ESA UNCLASSIFIED – For Official Use
ISVV Effectiveness Measurement in ESA Space Projects
Pedro A. Barrios, Maria Hernek, Marek ProchazkaEuropean Space Agency
NASA IV&V Workshop 11-13 September 2012
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 2
ESA UNCLASSIFIED – For Official Use
Objective / Outline
Objective
Present the results of an ESA study to assess the effectiveness of the ISVV process carried out in the scope of ESA missions
Assessment of past ISVV projects, with the following final objectives:
– Identify what is useful in ISVV process (i.e. what brings results)
– Identify what needs to be improved (i.e. added/removed/clarified/...)
– Make unified metrics collection an integrated part of the process
Outline
• ESA ISVV process: a quick overview
• ISVV metrics definition
• ISVV metrics collection & analysis
• Conclusions and future work
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 3
ESA UNCLASSIFIED – For Official Use
Independent Software Verification & Validation (ISVV) by ESA
1. ISVV is required for Mission and Safety Critical software, (ECSS-E-40/ECSS-Q-80)
2. ISVV tasks are additional and complementary to the nominal SW supplier’s verification and validations tasks
3. ISVV tasks cover verification and validation of software requirements, design, code and tests (typically starting at SW-SRR and finishing before the SW-QR)
4. ISVV supplier is required to be an organization independent of the software supplier as well as the prime/system integrator (full technical, managerial, and financial independence)
5. Most ESA projects implement the ISVV process as an industrial contract placed by the Prime contractor
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 4
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overview
MAN. Management
IVA. Independent Validation
IVE. Independent Verification
IVE.TA.Technical Specification Analysis
IVE.DA.Design Analysis
IVE.CA.Code Analysis
MAN.VV.ISVV level definition
IVA.Validation
MAN.PM.ISVV Process Management
• 6 activities/STAGES: Management (MAN), Verification (IVE) and Validation (IVA)
• Activities are composed of TASKS, and these are further split into SUBTASKS
1. Management (MAN.PM and MAN.VV) is concerned with issues such as ISVV objectives and scope, planning, roles, responsibilities, budget, communication, competence, confidentiality, schedule and ISVV level definition (to limit the scope of ISVV)
2. Technical Specification Analysis (IVE.TA) is verification of the software requirements
3. Design Analysis (IVE.DA) is verification of the SW Architectural Design and the Software Detailed Design
4. Code Analysis (IVE.CA) is verification of the SW source code
5. Validation (IVA) is testing of the SW to demonstrate that the implementation meets the technical specification
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 5
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overview
Example of a Task/Subtask description
• Activity: Technical Specification Analysis
• Task: SW Requirements Verification
• Subtasks: T1.S1, T1.S2 … T1.S11
• Start/End Events
• Inputs/Outputs
• Methods are identified for each subtask
Some numbers:• IVE.TA 1 task 11 subtasks
• IVE.DA 3 tasks 15/12/5 subtasks
• IVE.CA 3 tasks 10/5/3 subtasks
• IVA 3 tasks 3/3/3 subtasks
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 6
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overviewIVE: Technical Specification Analysis
SW Requirements Specification (PDR)
Interfaces Control Document (PDR)
System
Requirements
allocated to
System Requirements allocated to
Software (SRR)
SW-
Requirements
SW-HW Interface
Requirements (SRR)
Subtasks: To verify
• Software Requirements external consistency with the system requirements
• Interface Requirements external consistency with the system requirements
• software requirements correctness
• consistent documentation of the software requirements
• software requirements completeness
• dependability and safety requirements
• readability of the software requirements
• timing and sizing budgets of the software requirements
• Identify test areas and test cases for Independent Validation
• that software requirements are testable
• software requirements conformance with applicable standards
TA.T1: Software Requirements Verification
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 7
