (Computer numerical Controlled) machines which enable production of premium quality steelwork components by facilitating quality material preparation activities with optimum usage of time and materials and with high accuracy by avoiding all possible human errors, for the subsequent assembly and welding activities as part of the fabrication process.

We are also equipped with all the required precise CnC machinery and highly skilled personnel to face any kind of challenges in the fabrication of complex structures in order to turn the architect’s dreams into reality. This has been acknowledged by many renowned architects /designers throughout the world and we have been provided with many opportunities to get involved in iconic projects in the Middle East as well as in other parts of world where we serve various clients.

In order to meet complex requirements of developing a 2D concept into a 3D real time model, we adopt precise fabrication methods and quality standards to incorporate the required free hand curves/bends drawn by the architects onto the steel components.

In this process, we use highly precise total stations to co-ordinate each and every structural component being placed in multiple planes, as extracted from the 3D real time models, and maintain the architectural intent by deploying highly précised CnC machinery as well as an experienced workforce and supervisory staff. The efforts being extended to make the control assemblies wherever required, on the shop floor itself, eliminates all kinds of mismatches as well as related time losses to attend to any mismatches on site.

Our ability to convert concepts such as the rose bud in Rose Tower in Dubai, the complex wave form roof structures at Dubai Mall, the air craft shape at the New Doha International Airport (NDIA), desert flower at Qatar national Museum, and leaning tower at Capital gate at Abu Dhabi shows our strength to meet any kind of complex requirements.

The operator of our machines shall receive the nC data generated from the 3D TEKlA detailing software directly from the engineering office.

The details of the various high precise CnC machinery set up at our factories are as follows:

Plate Cutting MachineCNC Controlled Plate cutting/profiling machine supplied by SATO Cutting Systems, Germany, has the capability to process plates up to 24m long x 5m wide of 200 mm thick (max) by using oxy/acetylene or plasma cutting facilities.

14

Page 15: Eversendai Corporate Brochure

15

Tube Profiling MachinesThe pipe profiling machine supplied by Muller Opladen, Germany is a six axis CnC controlled machine utilizing plasma or oxy/acetylene for cutting the profiles on hallow sections. The machine has the ability to make profiles on pipes and square hallow sections with/without weld bevels.

Plate Punching, Drilling& Cutting Machine The plate processing machine supplied by Peddinghaus, u.S.A, has the ability to punch, drill, mark and cut plates using plasma or oxy/acetylene of thickness up to 75 mm.

saw, Drill & Notching line This heavy duty saw and drill supplied by Kaltenbach, Germany has the ability to cut sections of width 1340mm and height 730mm, capable of sawing at variable metering and automatic drilling with three axis drill facility up to a dia of 40 mm. The coping machine which is part of the setup is capable of coping and cutting the sections, angles, channels, tubes and hollow sections using its 6 axis robotic arm mounted with plasma and or oxy/acetylene cutting torch options.

Page 16: Eversendai Corporate Brochure

16

Bending Machine Eversendai has got one of the world’s largest section bending machine. This machine is capable of rolling all kinds of I sections & channels (on both axis) and pipes etc. Its operating range includes a maximum of 800mm diameter in pipes and 1000mm depth in sections.

Gantry Welder Heavy built-up requirements shall be carried out by using the automatic SAW Gantry Welding machine to build “H” beams, “I” beams and other hollow sections like rectangle and square box sections. This machine has been provided with two arms and accordingly two built-up sections can be welded simultaneously.

Plate Rolling Machine This is the most advanced “Roll by wire” technology based full hydraulic variable axis plate bending machine with a maximum capacity of 2200 MT. It is capable of rolling a maximum of 170 mm in plate thickness and 3000 mm in plate width along with the optional cone rolling facility.

surface Treatment Equipment The shops are provided with dedicated auto blasting machines with openings – 1500mm width x 200m height and 1200mm width x 1200mm height and manual blasting chambers (5m x 5m x 14m) to cater the needs for the blast cleaning of the steelwork prior to application of project specific paint systems.

Page 17: Eversendai Corporate Brochure

17

FABRICATION

Page 18: Eversendai Corporate Brochure

18

FABRICATION

Page 19: Eversendai Corporate Brochure

19

Page 20: Eversendai Corporate Brochure

20

FABRICATION

Page 21: Eversendai Corporate Brochure

21

Page 22: Eversendai Corporate Brochure

22

AWARDs & CERTIFICATIONs

22

GOlDEN CONsTRUCTION AWARD 2008

By the Trade leaders Club, Madrid, Spain

INTERNATIONAl sTAR AWARDFOR lEADERsHIP IN qUAlITy 2009

By Business Initiatives Directions, france

MAlAysIAN CONsTRUCTION INDUsTRy EXCEllENCE AWARDs 2005 – INTERNATIONAl ACHIEVEMENT AWARD

By the Construction Industry Development Board Malaysia

MAlAysIAN CONsTRUCTION INDUsTRy EXCEllENCE AWARDs 2013 – INTERNATIONAl ACHIEVEMENT AWARD

By the Construction Industry Development Board Malaysia

Page 23: Eversendai Corporate Brochure

23

Page 24: Eversendai Corporate Brochure

OUR EXPERTIsE

24

Integrated Structural Steel Works

Composite Structures

Mechanical fabrication

Self-Propelled jack-ups/liftboatsProcess Modules Topside Platforms Rig Refurbishmentjack-up Drilling Rigs Offshore Structures Offshore living Quarters

