Evaluation Plan for Geotargeted Efficiency ProgramsNovember 19, 2008
2
Describe draft plan– EVT/DPS collaboration (as requested)
Gather feedback from this group– Reality Check– Ideas for improvement
Purpose of this presentation
3
Evaluation Purpose
Proof of concept– What level of savings can targeted EE deliver? – How fast? How much does it cost?– Are savings delivered to constrained circuits?
How?– Through Process Evaluation– Verification of Savings Claims – Correlation of savings to the constraint in question
4
Not the Purpose!
The Evaluation will NOT determine if a particular transmission or distribution investment has been deferred or avoided– (but results can help!)
5
DPS getting help (Phew!)
Plan to hire a contractor – EEU Evaluation Budget
Contractor to help develop selected areas of evaluation
Kick off meeting where work plan is discussed
6
Evaluation Boundaries
Four Original Geotargeted Areas– Southern Loop– North Chittenden– St. Albans– Newport/Derby
18 months of program activity– June/July 2007 – December 2008
Leverage DPS ongoing evaluations
7
Five-piece evaluation framework
Target area selection, collaboration efforts Program implementation Savings verification Correlation of savings results at constraint Long term evaluation
8
Target Selection Process Eval
Goal: Increase confidence that selected areas have undergone robust review
Review and make recommendations as to – Broad process including all parties– Development of Target area proposals
DPS Contractor/Surveys/Spring 2009
9
Target Selection Process Eval
How were the original target areas chosen?
How did information barriers and time constraints affect the choices made?
What are perspectives of key parties regarding process & communication?
10
Implementation Process Eval
Goal: Reflection to help inform decisions– Program design and implementation process– How overall budgets are best utilized
DPS Contractor/Surveys/Spring 2009– Surveys of EVT/Customers & Trade Allies/etc.
11
Implementation Process Eval
What were lessons learned?– How were contract goals set and did they affect
program design?– Are there opportunities to improve effectiveness?
How did GT focus affect statewide delivery of efficiency resources?
Were lost opportunities created?
12
Savings Verification
Goal: Verify EVT GT Savings in each targeted area
Current DPS Contractor June/July 2009 Researchable questions include:
– How do GT area savings compare w/ non-GT? MWh and MW savings, cost/kWh, TRB, etc.
– Are GT interventions a ‘no regrets’ strategy?
13
System Impact Evaluation
Goal: Determine EE savings correlation to particular circuit
DPS Contractor - Analysis of Utility & Verification data– What is available?
July - October 2009
14
System Impact Evaluation
What are trends shown by substation data analysis?– Before/during/after implementation of GT services?– Compared to forecasted load growth?
Is it possible to detect GT impacts at substation level?
Were there other influences that significantly affected circuits positively or negatively?
15
Long-term evaluation questions
Not necessarily answered in the next year or by this process
What is correlation between savings at ISO peaks vs. local/VELCO peaks?
How do we verify current T&D capacity assumptions and track any deferral decisions?
What additional information is necessary to help assess effectiveness of GT programs?
Others?
16
The End
Thoughts/Ideas/Questions?
THANK YOU!
TJ Poor
Department of Public Service
802-828-0544