Establishing a Humanitarian Response Depot

Global Partnership for Emergency Preparedness

Project & HRD Feasibility Assessment

Initial Summary Report

Page 2: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

Tentative targeted time frames for an in country mission

Activities Undetaken

  Assessment Mission Insert Date

# Activity1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5

1 Phase 1: Country Assessment                                                                                

1.1 Initial Round Table meetings with Key Line Ministry focal points and stakeholders                                                                                

1.2 Data collection of Historical incidents of Emergencies in country 

        

        

        

        

        

        

        

       

1.3 Macro level country wide Logistics assessment 

        

        

        

        

        

        

        

       

1.4 Site Specific Assessments 

        

        

        

        

        

        

        

       

1.5 Assessment of in country Services &  Procurement Capacity 

        

        

        

        

        

        

        

       

1.6 Debriefing Session with identified key stakeholders 

        

        

        

        

        

        

        

       

2 Phase 2: Report Writing and Recommendations         

        

        

        

        

        

        

        

2.1 Consolidation of data and information                                                                               

2.3 Drafting of Main Assessment Report                                                                                

2.4 Review and Iterations with Technical team and host country                                                                                

2.5 Finalisation and Submission of Report and Reccomendations                                                                                

Milestones

We are here

Page 3: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

A desk review of past incidents of disasters and shocks. Nature of the shock, # of people affected, locations etc.

National & Regional Emergency Data Availability of

engineering, logistics and other expertise in

country etc. Also procurement

availability of key stocks

In country Services & Procurement CapacityAssessment

GPEP:Reminder Areas Assessed

Comprehensive review of national road network, airport

capacity, port capacity etc.

Macro Level country wide logistics Assessment

Review of proposed HRD sites, location,

infrastructure, utilities available, identified

requirements to turn into a functioning HRD etc.

Site Specific Assessments

Page 4: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

GPEP:National & Regional Emergency Data

A desk review of past incidents of disasters and shocks. Nature of the shock, # of people affected, locations etc.

National & Regional Emergency Data

Summary of Main Findings                                                                                             

Page 5: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

GPEP:In country Services & Procurement Capacity Assessment

Summary of Main Findings                                                                                            

Availability of engineering, logistics and other expertise in

country etc. Also procurement

availability of key stocks

In country Services & Procurement CapacityAssessment

Page 6: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

GPEP:Macro Level Country Wide Logistics Assessment

Summary of Main Findings

Road Networks              Port                         Airport                                                      

Comprehensive review of national road network, airport

capacity, port capacity etc.

Macro Level country wide logistics Assessment

Page 7: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

GPEP:Site Specific Assessments

Summary of Main Findings                                                                                            

Review of proposed HRD sites, location,

infrastructure, utilities available, identified

requirements to turn into a functioning HRD etc.

Site Specific Assessments

Locations Assessed                                                                                            

Page 8: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

Other Key Points to Note:

1. 2. 3.

Page 9: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

Encourage

Support

Lead

EncourageSupportLead

COMPREHENSIVE COLLABORATIVE CONSULTATIVE

Full leadership and project delivery provided by UNHRD team and relevant

experts.

Comprehensive Support: In cases where there is limited or no infrastructure, capacity or experience, or where the partner organization has requested due to local constraints - UNHRD will be responsible for full development and delivery of an HRD.

UNHRD works hand in hand with the in country project team to establish the hub.

Collaborative Support: In cases where there is some infrastructure, capacity or experience – UNHRD will work hand in hand with the partner to enhance effectiveness and efficiencies, while encouraging integration into the global HRD network.

UNHRD provides a framework, direction and guidance to the project team

Consultative Support: In cases where a partner has a well established HRD but is seeking tailored or bespoke support on specific areas – such as improved ICT systems for barcoding and warehouse management, contracting etc.

The Assessment team believes the initial approach should be:

GPEP: Three approaches

Page 10: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

Reminder on Next StepsComprehensive & Collaborative

Joint Feasibility AssessmentLogistics assessment: port/air access, road conditions, risk, incidence of shocks, nature of shocks

RequestCountry or Regional Association (RAs) makes request to UNHRD to engage in HRD support (directly or through local WFP presence)

Determine type of Engagement – Proposal Development

ConsultativeCollaborativeComprehensive

Design (on acceptance of proposal)

Tailored package of support according to the assessment and the partner’s request

Engagement taking into account local needs and priority areas

ImplementImplementation of accepted and approved package of support

Ongoing Offsite Technical Support

Responsive backstopping across all work stream technical areas.

New HRD established and fully integrated in a Network of HRDs

Step 1 Step 2

Step 3

Step 4

Step 5

Step 6

Step 7

Review and Follow UpProactive periodic backstopping of implemented project. Performance monitoring, site visits with technical backstopping.

Page 11: Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Initial Summary Report

Establishing a Humanitarian Response Depot

Questions?