Ferrobeton Zrt. ’s fields of action Design: Construction plan, shopdrawings, 3D modelling, statical calculations Production: Structural products, railway elements, housing, road elements, electric poles Transport: By road or railways Installation:
Citation preview
Introducing Ferrobeton Zrt. Hungary’s biggest prefabricator company
Established in 1955 in DunaújvárosProduce 60.000 m3 of concrete per year
FERROBETON is the member of the CRH Group and the middle-east european center of CRH Structural
Ferrobeton Zrt.’s fields of action
Design:Construction plan, shopdrawings, 3D modelling, statical calculations
Production:Structural products, railway elements, housing, road elements, electric poles
Transport: By road or railways
Installation:
- Possible to use higher quality of materials like C60/75 or higher- Controlled and monitored production, consistant quality- Independent from weather conditions- More precise production of reinforcement and concrete shape- Can be pre-scheduled for weeks, flexible in ordering
Basic about prefabricating concrete
Advantages Disdvantages
- Sometimes difficult to transport to site- Shape is often limited by the formwork capacity- Creating load-bearing joints are complicated and expensive- Unit cost is higher
Summary and worth to use
Recommended to use in complex structures where lots of same elements are repeatedRecommended to use to reduce in-situ concrete needs of large projectsRecommended to use to decrease construction time
Main projects of and their specifications
HANKOOK TYRE Factory 2006-2013 3 phases of 300.000 m2 total production areaNormal frame structure, one and 3 storey
GREEN HOUSE Building 2011-2012 3+7 storey office building with 18.000 m2 for officesCombination of columns, beams and hollowcore
GROUPAMA Football Stadium 2013 Stadium for more than 22.000 visitorsCombination of precast, monolitic and steel
HANKOOK TYRE Factory, Rácalmás 1st phase:
year 2006-2007
- Production area: 100.000 m2- Volume of precast structure: 7540 m3- Max. span of concrete beam: 26 m- Part of the roof structure is steel
2nd phase:
year 2009-2010
- Production area: 70.000 m2- Volume of precast structure: 5955 m3- Max. span of concrete beam: 32 m- No steel roof structure anymore
3rd phase:
year 2013-2014
- Production area: 100.000 m2- Volume of precast structure: 11385 m3- Max. span of concrete beam: 38,4 m- No steel roof structure anymore
HANKOOK TYRE Factory, Rácalmás
Structural description:- Foundation is solved with piling and in-situ base blocks- Column fixation is by precast rounded or doubled sockets
being concreted into the monolitic base blocks- Vertical bearing and stability by retangular columns with
the size of 50x50cm, longest column is 18,0m- Horizontal bearing by prestressed longitudinal I shaped
main beams and crossing secondary beams with T and I sections, longest beam is 38,40m
- Main groundfloor support is solved by TT floor panels above tunnels (calculated live load is 4 tons/m2)
The frame structure
Specification: the longest beam on roof has a span of 38,40 meters
Special multi-storey structural solution with precast elements
Structural description:- 3-storey building with the need of bearing 3 tons/m2 load- Column fixation is by precast rounded or doubled sockets
being concreted into the monolitic base blocks- Vertical bearing by retangular columns with the size of
60x60cm, longest column here is 21,0m (in one piece)- Horizontal bearing by beam grid in two direction, with
upside-down T shaped prestressed main beams and retangular secondary beams, longest beam is 12,0m
- 20cm floor plate is made with prestressed filigran panels with the thickness of 8cm and 12cm upper screed, max. span is 3,5m with no support
Specification: the highest column produced in one piece is 25,2 meters long
More construction pictures
GREEN HOUSE Office building, Budapest
Conditions to be known:- The erection time was scheduled to
winter time- The construction site was narrow, the
location is in the middle of the Capital- Only tower cranes were possible to use- 3 weeks was given to complete a floor- The span were between 4,50 and
13,2m- Only a few bracing cores were possible- There are 3 levels for parking in the
cellar as monolitic- There are 7 levels up for offices done as
precast
SPECIFICATIONS:- 7 levels of precast flooring- Octagonal shaped columns- Delta-beam for floor support- No column in one corner
Story: In Hungary almost all the office buildings are usually built with monolitic concrete structure sometimes combined with masonry. SKANSKA, a nord-european company insisted on that the structure has to be made by precast concrete elements to help FERROBETON completing this project.
GREEN HOUSE Office building, Budapest
- Usual sizes are 40/50 and 60/60cm- Most columns are 2-level high- All fixation is screwed by shoes- Beams are supported by consoles- Lightning protection is built-in- Beam ends are fixed with bolts- Some columns needed as circular - These were made as octagonal- Small, one level columns are 30/30- Weights were limited according to the capacity of tower cranes
Columns
GREEN HOUSE Office building, Budapest
- Side beams are retangular or L-shaped concrete beams- Inner floor beams are Delta-beams- Beams are supported by consoles- Beam ends are fixed with bolts- Weights were limited according to the capacity of tower cranes
Floor beams
GREEN HOUSE Office building, Budapest
- Long elements are FF 320 type- Short elements are FF 200 type- At bracing cores we used filigran floor plates- Floor elements are collaborating with 8cm of in-situ screed- Weights were limited according to the capacity of tower cranes
Floor beams
GREEN HOUSE Office building, Budapest More construction
pictures