Estimating Condition-Based Highway Reconstruction Needs. NCHRP 20-24(52) Task 14 (funded by NCHRP 20-7). Estimating Condition-Based Reconstruction NCHRP 20-24(52) Task 14. Questions about models for C & P (HERS & NBIAS) estimating reconstruction for other than traffic or safety - PowerPoint PPT Presentation
Citation preview
Estimating Condition-Based Highway Reconstruction
Needs
NCHRP 20-24(52) Task 14(funded by NCHRP 20-7)
Estimating Condition-Based ReconstructionNCHRP 20-24(52) Task 14
Questions about models for C & P (HERS & NBIAS) estimating reconstruction for other than traffic or safety
20-7 Quick Turnaround funded Task 14 (4 months)
Survey FHWA, AASHTO & State DOTs
Determine if there is a valid issue
If so, define possible approaches to address
Estimating Condition-Based ReconstructionWorking Group
FHWA Ross Chrichton, Ian Friedland, Steve Gaj, Darren
Timothy, Steve Sissel AASHTO
Tony Kane, Ken Kobetsky State DOTs
Caltrans – Michael Johnson Maryland – Neil Pedersen New York – Nancy Ross
Consultants PB - Hal Kassoff, Task Leader Cambridge – Arlee Reno, Bill Robert, Herb Weinblatt Alan Pisarski
Estimating Condition-Based ReconstructionDefinitions
Condition-based: physical deterioration (not traffic or safety)
Reconstruction: Replacement in kind focused on major
elements Roadway: includes full paving section, unsuitable
sub grade, failed drainage, etc. Bridge: includes replacement of > 50% of
superstructure or substructure
Estimating Condition-Based ReconstructionInterviewees
FHWA AASHTO State DOTs
Arizona Caltrans Delaware Illinois Louisiana Maryland Michigan Nebraska New York Ohio South Carolina Tennessee Vermont
Toll Authority Pennsylvania Turnpike
Estimating Condition-Based ReconstructionKey Findings
Condition-based Interstate reconstruction needs are not insignificant – most or all of original Interstate not reconstructed for traffic or safety will require condition-based reconstruction in foreseeable future
More prevalent in cold climates More prevalent in pavements than bridges –
examples abound in both Due to variety of causes – materials, design details,
soils, freeze-thaw, excessive traffic, higher axle loadings
Late 1980’s/early 1990’s turning point in durability of constructed pavements and bridges
Would add up to multiple-billions
Estimating Condition-Based ReconstructionRecommendations
Follow-on effort is justified Two options presented to Working Group
Enhanced Models & Methods Empirical Adjustment
Enhanced Models & Methods: Multi-year, Multi- millions, Integrated with Models & Methods
Empirical Adjustment: One shot adjustment for Interstates and similar facilities done situationally
Hybrid proposed by working group – Empirical approach but adapted to models and methods
Estimating Condition-Based ReconstructionActions
Complete report Provide information in larger Interstate report Decisions by FHWA & AASHTO on how to
proceed Implementing actions through FHWA and
NCHRP
Estimating Condition-Based Highway Reconstruction
Needs
Questions?