Mechanical Installation Work for Power & Petrochemical Plants

value Engineering & Erection Methodology

Page 25: Eversendai Corporate Brochure

High-Rise Buildings

long Span &Roof Structures

Bridges

Oil & GasOffshore/Onshore

and Marine fabrication

Industrial, Petrochemical& Power Plants

Retail & Commercial

OUR GlOBAlPORTFOlIO

25

Page 26: Eversendai Corporate Brochure

Caltex Tower, SingaporeHitachi Tower, Singapore

26

HIGH-RIsE BUIlDINGsOUR GlOBAl PORTFOlIO

Page 27: Eversendai Corporate Brochure

27

Republic Plaza, Singapore The Paragon, Singapore

Page 28: Eversendai Corporate Brochure

28

uE Square, Singapore Chartered Square Building, Thailand

Page 29: Eversendai Corporate Brochure

29

Petronas Twin Tower 2, Malaysia

Page 30: Eversendai Corporate Brochure

30

TH Perdana Tower, Malaysia Telekom Building, Malaysia

Page 31: Eversendai Corporate Brochure

31

Kuala lumpur Tower, Malaysia Marina Crown, Dubai

Page 32: Eversendai Corporate Brochure

32

Burj Al Arab, Dubai

Page 33: Eversendai Corporate Brochure

33

uP Tower, Dubai Al Mas Tower, Dubai

Page 34: Eversendai Corporate Brochure

34

Burj Khalifa, Dubai

Page 35: Eversendai Corporate Brochure

35

Rose Rayhaan Rotana, Dubai Emirates Office & Hotel Towers,Dubai

Page 36: Eversendai Corporate Brochure

36

The Index, Dubai Princess Tower, Dubai

Page 37: Eversendai Corporate Brochure

37

jW Marriott Marquis Hotel, Dubai

Page 38: Eversendai Corporate Brochure

38

Burj Dubai Annexe, Dubai

Al jalilah Hospital, Dubai

Page 39: Eversendai Corporate Brochure

39

Gate Building, Dubai

Chelsea Tower, Dubai Airport Control Tower, Dubai

Page 40: Eversendai Corporate Brochure

40

Address Residence Sky views, Dubai

Gate District Towers, Abu Dhabi

Page 41: Eversendai Corporate Brochure

41

Hard Rock Hotel, Abu Dhabi ADnOC Headquarters, Abu Dhabi

Page 42: Eversendai Corporate Brochure

42

Cleveland Clinic, Abu Dhabi

Page 43: Eversendai Corporate Brochure

43

Capital Gate Tower, Abu Dhabi

Page 44: Eversendai Corporate Brochure

44

Al Sham Tower, Abu Dhabi Al nasser Headquarters,Abu Dhabi

Page 45: Eversendai Corporate Brochure

45

Tornado Tower, Qatar Al Moayyed Tower, Bahrain

Page 46: Eversendai Corporate Brochure

46

Crescent City, Azerbaijan

Page 47: Eversendai Corporate Brochure

47

Kingdom Centre, Saudi Arabia Capital Market Authority Tower, Saudi Arabia

Page 48: Eversendai Corporate Brochure

48

Empire Tower, Indonesia Worli Tower, India

Page 49: Eversendai Corporate Brochure

49

Statue of unity, India

Kingfisher Towers, IndiaMarathon futurex, India

Page 50: Eversendai Corporate Brochure

50

lONG sPAN AND ROOF sTRUCTUREs

Tuas Checkpoint, Singapore

Indoor Stadium, Singapore

Page 51: Eversendai Corporate Brochure

51

Changi Airport Terminal 3, Singapore

Bintulu Airport, Malaysia

Page 52: Eversendai Corporate Brochure

5252

Kuala lumpur International Airport Main Terminal, Malaysia

Kuala lumpur International Airport Contact Pier, Malaysia

Page 53: Eversendai Corporate Brochure

5353

Rawang - Ipoh Double Track, Malaysia

Kl Sentral Station, Malaysia

Page 54: Eversendai Corporate Brochure

54

Customs, Immigration & Quarantine Complex, Malaysia

Abu Dhabi Airport, Abu Dhabi

Page 55: Eversendai Corporate Brochure

55

Qatar faculty of Islamic Studies, Qatar

Doha Convention Centre, Qatar

Page 56: Eversendai Corporate Brochure

56

Convention Center Extension - Education City, Qatar

new Doha International Airport, Qatar

Page 57: Eversendai Corporate Brochure

57

Khalifa Olympic Stadium, Qatar

Qatar national Museum, Qatar

Page 58: Eversendai Corporate Brochure

58

Ski Dubai, Dubai

Chhatrapati Shivaji International Airport, India

Page 59: Eversendai Corporate Brochure

59

Salalah Ampitheatre, Oman

Salalah Airport, Oman

Page 60: Eversendai Corporate Brochure

60

King Abdulaziz International Airport - Railway Station, Saudi Arabia

King Abdullah Petroleum Studies & Research Centre, Saudi Arabia

Page 61: Eversendai Corporate Brochure

61

Sheikh zayed Cricket Stadium, Abu Dhabi

Chek lap Kok Airport Extension, Hong Kong

felda Multi-Purpose Hall, Malaysia

Subang Airport Hangar, Malaysia

Qatar Airways Hangar, Qatar

Page 62: Eversendai Corporate Brochure

62

RETAIl & COMMERCIAl

Putrajaya Convention Centre, Malaysia

Suria KlCC, Malaysia

Page 63: Eversendai Corporate Brochure

63

PKT logistics Warehouse, Malaysia

PKT 12 Waves Warehouse, Malaysia

Page 64: Eversendai Corporate Brochure

64

nas Arena Multi Purpose Hall, Dubai

Opera House, Dubai

Page 65: Eversendai Corporate Brochure

65

Burj Al Salam Carpark, Dubai

Hub zero family Entertainment Centre, Dubai

Page 66: Eversendai Corporate Brochure

6666

Dragon Mart, Dubai

Dubai Mall, Dubai

Page 67: Eversendai Corporate Brochure

6767

Masdar Institute of Science & Technology, Abu Dhabi

yas Mall, Abu Dhabi

Page 68: Eversendai Corporate Brochure

6868

Qatar Science & Tech Park, Qatar

Pearl Mansion, Qatar

Page 69: Eversendai Corporate Brochure

6969

Qatar foundation Research & Development Complex, Qatar

Multipurpose Hand Ball Stadium Duhail, Qatar

Page 70: Eversendai Corporate Brochure

70

Dhirubai Ambani International Convention and Exhibition Centre, India

Page 71: Eversendai Corporate Brochure

71

Page 72: Eversendai Corporate Brochure

7272

TnRD Bangi Project, Malaysia

Kulim Wafer Plant, Malaysia

Motor City, Dubai festival City, Dubai

Asian Institute of Medicine, Science & Technology, Malaysia

floating Restaurant - Etihad Towers, Abu Dhabi

Page 73: Eversendai Corporate Brochure

7373

Robertson Quay, Singapore

King George’s foot Bridge, Singapore

BRIDGEs

Page 74: Eversendai Corporate Brochure

74

Marriott Executive Apartments, Dubai

Dubai frame, Dubai

74

Page 75: Eversendai Corporate Brochure

7575

Atmosphere Sky Bridge, India

KlIA 2 Sky Bridge, Malaysia

Page 76: Eversendai Corporate Brochure

76

Petronas Twin Towers Sky Bridge, Malaysia

KLIA - Pan Pacific Hotel Linkbridge, Malaysia

Page 77: Eversendai Corporate Brochure

77

jalan Tun Razak viaduct, Malaysia

Kuala lumpur lRT Bridge, Malaysia

Page 78: Eversendai Corporate Brochure

78

Bamban Bridge, Philippines

Mabalacat Bridge, Philippines

Page 79: Eversendai Corporate Brochure

79

INDUsTRIAl, PETROCHEMICAl& POWER PlANTs

3 X 700 MW Manjung Power Plant, Malaysia

Proton national Car Plant, Malaysia

Page 80: Eversendai Corporate Brochure

80

3 X 700 MW Manjung Power Plant, Malaysia - Boilers

Page 81: Eversendai Corporate Brochure

81

3 X 700 MW Manjung Power Plant, Malaysia - Electrostatic Precipitator

3 X 700 MW Manjung Power Plant, Malaysia - Stockyard

Page 82: Eversendai Corporate Brochure

82

3 X 700 MW Manjung Power Plant, Malaysia - Coal & Ash

3 X 700 MW Manjung Power Plant, Malaysia - fuel Gas Desulphurisation

Page 83: Eversendai Corporate Brochure

83

3 X 700 MW Manjung Power Plant, Malaysia - Mill Bay

2 X 700 MW jimah Power Plant, Malaysia

Page 84: Eversendai Corporate Brochure

84

3 X 700 MW Tanjung Bin Power Plant, Malaysia

Page 85: Eversendai Corporate Brochure

85

1 X 1000 MW Manjung Power Plant - unit 4, Malaysia

Page 86: Eversendai Corporate Brochure

86

Petronas fertiliser Complex, Malaysia

Sultan Salahuddin Abdul Aziz Power Station Phase II & III, Malaysia

Page 87: Eversendai Corporate Brochure

1 X 1000 MW Tanjung Bin Power Plant - unit 4, Malaysia

87

1x1000MW Tanjung Bin Power Plant-unit 4,Malaysia:Turbine Installation

Page 88: Eversendai Corporate Brochure

88

Terengganu Gas Terminal, Malaysia

Page 89: Eversendai Corporate Brochure

89

Sabah Oil & Gas Terminal, Malaysia

Page 90: Eversendai Corporate Brochure

90

MlnG 3, Malaysia

Perwaja Steel Mill Plant Extension, Malaysia

Page 91: Eversendai Corporate Brochure

91

2 X 300 MW EMCO Thermal Power Plant, India

2X 500MW nTPl Tuticorin Project, India

Page 92: Eversendai Corporate Brochure

9292

nakilat Damen Shipyard Phase 4, Qatar

Page 93: Eversendai Corporate Brochure

93

nakilat Damen Shipyard Phase 4A, Qatar

Page 94: Eversendai Corporate Brochure

9494

Garraf Development facility Operation, Iraq

Gabbro Terminal, Qatar

Page 95: Eversendai Corporate Brochure

95

Algeria fertiliser Plant, Algeria

2 X 600 MW north Chennai Power Station, India

Palm Oleo, Malaysia

Polycrystalline Silicon Plant, Malaysia

Page 96: Eversendai Corporate Brochure

OIl & GAs ONsHORE/OFFsHORE & MARINE FABRICATION

96

Specifications Design : Gusto MSC nG2500X

Hull dimensions : l: 61m x W: 36m x D:6m

leg length : 4 x 94.2 metres (lattice)

Max Water Depth : 70 metres

Max Wave Height : 8 metres

Main Deck Area : 800 square metres

variable load : 1,300 tonnes

Main CraneCapacity : 300 tonnes

AccommodationCapacity : 200 POB

Propulsion System : 4 x 1,200 KW

Control System : Dynamic Positioning System (DP-2)

Self-Propelled Jack-Up/Liftboat

SWL 12.5t @ 30m

HOSE REEL SB

R450

Huisman

MAX 85º 22900 TOS

TOG21350 A.B.

24500 A.B.

TOP DECK(EL. (+)22190)

4TH LEVEL

3RD LEVEL

2ND LEVEL

1ST LEVEL

MAIN DECK

BASELINETANK TOP (EL (+) 1208)

(EL. (+)18800)

(EL. (+)15700)

(EL. (+)12600)

(EL. (+) 9500)

(EL. (+) 6000)

(EL. (+) 0)

Page 97: Eversendai Corporate Brochure

97

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1988 Singapore Indoor Stadium

fabrication and Erection of Temporary Steel Structure

Ssangyong Guan Ho/ nipponSteel Corporation 400

1988 Singapore Indoor Stadium

Erection of Main Keel Truss and nS Space frame Structures

Ssangyong Guan Ho/ nipponSteel Corporation 1,200

1988

Pulau Seraya Power Station Stage II C.W. Conduits, Pumphouse & Water Treatment Plant, Singapore

Blasting and Painting to sheet piles, H-Piles and z-Piles

Singapore Piling & Civil Engineering Pte. ltd. 900

1989Pulau Seraya Power Station Stage II, Singapore

A) Blasting to SA 2.5 , Painting 3 coats of paint 375microns DfT to Sheet Piles, H-Piles and z-Piles. B)Welding of Box Piles and H-Pile shoes

Singapore Piling & Civil Engineering Pte. ltd.

A) Surface area 80,521 Sq.Mtrs B) 1100 Box Piles and 600 H-Pile.

1989Senoko Station Gas Turbine Power Plant, Singapore

Erection of Structural Steel Siemens - Kim Seng Heng Engineering & Construction Pte. ltd.

300

1989Reconstruction of Sir Arthur Bridge, Singapore

Piling of H-Piles and Sheet-Piles, fabrication, Erection of Temporary Steel Bridge and Strutting works for Cofferdam

Singapore Piling & Civil Engineering Pte. ltd. 300

1989 Restoration of national Museum, Singapore

fabrication and Erection of Structural Steel Roof

Singapore Piling & Civil Engineering Pte. ltd. -

1989Pulau Seraya Power Station Stage II, Singapore

fabrication, Strutting, Dismantling and Erection of Structural Steel works

Singapore Piling & Civil Engineering Pte. ltd. 900

1990

Pulau Seraya Power Station Stage II - foundation & Building Works, Singapore

Painting to the Erected Turbine Steel Structures

Singapore Piling & Civil Engineering Pte. ltd. 5,800

1991

Amphitheatre with 2 storey ancillary building and South East Asian Birds Walk-in Aviary for jurong Bird Park, Singapore

fabrication and Erection of Structural Steel Works

Singapore Piling & Civil Engineering Pte. ltd. 450

1991 Comcenter (Singapore Telecoms), Singapore

Erection of Steel Strutting at Basement

Singapore Piling & Civil Engineering Pte. ltd. 1,100

1991

Hitachi Towers - 37 Storey Office/Commercial Building at Collyer Quay, Singapore.

Erection of Structural Steel Works including Decking and Stud welding.

Obayashi Corporation/ nippon Steel Corporation 5,600

lIsT OF BUsINEss PROJECTs

Page 98: Eversendai Corporate Brochure

98

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1991

Caltex Towers - 33 Storey Office/Commercial Building at Collyer Quay, Singapore.

Erection of Structural Steel Works including Decking and Stud welding.

Obayashi Corporation/ nippon Steel Corporation 4,700

1992

Clarke Quay Restoration and Redevelopment, Singapore

Shop Drawing, Blasting to SA 2.5, Primer Painting, fabrication, 3 coat Paint system and Erection of Structural Steel Works

Singapore Piling & Civil Engineering Pte. ltd.

450 tonnes. (Roof

Structure consists of Hollow Section)

1992 Republic Plaza, Singapore

Erection of Structural Steel Works

Shimizu Construction/ nippon Steel Corporation 8,000

1993

Pulau Seraya Power Station Stage III C.W. Conduits, Pumphouse & Water Treatment Plant, Singapore

Blasting and Painting of Sheet Piles, H-Piles and z-Piles

Singapore Piling & Civil Engineering Pte. ltd.

Surface Area 180,000 m2 + 2,500 tonnes

1993Pulau Seraya Power Station Stage III, Singapore

Welding of Box Piles and H-Pile shoes

Singapore Piling & Civil Engineering Pte. ltd.