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overviewIVE: Design Analysis
Technical Specification (PDR)
SW Architectural Design (PDR)
Interfaces Control Doc
(PDR)
Subtasks: To verify
• SW architectural design external consistency with Technical Specification
• SW architectural design external consistency with Interface Control Documents
• interfaces consistency between different SW components• architectural design correctness • architectural design completeness• dependability & safety of the design• readability of the architectural design• timing and sizing budgets of the software• Identify test areas and test cases for independent Validation• architectural design conformance with applicable standards
if models are produced by the SW suppliers: • Verify test performed on high level model • Verify development and verification and testing methods and
environment• then construct model test cases & model test procedures• then execution of model test procedures
DA.T1: Architectural Design Verification
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 8
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overviewIVE: Design Analysis
Subtasks: To verify• detailed design external consistency with Technical Specification• detailed design external consistency with Interface Control
Documents• detailed design external consistency with Architectural Design• interfaces consistency between different SW components• detailed design correctness• detailed design completeness• dependability & safety of design• readability of detailed design• timing and sizing budgets of software• accuracy of the model (in case models are produced by the SW
suppliers)• Identify test areas and test cases for independent Validation• Verify detailed design conformance with applicable standards
Subtasks: To verify• timing and sizing budgets of software• that dependability & safety aspects on product are
specified in the SUM• readability of User Manual• completeness of User Manual• correctness of User Manual
DA.T2: Detailed Design Verification
DA.T3: Software User Manual Verification
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 9
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overviewIVE: Code Analysis
CA.T1: Source Code Verification
Subtasks: To verify• source code external consistency with Technical Specification• source code external consistency with Interface Control Documents• source code external consistency with Architectural Design and Detailed Design• interfaces consistency between different SW units• source code correctness with respect to technical specification, architectural design and detailed design• source code readability, maintainability and conformance with the applicable standards• dependability & safety of source code• Source code accuracy • Identify test areas and test cases for independent Validation• timing and sizing budgets of the software
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 10
ESA UNCLASSIFIED – For Official Use
ESA ISVV Process overviewIVE: Code Analysis
CA.T2: Integration Test Specification and Test Data VerificationSubtasks: To verify• consistency with Technical Specification• consistency with Software Architectural Design• integration test procedures correctness and completeness• If models are produced by the SW suppliers, then evaluate model verification and validation test results• integration test reports
CA.T3: Unit Test Procedure and Test Data VerificationSubtasks: To verify• consistency with Software Detailed Design• unit test procedures correctness and completeness• unit test reports
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 11
ESA UNCLASSIFIED – For Official Use
ISVV effectiveness metrics
• Key goal of activity is to estimate effectiveness of the ISVV process carried out in scope of ESA projects
• Major objective is to provide measurements and conclusions to support identification and prioritization of ISVV activities based on their ‘efficiency’
• Improve ISVV process is an additional objective
ISVV effectiveness to be calculated based on number of findings and their acceptance and impact
Based on number of findings, the following metrics are computed: findings per ISVV stage / task / subtask; finding per severity; findings per type and effective findings.
