ES410 Air Quality: smoke control Development of an intelligent, real-time smoke control system 1

ES410 Air Quality: smoke control

Embed Size (px)

DESCRIPTION

ES410 Air Quality: smoke control. Development of an intelligent, real-time smoke control system. Project Goal. “To develop an intelligent, real-time sensor control framework that will detect, monitor and control the development of smoke propagation throughout an office environment”. - PowerPoint PPT Presentation

Citation preview

Page 1: ES410 Air Quality: smoke control

ES410 Air Quality: smoke control

Development of an intelligent, real-time smoke control system

1

Page 2: ES410 Air Quality: smoke control

Project Goal

“To develop an intelligent, real-time sensor control framework that will detect, monitor

and control the development of smoke propagation throughout an office

environment”

2

Page 3: ES410 Air Quality: smoke control

Project Objectives

• Create a physical test rig to perform testing on

• Simulate propagation of flow using CFD

• Draw Conclusions from CFD

• Use to develop responsive sensor control system

Experimental Data

Fluid Theory

Simulations

Control System

3

Page 4: ES410 Air Quality: smoke control

Management Structure

• Project Manager throughout the project for stability.

• Project Leader changing every few weeks to give everyone experience.

• Specific dynamics of individuals within the team allowed it to work.

4

Page 5: ES410 Air Quality: smoke control

Work Breakdown Structure

5

Page 6: ES410 Air Quality: smoke control

Network Diagram

6

Page 7: ES410 Air Quality: smoke control

Gantt Chart

7

Page 8: ES410 Air Quality: smoke control

SMOKE

SmokeRegulationsExisting Systems

8

Page 9: ES410 Air Quality: smoke control

Smoke

• Hot Gases and Particulates

• Variable Toxicities and Density

• Transmits Heat via Convection

9

Page 10: ES410 Air Quality: smoke control

Smoke Effects

• Deaths

• Non Fatal Casualties

• Reduced Visibility

Inhibit ability to escape

Increases difficulty for firefighting

• Generate Flashover Conditions

• Property Damage

10

Page 11: ES410 Air Quality: smoke control

Regulations• Building Regulations

Part B

• British Standards• Design Guidance

e.g. CIBSE Guide E• Continuing Research

11

Page 12: ES410 Air Quality: smoke control

Smoke & Heat Extraction Ventilation - SHEV

Morgan H P, Smoke control methods in enclosed shopping complexes of one or more storeys: a design summary, BRE, 1979 12

Page 13: ES410 Air Quality: smoke control

Pressure Differential Systems

• Stairwell kept at higher pressure than floors

• Prevents smoke spreading into stairwell

13

Page 14: ES410 Air Quality: smoke control

Smoke Containment

Morgan H P, Smoke control methods in enclosed shopping complexes of one or more storeys: a design summary, BRE, 1979

Example of a Smoke Curtain

14

Page 15: ES410 Air Quality: smoke control

TEST RIG DESIGN

DesignScaling

15

Page 16: ES410 Air Quality: smoke control

Reason for use of Test Rig

Simulation models needed to be validated by experimental data.

“For many phenomena [such as turbulence] the exact equations are either not available or [a] numerical solution is not feasible.” Ferziger and Perić , Computational Methods for Fluid Dynamics

16

Page 17: ES410 Air Quality: smoke control

Test Rig Specification•Modular to allow various configurations of floors, walls, partitions, and inlets.

4 Outlets

6 Inlets17

Page 18: ES410 Air Quality: smoke control

Test Rig Specification1. Heating Box2. Hot Plate3. Perspex Box4. Laser Sheet5. Inlet & Outlet Fans6. Fan Power Supply7. Laser Lenses

Inlet & Outlet Fans 18

Page 19: ES410 Air Quality: smoke control

Scaling Equations

Dynamic SimilarityReynold’s Number, Re

Heat Transfer SimilarityGrashof Number, Gr

LUmRe

3

2

( )Sg T T LGr

Um = Mean VelocityL = Characteristic Lengthν = Kinematic Viscosityg = Acceleration due to Gravityβ = Volumetric Thermal Expansion CoefficientTS = Source TemperatureTinf = Quiescent Temperature 19

Page 20: ES410 Air Quality: smoke control

Scaling Results

Reynold’s NumberOffice value 20x larger than test rig value1 Order of Magnitude

Grashof NumberOffice value 100x larger than test rig value2 Orders of Magnitude

Re

Gr

20

Page 21: ES410 Air Quality: smoke control

SENSOR SYSTEM

21

Page 22: ES410 Air Quality: smoke control

Measurement: Sensory data used for analysis.

Control: Sensory data used to provide feedback to control system tocontrol smoke behaviour.

