Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Evaluation of Operational Performance and Proposal of Improvement Schemes for Two Key Intersections in
Dhaka, BangladeshK. Tang, S. Hong, S. Tanaka, M. Kuwahara
Key words: saturation flow rate, capacity, mixed traffic
① ③
BackgroundBackground
Key words: saturation flow rate, capacity, mixed traffic
Heavy traffic congestion (①:demand>capacity) on urban roads➔ Lack of systematical land use and transportation planning ➔ Mixed traffic (②) along with undisciplined user behavior (③)➔ Inappropriate traffic operations at intersections (④)
④②
Study Sites &Study Sites &
To evaluate operational performance of key intersections in Dhaka, Bangladesh, and propose improvement schemes for them to alleviate traffic congestion on urban road network
PurposePurpose➔ Inappropriate traffic operations at intersections (④)
(=capacity bottlenecks)
CBD Ⅰ Video P d fi d kStudy Sites & Data CollectionStudy Sites &
Data CollectionTwo key intersections in Dhaka, BangladeshVideo survey time: 07:30~09:30 am, July 13th, 2009 Ⅰ
Ⅳ
Camera 1 Camera 2
Ⅰ
ⅡⅤ
ⅢⅣ
Camera 1
Camera 2
CBD
CBD
Traffic flow
851
887
7
0
1003
471
3160
34295365
0
Ⅰ: 4306
Ⅴ: 876Ⅱ: 1129
Ⅲ: 4344
(Unit: veh/h or ped/h)
Ⅳ: 1745
686
27810
840
708
2878
0
758
415
402367
404 610545
Ⅰ: 1093
Ⅱ: 1362Ⅳ: 1251
325
Sonargaon
Video files
Stop-line crossing
time
Veh. type
Direct.
Predefined keys
App. & lane
Phase switching
time
Signal Control Geometric Design
Sonargaon
Improvement Schemes
Improvement Schemes
Data reduction with a resolution of 1/10 sec.
Ⅱ
Ⅲ
Ⅳ
City CenterAccess control area:
Non-commercial & small vehicles only
237567 250505
153280
Ⅱ: 1362
Ⅲ: 938
Ⅳ: 1251
(Unit: veh/h or ped/h)Shahbag
Φ1:295s Φ2:64s
)
(Ⅰ )(Ⅰ )Current
Image-processing software used for data reduction
(George 2.1)
Sonargaonredesign signal phasingshift stop-linescompact island
Shahbagredesign signal phasing
Cycle length=413s; Total lost time=54s;
(Ⅴ)
(Ⅱ)
(Ⅲ )(Ⅳ ) (Ⅲ )
Φ1:112s Φ2:28s
Cycle length=180s; Y=3s, AR=3s; Total lost time=18s
Φ3:22s
(Ⅳ )
(Ⅰ )
(Ⅲ ) (Ⅳ )
(Ⅰ )
(Ⅲ )
(Ⅴ)
(Ⅱ)
(Ⅰ )
(Ⅲ )
plan
Proposed plan
Φ1: 64s Φ2: 56s Φ3: 54s
(Ⅳ )(Ⅱ )
(Ⅰ )
(Ⅲ )
(Ⅳ )(Ⅱ )
(Ⅰ )
(Ⅲ )
(Ⅳ )
(Ⅱ )
(Ⅰ )Current plang g p g
increase taper lengths
Performance Evaluation
Performance Evaluation
Cycle length=194s;Total lost time=20s(Ⅲ ) (Ⅲ ) (Ⅲ )
Φ1:25s Φ2:26s
Cycle length=120s; Y=3s, AR=2s; Total lost time=20s
Φ3:16s Φ4:33s
(Ⅳ )
(Ⅰ )
(Ⅱ )
(Ⅲ )
(Ⅳ )
(Ⅰ )
(Ⅱ )
(Ⅲ )
(Ⅰ )
(Ⅱ )
(Ⅲ )
(Ⅳ )
(Ⅰ )
(Ⅱ )
(Ⅲ )
(Ⅳ )Proposed plan
9400 8680
9094
8158
9258 9000
10000
te, p
cu/h
Estimated saturation flow rates under the current and proposed plans
33313431 3500
4000
Estimated capacities under the current and proposed plans
ConclusionsConclusions
SFR_1: measured SFR under the current situation (red-light-running, bus stops, etc);
SFR_2: estimated SFR under the current situation by assuming disciplined user behavior (comply with traffic signals and follow lane markings, etc);
SFR_3: estimated SFR under improvement schemes, assuming disciplined user behavior;
c_1~c_3: estimated capacities based on SFR_1~SFR_3.
5243 5172 5440
4231 4433 4401
5339
4363 4553
5896 5640 5641
4614 4834 4800
5788
4758 4995
6076
7600
5800 5770
8158
0
1000
2000
3000
4000
5000
6000
7000
8000
A 1 A 2 A 3 A 4 A 5 A 1 A 2 A 3 A 4
Est
imat
ed S
atur
atio
n (D
ischa
rge)
Flo
w R
at
2247
801
2331
2015
687
1225
1541
1214
1502
2527
874
2418 2197
749
1336
1671
1324
1648
3331
1266
3051
2771
1229
2858
2392
2845
0
500
1000
1500
2000
2500
3000
A 1 A 2 A 3 A 4 A 5 A 1 A 2 A 3 A 4
Est
imat
ed C
apac
ity, p
cu/h
ContactContact
ConclusionsConclusions
Capacity could be increased by 8.5% at Sonargaon and 9.1% at Shahbag in average, if road users completely comply with traffic rules. Capacity could be improved up to 44.1% at Sonargaon and 110.2% at Shahbag through proposed schemes.
[email protected] Tang, JSPS Postdoctoral Research Fellow Institute of Industrial Science, The University of Tokyo
[email protected] Tang, JSPS Postdoctoral Research Fellow Institute of Industrial Science, The University of Tokyo
App. 1 App. 2 App. 3 App. 4 App. 5 App. 1 App. 2 App. 3 App. 4
Sonargaon Shahbag
SFR_1 SFR_2 SFR_3
App. 1 App. 2 App. 3 App. 4 App. 5 App. 1 App. 2 App. 3 App. 4
Sonargaon Shahbag
c_1 c_2 c_3