3,500 Box Piles and

1,200 H-Pile shoes

1993 Shell Easter Petroleum Pulau ular, Singapore

Erection of Structural Steel Works

Chiyoda Corp - Mitsui-Keppel Consortium 500

1993 ATM Towers, Thailand

Erection of Structural Steel, Alignment, olting, Deck Installation, Stud Bolt Welding, Civil work- laying of wire mesh, setting rebars, form work and concreting works

Pan Pacific Construction Engineering Pte ltd 4,200

1993

Balawan Combined Cycle Power Plant Block II, Medan, Indonesia

fabrication & Erection of Structural Steel, Blasting and Painting

SIEMEnS / Kian Sukses 750

1993 Kl Tower, Malaysia

Erection of Structural Steel, Alignment, Bolting and Installation of Secondary Steel

Wayss & fretag & victor Buyck Steel Construction Sdn Bhd

1,600

1994 Petronas Twin Tower 2, Malaysia

Erection of Structural Steel inclusive of embedded plates

Samsung - Kukdong - jasatera jv/Samsung Heavy Industries

8,000

1994 Perwaja Steel Mill Plant Extension, Malaysia

Erection of Structural Steel, Alignment Bolting and Welding

Hazama - Tomoe Corporation - Mech-Mar Keppel 4,000

1994 Kl Tower (Antenna Mast), Malaysia Erection of Antenna Mast

Wayss & fretag & victor Buyck Steel Construction Sdn Bhd

100

1994 Temasek Polytechnic (Phase II), Singapore

fabrication and Erection of Structural Steel Works

Singapore Piling & Civil Engineering Pte ltd. 1,000

Page 99: Eversendai Corporate Brochure

99

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1994 Empire Tower, Indonesia

Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding

PT Total Construction 3,000

1995 Petronas Tower 2 - Sky Bridge, Malaysia

Site Assembly and Erection, Alignment and Bolting of the Bridge connecting both the towers

Samsung - Kukdong - jasatera jv/Samsung Heavy Industries

500

1995 Suria KlCC, Malaysia

Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding

victor Buyck Steel Construction Sdn. Bhd. 18,000

1995

Kuala lumpur International Airport, Main Terminal Building and Contact Pier, Malaysia

Erection of Structural Steel, Alignment, Bolting and Welding Works

Taisei/Tomoe Corporation 9,305

1995 uE Square, Singapore Erection of Structural Steel Works

Kajima Corporation / Tomoe Corporation 1,900

1996 jKR Building, labuan, Malaysia

Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding

Pernas Construction Sdn Bhd &Cleaveland EOn Asia Sdn Bhd

1,600

1996

Sultan Salahuddin Abdul Aziz Power Station - Phase III, Kapar, Malaysia

Erection of Structural Steel, Bridge, Crane, Heat Exchangers and Starge Tanks , Bolting & Welding, Alignment, Installation of Decks, and Shear Studs

Cleaveland EOn Asia Sdn. Bhd 6,000

1996 Burj Al Arab, Dubai

Erection Methodology, Site Assembly, Erection of Structural Steel, Alignment, Bolting and Welding Works

Al Habtoor/fletcher/ Murray & Roberts jv 9,200

1996TPC II/Bl-2 Project, Pulau Ayer Merbau, Singapore

Erection of Structural Steel, Installation of Deck and Edge Plates

jSW & Sumitomo Construction Co. ltd 700

1996Tuas Checkpoint Tubular Structures, Singapore

Supply, fabrication, and Erection of Tubular Structures.

Gtm - Wansoon - Woh Hup - Mero Consortium 4,200

1997 light Rail Transit Bridges, Malaysia

Assembly and Erection of Structural Steel, Alignment and Bolting Works

victor Buyck Steel Construction Sdn. Bhd. 2,800

1997 Malaysia Airlines Hangar, Malaysia

Site Assembly, Erection of Structural Steel, Alignment and Bolting Works

Strarch & Geahin Engineering Berhad 2,100

1997

Kuala lumpur International Airport Pan Pacific Hotel - Link Bridge, Malaysia

Structural Design, Supply Material, Engineering, fabrication, Erection, Alignment and Bolting Works

Peremba – Multiplex jv 300

Page 100: Eversendai Corporate Brochure

100

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1997Sharp Roxy, SMM & SREC Warehouse, Malaysia

Erection of Structural Steel, Alignment and Bolting Works

Shimizu Corporation - Geahin Engineering Berhad 600

1997 TnRD Bangi, Malaysia Erection of Structural Steel, Alignment and Bolting Works Geahin Engineering Berhad 2,700

1997langzem Cement Plant Extension, langkawi, Malaysia

Erection of Structural Steel, Alignment and Bolting Works

nam fatt fabricators Sdn. Bhd. 800

1997 Palm Oleo 2 Project, Malaysia

Process Building, Tank farm, Pipe Rack, Erection of Structural Steel, Alignment and Bolting Works

Geahin Engineering Berhad 900

1997KlIA Cargo Terminal - CSS Structure , Malaysia

Erection of Structural Steel, Alignment and Bolting

MHE – Demag logistics Sdn Bhd 1,100

1997Kl Sentral Station - Roof Structure, Malaysia

Conceptual Design, Supply Material, Engineering, fabrication, Erection of Structural Steel, Alignment, Bolting and Site Welding Works

Ekovest – KMz – Dragages jv 1,350

1997 vision City, Malaysia Erection of Structural Steel, Alignment and Bolting Works

victor Buyck Steel Construction Sdn Bhd 700

1997Hitachi nippon Steel Semi Conductor, Singapore

Erection of Structural Steel and Installation of Deck. Kajima - nippon Steel 4,300

1997 Trellis Tower, Singapore Installation of Precast Panels Shimizu Corporation 7000 nos.

1997Singapore Manufacturing Project, Singapore

Erection of Structural Steel Works.

Chiyoda Corporation - Sumitomo Construction Consortium

1,200

1997

Pipe Bridge and Catwalk for Singapore Manufacturing, Singapore

Supply, fabrication and Erection of Structural Steel Works.

Chiyoda Corporation - McConnell Dowell S.E.A. Consortium

100

1998Petronas fertiilzer Complex, Guru, Malaysia

Erection of Structural Steel, Alignment and Bolting Works

Mitsubishi Heavy Industries/Cleveland EOn Asia Sdn. Bhd.

4,100

1998Hong Kong Airport Extension C304 Project, Hong Kong

Site Assembly, Erection of Structural Steel, Alignment and Bolting Works

Zen Pacific / Geahin Engineering Berhad 1,350

1998 Kerteh Aromatics Project , Malaysia

Installation of Structural Steel, Equipment, Tank and Piping Works

Toyo Engineering - nam fatt fabricators Consortium 1,250

1998Telekom Building - Sky Garden Steel Trusses, Malaysia

Supply Material, Engineering, fabrication and Erection of Structural Steel Works

Daewoo Corporation 1,150

1998 Telekom Building - Helipad, Malaysia

Erection of Steel and Aluminium Structures Daewoo Corporation 460

Page 101: Eversendai Corporate Brochure

101

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1998jalan Tun Razak viaduct, Kuala lumpur, Malaysia

Site Assembly and Erection of Structural Steel viaduct including Bearing Installation Works

Percon Corporation - namfatt 6,481

1998 Grande legenda Resort, Malaysia

Erection of Structural Steel, Alignment and Bolting Works Geahin Engineering Berhad 2,100

1998

Cyberjaya Multimedia Super Corridor for Telekom university , Malaysia

fabrication and Erection of Structural Steel, Alignment and Bolting Works

MK farlin Development - Perwaja Steel 1,200

1998 Emirates Tower - Hotel, Dubai

Site Assembly and Erection of Structural Steel, Alignment, Bolting and Site Welding Works

Besix - Ssangyong jv/Murray & Roberts - Cleveland Bridge jv

3,500

1998 Emirates Tower - Offices, Dubai

Site Assembly and Erection of Structural Steel, Alignment, Bolting and Site Welding Works

Besix - Ssangyong jv/Murray & Roberts - Cleveland Bridge jv

6,500

1998 Kl Sentral Station, Malaysia

Engineering, Supply Material, fabrication and Erection of Built-up Beams for Substructure

Ekovest - KMz - Dragages jv 1,000

1998 Institut Teknologi Petronas, Malaysia

Erection of Structural Steel, Alignment and Bolting Works Geahin Engineering Berhad 200

1998

Pinatubo Hazard urgent Mitigation Project - Mabalacat & Bamban Bridges, Philippines

Erection of Steel Arch Bridge for Bamban and Plate Girder Mabalacat Bridge

Mitsubhishi Heavy Industries 1,900

1998Polyvinyl Alchol Plant (PvA), Pulau Sakra, Singapore

Supply, fabrication, Painting and Erection of Structural Steel Works

Kuraray Engineering Co. ltd. 160

1998 One Raffles Link, Singapore

Erection of Structural Steel and Installation of Deck

Gammon Pte ltd & Wescol Asia Pacific Pte Ltd 2,200

1998 Bank of China, Singapore

Installation of Precast façade Panels

Shimizu Corporation/ lWC Industries 1600 nos.

1998 Paragon Tower, Singapore

Erection of Structural Steel Works nishmatsu - TTj Consortium 2,800

1998 Proton City- Phase 1-A4 Malaysia

Erection of Structural Steel Works Cleveland Eon Asia Sdn Bhd 3,500

1999

Sultan Salahuddin Abdul Aziz Power Station- Refurbishment upgrading & Extension of Coal Handling System, Malaysia

Engineering, fabrication and Installation of Conveyor Structures and Mechanical Erection Works

TnEC - Hartasuma - KTK Consortium 900

1999 Dubai Airport Control Tower, Dubai

Erection of Structural Steel, Alignment and Bolting Works Besix/Al nasr 900

Page 102: Eversendai Corporate Brochure

102

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

1999 Ritz Carlton Hotel, Doha, Qatar

Erection of Structural Steel, Alignment and Bolting Works Midmac Contracting/AIC 900

1999 Silicon Wafer fabrication facilities

Site-Assembly and Erection of Structural Steel, Alignment and Bolting Works

flour Daniel - Kvaerner Cleveland 2,300

1999 King Center foot Bridge ,Singapore

Shop Drawings, fabrication and Erection of Bridge Structures

Chin leong Construction Pte. ltd. 125

1999 Robertson Quay foot Bridge, Singapore

Shop Drawings, fabrication and Erection of Bridge Structures

Hon Construction Pvt. ltd., 130

1999 Inchcape Warehouse Project, Singapore

Erection of Structural Steel Works

Shimizu Corporation - nKK Corporation Consortium 600

2000 TH Perdana, Malaysia

Connection Design, fabrication and Erection of Structural Steel and fire Proofing Works

Maju Holdings Sdn Bhd 4,000

2000 felda Multi-Purpose Hall, Malaysia

Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel

felda Ekovest Sdn Bhd 425

2000 Kl Sentral Station Roof Top Trellis, Malaysia

Structural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works

EKD Construction Sdn. Bhd. 100

2000Kl Sentral Station Maintenance System, Malaysia

Erection of Structural Steel & Aluminium Works TK Gondala Pte. ltd. 150

2000Reefer Stack Access Gantry Structures, Malaysia

Erection of Structural Steel, Alignment and Bolting Works

namfatt fabricators Sdn. Bhd. 600

2000 Kingdom Trade Centre, Riyadh, Saudi Arabia

Structural Re-design, Engineering, Supply Material, fabrication, Erection of Structural Steel, Metal Deckingand Fire Proofing Works

Kingdom Holding Company, El Seif - Impregilo jv 6,027

2000Thermal Energy Storage Tank - KTC, Riyadh, Saudi Arabia

Structural Re-design, Engineering, Supply Material, fabrication and Installation of Tank

El Seif - Impregilo jv 380

2000Al faisaliah Roof feature - Riyadh, Saudi Arabia

Erection of Structural Steel Works.

