City of West Palm BeachSustainability Action Committee
EECBG & Performance Contract Project Review
Tuesday, August 2, 2011
Meeting Objectives
Introductions
Review Project Objectives
Overview of Findings & Recommendations
Open Discussion on Project Scope
Energy Systems Group
ESG is an Nationally Accredited Energy Services CompanyFounded in 1994Licensed in 35 States & US Virgin IslandsOver 230 Energy Services ProfessionalsSubsidiary of Vectren Corporation Over $1.2 Billion in completed projectsOver 300 Customers
ESG Clearwater Office
Project Objectives
City Wide EECBG and Guaranteed Energy Savings Performance Contracts
Reduce Utility Consumption & Expense Across City
Support Achievement City’s Sustainability Plan Goals
Fund Needed Work to Alleviate Strained Capital Budgets
Implement Leading Technologies Such As LED Street Lighting
What is Performance Contracting?
Energy Efficiency and Capital Improvement Projects that are Funded Entirely Through Resulting Energy and Operational Savings Which is Guaranteed by the Energy Services Contractor
Enabled by F.S. 489.145
Bundled Package of Energy Conservation Measures (ECMs) that Provides an Overall Self-Funding Program
Savings Must be Guaranteed by the ESCO
Total Project Must Fully Fund in a Term of 20 Years or Less
Project Cash Flow Must be Positive Each Year of the Term
100% Self Funded Projects
Guaranteed savings allows for funds that
would have been spent on utilities to pay for
project costs and other operational needs
Performance Guarantee &Measurement & Verification
Annual Savings Verification Report Each Year of Term
M&V Procedures Follow the International Performance Measurement & Verification Protocol (IPMVP)
Exact Methodology Determined by Project Scope, Acceptable Accuracy, and Cost Effectiveness
WPB Project Relies on Retrofit Isolation Measures Where Pre & Post Measurements Will Be Taken For Each Individual ECM
Audit Process
Phase 1Preliminary Analysis
Phase 2 Detailed Analysis
Phase 3 Final Development
1. Client Interviews 1. Detailed Modeling 1. ECM Design
2. Site Surveys 2. Cost Estimates 2. Project Financials
3. Potential ECM’s 3. Finalize ECM’s 3. Implementation Plan
4. Client Review 4. Client Review 4. Client Review
Scope of Audit
City Center
City Center Garage
Fire Station #1
Fire Station #2
Fire Station #3
Fire Station #4
Fire Station #5
Fire Station #6
Fire Station #7
Fire Station #8
City of West Palm Beach Police Stations and Garages
Evernia Street Garage
Clematis Street Garage
Water Treatment Plant
South Olive Park
Gaines Park
Vedado Park
Pleasant City
Coleman Park
Howard Park
Youth Empowerment Center
Vickers House North
Grassy Waters Preserve
Wilderness Pavilion
Everglades Pavilion
City of West Palm Beach Compound Complex
ECM Recommendation Criteria
Total Energy & Environmental Impact
Simple Payback & Savings to Investment Ratio (SIR)
Overall Prioritization of the Measure
Ability to Be Supported in a 15 Year Term Cash Flow
Recurring Savings From Grant Selected Projects To Fund Future Sustainable Initiatives
Street & Park Lighting Measures
General ScopeReplace / Retrofit Existing Street & Exterior Park Lighting with LED & Induction Fixtures
BenefitsBetter Color RenditionImproved EfficiencyIncreased Product LifeCommonality of Stock
$ Savings kWh Savings lbs of CO2 $427,363 2,380,291 5,712,699
General Lighting Measures
General ScopeRetrofitting Existing Lighting Systems with High Efficiency Fluorescent & LED Systems
BenefitsImproved EfficiencyImproved Lighting QualityIncreased Product LifeCommonality of Stock
$ Saving kWh Savings lbs of CO2 $97,096 982,364 2,357,674
Garage Lighting Measures
General ScopeNew Fluorescent Lighting Layouts & Controls at Police Station & Evernia St. GaragesRetrofits Utilizing Fluorescent Lighting at City Center Garage
BenefitsImproved Lighting Levels & Color RenditionImproved EfficiencyOptimization of Lighting System Performance
$ Savings kWh Savings lbs of CO2 $87,907 636,661 1,527,987
Water Conservation Measures
General ScopeLow-Flow Toilets & Automated Flush ValvesNew faucets, Aerators, & Low-Flow Shower Heads
BenefitsImproved EfficiencyImproved Sanitation
$ Savings kWh Kgal Therms CO2$3,240 4,181 492 221 10,034
Small HVAC Measures
General ScopeProgrammable Thermostats & Commissioning of Existing DX Systems
BenefitsReplace End of Life EquipmentImprove EfficiencyOptimize Building Performance
$ Savings kWh Savings lbs of CO2 $8,180 111,826 270,784
Lift Station Measures
General ScopeInstallation of New Variable Frequency Drives & Controls & Solar Ventilation Fans
BenefitsImproved Efficiency
$ Savings kWh Savings lbs of CO2 $70,560 740,217 1,776,521
Police Department Chiller Measure
General ScopeReplacement of Existing Chiller & Modification of Controls Settings
BenefitsReplace End of Life EquipmentImproved EfficiencyOptimized Building Performance
$ Savings kWh Savings lbs of CO2 $14,047 210,494 505,186
PC Project Financials
PC ProjectProject Cost $ 7,855,965Simple Payback 12.19 yrsSIR 1.05Projected Term Savings $ 12,229,971Guaranteed Term Savings $ 11,749,591
Grant ProjectProject Cost $ 599,998Simple Payback 9.4 yrsAnnual Savings $ 63,931
Total Impact on Sustainability
Environmental Impactlbs. of CO2 Removed = 12,160,883
Grams of NOX Removed = 20,268,138 Grams of SO2 Removed = 50,670,345
Acres of Tree Planted = 1,469Cars Removed = 709
Annual Impact•5,067,035 kWh Saved
•492 Gal Saved
•8.8% Reduction in Electric
•$64k Grant Project Savings
Actual KWH/YrProposedKWH/Yr
49,562,425
44,276,834
Annual City Electric Consumption
KW
H/Y
r