48
1 ECS ECS www.esveld.com www.esveld.com Seminar Madrid 23-24 February 2011 HIGH SPEED RAILWAYS IN THE WORLD IN 2011 HIGH SPEED RAILWAYS IN THE WORLD IN 2011 Coenraad Esveld Coenraad Esveld Emeritus Professor of Railway Engineering TU Delft Director of Esveld Consulting Services BV Emeritus Professor of Railway Engineering TU Delft Director of Esveld Consulting Services BV

Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

1

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HIGH SPEED RAILWAYS IN THE WORLD IN 2011

HIGH SPEED RAILWAYS IN THE WORLD IN 2011

Coenraad Esveld Coenraad Esveld Emeritus Professor of Railway Engineering TU Delft

Director of Esveld Consulting Services BV Emeritus Professor of Railway Engineering TU Delft

Director of Esveld Consulting Services BV

Page 2: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

2

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

CONTENTS OF PRESENTATION CONTENTS OF PRESENTATION

History of High-Speed Rail; Essentials of HSL; Track structure solutions; Overview of HSL world wide; Short wave irregularities.

History of High-Speed Rail; Essentials of HSL; Track structure solutions; Overview of HSL world wide; Short wave irregularities.

Page 3: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

3

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HISTORY OF HIGH-SPEED TRACK HISTORY OF HIGH-SPEED TRACK

Japan opened first HSL in ballasted track in the 1960’s; Daily maintenance was enormous; In the late 1990’s, still some 5,000 men were employed each night to restore the tracks for the next day’s operation; To reduce the enormous amount of maintenance, the Japanese developed their prefabricated slab track system which was first applied on the second Shinkansen line in 1972; This J-Slab is still their standard slab track system and was recently applied on Taiwan High Speed Line.

Japan opened first HSL in ballasted track in the 1960’s; Daily maintenance was enormous; In the late 1990’s, still some 5,000 men were employed each night to restore the tracks for the next day’s operation; To reduce the enormous amount of maintenance, the Japanese developed their prefabricated slab track system which was first applied on the second Shinkansen line in 1972; This J-Slab is still their standard slab track system and was recently applied on Taiwan High Speed Line.

Page 4: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

4

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

SHINKANSEN TRACK TAIWAN SHINKANSEN TRACK TAIWAN Route length 336 km Route length 336 km

Principal J-Slab dimensions: • Length: 4.20, 4.30, 4.40, 4.80 and 4.90 m • Width: 2.20 m • Thickness: 0.19 m

Principal J-Slab dimensions: • Length: 4.20, 4.30, 4.40, 4.80 and 4.90 m • Width: 2.20 m • Thickness: 0.19 m

Page 5: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

5

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

CA Mortar CA Mortar

Page 6: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

6

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

Page 7: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

7

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HISTORY OF HIGH-SPEED TRACK HISTORY OF HIGH-SPEED TRACK

The French followed Japan in the late 1960’s early 1970’s; It was Mr. Serge Montagné who worked as trainee in Japan, early 1970’s under Dr. Watenabe and Dr. Sato; The French designed their tracks entirely in traditional ballasted track; This design has been adopted by many others, amongst others Korean High Speed Line.

The French followed Japan in the late 1960’s early 1970’s; It was Mr. Serge Montagné who worked as trainee in Japan, early 1970’s under Dr. Watenabe and Dr. Sato; The French designed their tracks entirely in traditional ballasted track; This design has been adopted by many others, amongst others Korean High Speed Line.

Page 8: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

8

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

KTX TRACK WITH MONOBLOCK SLEEPERS KTX TRACK WITH MONOBLOCK SLEEPERS

Seoul – Pusan 412 km double track Seoul – Pusan 412 km double track

Page 9: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

9

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

NABLA SNCF NABLA SNCF

Page 10: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

10

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

KTX ELEVATED TRACK KTX ELEVATED TRACK

Seoul – Pusan 412 km double track Seoul – Pusan 412 km double track

Page 11: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

11

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

Page 12: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

12

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HISTORY OF HIGH-SPEED TRACK HISTORY OF HIGH-SPEED TRACK

In Germany the so-called Rheda system was developed, finally resulting in the Rheda 2000 system; More or less standard for Europe, but also applied outside Europe. This system was also applied in The Netherlands.

In Germany the so-called Rheda system was developed, finally resulting in the Rheda 2000 system; More or less standard for Europe, but also applied outside Europe. This system was also applied in The Netherlands.