AIC / Saudi Binladin Group jv 350

2000Secondary School at fenvale link, Singapore

Supply, fabrication, and Erection of Steel Structure Works.

Synergy Construction Pte. ltd. 125

2000 zhongghua Primary School, Singapore

Supply, fabrication and Erection of Structural Steel Works.

Synergy Construction Pte. ltd. 65

Page 103: Eversendai Corporate Brochure

103

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

20004 Storey single-user factory for Dupont, Singapore

Supply, fabrication and Erection of Structural Steel and Installation of Dect.

McConnell Dowell 1,400

2000ISBl & OSBl Super Structure for Dupont, Singapore

Supply, fabrication and Erection of Structural Steel Works.

McConnell Dowell 100

2000

Additions & Alterations to Existing St Margaret’s Primary School, Singapore

Supply, fabrication and Erection of Structural Steel Works.

Synergy Construction Pte. ltd. 260

2000 zhongghua Primary School, Malaysia

Supply, fabrication and Erection of Structural Steel Works.

Synergy Construction Pte. ltd. 175

2001

Manjung 3 x 700 MW Coal fired Power Plant - Boiler Package, Malaysia

Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works.

Alstom Export Sdn Bhd 40,000

2001 uP Tower, Dubai Erection of Structural Steel and Pre-cast Concrete Slabs

nasa Multiplex/Emirates Building Systems 1,600

2001 MlnG Tiga, Malaysia

Erection of Structural Steel for Pipe Racks, Pipe Sleepers, Accessories, Platforms and Access Ways

Dotanah Engineering & Contracting Sdn. Bhd. 850

2001

Manjung 3 x 700 MW Coal fired Power Plant - fGD Package, Malaysia

Erection of Mechanical Works for fuel Gas Desulphurisation Plant, consisting of Steel Structure, Ducting, Piping, Insulation & Refractory, Painting, Control and Instrumentation Works.

Alstom Export Sdn Bhd 4,500

2001

Manjung 3 x 700 MW Coal fired Power Plant - Coal And Ash Package, Malaysia

Erection of Mechanical Works for Coal & Ash Handling System, consisting of Steel Structure, Transfer Towers, Conveyor Belts, Silos, Trippers, Piping, Refractory, Painting, Cladding, Control and Instrumentation Works

Alstom Export Sdn Bhd 6,500

2001 Matriculation School - Gambang, Malaysia

Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works.

Maju Holdings Sdn Bhd 4,500

2001 Gelugor Power Station, Malaysia

Supply Material, Engineering fabrication and Erection of Chimney Stack.

Mudajaya Construction Sdn. Bhd. 650

Page 104: Eversendai Corporate Brochure

104

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2001

Manjung 3 x 700 MW Coal fired Power Plant - Coal Stock yard Package, Malaysia

Erection of Mechanical Works for Coal Stockyard consisting of Steel Structure, Stacker, Reclaimer, Transfer Towers, Conveyor Belts, Painting, Cladding, Control and Instrumentation Works

KOCH Industrial (M) Sdn Bhd 3,500

2001

Electrified Double Track Project between Rawang and Ipoh, Malaysia

Supply Material, Engineering, fabrication and Erection of Structural Steel Works

IjM Corporation Bhd 2,415

2001Philip Morris - Greenfield Project, Philippines

Supply Material, Engineering, fabrication and Erection of Structural Steel Works

leighton Contractors (Philipppines) Inc. 4,200

2001 Putrajaya Convention Centre, Malaysia

Supply Material, Engineering, fabrication and Erection of Structural Steel Works

IjM Corporation Sdn. Bhd. 6,800

2001 new Bintulu Airport, Malaysia

Supply Material, Engineering, fabrication and Erection of Structural Steel, Metal Sheet Roofing and Ceiling Works

Global upline Sdn Bhd 1,000

2001 Peiying Primary School, Singapore

Supply, fabrication and Erection of Structural Steel Works

Seng Hock Heng 183

2002

Panglima 720 MW Combined Cycle Power Plant - Electrochilorination Plantm Malaysia

Erection of Mechanical & Electrical Works

Siemens Power Generation AsiaPac Sdn Bhd / DAIKI Engineering Co ltd

-

2002

Asian Institute of Medicine, Science and Technology (AIMST), Malaysia

Erection of Structural Works SP Setia Bhd 8,500

2002 Sheikh zayed Cricket Stadium, Abu Dhabi Erection of Structural Works Al-Habtoor/Murray & Roberts

jv 800

2002 Skywalk Tower link Bridge Project, Dubai Erection of Structural Works Emirates Building Systems

l.l.C 140

2002 Al Moayyed Tower , Bahrain Erection of Structural Works fujairah national

Construction l.l.C. 2,000

2002 Kastam Kompleks, Kelana jaya, Malaysia

Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works.

Maju Holdings & lal Engineering Sdn Bhd 1,860

2002 Opera Estate Primary School, Malaysia

Supply Material, Engineering, fabrication, Galvanizing and Erection of Steel Works

Synergy Construction Pte ltd 400

2002 BP nam Con Son Gas Project, vietnam

Supply Material, Engineering, fabrication & Export of Structural Steel Works

McConnell Dowell Constructor (Aus) Pty ltd 1,050

Page 105: Eversendai Corporate Brochure

105

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2002 Abu Dhabi Conference Hall, Abu Dhabi Erection of Structural Works Al-nasr Engineering/Belhasa

Six Construct 1,300

2002 jebel Ali ‘K’ Station Phase II, Dubai

Strengthening works for Service Building

Department of Electricity and Water, Six Construct ltd.

2002 jebel Ali ‘K’ Station Phase II, Dubai

Dismantling & Erection of Structural Steelwork

Department of Electricity and Water, Six Construct ltd. 350

2002 21st Century Tower, Dubai

Structural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works

Arabtec / Al Rostamani jv 300

2002 Grosvenor Hotel & Apartments, Dubai

Engineering, Supply Material, fabrication and Erection of Steel Works

nasa Multiplex l.l.C 300

2002Dubai International finance Centre - Gate Building, Dubai

Design, Supply, fabrication and Erection of Structural Steel Works

nasa Multiplex l.l.C 2,000

2002Service Bridges Over Sg Klang and Sg Kerayong, Malaysia

Erection of Steel Bridge namfatt fabricators Sdn Bhd 215

2002

Tuanku jaafar Power Station Port Dickson Rehabilitation Project Phase 1, Malaysia

Erection of Structural Steel Works Sri Pelagat - Taisei jv 3,800

2002 Sharp Warehouse - jebel Ali, Dubai

Site Assembly and Erection of Steelwork for Car Park and Roof Structure

Shimizu Corporation, japan lumpsum

2002

Proposed Redevelopment of Kampong java Market , Singapore

Shop Drawings, Supply, fabrication and Erection of Structural Steel Works.

Hor Kew Private limited - EAC Enterprise Pte ltd Consortium

1,000

2002upgrading of Market/Hawker Centre at Toa Payoh, Singapore

Design, Supply, Shop Drawing, fabrication, Assembly and Installation of Space frame Structures.

Hor Kew Private limited - EAC Enterprise Pte ltd Consortium

300

2002

Additions & Alterations of Chua Chu Kang Primary School, Singapore

Shop Drawings, Supply, fabrication and Erection of Structural Steel Works

Synergy Construction Pte ltd 105

2002 River valley Primary School, Singapore

Shop Drawings, Supply, fabrication and Erection of Structural Steel Works

CPG - Precise Development Pte ltd Consortium 280

2002 nan Hua Secondary School, Singapore

Shop Drawings, Supply, fabrication and Erection of Structural Steel Works

CPG - Precise Development Pte ltd Consortium 380

2002Catholic Primary & Secondary School, Singapore

Shop Drawings, Supply, fabrication and Erection of Structural Steel Works

nEO Corporation 300

2003Electrified Double Track Project - IPOH Station, Malaysia

Erection of Main Roof & Main Column Torsco Berhad 350

Page 106: Eversendai Corporate Brochure

106

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2003Convocation Centre for Kustem university, Malaysia

Structural Design, Engineering, Supply Material, fabrication & Erection of Structural Steel Works

Ibai Bina Sdn Bhd 450

2003 Ski Dubai - Mall of Emirates, Dubai

Erection of Ski Dome Structure Al naboodah laing O’Rourke 3,700

2003 Ski Dubai - Mall of Emirates, Dubai

Structural Design, Supply Material, fabrication and Erection of Temporary Structural Steel Works

Al naboodah laing O’Rourke 700

2003 Marina Crown, Dubai

Structural Design, Supply Material, fabrication & Erection of Structural Steel including Concrete Core Wall Design and Construction

Transemirates Contracting 3,200

2003 Dragon Mart, Dubai

Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works

Al Shafar Transport & Contracting Co 20 ,000

2003 Khalifa Olympic Stadium, Doha

Structural Design for Temporary Towers, Engineering, Supply Material, fabrication and Erection of Structural Steel Works

Midmac/ Six Construct 3,300

2003Changi Water Reclamation Plant, Singapore

Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks

lum Chang Building Contractors Pte. ltd. 700

2003Changi Airport Main Terminal 3 Building, Singapore

Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks

Shimizu corporation 5,700

2003Circle line Stage 1 C-824 Boulevard Station, Singapore

Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks

lum Chang Building Contractors Pte. ltd. 800

2004Dubai International Airport - Conveyor Bridge, Dubai

Structural Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

Al Habtoor / Murray & Roberts 33

2004 DIfC Gate Building 1 to 4, Dubai

Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

ACT - Peremba j.v. 2,000

2004 DIfC Gate Building 5 & 6, Dubai

Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

nasa Multiplex 180

2004Customs, Immigration & Quarantine Package 2, Malaysia

fabrication and Erection of of Structural Steel Works Hl Engineering 1,450

Page 107: Eversendai Corporate Brochure

107

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2004Tanjung Bin Power Plant - Boiler Erection Package, Malaysia

Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works.

