33
1 13/10/2011 EURIDICE Industrial results Donatella Vedovato Venice International University

EURIDICE Industrial results Donatella Vedovato Venice International University

  • Upload
    luz

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

EURIDICE Industrial results Donatella Vedovato Venice International University. Outline. Intelligent Cargo in the pilot cases ; Trials feedback ( PIs and usability ) ; Limitations ; Next steps. Design and development. Requirement definition. Validation and trials. Tasks. - PowerPoint PPT Presentation

Citation preview

Page 1: EURIDICE Industrial  results Donatella Vedovato Venice International University

1 13/10/2011

EURIDICE Industrial results

Donatella VedovatoVenice International University

Page 2: EURIDICE Industrial  results Donatella Vedovato Venice International University

Outline

Intelligent Cargo in the pilot cases;Trials feedback (PIs and usability);Limitations;Next steps

Page 3: EURIDICE Industrial  results Donatella Vedovato Venice International University

Demonstrator

Task

s

Requirement definition

Assessment

2012

Design and development

Validation and trials

The Intelligent Cargo in the pilot cases- project task plan -

Time2009 2010 20112008

Page 4: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport process

S4 Cooperative warehousing through

cargo-centric information services

S8Automated clearance and billing of transiting goods

S7 Intelligent routing through cargo-infrastructure cooperation

S6 Cargo- assisted intermodal transport

S1 Connected transport and production processes

S5 Self- returning empty pallets and boxes

S2 Active cold-chain monitoring

S3 Cargo controlling transportation in 3PL services to final customer ConsigneeConsignor

Producer/ Distributor

AuthorityOperator

Infrastructure

The Intelligent Cargo in the pilot cases- the pilots -

Page 5: EURIDICE Industrial  results Donatella Vedovato Venice International University

ConsigneeConsignor

Operator

Producer/ Distributor

Authority

Infrastructure

Tran

spor

t Pr

oces

sIn

telli

gent

Car

go

appl

icat

ion

Cargo loading

Cargo identification

Loading check Truck/wagon

status Free space

visibility

Tracking History and events Estimated Time of Arrival and

combined ETA Cargo condition monitoring Re-routing Triggering outbound asset Triggering authorization Parking reservation Security notification

Transport execution

Delivery confirmationPaymentAnti-theft

Delivery

The Intelligent Cargo in the pilot cases

Page 6: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Cargo identification

Cargo loading

Page 7: EURIDICE Industrial  results Donatella Vedovato Venice International University

Cargo loading

✔ Loading check

Page 8: EURIDICE Industrial  results Donatella Vedovato Venice International University

Cargo loading

✔ Truck/wagon status UC.02.03 Wagon proposal UC.02.03 Wagon proposal

Wagon 45Wagon 2Wagon 1

Wagon ID

Below is list for all available wagons for order <transportOrderNumber>

UnloadedUnloadedUnloaded

Wagon status

Select wagon

Page 9: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Free space visibility

Cargo loading

Page 10: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport execution

Page 11: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport execution

✔ Tracking✔ History of events and alerts

Page 12: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ ETA - Estimated Time of Arrival

Transport execution

Page 13: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport execution

✔ Cargo condition monitoring

Page 14: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport execution

✔ Re-routing

Page 15: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Triggering outbound asset

Transport execution

Page 16: EURIDICE Industrial  results Donatella Vedovato Venice International University

Transport execution

✔ Automated security notification ✔ Triggering authorization

Page 17: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Automated parking reservation

Transport execution

Page 18: EURIDICE Industrial  results Donatella Vedovato Venice International University

Delivery

✔ Delivery confirmation

Page 19: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Automated payment

Delivery

Page 20: EURIDICE Industrial  results Donatella Vedovato Venice International University

✔ Anti-theft

Delivery

Page 21: EURIDICE Industrial  results Donatella Vedovato Venice International University

Nice but…does my company have real benefits using

the IC?✔ Do I receive the information needed in a faster way with respect to the current situation?

✔ Is the information sent by the IC correct?

✔ Is there a positive impact on the customer service?

✔ Is there a positive impact on my costs?

Trials feedback- metrics*

* Results based on the first on going trials performed by some pilots

Page 22: EURIDICE Industrial  results Donatella Vedovato Venice International University

Time reduction: status change (e.g. cargo loaded, unloaded etc)

✔ Metric: Average notification time in case of status change

✔ Meaning: How long does it take to receive the information about the status change with respect to the moment when it’s verified?

