1
Eskom power stations Lephalale Thabazimbi Kenhardt Springbok Newcastle Richards Bay Durban Port Shepstone East London Port Elizabeth Mossel Bay Ladysmith Bergville Bloemfontein Beaufort West George Grabouw Bela Bela Pietermaritzburg Mthatha Welkom De Aar Musina Polokwane Tzaneen Phalaborwa LIMPOPO MPUMALANGA GAUTENG BOTSWANA ZIMBABWE MOZAMBIQUE NAMIBIA NORTH WEST FREE STATE KWAZULU - NATAL NORTHERN CAPE WESTERN CAPE EASTERN CAPE Base load stations 1 Arnot 2 352 MW 2 Duvha 3 600 MW 3 Hendrina 2 000 MW 4 Kendal 4 116 MW 6 Kriel 3 000 MW 7 Lethabo 3 708 MW 8 Majuba 4 110 MW 9 Matimba 3 990 MW 10 Matla 3 600 MW 11 Tutuka 3 654 MW 5 Koeberg 1 940 MW Return-to-service stations 12 Camden 1 510 MW 13 Grootvlei 1 200 MW 14 Komati 940 MW The return-to-service ( RTS ) stations were mothballed in 1990 and are in the process of being recommisioned due to the growing demand for electricity. The return-to-service project for Camden power station ended on 31 March 2010 with the entire station fully commercial. The peaking stations can generate electricity within a few minutes of start-up, making them ideally suited to supply power during peak periods. They also assist in regulating the system voltage and frequency to ensure stability of the national transmission network. Peak demand stations 15 Gariep 360 MW 16 Vanderkloof 240 MW Hydro-electric 17 Drakensberg 1 000 MW 18 Palmiet 400 MW Pumped storage scheme rds Ba urban epston zabeth 19 Acacia 171 MW 20 Port Rex 171 MW 21 Ankerlig 1 338 MW 22 Gourikwa 746 MW Gas turbine Cape Town Saldanha Kleinsee Oranjemund Legend Coal-fired (Operating) Coal-fired ( RTS ) Coal-fired (New build) Nuclear Hydro-electric Pumped storage scheme Gas turbine National grid Wind Facility Concentrating Solar Power ( CSP ) Hydro-electric (Distribution) Renewable energy 23 Klipheuwel Wind Facility 3 MW Wind Facility New build 24 Medupi 4 788 MW 26 Kusile 4 800 MW Coal Coal Coal Nuclear Distribution 29 First Falls 6 MW 30 Second Falls 11 MW 31 Colley Wobbles 42 MW 32 Ncora 2 MW These hydro-electric power stations fall within the Distribution Division in the Eastern Cape operating unit and are used to stabilise the distribution network in that area. Vredendal Pretoria Johannesburg Nelspruit Upington 9 10 13 14 12 11 6 8 4 7 2 3 1 21 22 20 19 5 25 Ingula 1 332 MW Pumped storage scheme 15 17 25 16 18 23 27 Sere Wind Facility 100 MW Wind Facility Hydro-electric 28 Concentrating Solar Power ( CSP ) 100 MW Solar 28 27 29 30 31 32 Witbank Ermelo Standerton Vereeniging Volksrust 26 Cape Agulhas Issued by: Generation Communication Department February 2013 24

Eskom power stations · Eskom power stations Lephalale Thabazimbi Kenhardt Springbok Newcastle Richards Bay Durban Port Shepstone East London Port Elizabeth Mossel Bay Ladysmith