IHI/ISHI Power Sdn Bhd 61,250

2004

Tanjung Bin Power Plant - Coal Bunker Assembly Package, Malaysia

Pre-assembly and Erection of Coal Bunkers. IHI/ISHI Power Sdn Bhd 1,370

2004Customs, Immigration & Quarantine Complex Package 3, Malaysia

fabrication and Erection of of Structural Steel Works. Hl Engineering 850

2004 Sky Train - Dubai Airport, Dubai

Structural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works

fujitec Co. ltd - Dar-al-Handashah 350

2004 Bright Start Tower, Dubai

fabrication, Site Assembly and Erection of Roof feature and Side frames.

Bright Start Holdings, Dubai Contracting Company l.l.C 500

2005 Dubai Mall, Dubai

Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

AlICO ltd 13,000

2005 Burj Dubai - link Beams, Dubai

Engineering, Supply Material, fabrication and Erection of link Beams

Samsung / Besix / Arabtec jv 1,500

2005 Canon factory, Singapore

Supply and lay TPO membrance Integrated Systems.

Shimizu Corporation 34,000 m²

2005Teluk Salut 180 MW Combined Cycle Power Plant, Malaysia

Engineering, fabrication and Erection of Steel Structure, Boiler Casings, Ducts and Stacks

Mitsubishi Corporation - Mitsubishi Heavy Industries Consortium

1,050

2005 Tecom Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

Belhasa 55

2005 Chelsea Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works

Dubai Contracting Company l.l.C 140

2005 Sport City Tower, Qatar Engineering, Supply Material, fabrication and Erection of Secondary Steel Works

Besix Midmac jv 400

2005 Salalah Amphitheater, Oman

Site Assembly and Erection of Cantilever Stadium Roof Structure

Gharbia Enterprises/IHGT 550

Page 108: Eversendai Corporate Brochure

108

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2005 Qatar Airways Hangar, Qatar

Site Assembly and Erectionof Structural Steel Works Stamsteel/Strarch 1,650

2005 Qatar Science & Technology Park, Qatar

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Qatar Petroleum /Qatar foundation 13,000

2005 Marina Heights Tower, Dubai Marina, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Roof feature Structural Steel

Dutco Balfour Beatty l.l.C. 80

2005 Rose Rotana Tower, Dubai

Structural Design, Engineering, Supply Material, fabricaition, Site Assembly and Erection of Structural Steel Works and Metal Deck

Arabian Construction Company 6,500

2005 Dubai festival City, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Al futtiam Carillion 6,200

2005 MAG 214, jumerah lake Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Trans Emirates Contracting 200

2006

jimah 2 X 700MW, Coal fired Power Plant - Boiler Erection Package, Malaysia

Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works

ISHI Power Sdn Bhd / IHI Corporation 38,000

2006

jimah 2 X 700MW, Coal fired Power Plant - ESP & fGD Erection Package, Malaysia

Erection of Structural Steel and Mechanical - fuel Gas Desulphurization Equipment, Electrostatic Precipitator, Ducting, Piping & Painting Works

ALSTOM Power Asia Pacific Sdn Bhd / Alstom K.K, japan 6,000

2006 The Index Building, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

nasa Multiplex llC 6,000

2006 Almas Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Taisei Corporation/ACC jv 3,500

Page 109: Eversendai Corporate Brochure

109

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2006

new Doha International Airport (Phase 1) - Main Terminal Building, Qatar

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Taisei Corporation/TAv jv 25,000

2006 Tornado Tower, Qatar

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Midmac - Six Construct jv 4,250

2006 Burj Al Salam Car Park, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Dubai Contracting Company llC 1,800

2007Shin Eversendai Engineering Office, Rawang, Malaysia

Design and overall construction of a single storey Warehouse with a 2 storey Office, Canteen, TNB Sub-Station and Suction Tank

Shin Eversendai Engineering (M) Sdn Bhd 456

2007 Motor City, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

nasa Multiplex llC 3,500

2007 Burj Khalifa (Spire), Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Samsung/Besix/Arabtec jv 4,000

2007 Al Shams Sky Tower, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Arabian Construction Company 7,750

2007 Princess Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Arabian Construction Company 2,500

2007 united Tiara Towers, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Arabian Construction llC 9,200

2007Anantara Palm jumeirah & Tiara Residences, Dubai

Structural Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Arabian Construction llC 1,000

Page 110: Eversendai Corporate Brochure

110

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2007 Capital Gate Building, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Al Habtoor Engineering 13,320

2007 Dubai Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Al Habtoor/Al jaber jv 12,500

2007 Al Salam TECOM Tower, Dubai

Erection of Structural Steel Works DCC, Ws Atkins 100

2008new Doha International Airport (Phase II), Qatar

Site Asembly and Erection Structual Steel Works Taisei /TAv, Bechtel 21,110

2008 Tamouh Site Office, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

zelan Holdings Sdn Bhd 420

2008 Burj Khalifa - Annex Building, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works and Metal Decking

Samsung/Besix/Arabtec jv 850

2008Dubai Mall Hotel & Health Club Roof, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Emaar Properties PjSC 125

2008

new Doha International Airport, Extension Works (Phase I Expansion), Qatar

Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works

Taisei /TAv, Bechtel 19,500

2008 Emirates Park Tower Hotel, Dubai

Reinforced Concrete Structural Works for Twin 80 storey tower, Blind Concrete Works, form Works, Concreting, Block and allCivil Works

nasa Multiplex llC

2008

Khalifa Central Market and Tower Development, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking, Erection and Intumescent Fireproofing Works

Arabian Construction Company 3,340

2008Cabot Material Research upgrading Project, Malaysia

Piping and Mechanical Installation Construction Works

CMR Sdn Bhd -

Page 111: Eversendai Corporate Brochure

111

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2008new Doha International Airport, CP10 AGl Substation, Qatar

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Transportation and Erection of Structural Steel

Sinohydro-Gamuda-WCT (SGW) jv 200

2008 Al Rafi Car Park, Dubai

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking, Erection of Steel Structure

Dubai Contracting Company l.l.C 1,827

2009 Cinema upper Roof - Dubai Mall, Dubai

Connection Design, Engineering, Supply Material, fabrication, Site Assembly, Erection of Steel Works and Fireproofing

Emaar Properties PjSC 800

2009 Saadiyat Island, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Site Assembly amdErection of Steel Works

Al jaber legt Engineering & Contracting (AlEC) llC 1,400

2009

Convention Centre Extension and link Bridge to QSTP - Education City, Qatar

Civil Works - foundation Works, Connection Design, Supply Material, Engineering, fabrication, Site Assembly and Erection of Structural Steel Works

Qatar Petroleum/Qatar foundation 15,000

2009Arzanah Development - Rihan Heights, Abu Dhabi

Structural Design, Engineering, Supply Material, fabrication, Erection and Dismantling of Temporary Steel Platform Support for Transfer Beam Construction

Silver Coast - Sunway jv 1,183

2009

uAE university new Campus PPP Development - Al Ain, Abu Dhabi

Engineering, Supply Material, fabrication and Erection of Secondary Steel Works

OGER Abu Dhabi llC 400

20092x600 MW north Chennai Power Station, India

Engineering, fabrication & Erection of Structural Steel works for Turbine Building, Coal Bunker, Mill Bay Structure, Pipe Rack and Aux Buildings

Bharat Heavy Electricals ltd (BHEl) 16,690

2009Chhatrapati Shivaji International Airport - South West Pier, India

Connection Design, Engineering, Supply Material, fabrication, Erection and fire proofing Works

larsen & Toubro 450

Page 112: Eversendai Corporate Brochure

112

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2009 Gate District Towers, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure including special strand jacking lifting techniques and Fire proofing Works

Arabian Construction Company 6,770

2009 Pentominium Tower, Dubai

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Erection of Steel Structure

Arabian Construction Company 2,616

2009Al nasser Headquarters, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation, Painting, Metal Decking, Erection of Steel Structure and Intumescent Fireproofing Worksescent Fireproofing Works

Al Rostamin Pegel llC 3,450

2009 Dubai Pearl Phase 1 Civil Works, Dubai

All Structural Concrete Work, formwork, Reinforcement Work, Block Work and Skeleton Civil Work

Al-Habtoor - leighton jv RCC Works

2009 The OPuS, Dubai Civil - Insitu Structural frameworks (Concrete)

Brookfield Multiplex Construction

2009

Central Market Redevelopment - Khalifa Podium, Abu Dhabi

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation, Painting, Metal Decking and Erection of Steel Structure

Arabian Construction Company 1,320

20092x500 MW nTPl Tuticorn Thermal Power, India

Erection, Painting, Testing and Commissioning of Boiler Structures, Pressure Parts, no-pressure parts and Rotating Equipments

Bharat Heavy Electricals ltd (BHEl) 18,031

2009 Burj Khalifa - Gate House, Dubai

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting and Erection of Steel Structure

Samsung/Besix/Arabtec jv 65

2009Mumbai International Airport - South West Pier, India

Engineering, Material Supply, fabrication, Surface Preparation and Painting, Transportation and Erection of Structural Steel

larsen & Toubro 3,410

2010nKOM- nakilat-Keppel Offshore & Marine, Qatar

fabrication and Assembly of Dry Dock structures

Qatar Gas Transport Company 346

Page 113: Eversendai Corporate Brochure

113

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2009Stacker Reclaimer B Restoration Work, Malaysia

Dismantling and Refurbishment of Stacker Reclaimer, Mechanical and Electrical Equipment and Instrumentation Work

jimah Energy venture Sdn Bhd 195

2010 Emiri Terminal - Steel Roof Structure, Qatar

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting Works

Al fasi Construction Singapore (ACS) 180

2010 north Central Plant - Education City, Qatar

Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Site Assembly and Erection of Steel Structure