Page 13: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

13

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

RHEDA CLASSIC RHEDA CLASSIC

Page 14: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

14

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

RHEDA 2000 SLAB TRACK RHEDA 2000 SLAB TRACK

Page 15: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

15

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HISTORY OF HIGH-SPEED TRACK HISTORY OF HIGH-SPEED TRACK

Page 16: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

16

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

TRANSRAPID SHANGHAI TRANSRAPID SHANGHAI

Operating speed 430 km/h, route length 30 km

Page 17: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

17

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

Characteristic TRANSRAPID ICE 3 TGV-A

Speed max. 500 km/h 330 km/h 300 km/h

Mass / seat 0.6 t 1.1 t 1.0 t

Acceleration time 0-200 km/h 82 s 150 s 170 s

0-300 km/h 120 s 335 s 345 s

0-400 km/h 165 s

0-500 km/h 225 s

Acceleration distance 0-200 km/h 2,200 m 5,000 m

0-300 km/h 4,900 m 18,900 m 18,500 m

0-400 km/h 9,300 m

0-500 km/h 17,000 m

Characteristic TRANSRAPID ICE 3 TGV-A

Speed max. 500 km/h 330 km/h 300 km/h

Mass / seat 0.6 t 1.1 t 1.0 t

Acceleration time 0-200 km/h 82 s 150 s 170 s

0-300 km/h 120 s 335 s 345 s

0-400 km/h 165 s

0-500 km/h 225 s

Acceleration distance 0-200 km/h 2,200 m 5,000 m

0-300 km/h 4,900 m 18,900 m 18,500 m

0-400 km/h 9,300 m

0-500 km/h 17,000 m

Page 18: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

18

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

Country In operation Under construction Total Country [km]

China 4,326 6,696 10,025

Spain 1,525 2,219 3,744

Japan 1,906 590 2,496

France 1,872 234 2,106

Germany 1,032 378 1,410

Italy 923 92 1,015

Turkey 235 510 745

South Korea 330 82 412

Taiwan 345 0 345

Belgium 209 0 209

The Netherlands 120 0 120

United Kingdom 113 0 113

Switzerland 35 72 107

HIGH-SPEED LINES V > 250 KM/H, BASED ON UIC FIGURES

Page 19: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

19

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

ESSENTIALS OF HIGH-SPEED SYSTEMS ESSENTIALS OF HIGH-SPEED SYSTEMS Vehicle track interaction to be considered as one dynamic system; Low unsprung mass; Strong limitations in geometrical deviation of wheel and rail; Low conicity; Critical train speed; Switch design with emphasis on dynamics, safety and availability; Pressure waves in tunnels; Furthermore: aerodynamics, noise and vibration, dynamics of the catenery, power supply, signalling; RAMS is a key factor!

Vehicle track interaction to be considered as one dynamic system; Low unsprung mass; Strong limitations in geometrical deviation of wheel and rail; Low conicity; Critical train speed; Switch design with emphasis on dynamics, safety and availability; Pressure waves in tunnels; Furthermore: aerodynamics, noise and vibration, dynamics of the catenery, power supply, signalling; RAMS is a key factor!

Page 20: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

20

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

UNSPRUNG MASS UNSPRUNG MASS

For the sum of the quasi-static and low frequency Q-force a standard of 170 kN is applied; For the sum of the quasi-static and low frequency Q-force a standard of 170 kN is applied;

Page 21: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

21

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

EQUIVALENT CONICITY EQUIVALENT CONICITY

For a stable running performance of high-speed trains the equivalent conicity is a prime factor; SNCF starts with a very low conicity of 0.025, increases till approximately 0.10, with exceptional values of 0.13; DB starts much higher in the order of 0.10, associated with the philosophy of worn wheel profiles. Maximum value 0.15.

For a stable running performance of high-speed trains the equivalent conicity is a prime factor; SNCF starts with a very low conicity of 0.025, increases till approximately 0.10, with exceptional values of 0.13; DB starts much higher in the order of 0.10, associated with the philosophy of worn wheel profiles. Maximum value 0.15.

Page 22: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

22

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

TRACK LOADSTRACK LOADS • Wavelength λ• Frequency f• Wavelength λ• Frequency f

λ =vf

λ =vf

λ[m]λ[m]Wav

eleng

th

Wav

eleng

th

Rollin

g de

fect

s

Rollin

g de

fect

s

Balla

st

and

Form

ation

Balla

st

and

Form

ation

Welds

Welds

Hertzian spring

Hertzian springW

heels

Wheels

BogieBogie

Sprung mass

Sprung mass

1000-100 Hz

1000-100 Hz

100-20 Hz

100-20 Hz

20-5 Hz

20-5 Hz

5-0.7 Hz

5-0.7 Hz

0.30.3 33 1010 120

120

ForcesForces Passenger comfortPassenger comfort

Page 23: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

23

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

SHORT-WAVE IRREGULARITIES SHORT-WAVE IRREGULARITIES Sort-wave irregularities most aggressive and essential to limit; Most important to limit to 1 : 1000 to reduce impact force; Sort-wave irregularities most aggressive and essential to limit; Most important to limit to 1 : 1000 to reduce impact force;

