ETAEnvironmental Health and Safety Monthly Metrics
December, 2014
ETA Accidents- 12/14
Type Date Dept. Description Severity Status
No ETA accidents reported in December
ETA Accidents- By Type
Nov '13 Dec '13 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Strain-Back/Leg NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN
Repetitive NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN
Fracture/Break NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Burn 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN
Cut/Abrasion NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN 1 NaN NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN
Other NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Burn Contusion Cut/Abrasion
Cut/Abrasion
Fracture/Break
Other
Strain-Back/LegRespiratory Repetitive
ETA Accidents- Severity
Nov
'13
Dec
'13
Jan
'14
Feb
'14
Mar
'14
Apr
'14
May
'14
Jun
'14
Jul '
14
Aug
'14
Sep
'14
Oct
'14
Nov
'14
Dec
'140
1
2
3
First Aid Recordable Lost Work
Emergency Incidents- 12/14
Date Incident Area Status
There were no ETA reported emergency incidents in December
Ergonomic Assessments- By Month
Dec '13 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14
Completed 1 4 5 9 4 3 7 6 5 3 2 4 1
Open 0 0 0 0 0 0 0 0 1 0 2 2 2
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open EETD Ergonomic Assessments
Date Requested
Dept. Type Status
12/16/14 ESDR Move Assigned
12/16/14 ESDR Preventative Assigned
11/25/14 DIV Preventative Actions Pending
11/4/14 EAEI Discomfort Actions Pending
10/29/14 EAEI Discomfort Actions Pending
10/10/14 EAEI Discomfort Actions Pending
8/26/14 EAEI Preventative Actions Pending
5
2
1
Open Assessments by Dept.
EAEIESDRDIVBTUS
ETA Job Hazard Analysis (JHA)- Pending
Nov '13 Dec '13 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14
New Hire <30 Days
4 3 2 4 14 2 1 9 2 4 10 2 0 3
New Hire >30 Days
0 0 0 1 0 2 1 0 1 0 0 0 0 0
Expired <30 Days
3 1 1 1 2 0 0 1 3 2 0 0 0 0
Expired >30 Days
0 0 0 0 0 0 0 0 0 1 0 0 0 0
1
3
5
7
9
11
13
15
17
JHA
’s D
ue
New Hire vs. Expired Metric Started Sep ‘13
Job Hazard Analysis- % Completion
Dec '13 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '1480
82
84
86
88
90
92
94
96
98
10099
99.599
97
9999.5
9899 99
98
99.5100
99.5
92 92 92
9091
9091 91
9091 91 91 91
ETA % LBNL %
%
ETA Incomplete Training Assignments
Dec '12
Jan '13
Feb '13
Mar '13
Apr '13
May '13
Jun '13 Jul
'13Aug
'13Sep
'13Oct '1
3Nov
'13Dec '
13Jan
'14Feb
'14Mar '
14Apr '
14
May '14
Jun '14 Jul
'14Aug
'14Sep
'14Oct '1
4Nov
'14Dec '
140
50
100
150
126
116
93
66
76
59
91
78
66 64
92
73
48
89 88
78
52
93
81
65
9297
69
84
75
Incomplete Assignments
* Does not include SEC0203 “External Monitoring” Notice or “FSM” courses
Training % Completion Status
Dec '13 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '1480
82
84
86
88
90
92
94
96
98
100 99.598.5 98.5
9999.5
98.599 99
98.5 98.599
98.599
9495 95 95 95 95
9495 95 95
9493 93
ETA % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 75)
Ergonomics; 19
UC COI/Ethics; 15
Fire Extinguisher; 13
Cyber Security; 8
GERT; 4
Chemical Hygiene; 3
Electrical/LOTO; 3
Haz Waste; 2
Hosting Foreign; 2
Overview of EHS; 2
PPE; 2 Other; 1 Pressure; 1
Training Assignments Due (Total = 75)
Open Assignments by Dept. Open Assignments by Hire Date
< 1 Month 2 to 6 Months > 6 Month0
10
20
30
40
50
60
11 12
52
Assignments
40
20
12
3
EAEI BTUSESDR DIV
ETA Training Assignments Due
Affiliate
Career
Limite
d
Reh Retire
Term Appt.
GSRA
Student A
sst.
Post Doc.
Facu
lty
Visit R
esearch
Contracto
r0
5
10
15
20
25
30
35
31
26
5 4 3 2 2 1 1 0 0
Assignments due by Job Type
<1 Month
1-2 Months
>2 Months
0 5 10 15 20 25
23
18
2
Renewal Training Assignments- 43 Total
Electrical Equipment Inspection Failure Status (Red Dot)
Nov '14 Dec '140
2
4
6
8
10
12
14
16
18
>180 Days Due31-180 Days Due<30 Days Due
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (1/5/15)
Equipment Date Days Failed
Dept. Area Status
Fixture Current Sensor 1/9/09 2187 BTUS 46-231 Unable to locate unit
Waveform Generator 4/7/11 1369 BTUS 46-115 Unable to locate unit
Dual Seal Vacuum Pump 4/27/11 1349 EAEI 63-101 Unable to locate unit
Aethalometer 4/28/11 1348 EAEI 63-101 Unable to locate unit
AC Line Conditioner 6/6/12 943 EAEI 70-278 Power cord needs to be replaced
Blower 6/11/12 938 EAEI 70-289 Power cord needs strain relief
Appliance Monitors 10/18/12 809 ESDR 90-1141 Units may never have been built. Request closure.