Gulf Contracting Company Wll 620

2010 Algeria Oman fertilizer Plant, Algeria

Engineering, fabrication, Surface Preparation & Paintingand Export of Steel Structures of fOB basis

Shapoorji Pallonji Mideast llC 3,477

2010yas Island Development - Signage Canopies, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure

Thomas Bennett Signs llC 98

2010 Etihad Tower - Roof, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure

Arabian Construction Company 115

2010 Capital Gate Building - Helipad, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure

Al Habtoor Engineering Company llC 140

2010Sowwah Square - Tower Canopies, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure

OGER Abu Dhabi llC 120

2010

Sowwah Square - north and South Carpark lobbies (Glass Boxes), Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure

OGER Abu Dhabi llC 625

2010 Emirates Park Tower Hotel - Podium, Dubai

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Erection of Steel Structure and Cemetitious Fireproofing Works

Brookfield Multiplex Construction 725

Page 114: Eversendai Corporate Brochure

114

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2010new Doha International Airport - Central utility Plants, Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure

CAT International Qatar Wll 1,526

2010PKT logistics Warehouse & Office, Malaysia

Design and overall construction of a single storey Warehouse with a 2 storey Office, TNB Sub-Station, Guard House for PKT logistics (35,000 m2)

Shin Eversendai Engineering (M) Sdn Bhd 1,200

2010 Cleveland Clinic, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Metal Decking, Erection of Steel Structure and Cememtitious Fireproofing

Samsung/Sixco jv 30,150

2010Capital Market Authority Tower, Saudi Arabia

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Metal Decking, Erection and Fireproofing Works

Saudi Bin laden Group 25,500

2010

new Doha International Airport - north node, Concourse C & D - Phase 3 CP 51, Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel

Midmac - Sixco jv 35,000

2010

King Abdullah Petroleum Studies and Research Centre, Saudi Arabia

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel Strucutre

Saudi Arabian Oil Company 14,000

2010Doha Convention Center and Tower, Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel Strucutre

Six Construct/Midmac jv 12,094

2010 Trump Tower, India Construction of Substructure and Superstructure Core and Shell Works

Rohan lifescapes 4,275

2010 Marathon futurex, India

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Transportation and Erection of floor Beams and Plate Sections for Composite Slab

Marathon Realty Pvt ltd 1,440

Page 115: Eversendai Corporate Brochure

115

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2010 BWE 2x487 TPH Boiler Structure, India

Engineering, Material Supply, fabrication, Surface Preparation and Painting of Boiler Steel Structure and Accessories, Gratings and Handrail Works and Delivery on Ex-works basis

BWE Energy India Pvt ltd 3,370

20102x500 MW nTPl Tuticorn Thermal Power, India

Erection, Testing and Commissioning of Electrostatic Precipitator and Auxiliaries

Bharat Heavy Electricals ltd (BHEl) 17,971

20102x300 MW EMCO Thermal Power Plant, India

Erection, Testing and Commissioning of Boiler, Turbine, Generator and Auxiliries including Electrical, Commercial and Industrial Works

GMR Energy limited 41,988

20102x660 MW Bhavanapadu Thermal Power , India

Erection, Testing and Commissioning of Boiler, Turbine, Generator and Auxiliries including Commercial and Industrial Works

Abir Infrastructure Pvt ltd 68,761

2010

Office Towers for Bank Kerjasama Rakyat Malaysia Berhad, Malaysia

Spply fabrication, Painting, Fireproofing and Erection of Structural Steel

Kasugi Prima Bhd 505

2010

Academy Training Complex & Tactical Training Building, Police Training Center (Pulaupol) Kl, Malaysia

Steel structure, roof covering and box gutter work

Bina Puri Construction Sdn Bhd 300

2010new Doha International Airport Retrofitting Work, Doha, Qatar

Installation of strengthen plates SKy ORyX jOInT vEnTuRE Manpower

supply

2010 Khatau Mills, India

G+ 2 floors Carrying out Structural Steel wok for Marketing Office at Khatau Mill, Byculla

Swayam Realtors & Traders ltd 199

2010 Tamkeen Tower, Riyadh, Saudi Arabia

Supervision of Structural Steel works installation(only)

Al Rajhi Projects & Construction llC

2010upgrading Al Salam Street & Abu Dhabi City Ring Road, Abu Dhabi

Installation of formwork, Reinforcement, Scaffolding and Pouring of Concrete works

Samsung

2011 Dubai Pearl, Dubai

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre

Al habtoor leighton Group 361

Page 116: Eversendai Corporate Brochure

116

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2011MASDAR Institute for Science & Technology, Abu Dhabi

Basic Designing including Connections, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Galvanization, Metal Decking, Erection and Intumescent Fireproofing Works

Arabian Construction Company 1,580

2011 Etihad Towers - South façade, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Structure

Arabian Construction Company 87

2011Etihad Towers - Seafood floating Restaurant, Abu Dhabi

Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Strucutre

Arabian Construction Company 255

2011 Etihad Tower - Roof features, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Strucutre

Arabian Construction Company 145

2011 SAMBA Headquarters, Saudi Arabia

Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection and Fireproofing Works

El Seif Engineering Contracting Company ltd 834

2011 new KlIA 2 Airport Terminal, Malaysia

Design, Supply and Installation of Structural Steel Works for Satellite Building, Sky Bridge and Contact Piers

Bina Puri Sdn Bhd 5,000

2011 Sabah Oil & Gas Terminal, Malaysia

Supply, fabrication, Surface Preparation, Painting and Delivery of Steel Structure

Samsung Engineering Malaysia Sdn Bhd 5,000

2011Maldives Airport Terminal Improvement, Maldives

Supply and Delivery of Pre-fabricated Structural Steel Works

GADl (Isle of Man) ltd (GMR Group) 25

2011

Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Boiler Package, Malaysia

fabrication & Erection of Structural Steel Works of Turbine Building and Installation of Pressure and non Pressure Parts, Coal Bunker, Mill Bay Structure, Piping and Auxiliaries

Alstom Services Sdn Bhd 32,600

2011

Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Ducting, Malaysia

Supply of Ducts Alstom Services Sdn Bhd 1,370

2011

Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Steam Turbine Hall, Malaysia

Construction and completion of Structural Steel for Steam Turbine Hall including Shop Drawings, Procurement, fabrication, Delivery and Erection

Mudajaya Corporation Bhd 3,150

Page 117: Eversendai Corporate Brochure

117

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2011

“Erhama Bin jaber Al jalahma Shipyard - Production Support facility Building.Phase-5 .Port of Ras laffan,Qatar

Design, Connection Design, Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works, fire Proff, Roof/ Wall Cladding Works

Gulf Contracting Company Wll 230

2011 MIAl HangarEngineering, fabrication, Site Assembly and Erection of Structural Steel Work

larsen & Toubro 860

2011 four Seasons

G+3 floors, Structural Steel Works, Concreting Works, Civil finishes Works and Miscellaneous Works

Magus Estates & Hotels Private limited 320

2011

MIAl Subcontract #T2/2-G, fixed link Bridge Structural Steel Works

Engineering, fabrication, Site Assembly and Erection of Structural Steel Works for 12 nos flB’s

larsen & Toubro 2,272

2011The Regent Emirates Pearl Hotel, Plot 5, Abu Dhabi

Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Erection of Misc Steel Structures

Arabian Construction Company 212

2011 Dubai Mixed use Tower, Dubai

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Misc Steel Structure for Podium, Carpark, Pool and link bridges from Carpark to Towers

Arabian Construction Company 495

2011 City of lights, Reem Island, Abu Dhabi

Detailed design, Material Supply, fabrication and installation of Embeds, Base Plate, Anchor Bolt and Shear Studs

Brookfield Multiplex Construction 5

2011 Stand Point Tower, Dubai

Installation of formwork, Reinforcement, Scaffolding and Pouring of Concrete of works

Besix - Arabtec jv

2012

Tanjung Bin 4- 1 x 1,000 MW Coal fired Power Plant - Engineering, Constrution & Procurement (EPC), Malaysia

fabrication & Erection of Steel Structure and Installation of Boiler Pressure and non-Pressure Parts including Auxiliary Equipment and Piping and related services as Part of an EPC Consortium Partner

Tanjung Bin Energy Issuer Bhd 54,491

Page 118: Eversendai Corporate Brochure

118

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2011

“EPIC for Building Superstructures (Phase 4A) Erhama Bin jaber Al jalahma Shipyard - Energy Center, Work Shop/Painting Shop facility and Super yacth Hall.Port of Ras laffan, Qatar

Design, Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre including Fire Proofing. Design and Construction of Mega Sliding Door of size 33.92m width and 45m height. Supply and Installation of double skin & Single Skin Roofing System 76,325Sq.mtrs

Qatar Petroleum 8,000

2012 Qatar faculty of Islamic Studies, Malaysia

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Erection of Steel Strucutre

CCC and Teyseer Contracting Co Wll j.v 3,627

2012 Worli Mixed use Development, India

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre

Samsung C&T Pte limited 3,150

2012Salalah Airport Expansion Project, Oman

Erection of Structural Steel, Alignment, Bolting and Welding Works

larsen & Toubro limited 4,257

2012 yas Mall, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre

Six Construct Co. ltd 6,005

2012 ADnOC Headquarters, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure

Six Construct Co. ltd 4,507

2012MASDAR Headquarters, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure

Brookfield Multiplex Construction 3,588

2012 ADnOC Headquarters Roof, Abu Dhabi

fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel

Six Construct Co. ltd 1,600

2012 Qatar foundation Headquarters, Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre

Midmac Contracting Company W.l.l. 2,414

Page 119: Eversendai Corporate Brochure

119

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2012national Museum of Qatar (Package 1),Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Structure

Hyundai Engineering & Construction Co., ltd 26,500

2012 national Museum of Qatar, Qatar

Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Structure

Hyundai Engineering & Construction Co., ltd

2012

King Abdulaziz International Airport Railway Station, Saudi Arabia

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure

Saudi Bin laden Group 12,085

2012

Tokuyama Malaysia Polycrystalline Silicon Project (TMP2), Malaysia

fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel

Taisei Corporation 4362

2012Iron Ore Distribution Project, Manjung, Malaysa

fabrication & Supply vale Malaysia Minerals Sdn Bhd 5300

2012 MfAR Developers Pvt ltd, India

Structural Steel work - Shop drawing, Material Supply, fabrication.a) Supply of Shear Plates for Piles - 25 mmb) Supply of Shear Studs - 20

mm dia X 125 mm length

MfAR Holdings Private limited 52

2012Al jalila Children’s Specialty Hospital, Dubai

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Galvanizing and Erection of Steel Structure

