EIH: Initial need

Process development at pilot scale: A key step to industrial innovation

• In order to reduce Europe’s dependency on imported non energetic raw materials it is necessary to promote the domestic production of these materials. Nevertheless:

• Resources accessible to European companies (from primary and secondary resources) are often low grade and/or polymetallic.

• Extractive industry is under pressure to enhance its environmental standards because of high social expectation in Europe.

-> Thus innovative extractive processes are needed.

•Hydrometallurgy is one of the technology families that will help facing these challenges. Academic research groups able to conceive innovative processes and companies willing to implement them exist in Europe. But the link between academia and industry, a generalist and holistic piloting platform is still missing.

TRL 1 2 3 4 5 6 7 8 9

0,1 l/h0,1 l/hLab scaletests 1 l/h1 l/h

unit operation

maturation

•Recycling•10 l/h•100 l/h•Mines

•Recycling•10 l/h•100 l/h•Mines

Developpment pilot

•100 l/h•10 000 l/h

•100 l/h•10 000 l/h

Demonstration pilot

•1 000 l/h•1 000 000 l/h

•1 000 l/h•1 000 000 l/h

Industrialplant

Death valley

Page 3: European Hydrometallurgical Institute: A progress report

EIH: Previous steps

| PAGE 3

•Octobre: CEA starts instructing the question•March: Initial idea presented by industrial actors

•Decembre: 1st Market study•June: First internal document describing the EHI

•July: CEA takes the lead on the EHI project•June: Second internal report describing a potential design of the EHI

•Septembre: Preliminary design of phase 1 of the EHIr•August: 1èst version of the business model•July: Languedoc-Roussillon Region commits to financing part of phase one.•June: 2nd Market study•Aprile: EIP-RM Labelisation•January: 1ère EHI consortium meeting

2014

2013

2012

2011

Page 4: European Hydrometallurgical Institute: A progress report

Flow sheet proposal

Test at lab scale

Pilot scale testing

Industrial scalevalidation

EIH: The main service offer

Customer

European Institute for Hydrometallurgy

Value proposition

Value creation

Needsexpression

Needs assesment

MaturedInnovativeProcesses

Academicpartners

A holistic service provider for trouble shooting in extractive metallurgy

Innovation need

Matured technos

Page 5: European Hydrometallurgical Institute: A progress report

Piloting platforms:

Conceived to maximisetesting efficiency

Must offer a large range of technologies

A private company:

Translates the clients needsConceives the flow sheetsIdentifies the technological bottlenecksUndertakes the piloting tests

A strong network:

Takes charge of the EHI innovation needsSuggests innovative techniquesActs as a prescriber for EHI

EIH: The needs

| PAGE 5

A tool A service provider Partners

Page 6: European Hydrometallurgical Institute: A progress report

| PAGE 6

Plateforme Bas débit

Mise en service S1 2016

Surface au sol 1000 m²

Surface plancher 2000 m²

Effectif total direct 30

Investissement 8,5M€

EIH : The Tool

Technology platforms

Page 7: European Hydrometallurgical Institute: A progress report

| PAGE 7

EIH : The Tool

Technology platforms

Page 8: European Hydrometallurgical Institute: A progress report

Clients

EIH: The service provider

Ressourcesprimaires

Ressources secondaires

Acteurs du service environnemental

Universités et organismes de recherche

| PAGE 8

Primary resourcesPrimary

resourcesSecondary resourcesSecondary resources

Environmental services

Environmental services

Research InstitutionsResearch

Institutions

Page 9: European Hydrometallurgical Institute: A progress report

Products:

| PAGE 9

EIH: The service provider

Full development-> TRL 1 to 7Full development-> TRL 1 to 7

Pilot development-> TRL 4 to 7Pilot development-> TRL 4 to 7

Proof of concept-> TRL 2 to 4Proof of concept-> TRL 2 to 4

Practical trainingPractical training

Trouble shootingTrouble shooting

Page 10: European Hydrometallurgical Institute: A progress report

Planning

2014 2015 2016Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Network Status drafting

Service provider Structuration, BM

Fund raising

Operations in a borrowed hall

Commissionning of

hall 1

Tool Design phase 1

Construction Hall 1

1st general assembly PROMETIA

H2020 call

Creation of the company

Preliminary design hall1 Filling building permit

| PAGE 10

Page 11: European Hydrometallurgical Institute: A progress report

Expected Impacts:Strengthening EU’s raw material autonomyEnhancing the competitiveness of EU’s raw materials producers and consumersCreating new market opportunities for equipment producersLocal job creation

Partners :Industry :

Academia :

| PAGE 11

EHI : Partners & impact