Inclination: High-Speed < 1.0 mrad

2dynF = C v Inclination* *

Page 24: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

24

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

ANALYSES FOR HIGH-SPEED TRACK ANALYSES FOR HIGH-SPEED TRACK Longitudinal forces, especially at long bridges; Static design; Dynamics:

Wave propagation in soft soils; Long wave vehicle track interaction; Short wave wheel rail interaction;

Longitudinal forces, especially at long bridges; Static design; Dynamics:

Wave propagation in soft soils; Long wave vehicle track interaction; Short wave wheel rail interaction;

Page 25: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

25

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

CRITICAL TRAIN SPEED CRITICAL TRAIN SPEED

On soft soils propagation of Rayleigh waves is a major issue On soft soils propagation of Rayleigh waves is a major issue

ρGCC TR =≈ρGCC TR =≈

Page 26: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

26

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

MEASUREMENTS IN ENGLAND ON SOFT SOILS MEASUREMENTS IN ENGLAND ON SOFT SOILS

-14 -14

-13 -13

-12 -12

-11 -11

-10 -10

-9 -9

-8 -8

-7 -7

-6 -6

-5 -5

120 120 150 150 180 180 210 210 240 240

Running speed [km/h] Running speed [km/h]

Vert

ical

dis

plac

emen

t [m

m]

Vert

ical

dis

plac

emen

t [m

m]

High speed train High speed train IC train IC train

Critical train speed Critical train speed

225 225

Page 27: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

27

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

TRACK TOLERANCES

TRACK TOLERANCES

Page 28: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

28

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

BALLASTLESS TRACK BALLASTLESS TRACK

Reduced height; No flying ballast particles; High lateral resistance; Low maintenance, hence higher availability; Increased service life.

Reduced height; No flying ballast particles; High lateral resistance; Low maintenance, hence higher availability; Increased service life.

Pro Pro

Contra Contra

Investment costs. Investment costs.

Page 29: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

29

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

RH

EDA

200

0 SL

AB

TR

AC

K

RH

EDA

200

0 SL

AB

TR

AC

K

Pad stiffness < 35 kN/mm Pad stiffness < 35 kN/mm

Page 30: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

30

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

BÖGEL PREFAB SLAB TRACK BÖGEL PREFAB SLAB TRACK

Page 31: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

31

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

GEL

PR

EFA

B S

LAB

B

ÖG

EL P

REF

AB

SLA

B

Page 32: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

32

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

SLAB TRACK DESIGN SLAB TRACK DESIGN GERMAN SCHOOL

Slab: reinforcement just in neutral axis for crack control Foundation: high quality Ev2= 120 N/mm2

GERMAN SCHOOL Slab: reinforcement just in neutral axis for crack control Foundation: high quality Ev2= 120 N/mm2

Rheda 2000: Optimal on engineering structures, not on subgrade Rheda 2000: Optimal on engineering structures, not on subgrade

ON SUBGRADE Slab: bending reinforcement (total ~ 1.5 % for B35) Foundation: medium quality Ev2= 40 - 60 N/mm2

ON SUBGRADE Slab: bending reinforcement (total ~ 1.5 % for B35) Foundation: medium quality Ev2= 40 - 60 N/mm2

Ph.D. study TU Delft Test track Best Ph.D. study TU Delft Test track Best

Page 33: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

33

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

SLAB WITH BENDING STIFFNESS SLAB WITH BENDING STIFFNESS

German Ev2 = 120 N/mm2 German Ev2 = 120 N/mm2

Reinforcement percentage: 1.5 %Reinforcement percentage: 1.5 %

Ev2 = 30 N/mm2Ev2 = 30 N/mm2

0.0480.048

0.050.05

0.0520.052

0.0540.054

2525 3535 4545 5555

H Slab [cm]H Slab [cm]

C fo

unda

tion

[N/m

mC

foun

datio

n [N

/mm

33 ]]

Poor qualityPoor quality

0.0480.048

0.050.05

0.0520.052

0.0540.054

2525 3535 4545 5555

H Slab [cm]H Slab [cm]

C fo

unda

tion

[N/m

mC

foun

datio

n [N

/mm

33 ]]

