EUROC perspective on the SHIFT²RAIL Master Plan Stakeholder hearing 20/06/2014 - Brussels

EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

Embed Size (px)

Citation preview

Page 1: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

EUROC perspective on the

SHIFT²RAIL Master Plan

Stakeholder hearing

20/06/2014 - Brussels

Page 2: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

2 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

SHIFT²RAIL – an unprecedented opportunity for

the European railway sector

A unprecedented investment in rail for improving the quality and cost

effectiveness of the railway system

Strengthen the attractiveness of rail to end users

Accelerate the integration of customer-led requirements and technologies as

innovative business solutions

Pave the way towards a sustainable transport system for future generations in

Europe

Reinforce European leadership in designing, constructing, operating and

maintaining the railway system

Page 3: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

Willing Innovators

3 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Page 4: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

4 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Customer first

EUROPEAN RAIL SYSTEM OF THE FUTURE

Page 5: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

5 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Developing the vision

Control, Command and Communication Infrastructure Rolling Stock Energy Supply and Consumption Railway People Information Management Security Safety

Vision

Objectives

Enablers

The system and its Operation

Page 6: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

6 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

SHIFT²RAIL Master plan – assure the system approach

An interesting set of innovation challenges …

… with no clear integration focus from a customer point of view

The business needs are not the same across the various sector

stakeholders

A fundamental role for the Rail Operating Community especially in the

cross-cutting activities

A majority of rail journeys are regional / suburban => focus more on

regional networks and “attractive low cost solutions”

OPERATIONAL SOLUTIONS

LONG-LIFE

CUSTOMER SATISFACTION

LOW COST

General remarks

Page 7: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

7 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Stations and multi modal transport services

THE crucial interface between the rail system and its end customers

Important for Railway Undertakings and Infrastructure Managers (EUROC

expertise)

The obvious point of entry to the rail system

A fundamental part of the journey experience for all European passengers

An obvious added value to complement the existing Innovation Programmes

of the Joint Undertaking => IP6

Page 8: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

8

The Joint Undertaking

IP5

SHIFT²RAIL Master plan - Stakeholders meeting - 20/06/2014

REQUIREMENTS

ATTRACTIVENESS

IP6 IP4 IP3 IP2 IP1

System view and Quality Assurance

Page 9: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

9 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Delivering innovation

Close the gap between operational needs, research &

innovation efforts and industrialisation processes

Support operational implementation of innovative solutions

Collaborative approach from the entire European rail sector

A clear and shared strategy towards the closing of “open points”

(TSIs)

Business-led solutions - let’s get on and deliver

Page 10: EUROC perspective on the SHIFT²RAIL Master Plan · EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014 2 SHIFT²RAIL – an unprecedented opportunity for the European

10 EUROC - SHIFT²RAIL Master plan - Stakeholder meeting - 20/06/2014

Thank you for your attention

More information

‒ Mark TOPAL – ÖBB ([email protected]) ‒ José Carlos CLEMENTE – REFER ([email protected] )