Tracer Emitter Units (Multiple) 11/20/12 776 BTUS 70-217 Units placed out of service
Particle Samplers (multiple units) 2/5/13 699 EAEI 71-106 Units placed out of service
Spark Ignition Unit 10/3/13 459 BTUS 70-173 Unable to locate unit
Residential Furnace 10/18/13 444 BTUS 70-173 Unit being used for parts
Turbine Meter Readout 10/21/13 441 BTUS 70-173 Unable to locate unit
Pressure Transducer Power Supply 10/21/13 441 BTUS 70-173 Unable to locate unit
MFC Pump 12/2/13 390 EAEI Sacto Waiting for pump to be brought back from field
Power Supply #1 11/7/14 59 EAEI 70-278 Uncovered AC terminal strip
Power Supply #2 11/7/14 59 EAEI 70-278 Power cord needs replacement
Power Supply 12/10/14 26 ESDR 70-173 Unlanded conductors, ground bond not attached
Safety Concerns Submittals- ETAJu
l '12
Aug
'12
Sep
'12
Oct
'12
Nov
'12
Dec
'12
Jan
'13
Feb
'13
Mar
'13
Apr
'13
May
'13
Jun
'13
Jul '
13A
ug '1
3S
ep '1
3O
ct '1
3N
ov '1
3D
ec '1
3Ja
n '1
4F
eb '1
4M
ar '1
4
Apr
'14
May
'14
Jun
'14
Jul '
14A
ug '1
4S
ep '1
4O
ct '1
4N
ov '1
4D
ec '1
40
1
2
3
4
5
6
7
8
9
10
Completed Open
ETA Safety Concerns Status
# Date Concern Type Status
1034 5/5/14 Surface of B90 4th floor walkway is uneven where meets exterior stairway. Trip hazard.
Building Maint.
Open- Work Request #WIM577
1180 9/23/14 Need steps from B90 shuttle stop up to sidewalk. Uneven surface.
Traffic- Ped CATS submitted for funding
1189 10/22/14 Poor lighting near B90 stairways Building Maint.
Open- Assigned to Facilities
1198 11/22/14 Trash bin located at B63 is causing damage to exterior water pipe. Also blocking access ramp.
Building Maint.
Open- Facilities needs to find a new location.
Corrective Action Reports (CATS)- 12/14
CAT # Date Description Lead Status
9675 7/29/14 Seismically secure the laser table near the 70-157 entrance. DOE assessment follow-up item.
X. Mao Facilities work request submitted for cost estimate.
9686 8/18/14 Improve Chemical Management System (CMS) input in 70-295
V. Battaglia CMS updated during recent self-assessment. Need to train proxies. Due 10/31/14.
9706 9/9/14 Ensure air changes in 70-174 meet fire code requirements
S. Synarski Facilities work request submitted. Cannot close until FWR is completed by Facilities. Due 11/28/14.
Activity Hazard Documents (AHD)- 12/14
AHD Description Status Location PI
3947 Chemical- Lithium Draft: New AHD in development for glove box
70-291 E. Cairns
3963 Chemical- Hydrogen Draft: New AHD in development for permeation device
70-143 A. Weber
3964 Chemical- Chlorine Draft: New AHD in development for 100ppm chlorine use
70-103 R. Chen
3509 Laser/X-Ray Discontinued 70-163 V. Zormpa
Audits and Inspection Status- 12/14
Type Date Lead Status
Quarterly SAA Inspections
1/15 R. Scholtz Scheduling last week of January
Management Electrical Safety Walkthrough
12/1/14B62- TBD
A. Gadgil 12/1/14 walkthroughs completed. Additional walkthroughs of B62 need to be scheduled.
Significant Safety Achievements- 12/14• Continue set-up of Work Planning and Control (WPC)
projects/activities for ESDR.• I have participated in multiple reviews of the draft LBNL Electrical
Safety Manual (ESM).• I completed a three-day NFPA 70E electrical safety training course.• The chemical container/sample clean-out of the B62 (Kerr) lab
areas continues.• Assisted with the glove box decontamination/decommissioning in
B62-246.• The December ETA Safety Committee meeting was completed.
Short Term Safety Outlook- 1/15
• Continue the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for ETA. We are focusing on completion of ESDR activities first.
• Start the Glove Box Operation Self-Assessment project.• Complete the management electrical safety walkthroughs of Building
62.• Follow-up on electrical equipment issues identified from ETA
electrical safety management walkthroughs.• Complete the quarterly SAA hazardous waste inspections.• Assist with the set-up for new lab areas 70-143, and B33 JCESR.• Continue old chemical/sample clean-outs in 62-220, 62-246, and 62-
105 chemical closet.• Continue to address issues identified by the fire marshal in ETA lab