Upload
bell-wright
View
29
Download
0
Tags:
Embed Size (px)
DESCRIPTION
VO Activities at ESO Paolo Padovani, ESO Head, VO Systems Department, DMD EURO-VO Facility Centre Scientist. ESO Paranal. 12 instruments offered at last call (Sept. 29) [+ 2 sub-mm]. ESO La Silla. 8 instruments offered at last call (Sept. 29). The ESO archive. The ESO archive: VO challenges. - PowerPoint PPT Presentation
Citation preview
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
1
VO Activities at ESO Paolo Padovani, ESO
Head, VO Systems Department, DMD
EURO-VO Facility Centre Scientist
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
2
ESO Paranal
12 instruments offered at last call (Sept. 29) [+ 2 sub-mm]
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
3
ESO La Silla
8 instruments offered at last call (Sept. 29)
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
4
The ESO archive
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
5
The ESO archive: VO challenges
1. Ground-based: calibrations/observing conditions changing on a nightly basis
2. Varied: 20 different instruments, ranging from imagers and spectrographs to polarizers and interferometers; optical and sub-mm
3. Evolving: 2nd generation VLT instruments
coming + Public Surveys and ALMA
4. Large: currently 100 Tb (compressed),
expected growth x 15 in the next ~ 6
years
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
6
VO-compliant archive
The VO requires data centres to have a “VO-layer” to:
• “translate” any locally defined parameter to the standard (IVOA compliant) ones (e.g., RA can be called in many different ways)
• hide any observatory/telescope/instrument specific detail and work in astronomical units: e.g., wavelength range/band (not grism or filter name), spectral resolution, field of view, limiting magnitude provide the right meta-data (data about data)
The VO will work at best with high level “science-ready” data data centres should make an effort to provide such data
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
7
VO @ ESO VO Systems (VOS) department created in
the Data Management & Operations Division (DMD) Nov. 2004 to formalize ESO VO work. Its tasks:
• make the ESO archive into a real scientific resource for the ESO community by:
creating, ingesting, and publishing “Advanced Data Products” (ADP) [science ready, level 3]
making the archive “VO-compliant” [provide access via VO standards and tools]
• develop VO technology, standards, and tools
• develop the VO Facility Centre with ESA
• take care of all ESO archive interfaces (Jan 2006)
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
8
VOSystemsPaolo Padovani
Advanced Data ProductsPiero Rosati
Facility CentreVO TechnologyMarkus Dolensky
Paul HarrisonJ.-C. MalapertBruno RinoFabien Chereau (Oct. 06)
Nausicaa DelmotteJörg RetzlaffCharles RiteRemco SlijkhuisBenöit VandameMyha Vuong (DFO)NN (DCA funded)14 FTEs, 3 EC funded (2 VO-TECH+ 1 DCA)
Andreas WicenecE. Hatziminaoglou(Dec. 06)
VOS Dept.
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
9
Current ESO VO Work
1. Improved archive interface (http://archive.eso.org) [VO Table format output, prototype SIA service]
2. Science-driven requirements already implemented into ESO metadata repository and data models to serve both the real and virtual observatory (behind the scene)
3. Creation of Advanced Data Products (ADP = “science-ready” data)
4. Preparation well under way for ADP ingestion and publication (metadata extraction and mapping tool)
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
10
ESO Science Archive New Interface
A first step towards a VO-compliant interface
Complex queries by:
• Coordinates, target
name• Input lists• Scheduling info.• Proposal information• Instrument, obs cat.
As of 4 Apr 2005, ESO SAF is open worldwide to the astronomical community
VO Table
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
11
ADP Production
1. Built the ADP/MVM data reduction system for the production of ADP, specifically for ISAAC, WFI, VIMOS, SOFI and other VLT imaging instruments (based on the EIS/MVM software)
2. Released on Sept. 30 2005 the ISAAC/GOODS ADP, reduced with the ADP/MVM (astrometrically calibrated stacked images and mosaics reduced from 11,600 science frames, 10,600 calibration frames, photometrically calibrated using SOFI data)
3. Part of the GOODS/ESO Public Programme in Chandra Deep Field South (PI: Cesarsky)
4. Deepest large nearIR field carried out to date: 160 arcmin2 in J & K, 127 arcmin2 H (J, H, K: 25.5, 25, 25 ABlim at 5s)
ISAAC/GOODS releaseSept. 30 2005
• Extensive use by worldwide community; complements HST and Spitzer data for galaxy evolution studies out to z~7• Users highly satisfied with data quality (0.4-0.6” seeing, good inter-calibration)
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
12
ADP Ingestion & Publication
1. ADP currently scattered around the community will be collected, validated and published into archive (according to detailed guidelines) [paradigm change]
2. ESO now requires ADP from Large Programs and upcoming VST & Vista surveys
3. Science-ready imaging ADP are being produced by ADP/MVM
4. A “VO-compliant” data ingestion interface is being developed
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
13
EURO-VO Projects
• DCA! • VO-TECH: work integrated within ESO
(SED builder [mag. to flux conversion], user certification [Single-Sign-On], VOSpace specification and prototype)
• Facility Centre: a joint ESO/ESA activity, physically located at ESO
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
14
The EURO-VO FC
• An operational organization, that provides the EURO-VO with a persistent, centralized registry for resources, standards and certification mechanisms as well as community support for VO technology take-up and scientific programs (the EURO-VO “public face”)
• At present, resources provided by ESO & ESA at a “best-effort” level (≈ 1 FTE; no EU funding: FP7 proposal!?)
• EURO-VO FC Astronomer, Evanthia Hatziminaoglou, will join VOS on Dec. 1• First Activities: Selection of EURO-VO Science Advisory Committee; held first meeting in April at ESO, second meeting planned for Nov. 22 at ESRIN
New EURO-VO Web pages (http://www.euro-vo.org/) EURO-VO technical workshop (ESO June 2005), with EURO-VO partners (http://www.euro-vo.org/workshop2005)
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
15
120 participants from 47 institutions and 16 different countries
EURO-VOWorkshopJun. 27 - July 12005
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
16
Our Plans
1. More ADP (internal and above all from ESO PIs)
2. Brand new VO-compliant archive interface (based on metadata registry) part of new ESO portal
3. VO tools to enhance archive interface: e.g.,• Visualization of multi-wavelength data
sets/observations building on AVO and AstroVirtel experience
• Integrated browsing of imaging and spectral data
• Flux conversions based on optical element database
• Spectral Energy Distribution building, spectral templates and models
4. Data quality (Quality Control products)5. All this by 2008
Oct. 2 - 3, 2006
P. Padovani, 1st DCA Board Meeting
17
DCA Project
ESO’s interests: 1. WP3, lead with ESA (16 person-months)2. WP6 (2 person-months)
WP3 is the largest WP in terms of FTEs (68/170 p-m) and includes also: CNRS, INAF, INTA, NOVA, LU
Preliminary Data Centre census: first input of “essential VO archives” was given by the SAC at its first meeting. It includes ~ 35 entries