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 12
ESA UNCLASSIFIED – For Official Use
Measurement Process
• 3 steps activity: ISVV metrication definition / ISVV metrics collection / ISVV metrics assessment
• Industrial context:
• Measurement needs and processes started by ESA
• Provision of metrics performed through different small contracts granted by ESA to different ESA ISVV suppliers
• Data analysis, collection and metrics analysis and calculation performed by an ESA contractor to this activity
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 13
ESA UNCLASSIFIED – For Official Use
Measurement Process
Data gathering, with following contents:
• SW product metrics (size in kLOC, number of requirements, criticality)
• ISVV project metrics (ISVV level, ISVV scope and stages, documentation quality at reviews)
• Findings (task, subtask, which document, type, severity, use of tools, acceptance, impact measured in number of changes)
Note: excel tool was used
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 14
ESA UNCLASSIFIED – For Official Use
Measurement Process
• 15 products from 5 projects
• 4 different ISVV suppliers
• The IVE effectiveness metrics are assessed:
o per product
o per SW products of similar size
o In total, i.e. in all projects and SW products considered
• Analysis is performed:
o Per all stages
o Per ISVV project stage
o Per ISVV task /subtask
Findings per stage/task/sub-task, per severity, per type, Effective Findings & Tools usage
Project Product SIZE TYPEGAIA GAIA intermediate Big ASW
CryoSat CryoSat CDMU Medium ASW CryoSat AOCS Medium ASWLISA PF LISA PF BSW Small BSW LISA PF ASW Big ASW LISA PF DHSW Medium ASWGalileo MSF Galileo MSF Big ASW
Galileo MGF Galileo MGF Big ASW
Galileo IPF Galileo IPF AF Medium ASW
Galileo IPF RTMC Big ASWGalileo NSGU Galileo NSGU Big ASW
Galileo PxSU Galileo PxSU BSW Medium BSW
Galileo PxSU ASW Medium ASW
ATV ATV FAS Big ASW ATV MSU Medium ASW
Note: Only one product classified as small
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 15
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (1/10)
Total Findings• Total number of IVE findings for 15 products within this analysis is 2492
• No clear relationship between findings & product size
red=big products ; blue=medium; green=small
Mean & Standard deviation
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 16
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (2/10)
Findings per stage
TA: Technical Specification AnalysisCA: Code AnalysisDA: Design Analysis
IVE.CA82433%
IVE.DA71028%
IVE.TA95839%
Share of total findings per stage
Findings per stage per Product
103
349
562
596
413
369
46
27
27
0%10%20%30%40%50%60%70%80%90%
100%
Big Medium Small
IVE.TA
IVE.DA
IVE.CA
Findings per size per stage
• Although there is some variability per product, number of findings are roughly 1/3 for three stages
• The majority of findings are at the TA stage for big type products, and CA stage for small
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 17
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (3/10)
Findings per task (TA: Technical Specification Analysis)
IVE.TA.T2 (Requirements verif)70279%
IVE.TA.T1 (Requirements traceab verif)19121%
Share of total findings for TA tasks
154
408
37
267
0
27
0%10%20%30%40%50%60%70%80%90%
100%
Big Medium Small
IVE.TA.T2
IVE.TA.T1
Findings per size for TA tasks
• Majority of findings of TA stage are at TA.T2 task (Software Requirements Verification) for all products, all projects, all product sizes with only one exception.
• As the size of products decreases, more findings are discovered at TA.T2 task
Findings per product for TA tasks
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 18
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (4/10)
Findings per task (DA: Design Analysis)
IVE.DA.T2 (AD verification)288
47,1%
IVE.DA.T3 (DD traces verif)32
5,2%
IVE.DA.T4 (DD verif)257
42,1%
IVE.DA.T1 (AD traces verif)33
5,4%
IVE.DA.T5 (SUM verif)1
0,2%
Total share of findings for DA stage
10
170
22
142
1
22
113
8
96
0
152
19
0
0%
20%
40%
60%
80%
100%
Big
Me
diu
m
Sm
all
IVE.DA.T5
IVE.DA.T4
IVE.DA.T3
IVE.DA.T2
IVE.DA.T1
Majority of findings of the DA stage are either at DA.T2 (Architectural Design Verification) task or at DA.T4 task (Detailed Design Verification) depending of the different products.
