Upload
hector-adams
View
214
Download
0
Tags:
Embed Size (px)
Citation preview
Essex County Transportation Services Department
Essex County Highways
2012 Construction Program
Peter Bziuk P. Eng.
Manager Construction Services
Essex County Highways
• 2012 Construction Program Highlights– $14,200,000 expenditure level– Includes approx. $1,100,000 from 2011– Rehabilitation Program– Capacity Improvement Program
Rehabilitation Program
• 25 Planned Projects– 5 Bridges ( 2 Engineering, 3 Construction )– 11 Roads– 5 Maintenance– 4 Culverts ( 2 Engineering, 2 Construction )
Capacity Improvement Program
• County is continuing a multi year capacity improvement program for the network
• County funding is being utilized, Senior level funding is being pursued
• 7 Planned Projects for 2012– 5 Construction, 2 Engineering
Essex County Highways
• Bridge Projects ($2,970,000)– 3 Structure Rehabilitations
• CR 22 @ Duck Creek• CR 10 @ Long Marsh Drain• CR 14 @ Collard Drain
– 1 Structure Rehab / Expansion:• CR 22 @ Puce River
– 2 Pre-engineering for 2013 construction:• CR 14 @ Silver Creek• CR 42 @ Moisson Creek
Essex County Highways
• Culvert / Drainage ( $1,182,000 )– CR 14 @ Maddox Drain culvert replacement
– CR 19 @ East Townline Drain improvements
– CR 34 – Drain Improvement – Kingsville
– 2 – Culvert Engineering projects for 2012
• CR 43 @ Gzowski Drain
• CR 50 @ Beaudoin Drain
Essex County Highways
• Road Projects ($4,940,000)– Recycling/Resurfacing:
• CR 19 Tecumseh/Lakeshore – 2.8 km
• CR 12 Essex – 3.0 km
• CR 20 LaSalle – 3.0 km
• CR 19 Lakeshore – 0.5 km
• CR 18 Kingsville – 1.1 km
• CR 34 Leamington – 5.9 km
• CR 8 Lakeshore/Essex – 2.2 km
• CR 8 Essex – 1.2 km
• CR 3 LaSalle – 1.7 km
• CR 10 Amherstburg – 4.1 km
Essex County Highways• Pavement Preservation ( $250,000 )
– Route and Seal – various locations– Surface Treatment – various locations - 12 km
• Bridge Preservation– 4 deck/expansion joint repairs– Various guiderail repairs / upgrades
• Estimated Quantities– 39,740 tonnes of Hot Mix Asphalt– 99,200 sm. of Pavement Recycling– 17,550 tonnes of Granular A
Essex County Highways
• Capacity Projects ( $3,200,000 )– CR 23/46 – Intersection Improvements – LS– CR 22 Phase 5 - Contract A – LS– CR 19/22 Improvements - Engineering– Various Connecting Link projects with Towns
• CR 19 - Tecumseh
• CR 6 – LaSalle
• CR 20 - Amherstburg
Essex County Highways
• EA’s / Engineering:– CR 19 / CR 22 with MTO Prelim. Design
($200M)– CR 22 – CR 2 to Puce Detailed Design
($18.5M)– CR 42 EA – CoW to CR 25 ($30M)– Lauzon Parkway Extension – MTO/CoW /CoE– Active Transportation Study ($52M)
• Adoption and implementation
Essex County Highways
• Thank you for your interest,
• Thank you for your support in delivering our annual programs,
• Looking forward to another successful construction season.