Poor qualityPoor quality

Page 34: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

34

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

EXISTING WELD GEOMETRY STANDARDS EXISTING WELD GEOMETRY STANDARDS

Normally Versine: 0 < p < 0.3 mm Normally Versine: 0 < p < 0.3 mm

p < 0.3 mm/1 m p < 0.3 mm/1 m

Grind off top Grind off top

Page 35: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

35

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011 FO

RC

E-B

ASE

D A

SSES

SMEN

T O

F W

ELD

GEO

MET

RY

FOR

CE-

BA

SED

ASS

ESSM

ENT

OF

WEL

D G

EOM

ETR

Y

Page 36: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

36

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

FORCE-RELATED WELD STANDARDS FORCE-RELATED WELD STANDARDS

Inclination: High-Speed < 1.0 mrad Conventional < 1.8 mrad

Dynamic contact force is function of inclination: Dynamic contact force is function of inclination: 2

dynF = Constant v Inclination* *

Page 37: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

37

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

QUALITY INDEX QUALITY INDEX

max

norm

InclinationQI = 1 OKInclination

≤ ⇒

Page 38: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

38

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

38

FORCE-BASED WELD GEOMETRY STANDARDS FORCE-BASED WELD GEOMETRY STANDARDS Speed Inclination

40 km/h 3.2 mrad

60 km/h 2.8 mrad

80 km/h 2.4 mrad

100 km/h 2.2 mrad

120 km/h 2.0 mrad

140 km/h 1.8 mrad

160 km/h 1.6 mrad

180 km/h 1.4 mrad

200 km/h 1.3 mrad

250 km/h 1.1 mrad

300 km/h 1.0 mrad

QI=1 QI=1

Applied by ProRail The Netherlands

Page 39: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

39

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

NEW STANDARDS VERTICAL NEW STANDARDS VERTICAL

Advantages of new standards:

1. Also negative welds allowed;

2. Maximum versines at 140 km/h 2 times larger;

3. Speed dependent.

Page 40: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

40

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

DYNAMIC CONTACT FORCE DYNAMIC CONTACT FORCE

9 % correlation  91 % correlation 

Page 41: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

41

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

PRACTICAL IMPLEMENTATION PRACTICAL IMPLEMENTATION

Page 42: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

42

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

EXPECTED COST SAVINGS EXPECTED COST SAVINGS Due to impact load reduction at welds:

10 – 20 % of annual maintenance budget;

ProRail budget in The Netherlands: ~ € 250 mio for 4,500 single track;

Savings: € 25 – 50 mio total, or € 5 – 10,000 per km single track.

Page 43: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

43

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

WHEEL/RAIL CONTACT WHEEL/RAIL CONTACT

Headchecks and squats are major problems in Holland; Main remedy is early grinding; Special anti headcheck profiles.

Headchecks and squats are major problems in Holland; Main remedy is early grinding; Special anti headcheck profiles.

ROLLING CONTACT FATIGUE

CONFORMITY OF PROFILES Equivalent conicity 0.025 - 0.15. Equivalent conicity 0.025 - 0.15.

Page 44: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

44

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

HEADCHECKS HEADCHECKS

Page 45: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

45

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

WHEEL/RAIL CONTACT AREA WHEEL/RAIL CONTACT AREA

Theoretical profiles

In service, headcheck free Source: Rolf Dollevoet, ProRail

Page 46: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

46

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

ANTI HEADCHECK PROFILE DOLLEVOET ANTI HEADCHECK PROFILE DOLLEVOET

Page 47: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

47

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

SQUATS SQUATS

Page 48: Esveld presentation Madrid intro HSL · 2011. 2. 24. · 3 ECS ECS Seminar Madrid 23-24 February 2011 HISTORY OF HIGH-SPEED TRACK zJapan opened first HSL in ballasted track in the

48

ECS ECS

www.esveld.com www.esveld.com

Seminar Madrid 23-24 February 2011

CONCLUSIONS CONCLUSIONS Both ballasted and non-ballasted track structures are suitable for HST; Availability and minimum life cycle cost are increasingly important; therefore trend towards slab track; Slab tracks are still far from optimal; Dynamics plays a crucial role in track design: - tight standards for running surface and - sufficient resilience in the track components; Wheel – rail interface should be well designed and maintained; Quality is a key factor in both construction and maintenance.

Both ballasted and non-ballasted track structures are suitable for HST; Availability and minimum life cycle cost are increasingly important; therefore trend towards slab track; Slab tracks are still far from optimal; Dynamics plays a crucial role in track design: - tight standards for running surface and - sufficient resilience in the track components; Wheel – rail interface should be well designed and maintained; Quality is a key factor in both construction and maintenance.