Findings per product for DA tasks
Findings per size for DA tasks
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 19
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (5/10)
Findings per task (CA: Code Analysis)
IVE.CA.T2 (Verif of code)29956%
IVE.CA.T3 (IT tests verification)18535%
IVE.CA.T4 (UT test verification)407%
IVE.CA.T1 (traces of code)122%
Total share of findings for CA stage
Share of findings per product for CA tasks
1
183
85
13
4
95
82
27
7
21
18
0
0%
20%
40%
60%
80%
100%
Big
Me
diu
m
Sm
all
IVE.CA.T4IVE.CA.T3IVE.CA.T2IVE.CA.T1
Findings per size for CA tasks
Majority of findings of CA stage are at the CA.T2 task (Source Code Verification) in totals, then it varies product by product. CA.T3 (IT tests Verification) also represents a big share
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 20
ESA UNCLASSIFIED – For Official Use
IVE.TA.T2.S4105
15,0%
IVE.TA.T2.S3100
14,2%
IVE.TA.T2.S592
13,1%
IVE.TA.T2.S810
1,4%
IVE.TA.T2.S101
0,1%
IVE.TA.T2.S1338
48,1%
IVE.TA.T2.S256
8,0%
ISVV metrics collection & analysis (6/10)
Findings per sub-task (e.g. TA subtasks)
IVE.TA.T1.S31
1%
IVE.TA.T1.S174
39%
IVE.TA.T1.S2179%
IVE.TA.T1.S499
51%
• Exact numbers are available for all the subtasks
• There are subtasks producing a reduced number of findings. Three possible cases: subtask not performed within the ISVV project, subtask not producing findings or data not available for the subtask
T2: Software Requirements Verification
T1: Requirements Traceability Verification
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 21
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (7/10)
Findings per severity
Major90836%
Minor144358%
Comment, very low1416%
• Most of findings are minor. Major findings account for 36%.• Proportions found across the three stages (TA, DA, CA) are similar to these
numbers
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 22
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (8/10)
Findings per type
490
350
67
173
3288610
383
307
191
125723
178
7
12
27
42
5
14
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Big
Medoim
Sm
all
Typo
Readability & Maintainability
N/A
No Problem
Technical feasibility
Internal Consistency
External Consistency
Completeness
Correctness
Most of findings are of type correctness, followed by findings of type completeness
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 23
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (9/10)
Tools usageAutomated
1%
Manual97%
Semi-automated
2%
Majority of findings were discovered manually (97% of the total findings) and only very few of them using tools (either to automatically discover the finding or the so-called ‘semi-automated’, using tools to further evaluate to discover any finding)
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 24
ESA UNCLASSIFIED – For Official Use
ISVV metrics collection & analysis (10/10)
Effective findings (ISVV findings that implied a change, improvement, correction to the software product)
Effective69%
Not effective
31%
Accepted findings per product
• Majority of findings are effective no matter product & size, except for small product for which majority of findings are not effective
• Majority of findings per stage are effective (72% TA & DA stages; 61% at CA stage)
• Majority of findings are effective for all severities (70% for major, 69% for minor) 880
287
807
418
27
73
0%
20%
40%
60%
80%
100%
Big
Med
ium
Sm
all
Not effective
effective
Accepted findings per size
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 25
ESA UNCLASSIFIED – For Official Use
Conclusions (1/2)
• Total number of findings
- Measurements based on number of findings
- Focus on IVE metrics
- No correlation found between number of findings & product size
• Total number of findings per ISVV stage / task /subtask
- Stage: Roughly even distribution (39% TA, 28% DA, 33% CA)
- Task/Subtasks: Identified the tasks producing most of the findings for TA, DA, CA (e.g. ‘Correctness/Completeness’ subtasks are producing many findings; ‘consistency’ subtasks produce some)
• Type of findings: The majority of findings are of type correctness (36%) & completeness (28%)
• Effective findings: The majority of findings (69%) are effective (i.e. implying changes/corrections to the software product)
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 26
ESA UNCLASSIFIED – For Official Use
Conclusions (2/2)
• Severity: Most findings are minor at all stages, with 58% minor, 36% major and remaining 6% for other severity (comment, very low)
• Tools: The majority of the findings were discovered manually (97%) and only very few of them using tools. Tools were used only for 3% of findings (especially at the CA stage)
Example: if we started today an ISVV contract on a project, we could expect, on average: 166 findings, from which 115 would be effective findings; out of those, 41 would be major findings, and those would be spread on the different stages as: IVE: 16 TA, 11 DA, 14 CA
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 27
ESA UNCLASSIFIED – For Official Use
Future work
• Collect metrics for the upcoming ISVV projects.