Al futtaim Carillion 4,639

2012 Abu Dhabi International Airport, Abu Dhabi

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure

TCA joint venture 24,832

2012 Crescent City Project, Baku, Azerbaijan

Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure

Gilan Holding llC 6,252

2012 Al Safooh Transit System (TRAM), Dubai

Installation of formwork, Reinforcement, Scaffolding and Pouring of Concrete works for the stations

Besix

Page 120: Eversendai Corporate Brochure

120

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2012 Masdar Head Quarters, Abu Dhabi

fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel

Multiplex 2,623

2013 Petronas lnG Train 9, Malaysia

Shop fabrication of Steel Structure jGC (Malaysia) Sdn Bhd 2,245

2013 Doha land, Phase 1C, Qatar

Connection Design, Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works, Metal Deck and fire Proof

Brookfield Multiplex Construction 650

2013

Doha Convention Center and Tower- Temporary Platform for Piling Works, Qatar

Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works & Dismantling

Six Construct/Midmac jv 772

2013 lusail Multipurpose Hall Package 02, Qatar

Connection Design, Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works, Metal Deck and fire Proof

Consolidated Contractors Group S.A.l(offshore)(CCC)/Teyseer Contracting company W.l.l

820

2013

Qatar foundation Research & Development Complex, Qatar

Design, Connection Design, Supply, fabrication, Painting, Delivery, Erection Of Structural Steel Works, Metal Deck And fire Proof

Redco - Construction - Almana 4,050

2013 Duhail Multipurpose Sports Club, Qatar

Design, Connection Design, Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works, Metal Deck And fire Proof

Redco - Construction - Almana 2,200

2013 Mall of Qatar, Qatar

Connection Design, Supply, fabrication, Painting, Delivery, Erection of Structural Steel Works

Al Khayat Trading & Contracting 205

2013 World Crest/ Shree niwas Mill, India

Engineering, Procurement, Shop fabrication, Transport, Delivery and Erection of Mild Steel Structure Beam

lodha Group, Mumbai 121

2013 World One-King Tower, India

Structural Steel Works - Connection Design, Shop Drawings, Material Supply, Shop fabrication, Mill Scaling Removal, Delivery And Erection

lodha Group, Mumbai 914

2013 TCS Siruseri-Signature Tower, India

fabrication, Supply, Short Blasting (SA 2.5), Paiting, Transportation And Erection And Handing Over Of Structural Steel Works

larsen & Toubro 560

Page 121: Eversendai Corporate Brochure

121

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2013

Pasari-Bio Wonder Project, Kolkata-Supply & Erection, India

Design, Procurement, fabrication, Delivery And Erection Of Mild Steel Strutural Beams And Columns for Cantilever Structure

Pasari Multiprojects Pvt.ltd 480

2013

Margus Estates & Hotels - Roof top restaurant, four Seasons Hotel, Mumbai

Supply, fabrication And Erection Of Structural Steel Works AER (Roof Top Restaurant)

Magus Estates & Hotels Private limited 5

2013

GvK-MIAl - Closure of Gable End Opening & providing rolling shutter for HMD Hangar, India

Closure Of Gable End Opening And Providing Rolling Shutter for IMD Hangar

Mumbai International Airport Pvt.ltd (GvK) 11

2013

Garraf, Iraq Development facility Operation - fGCu and associated equipment for 15MW Power Plant, Iraq

Supply and Delivery of fuel Gas Conditioning unit (fGCu) and Associated Equipments

Petronas Carigali Iraq Holding, Bv

2013

Garraf, Iraq Development facility Operation - upgrade for 15MW Power Plant, Iraq

EPC of fuel Gas Conditioning unit (fGCu), Compressor Skid and fully Equipped Mini Substation

Petronas Carigali Iraq Holding, Bv 270

2013 The Binary, Abu Dhabijust in-situ, Blast Cleaning of Installed Rebars, Miscellaneous

Binary Development

2013 Tj Pearl Mansion, Qatar

Connection Design, Shop Drawing, Supply of Materials, fabrication, Blasting/Priming, Hot Dip Galvanising, Site Assembly, Erection and Decking

Midmac Contracting Company W.l.l. 3,800

2013Hub zero family Entertainment Centre, Dubai

Connection Design, fabrication Drawing, Raw Materials Supply, fabrication, Blasting, Primer And Application of Cementious/Intumescent Fireproofing, Installation of Structural Steel Works, Supply and Installation of Composite Metal Decking

Samsun C&T 2,057

2013 Atmosphere Sky Bridge, India

Connection Design, Shop Drawing, fabrication, Blasting, Painting, Erection and Decking

larsen & Toubro limited 1300

Page 122: Eversendai Corporate Brochure

122

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2014 new jet Propulsion Centre, Saudi Arabia

Design Verification, Connection Design, Shop Drawing, Supply Of Material, fabrication, Blasting And Primer, Delivery To Site And Erection Of Structural Steel Works

freyysinet Saudi Arabia 5,715

2014Kshitij, Paramanandwadi, India

Construction Of Composite Structure

Roxinal Real Estate Pvt. ltd, Mumbai 3,365

2014MIAl Phase 3 Structural Steel Works, India

Composite Columns, Material Supply, fabrication, Transportation, Erection Of Structural Steel Works

larsen & Toubro limited, Mumbai 1,135

2014 j3 Project, jamnagar,India

Supply Of fabricated And Painted Structural Steel

Reliance Industries limited, Mumbai 12,225

2014 Kingfisher Towers, Bangalore, India

Supply, fabrication, Transportation And Erection Of Structural Steel Works

larsen & Toubro limited, Chennai 1,500

2014MIAl Phase 4 Structural Steel Works, India

Material Supply, fabrication, Transportation, Erection Of Structural And Miscellaneous Steel Works

larsen & Toubro limited, Chennai 1,475

2014 Terengganu Gas Terminal, Malaysia

Supply And Installation Of Steel Structures, fabrication And Erection Of Piping And Mechanical Equipment

Petronas Carigali Sdn. Bhd.

2014 Opera House, Dubai Engineering, Detailing, fabrication And Installation Of Structural Steel Works

Consolidated Contractors Company (CCC)

3,281

2014 Hard Rock Hotel,Abu Dhabi

Connection Design, fabrication, Metal Decking, Supply, Erection Of Structural Steel Works, Painting And Fire Proofing Works

Al futtaim Carillion llC 1,600

2014King Abdullah financial District Monorail Depot Building

Saudi Oger 385

2014 Address Residences fountain views

Connection Design, Supply, fabrication, Erection Of Structural Steel Works

Arabian Construction Company 926

2014Sheikh Khalifa Bin zayed Al nahyan Masjed, Al Ain, u.A.E

Design Verification, Connection Design, fabrication, Supply, Erection And Fireproofing Works

Arabian Construction Company 2,097

2014 Dubai frame - zabeel Park, Dubai, u.A.E.

Connection Design, fabrication, Supply, Fireproofing, Erection & Strand jacking Of Structural Steel Works

Al Rostomani Pegel llC 663

2014QnM - Secondary steel(Remeasurable)

Supply, fabrication, Delivery, Installation Of Secondary Steelworks

Hyundai Engineering & Construction 412

2014Mall of Qatar - Spine Mall / luxury Plaza /Oasis

Design, Preparation Of Shop Drawings, Supply, fabrication, Delivery, Installation Of Structural Steel Along With Application Of Cementitous Fireproofing

Professional Aluminium Company 772

122

Page 123: Eversendai Corporate Brochure

123

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2014

Gabbro Terminal Expanasion (Steel + Mechnical Equipments)- (Remeasurable)

Supply And Installation Of Structural Steel And Installation Of Mechanical Systems And Miscellaneous Steel for Conveyors, Transfer Towers, Stackers And Hopper Building

Six Construct Qatar limited (Wll)

10,552

13,119

2014 KOS Arch Dismantle and Erection

Engineering, Supply, fabrication, Delivery, Installation Of Structural Steelworks

Midmac - Six Construct j.v (MSjv)

6,436

2014 Development of ISf Camp.KCT / PAC

Engineering, Design, fabrication, Supply And Erection Of Structural Steelworks

urbacon Trading and Contracting 516

2014 People Mover system

Design, Preparation Of Shop Drawings, Supply, fabrication, Delivery, Erection & Hand Over Of Structural Steel Including Metal Decking, Grating And Roof Cladding

Habtoor leighton Groupleighton Contracting (Qatar) W.l.l

903

2014 Al-Wahda Arch & visitor Centre

Connection Design, Preparation Of Shop Drawings, Supply, fabrication, Delivery, Erection, Hand Over Of Structural Steel Including Fireproofing (Only To Visitor Centre Beams) And Cable Works

Hyundai Engineering & Construction

11,236

2015Al jalilah link Bridge, Dubai, u.A.E

Connection Design, fabrication, SupplyAnd Erection Of Structural Steel Works

Arabian Construction Company

385

2015yas Mall South West Car Park, Abu Dhabi, u.A.E

Connection Design, fabrication, SupplyAnd Erection Of Structural Steel Works

Six Construct Co. ltd. 800

2015Warner Bros. Theme Park, Abu Dhabi, u.A.E.

Connection Design, fabrication, Fireproofing, Supply And Erection Of Structural Steel Works

Six Construct Co. ltd. 9,400

2015ynP yanbu Refinery Project, KSA

Connection Design, fabrication AndSupply Of Structural Steel Works CPCAjv 2,430

2015 nas Arena Multi Purpose Hall

Connection Design, fabrication, Metal Decking, Supply, Erection Of Structural Steel Works, Painting And Fire Proofing Work

Al naboodah Contracting Co. llC 3,991

2015

Dhirubai Ambani International Convention& Exhibition Centre

fabrication And Delivery To Daicec Site, Mumbai.Raw Material Supply, fabrication, Delivery To Mumbai Port On Cfr Basis

Reliance Industries limited 33,570

2015 Address Residence- Sky views

Connection Design, fabrication, Metal Decking, Supply, Erection Of Structural Steel Works, Painting And Fire Proofing Works

Arabian Construction Company

7,010

2015 Conversion Hangar, Saudi Arabia

Connection Design, fabrication, Supply, Metal Decking, Cladding, Erection & Fireproofing Of Structural Steel Works

joannou & Paraskevaidas 1,754

2015 Conversion Hangar, Saudi Arabia

Connection Design, fabrication, Supply, Metal Decking, Cladding, Erection & Fireproofing Of Structural Steel Works

joannou & Paraskevaidas 1,754

Page 124: Eversendai Corporate Brochure

124

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2015PKT logistics 12 Waves Warehouse, Malaysia

Construct And Complete:- One Single Storey Warehouse Block Including Workers Office - One Double Storey Office Block - Two Guardhouses- One Tnb Sub-Station- One Pump Room- “Bomba’ Tank- Covered Parking

Eversendai Corporation Berhad 2,100

2015 Statue of unity, India

Supply, factory fabrication, Painting, Erection, Alignment & Handling Over Of Structural Steel Works At Statue Of unity Project, Gujarat

larsen & Toubro limited

2015 Plant 7 Steel Structure Package

Turnkey Supply, fabrication, Painting, Delivery And Erection Of Plant 7 Steel Structure With 12 lines

latexx Manufacturing Sdn. Bhd.

