4
CURRICULUM VITAE Esron Pakpahan Griya batu aji asri - Batam Batam - Indonesia. Mobile phone: +62 812 7756 4297 Passport No. B 0333832 Email : [email protected] OBJECTIVE: Self discipline, hard work, honest and responsibility Good Analytical minded Professional with hands on experience in the field of construction Yards Fabrication & Ship Building with commitment to strive towards Company's excellence. Seeking a challenging environment that encourages learning and creativity, providing exposure to new ideas, stimulating personal and professional growth. SUMMARY: Having more than 16 years of relevant experience in construction supervision well oriented in scheduling of manpower, tools and equipment for timely completion of project to confirm that they comply with specified procedure, Client or Customer requirement at Oil & Gas Industries, Fabrication Yards & Ship Building. QUALIFICATIONS: * Senior High School in SMA Negeri 1 Rimbo Bujang jambi Graduated 1994 * Junior High School in SMP Negeri Sipagimbar Graduated 1991 * Elementary School in SD Negeri Silantom Tonga Graduated 1988 REFERENCES: 1.Mick James ( Batam Facility Manager )+62 81364759162/ E: [email protected] 2.Mike Dorris (Module yard Manager,Batam ) +62 812 702 6714/ E: [email protected] 3.Jimmy Teo CB ( Project Manager ) 65 9684 9226/ E: [email protected] 4.Waylon Jhonson ( Area Manager ) +62 812 7050 739/ E: [email protected] 5.Toni Motu (Project Manager )+62 8111550024/ E: [email protected]

ESRON new Cv.pdf 2

Embed Size (px)

Citation preview

CURRICULUM VITAE

Esron Pakpahan Griya batu aji asri - Batam Batam - Indonesia. Mobile phone: +62 812 7756 4297 Passport No. B 0333832 Email : [email protected]

OBJECTIVE:

Self discipline, hard work, honest and responsibility Good Analytical minded Professional with hands on experience in the field of construction Yards Fabrication & Ship Building with commitment to strive towards Company's excellence. Seeking a challenging environment that encourages learning and creativity, providing exposure to new ideas, stimulating personal and professional growth.

SUMMARY:

Having more than 16 years of relevant experience in construction supervision well oriented in scheduling of manpower, tools and equipment for timely completion of project to confirm that they comply with specified procedure, Client or Customer requirement at Oil & Gas Industries, Fabrication Yards & Ship Building.

QUALIFICATIONS:

* Senior High School in SMA Negeri 1 Rimbo Bujang jambi Graduated 1994

* Junior High School in SMP Negeri Sipagimbar Graduated 1991

* Elementary School in SD Negeri Silantom Tonga Graduated 1988

REFERENCES: 1.Mick James ( Batam Facility Manager )+62 81364759162/ E: [email protected]

2.Mike Dorris (Module yard Manager,Batam ) +62 812 702 6714/ E: [email protected]

3.Jimmy Teo CB ( Project Manager ) 65 9684 9226/ E: [email protected]

4.Waylon Jhonson ( Area Manager ) +62 812 7050 739/ E: [email protected]

5.Toni Motu (Project Manager )+62 8111550024/ E: [email protected]

PROFESSIONAL SUMMARY 1.Company: BECHTEL Corp.Inc Batam – Indonesia (SMOE YARD) Service Project: WHEATSTONE PROJECT LNG BATAM MODULE YARD ( Client: Cevron) Occupation or position held : Piping Superintendent ( 10 August 2015 – 30 April 2016 ) 9 Month

Responsibility: Responsible for the efficient and effective coordination of field operations. Ensure that risk reduction controls are in place and regularly reviewed for safety, environmental and

quality aspects of the project. Ensure that all personnel are trained in their roles and responsibilities and are competent to perform the

duties allocated to them. Monitor and review the plant labour and subcontractors to ensure production targets are met or bettered

and take appropriate actions as necessary. Responsible for the efficient and effective coordination and supervision of construction activities. Ensure all activities are performed in compliance with the requirements of the relevant specifications,

codes and standards, which form part of the contract. Organize, coordinate and direct construction activities in accordance with the construction schedules so as

to complete the works on time and within budget whilst constantly ensuring that planning safety, environmental and quality requirements are met.

Ensure all activities are performed in compliance with the requirements of the relevant specifications, codes and standards, which forms part of the contract.

Ensure that safe and environmentally acceptable working methods and practices are implemented and that plant and equipment are made available, properly operated and maintained, to enable operations to be carried out safely and without environmental harm.

Promote total job safety and environmental awareness by employees, subcontractors and all persons in the job vicinity and stress to all employees and subcontractors the importance senior management attaches to safe work practices and environmental protection.

Assesses and allocate priorities as necessary.