• Analyze tasks/sub-tasks not producing many findings (they might need better explanations within the ISVV guide, review the methods and tools proposed to be used when performing them, …)
• Analyze Independent Validation:
o Define useful metrics for IVA and asses IVA effectiveness
o Extend the scope of IVA, to cover Qualification & Acceptance of the SW and the Operational scenarios (i.e. having the operational view to create SW validation campaigns)
• Modeling:
o Some model related sub-tasks have not been ‘profiled’
o Understand how models produced during SW development could be used during ISVV activities (e.g. Model-Based Testing techniques to produce validation campaigns)
• ISVV effectiveness Metrics:
o Some other way how to measure effectiveness?
o Cost figures?
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 28
ESA UNCLASSIFIED – For Official Use
Thanks for your attention !!!!
For more information, please contact:
Pedro A. Barrios, European Space Agency
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 29
ESA UNCLASSIFIED – For Official Use
Back-up Slides
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 30
ESA UNCLASSIFIED – For Official Use
Findings per sub-task (1/3)
IVE: Technical Specification Analysis
TA.T1: Software Requirements Verification(===) IVE.TA.T1.S1: Verify Software Requirements external consistency with the system requirements
(===) IVE.TA.T1.S2: Verify Interface Requirements external consistency with the system requirements
(+++) IVE.TA.T1.S3: Verify software requirements correctness
(===) IVE.TA.T1.S4: Verify the consistent documentation of the software requirements
(+++) IVE.TA.T1.S5: Verify software requirements completeness
(+++) IVE.TA.T1.S6: Verify the dependability and safety requirements
(+++) IVE.TA.T1.S7: Verify the readability of the software requirements
(---) IVE.TA.T1.S8: Verify the timing and sizing budgets of the software requirements
(---) IVE.TA.T1.S9: Identify test areas and test cases for Independent Validation
(---) IVE.TA.T1.S10: Verify that the software requirements are testable
(---) IVE.TA.T1.S11: Verify software requirements conformance with applicable standards
High level view of number of findings per sub-taskLegend:
(+++): Subtask producing a considerable number of findings
(===): Subtask producing some findings
(---): Subtask producing a reduced number of findings
(xxx): Metrics not available for that subtask
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 31
ESA UNCLASSIFIED – For Official Use
Findings per sub-task (2/3)
IVE: Design Analysis
DA.T1: Architectural Design Verification(===) IVE.DA.T1.S1: Verify the SW architectural design external consistency with the Technical Specification (---) IVE.DA.T1.S2: Verify the SW architectural design external consistency with the Interface Control Documents (===) IVE.DA.T1.S3: Verify interfaces consistency between different SW components(===) IVE.DA.T1.S4: Verify architectural design correctness (===) IVE.DA.T1.S5: Verify architectural design completeness(===) IVE.DA.T1.S6: Verify the dependability & safety of the design(+++) IVE.DA.T1.S7: Verify the readability of the architectural design(===) IVE.DA.T1.S8: Verify the timing and sizing budgets of the software(---) IVE.DA.T1.S9: Identify test areas and test cases for independent Validation(---) IVE.DA.T1.S10: Verify architectural design conformance with applicable standards(xxx) IVE.DA.T1.S11: Verify the test performed on the high level model (xxx) IVE.DA.T1.S12: Verify the development and verification and testing methods and environment(xxx) IVE.DA.T1.S13: then construct model test cases(xxx) IVE.DA.T1.S14: then construct model test procedures(xxx) IVE.DA.T1.S15: then execution of model test procedures