  • Upload
    doanbao

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Esko

m p

ower

sta

tions

Leph

alal

e

Thab

azim

bi

Ken

hard

t

Spri

ngbo

k

New

cast

le

Rich

ards

Bay

Dur

ban

Port

She

psto

ne

East

Lon

don

Port

Eliz

abet

h

Mos

sel B

ay

Lady

smith

Berg

ville

Bloe

mfo

ntei

n

Beau

fort

Wes

t

Geo

rge

Gra

bouw

Bela

Bel

a

Piet

erm

aritz

burg

Mth

atha

Wel

kom

De

Aar

Mus

ina

Polo

kwan

eTzan

een Ph

alab

orw

a

LIM

POPO

MPU

MA

LAN

GA

GA

UTE

NG

SWA

ZI

LAN

D

LESO

THO

BOTS

WA

NA

ZIM

BABW

E

MO

ZA

MBI

QU

E

NA

MIB

IA

NO

RTH

WES

T

FREE

STA

TE

KW

AZ

ULU

-N

ATA

L

NO

RTH

ERN

CA

PE

WES

TERN

CA

PE

EAST

ERN

CA

PE

Base

load

sta

tions

1 A

rnot

2

352

MW

2 D

uvha

3

600

MW

3 H

endr

ina 2

000

MW

4 K

enda

l 4

116

MW

6 K

riel

3

000

MW

7 Le

thab

o 3

708

MW

8 M

ajub

a 4

110

MW

9 M

atim

ba 3

990

MW

10 M

atla

3

600

MW

11 T

utuk

a 3

654

MW

5 K

oebe

rg 1

940

MW

Retu

rn-t

o-se

rvic

e st

atio

ns12

Cam

den

1 51

0 M

W13

Gro

otvl

ei 1

200

MW

14 K

omat

i 9

40 M

W

The

retu

rn-t

o-se

rvic

e ( R

TS)

stat

ions

wer

e m

othb

alle

d in

199

0 an

d ar

e in

the

pro

cess

of b

eing

rec

omm

isio

ned

due

to t

he g

row

ing

dem

and

for

elec

tric

ity.

The

ret

urn-

to-s

ervi

ce p

roje

ct fo

r C

amde

n po

wer

sta

tion

en

ded

on 3

1 M

arch

201

0 w

ith t

he e

ntir

e st

atio

n fu

lly c

omm

erci

al.

The

peak

ing

stat

ions

can

gen

erat

e el

ectr

icity

with

in a

few

min

utes

of

star

t-up

, m

akin

g th

em i

deal

ly s

uite

d to

sup

ply

pow

er d

urin

g pe

ak

peri

ods.

The

y al

so a

ssis

t in

regu

latin

g th

e sy

stem

vol

tage

and

freq

uenc

y to

ens

ure

stab

ility

of t

he n

atio

nal t

rans

mis

sion

net

wor

k.

Peak

dem

and

stat

ions

15 G

arie

p 3

60 M

W16

Van

derk

loof

2

40 M

W

Hyd

ro-e

lect

ric

17 D

rake

nsbe

rg 1

000

MW

18 P

alm

iet

400

MW

Pum

ped

stor

age

sche

me

Rich

ards

Bay

Dur

ban

Port

She

psto

ne

Port

Eliz

abet

h

19 A

caci

a 1

71 M

W20

Por

t Re

x 1

71 M

W21

Ank

erlig

1

338

MW

22 G

ouri

kwa

746

MW

Gas

tur

bine

Cap

e To

wn

Sald

anha

Kle

inse

e

Ora

njem

und

Lege

nd

Coa

l-fir

ed (

Ope

ratin

g)

Coa

l-fir

ed (

RTS)

Coa

l-fir

ed (

New

bui

ld)

Nuc

lear

Hyd

ro-e

lect

ric

Pum

ped

stor

age

sche

me

Gas

tur

bine

Nat

iona

l gri

d

Win

d Fa

cilit

y

Con

cent

ratin

g So

lar

Pow

er (

CSP

)

Hyd

ro-e

lect

ric

(Dis

trib

utio

n)

Rene

wab

le e

nerg

y

23 K

liphe

uwel

Win

d Fa

cilit

y

3

MW

Win

d Fa

cilit

y

New

bui

ld 24 M

edup

i 4

788

MW

26 K

usile

4

800

MW

Coal

Coal

Coal

Nuc

lear

Dis

trib

utio

n29

Fir

st F

alls

6

MW

30 S

econ

d Fa

lls

11

MW

31 C

olle

y W

obbl

es

42

MW

32 N

cora

2

MW

Thes

e hy

dro-

elec

tric

pow

er s

tatio

ns f

all

with

in t

he D

istr

ibut

ion

Div

isio

n in

the

East

ern

Cap

e op

erat

ing

unit

and

are

used

to s

tabi

lise

the

dist

ribu

tion

netw

ork

in t

hat

area

.

Vred

enda

l

Pret

oria

Joha

nnes

burg

Nel

spru

it

Upi

ngto

n

9

10

13

14

12

116

8

4

7

23

1

21

22

20

19

5

25 In

gula

1

332

MW

Pum

ped

stor

age

sche

me

15

17

25

16

18

23

27 S

ere

Win

d Fa

cilit

y

10

0 M

WW

ind

Faci

lity

Hyd

ro-e

lect

ric

28 C

once

ntra

ting

Sola

r Po

wer

( CSP

) 1

00 M

WSo

lar

28

27

29

30

3132

Witb

ank

Erm

elo

Stan

dert

on

Vere

enigi

ng

Volk

srus

t

26

Cap

e A

gulh

as

Issu

ed b

y: G

ener

atio

n C

omm

unic

atio

n D

epar

tmen

t F

ebru

ary

2013

24