1,200

2015 Steel Girder Works

Provide All Skilled labour, Materials, Tools, Equipment And The necessary Machineries for The Execution And Completion Of The Girder Works

Ireka Engineering and Construction Sdn Bhd

183

2015 Petronas RAPID fabrication And Supply Of Structural Steel Tecnidas Reunidas Malaysia Sdn. Bhd. 4,482

2015 RAPID Package 5 Supply fabrication and delivery for AXDB004, BXDB004, MXDB004

Toyo Engineering & Construction Sdn. Bhd.

2,016

2015 Sales Gallery @ MIG

Civil & Structural Work (Core And Shell)for The Sales Gallery

vishwaroop Estates & Developers Private limited

90

2015 Top Glove factory

Engineering Procurement Construction (Excluding M&E works) for One factory unit, Two Mezzanine floor for The Manufacture Of Quality Hand Gloves (f30) Which Includes:• Guard House• Waste Chamber

Top Quality Glove Sdn. Bhd. 650

2015 Malai Mandir Design, Connection Design, Shop Drawings, Procurement Of Structural Steel And fabrication

Delhi land & finance 11

2015 Oasis Mixed used Development

Design, fabrication, Supply, Installation, Testing, Commissioning, And Maintenance Of The Structural Steel Theme Park Roof

M/s. REDCO Construction- AlMAnA W.l.l

2015Al Wakrah Expressway - Bypas Road

Supply Of Temporary Bridge Bearings Steel Which Includes Shop Drawing, fabrication, Machining And Transportation

larsen & Toubro ltd 58

2015Doha Mixed use Development - Dome

Roof Steel Structure Design, Engineering, Preparation Of Shop Drawings, fabrication, Delivery To Site, Erection, Completion, finishing, Providing As-Buill Drawings, Testing And Commissioning, Handing Over And Remedying Of Defects

REDCO Construction Almana

7,912

Page 125: Eversendai Corporate Brochure

yEAR (awarded) PROJECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy

(tonnage)

2015Doha Mixed use Development - Columns

Design Verification, Engineering, Preparation Of Shop Drawings, fabrication, Delivery To Site, Erection, Completion, finishing, Providing As-Buill Drawings, Testing And Commissioning, Handing Over Of Structural Steel Works

REDCO Construction Almana

1,975

2015 Abraj Quartier 1 & 2 fabrication, Supply And Installation Of Structural Steel Works

Redco Construction Almana 326

2016Al Maryah Central Mixed use Development

Connection Design, Supply, fabrication, Erection Of Steel Works Including fire Proofing & Metal Decking Works

Brookfield Multiplex 5560

2016

Riyadh Metro Elevated Stations - Package 3, line 4 & 6

Connection Design, Supply, fabrication, Erection Of Steel And Fire Proofing Works fAST Consortium 8395

2016

Integrated Gas Development Expansion - Package 1

Modules factication Works - fabrication And Assembly Of Pre-Assembled units (PAu) - 02 nos. And Pre-Assembled Racks (PAR) -14 nos Which Include Supply fabrication And Erections Of Steel Structures, ladders, Platforms And Handrails, Piping And Piping Supports, Electrical Works & Instrumentation Works, Equipment Installation, Painting, Insulation, Fireproofing, Inspection, NDT, QC Reviews, Tests Such As Hydro And Pneumatic Tests, Weighing Of Modules, Pre-Commissioning Tasks And Preparation for Transport By load-Out from jetty

Tecnimont Spa

2016Integrated Gas Development Expansion - Train4

Supply, fabrication And Assembly Of One Teg Module Which Include Supply Of Bulk Materials I.E. Steel Structures, Piping And fabrication And Erections Of Primary And Secondary Steel Structures, ladders, Platforms And Handrails, Piping And Pipe Supports, Electrical Works, Instrumentation Works, Mechanical Equipment Installation, Painting, Insulation Inspection, nDT, QC Reviews, Tests Such As Hydro And Pneumatic Tests, Weighing Of Modules, Pre-Commissioning Tasks And Preparation for Transport By load-Out from jetty

Prosernat

2016Doha Mixed-use Development Theme Park

Design Verification, Fabrication, Supply, Delivery, Erection of CHS at Perimeter Mall, Steel Columns for Hotel Tower, Steel Ramp, Catwalk On Theme Park Roof And Installation Of Anchor Bolts for Tree Columns

M/s. Redco Construction - Almana

1950

125

Page 126: Eversendai Corporate Brochure

21st Century Tower, Dubai

Cargo Terminal, Malaysia

Hentian Putra, Malaysia

Pahang Matriculation College, Malaysia

Senoko Power Plant, Singapore

jKR Building, Malaysia

Thermal Energy Tank, Saudi Arabia Anantara Palm, Dubai

SAMBA financial Group Headquarters, Saudi Arabia

Stacker Reclaimer, Malaysia

Philip Morris, Philippines

Ritz Carlton, Qatar Marina Heights, Dubai

Al faisaliah, Saudi Arabia

Grosvenor House, Dubai

Sowwah Square – Tower Canopies, Dubai

Page 127: Eversendai Corporate Brochure

EVERsENDAI

MAlAySIAEVERsENDAI CORPORATION BERHAD(Registered Address)lot 19956, jalan Industri 3/6,Rawang Integrated Industrial Park,48000 Rawang,Selangor Darul Ehsan, Malaysia.Tel : +603 6091 2575fax : +603 6091 2577Email : [email protected]

(Principal Place of Business)level 5, Menara Mudajaya,12A, jalan Pju 7/3, Mutiara Damansara,47810 Petaling jaya,Selangor Darul Ehsan, Malaysia.Tel : +603 7733 3300fax : +603 7733 3351/52

EVERsENDAI OFFsHORE sDN BHD

EVERsENDAI ENERGIA sDN BHD(formerly known as ShineversendaiEngineering (M) Sdn Bhd)

EVERsENDAI CONsTRUCTIONs(M) sDN BHD

ECB PROPERTIEs sDN BHDlot 19956, jalan Industri 3/6,Rawang Integrated Industrial Park,48000 Rawang,Selangor Darul Ehsan, Malaysia.Tel : +603 6091 2575fax : +603 6091 2577Email : [email protected]

EVERsENDAI OIl & GAs (M) sDN BHDlevel 5, Menara Mudajaya,12A, jalan Pju 7/3, Mutiara Damansara,47810 Petaling jaya,Selangor Darul Ehsan, Malaysia.Tel : +603 7733 3300fax : +603 7733 3351/52Email : [email protected] [email protected]

DuBAIEVERsENDAI ENGINEERING llCEVs CONsTRUCTION llC29th floor, vision Tower,Al Khaleej Al Tejari Street 1, Business Bay,PO Box 29537, Dubai, united Arab Emirates.Tel : +971 4 453 9881fax : +971 4 453 9940Email : [email protected]

SHARjAHEVERsENDAI ENGINEERING FZEPlot no. 2E-04,05,09 & 10,P.O.Box 42531,Hamriyah free zone Establishment,Sharjah, united Arab Emirates.Tel : +971 4 267 3738fax : +971 4 267 3663Email : [email protected]

QATAREVERsENDAI ENGINEERING qATAR WllP.O. Box 35283,Street no.41, new Industrial Area,Doha, Qatar.Tel : +974 4 411 4378fax : +974 4 411 4381Email : [email protected]

AzERBAIjAnEversendai Engineering llCEmail : [email protected]

RAS Al KHAIMAHEVERsENDAI OFFsHORE RMC FZERAK Maritime City,P.O. Box 5130,Ras Al Khaimah, united Arab Emirates.Tel : +971 4 456 4815fax : +971 4 456 4833Email : [email protected]

45th floor, vision Tower,Al Khaleej Al Tejari Street 1, Business Bay, P.O Box 116654, Dubai, united Arab Emirates.Tel : +971 4 456 4815fax : +971 4 456 4833Email : [email protected]

ABu DHABIEVERsENDAI ENGINEERING llCP.O. Box 107729,Abu Dhabi, united Arab Emirates.Tel : +971 2 495 0700fax : +971 2 445 4672Email : [email protected]

KInGDOM OfSAuDI ARABIAEVERsENDAI ENGINEERING sAUDI llC P.O. Box 241763, Al-Masif Area, Al Iman Saudi Bin Aziz Bin Mohammed Road, Riyadh 11692, Kingdom of Saudi Arabia.Tel : +966 1 494 4891fax : +966 1 494 4892Email : [email protected]

InDIAEVERsENDAI CONsTRUCTION PVT lTDPlot no.1-2, The lords Block-1,5th floor, Thiru-vi-ka Industrial Estate,jawaharlal nehru Road, Ekkattuthangal,Guindy, Chennai-600 032,Tamil nadu, India.Tel : +91 44 4070 1234fax : +91 44 4070 1230 Email : [email protected]

SInGAPOREEVERsENDAI CONsTRUCTION(s) PTE lTDEVERsENDAI ENGINEERING PTE lTDEVERsENDAI TECHNICs PTE lTD 6001, Beach Road, #18-01, Golden Mile Tower, Singapore 199589.Tel : +65 6227 0335fax : +65 6227 0021Email : [email protected]

THAIlAnDEVERsENDAI s-CON ENGINEERINGCO. lTD. 140 Moo 2 T. Khuyaimee, A. Sanamchaikhed, Chacherngsao 24160 Thailand.Tel : +66 3 850 2707 Email : [email protected]

SRI lAnKAEversendai Engineering (Pvt) ltd. Email : [email protected]

Page 128: Eversendai Corporate Brochure

www.eversendai.com