DA.T2: Detailed Design Verification(---) IVE.DA.T2.S1: Verify the detailed design external consistency with the Technical Specification(---) IVE.DA.T2.S2: Verify the detailed design external consistency with the Interface Control Documents(---) IVE.DA.T2.S3: Verify the detailed design external consistency with the Architectural Design(+++) IVE.DA.T2.S4: Verify interfaces consistency between different SW components(===) IVE.DA.T2.S5: Verify detailed design correctness(===) IVE.DA.T2.S6: Verify detailed design completeness(+++) IVE.DA.T2.S7: Verify the dependability & safety of the design(---) IVE.DA.T2.S8: Verify the readability of the detailed design(===) IVE.DA.T2.S9: Verify the timing and sizing budgets of the software(xxx) IVE.DA.T2.S10: Verify the accuracy of the model (in case models are produced by the SW suppliers)(---) IVE.DA.T2.S11: Identify test areas and test cases for independent Validation(---) IVE.DA.T2.S12: Verify detailed design conformance with applicable standards
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 32
ESA UNCLASSIFIED – For Official Use
Findings per sub-task (3/3)
DA.T3: Software User Manual Verification(---) IVE.DA.T3.S1: Verify the timing and sizing budgets of the software(---) IVE.DA.T3.S2: Verify the dependability & safety aspects on the product are specified in the SUM(---) IVE.DA.T3.S3; Verify the readability of the User Manual(---) IVE.DA.T3.S4; Verify the completeness of the User Manual(---) IVE.DA.T3.S5: Verify the correctness of the User Manual
IVE: Code Analysis
CA.T1: Source Code Verification(---) IVE.CA.T1.S1: Verify source code external consistency with Technical Specification(---) IVE.CA.T1.S2: Verify source code external consistency with Interface Control Documents(---) IVE.CA.T1.S3: Verify source code external consistency with Architectural Design and Detailed Design(---) IVE.CA.T1.S4: Verify interfaces consistency between different SW units(+++) IVE.CA.T1.S5: Verify source code correctness with respect to technical specification, architectural design & detailed design(+++) IVE.CA.T1.S6: Verify the source code readability, maintainability and conformance with the applicable standards(+++) IVE.CA.T1.S7: Verify the dependability & safety of the source code(---) IVE.CA.T1.S8: Verify the accuracy of the source code(---) IVE.CA.T1.S9: Identify test areas and test cases for independent Validation(===) IVE.CA.T1.S10: Verify the timing and sizing budgets of the software
CA.T2: Integration Test Specification and Test Data Verification(===) IVE.CA.T2.S1: Verify consistency with Technical Specification(---) IVE.CA.T2.S2: Verify consistency with Software Architectural Design(+++) IVE.CA.T2.S3: Verify integration test procedures correctness and completeness(xxx) IVE.CA.T2.S4: If models are produced by the SW suppliers, then evaluate model verification and validation test results(xxx) IVE.CA.T2.S5: Verify integration test reports
CA.T3: Unit Test Procedure and Test Data Verification(---) IVE.CA.T3.S1: Verify consistency with Software Detailed Design(===) IVE.CA.T3.S2: Verify unit test procedures correctness and completeness(xxx) IVE.CA.T3.S3: Verify unit test reports
ISVV Effectiveness Measurement | Pedro A. Barrios | European Space Agency | 27/07/2012 | TEC-SWS | Slide 33
ESA UNCLASSIFIED – For Official Use
IVA: Independent Validation
IVA.T1: Identification of Test Cases• IVA.T1.S1: Evaluate Task Input Inspection
• IVA.T1.S2: Perform Analysis
• IVA.T1.S3: Writing Independent Validation Test Plan
IVA.T2: Construction of Test Procedures • IVA.T2.S1: Achieve knowledge about the SVF
• IVA.T2.S2: Implement Test Cases into Test Procedures
• IVA.T2.S3: Updating the Independent Validation Test Plan
IVA.T3: Execution of Test Procedures• IVA.T3.S1: Execute the Test Procedures
• IVA.T3.S2: Investigation of failed tests