2. Company: PT.Mc. CONNEL DOWELL BATAM, INDONESIA Service Project: WHEATSTONE LNG PROJECT ( 37 Pipe Rack & 1 Loading Platform ) Occupation or position held : Structural & Piping Supervisor ( 10 June 2014 – 11 July 2015 ) 1 year-1 month Responsibility:

Supervision for the installation of modulated pipe racks and hook up piping Supervision for field fabrication and shop fabrication, fit-up installation and erection of piping systems of

oil and gas refineries. Checking of isometric drawings and preparation of cutting plans of the isometric drawings which are

scheduled for fabrication. Scheduling of tools, manpower and equipment for timely completion of project. Forecasting 3 weeks look ahead schedule and tracking of accomplishments of foremen and group leaders. Preparation of materials and delegation of work to foremen and group leaders to attain the daily and

weekly workload schedule. Coordinates with engineering group regarding the problems encountered during the installation of pipes. Responsible for the implementation of safety rules and regulations and reminds subordinates to adhere to

the safety rules and regulations during weekly toolbox meeting. Responsible for checking of work to ensure excellent quality of collective work. Quantity tracking and reporting production output and completed lines during weekly production and

coordination meetings.

.

3. Company: ) .Company: BECHTEL Corp.Inc Batam – Indonesia (SMOE YARD) Service Project: APLNG PROJECT BATAM MODULE YARD ( Client: Conoco Philips) Occupation or position held : Piping Superintendent ( 17 October 2012 – 09 June 2014 ) 1 years- 8 month Responsibility:

Responsible for the efficient and effective coordination of field operations. Ensure that risk reduction controls are in place and regularly reviewed for safety, environmental and quality aspects

of the project. Ensure that all personnel are trained in their roles and responsibilities and are competent to perform the duties

allocated to them. Monitor and review the plant labour and subcontractors to ensure production targets are met or bettered and take

appropriate actions as necessary. Responsible for the efficient and effective coordination and supervision of construction activities. Ensure all activities are performed in compliance with the requirements of the relevant specifications, codes and

standards, which form part of the contract. Organize, coordinate and direct construction activities in accordance with the construction schedules so as to

complete the works on time and within budget whilst constantly ensuring that planning safety, environmental and quality requirements are met.

Ensure all activities are performed in compliance with the requirements of the relevant specifications, codes and standards, which forms part of the contract.

Ensure that safe and environmentally acceptable working methods and practices are implemented and that plant and equipment are made available, properly operated and maintained, to enable operations to be carried out safely and without environmental harm.

Promote total job safety and environmental awareness by employees, subcontractors and all persons in the job vicinity and stress to all employees and subcontractors the importance senior management attaches to safe work practices and environmental protection.

Assesses and allocate priorities as necessary.

4. Company: PT SOCALMO MC DOW JV VAVOUTO-NEW CALEDONIA Service Project: KONIAMBO PROJECT ( Client: Koniambo Nikel Sas ) Occupation or position held : General Supervisor ( 17 January 2011 – 09 July 2012 ) 1 year - 6 month Responsibility:

Supervision for the installation of modulated pipe racks and hook up piping Supervision for field fabrication and shop fabrication, fit-up installation and erection of piping systems of oil and gas

refineries. Checking of isometric drawings and preparation of cutting plans of the isometric drawings which are scheduled for

fabrication. Scheduling of tools, manpower and equipment for timely completion of project. Forecasting 3 weeks look ahead schedule and tracking of accomplishments of foremen and group leaders. Preparation of materials and delegation of work to foremen and group leaders to attain the daily and weekly

workload schedule. Coordinates with engineering group regarding the problems encountered during the installation of pipes. Responsible for the implementation of safety rules and regulations and reminds subordinates to adhere to the safety

rules and regulations during weekly toolbox meeting. Responsible for checking of work to ensure excellent quality of collective work. Quantity tracking and reporting production output and completed lines during weekly production and coordination

meetings. Supervision for Pre hydro and post hydro punch items of the test package systems. Supervision for the installation of piping standard supports.

5. Company: PT MC CONNEL DOWELL Batam – Indonesia Service Project: PARS PROJECT ( Client: Exxon Mobile ) & Occupation or position held : Supervisor ( 12 June 2007 – 08 February 2010 ) 2 years- 8 month Responsibility:

Supervision for the installation of modulated pipe racks and hook up piping Supervision for field fabrication and shop fabrication, fit-up installation and erection of piping systems of oil and gas

refineries. Checking of isometric drawings and preparation of cutting plans of the isometric drawings which are scheduled for

fabrication. Scheduling of tools, manpower and equipment for timely completion of project. Forecasting 3 weeks look ahead schedule and tracking of accomplishments of foremen and group leaders. Preparation of materials and delegation of work to foremen and group leaders to attain the daily and weekly

workload schedule. Coordinates with engineering group regarding the problems encountered during the installation of pipes. Responsible for the implementation of safety rules and regulations and reminds subordinates to adhere to the safety

rules and regulations during weekly toolbox meeting. Responsible for checking of work to ensure excellent quality of collective work. Quantity tracking and reporting production output and completed lines during weekly production and coordination

meetings.

6. Company: PT.Tan Jaya Lancar Hutama Batam – Indonesia ( PT.Nanindah Mutiara Shipyard ) Designation: Foreman Service Project: - New Building Project & Repair ( 22 April 2000 – 31 July 2002) 2 years – 3 month Responsibility: b. To be leader team c. Discuss with supervisor about piping problem and take solution d. Checking piping modification on site and give report to supervisor to get approval e. Making piping isometric drawing f. Checking piping work onboard and ensure that job is follow drawing and have good quality g. Making progress report to supervisor

DECLARATION: I hereby declare that all the above details are true and correct to the best of my knowledge.

Yours faithfully,

Esron Pakpahan