✔ Formula: ATSC = Σ(TSU - TSC) / Nwhere

AT: Average Time [min]TSU: Time when status is updated [min]TSC: Time when the status changed [min]

N: Number of measurements [#]

St

atus

cha

nge

(e.g

. car

go a

rriv

ed,

load

ed

etc)

Pilot number

Time needed

without IC

Time needed with IC

Time reduction with respect to the actual

situation

Pilot 7 8 hours 8 seconds 99,97%

Pilot 3 5 hours 1 minute 99,67%

Pilot 1 More than 1 hour 5 minutes 92,75%

Page 23: EURIDICE Industrial  results Donatella Vedovato Venice International University

Time reduction: deviation from established physical conditions

✔ Metric: Average notification time in case of deviation from established conditions✔ Meaning: How long does it take to receive the information about the deviation from established condition with respect to the moment when it’s verified?✔ Formula: ATDC= Σ(TDU - TDH) / N

whereTDU is the Time when Deviation is Updated [min]TDH is Time when Deviation Happened [min] N is Number of measurements [#]

Ave

rage

not

ifica

tion

time

in

case

of d

evia

tion

from

esta

blis

hed

con

ditio

ns

Pilot number

Time needed

without IC

Time needed with IC

Time reduction with respect to the actual

situation

Pilot 3 About 6 hours 1 minute 99,72%

Pilot 2 45 minutes 5 minutes 88,89%

Pilot 5 1 hour and half 12 minutes 86,89%

Page 24: EURIDICE Industrial  results Donatella Vedovato Venice International University

Reliability of the information: cargo identification

✔ Metric: Percentage of error-free identifications✔ Meaning: What is the percentage of cargo correctly identified with respect to the shipment list?✔ Formula: PEFI= 1-(Σ NCEI/ Σ NC ATSC)

whereNCEI is Number of Cargo with Error regarding

identificationNC is total number of cargo

✔ As-Is results: 97-98% of error free identifications

✔ To Be results: close to 100% (technical/human aspects)

Page 25: EURIDICE Industrial  results Donatella Vedovato Venice International University

Reliability of the information: ETA (Estimated Time of Arrival)

✔ Metric: Percentage of correct last ETA (Estimated Time of Arrival)✔ Meaning: How many cargo arrived respect the last ETA defined?✔ Formula: PCETA= Σ NCCETA/Σ NC

whereNCCETA is Number of Cargo with Correct ETA [#]NC is Total Number of Cargo [#]

✔ As-Is results: about 90%

✔ To Be results: close to 100%

Page 26: EURIDICE Industrial  results Donatella Vedovato Venice International University

Customer service

✔ Metric: Percentage of on time deliveries✔ Meaning: How many deliveries are shipped with respect of the delivery time?✔ Formula: POTD = Σ NOPOT/ Σ NOF

whereNOPOT: Number of Orders performed on-time [#]NOF: Number of Orders Fulfilled [#]

✔ To Be results: close to 100%

✔ Metric: Percentage of correct order fulfillment✔ Meaning: How many orders are correctly fulfilled (in terms of time, type and quantity of goods)?✔ Formula: PPOF= Σ NOPF/ Σ NOF

whereNOPF is Number of Orders Correctly Fulfilled

[#], NOF is total number of orders

✔ To Be results: close to 100%

Page 27: EURIDICE Industrial  results Donatella Vedovato Venice International University

Labor cost reduction - rescheduling

✔ Metric: Labor cost✔ Meaning: How much can the company reduce the labor costs to collect the necessary information to reschedule the plan due to transport problems (information flow)?✔ Formula: LCR= HLCR*NHR

whereLCR is Labor Cost for Rescheduling [€]; NHR Number of Hours for Rescheduling [#]

✔ To Be results: close to 100%

Page 28: EURIDICE Industrial  results Donatella Vedovato Venice International University

Timely information- Cargo identification- Status change- Deviation from definedroute- Physical conditions

Reliable information:- ETA calculation;- Cargo identification

Customer ServiceImprovement:- On time deliveries- Correct deliveries

Labor cost reduction about rescheduling

Inte

llige

nt C

argo

Trials feedback- summary

Page 29: EURIDICE Industrial  results Donatella Vedovato Venice International University

Trials feedback - Usability of EURIDICE system

✔ On line questionnaire about: usability, flexibility, performance, integration/scalability and fit for purpose of EURIDICE;

✔ 24 questions: Likert scale with Weight (1-5) and Level of Satisfaction (1-5)

* Results about 4 pilots

Page 30: EURIDICE Industrial  results Donatella Vedovato Venice International University

1,00 1,50 2,00 2,50 3,00 3,50 4,00 4,50 5,00

Easiness data getting in and out

Satisfactory error prevention

Straightforward performance of task

Fast reply

Clear and understandable

Average satisfaction

Average weight

Trials feedback - Usability of EURIDICE system - the top five

Page 31: EURIDICE Industrial  results Donatella Vedovato Venice International University

Possible limitations in EURIDICE use

✔Technical: ✔ GPS connection; ✔ RFID reading (physical constraints);✔ Network connectivity;

✔ Organizational ✔ Involvement of different players along the

supply chain; ✔ Authorization to install the hardware at

certain locations (e.g. public authorities);

Page 32: EURIDICE Industrial  results Donatella Vedovato Venice International University

Next steps

Trials on going; PIs collection; Feedback collection from the trials (impact on user

activity, improvements etc)

Page 33: EURIDICE Industrial  results Donatella Vedovato Venice International University

Thank you for your attention!

For further information: [email protected]