Sensors

Control PCControl Laws Smoke Behaviour

Closed Loop Control

Ventilation+ -

Feedback leads to a dynamic system which reacts to the smoke in real time

Control & Measurement System

22

Page 23: ES410 Air Quality: smoke control

Temperature Sensors

MCP9701A±2°C Absolute Accuracy±1°C Relative Accuracy (25°C)Can drive large capacitive loadsLinear response – direct ADC connection

Smoke Sensors

Custom madeOptical attenuation880nm wavelengthMeasures relative smoke density

1) Phototransistor (Receiver)2) IR LED (Emitter)3) Transparent windows4) Smoke slot5) Casing

Sensory Array

Smoke Sensor

23

Page 24: ES410 Air Quality: smoke control

40mm Brushless DC fansComplimentary pairs

Fan Control Circuitry

Low Pass Filtered PWM2 Pole FilterDC onlyDiode protected MOSFETLow side control

Ventilation

24

Page 25: ES410 Air Quality: smoke control

I2C Bus

Control PC

RS232

Microcontroller(I2C Master)

InletFan

OutletFan

TempSensor

SmokeSensor

Microcontroller(I2C Slave)

InletFan

OutletFan

TempSensor

SmokeSensor

System Block Diagram

25

Page 26: ES410 Air Quality: smoke control

Packet Formatted Communications Protocol

SmokeTalk

$ Destination{1 Byte}

Destination Port

{1 Byte}

Source{1 Byte}

Source Port{1 Byte}

Type{1 Byte}

Control{1 Byte}

Data{2 Bytes} \r\n

26

Page 27: ES410 Air Quality: smoke control

CONTROL SYSTEM

PurposeDesignGeneral Operation

27

Page 28: ES410 Air Quality: smoke control

The Control System

• Purpose

– What

– Why

– How

• Design

– What

– Why

– How28

Page 29: ES410 Air Quality: smoke control

Purpose

• What – A PC client that sends and receives data through a serial port

• Why – To more effectively control smoke

• How – By taking measurements and following a set of control laws

29

Page 30: ES410 Air Quality: smoke control

Design

• What – A Java application interfacing with the Master micro-controller via SmokeTalk

• Why – Fast development, great flexibility

• How – A scalable, modular, responsive Java application

30

Page 31: ES410 Air Quality: smoke control

General Operation

31

Page 32: ES410 Air Quality: smoke control

EXPERIMENTAL RESULTS

PIV Results & AnalysisSensor Results & Analysis

32

Page 33: ES410 Air Quality: smoke control

Particle Image Velocimetry

Figure 1: PIV setup. Source: Dr P Dunkley, University of Warwick.33

Page 34: ES410 Air Quality: smoke control

Figure 4 - Inlet PIV Vector Plot

• Inlet and wall positions

• Velocities

• Wall interactions

• Vortex shedding (video)

Figure 5 - Outlet PIV Vector Plot

• Outlet and wall positions

• Lower velocities

• Recirculation (video) 34

Page 35: ES410 Air Quality: smoke control

Inlet Particles

35

Page 36: ES410 Air Quality: smoke control

Inlet Velocity Vector

36

Page 37: ES410 Air Quality: smoke control

Outlet Particles

37

Page 38: ES410 Air Quality: smoke control

Outlet Velocity Vector

38

Page 39: ES410 Air Quality: smoke control

Averaged Cell 1 Smoke Density Comparison with varying fan condition

0

20

40

60

80

100

120

140

-10 -8 -6 -4 -2 0 2 4 6 8Smoke Reading (Volts)

Tim

e S

tep

(s)

4 Calibrations (----) 4 Inlets (BBBB) 4 Outlets (SSSS)

Figure 6: Averaged cell 1 smoke density comparisons with varying fan conditions

• Calibration Condition = all fans off

• Smoke movement through individual cells through turbulence and pressure differences

• Relative positioning of fans and sensors

• Both fans and sensors work as desired39

Page 40: ES410 Air Quality: smoke control

Average Smoke Readings in rig with varying fan arrangements

0

20

40

60

80

100

120

140

160

-20 -15 -10 -5 0 5 10 15 20

Smoke Reading (Volts)

Tim

e S

tep

(s)

Av BBBB Av BBSS Av BSBB Av BSBS Av Calibration Av SBSB Av SSSS

Figure 7: Average Smoke Reading in rig with varying fan arrangements

• Pressure condition – inlets and outlets

• Relative position and arrangement to inlet 40

Page 41: ES410 Air Quality: smoke control

Average Rig Smoke Readings with Varying Setups

0

10

20

30

40

50

60

-10 -5 0 5 10 15

Smoke Reading (Volts)

Tim

e S

tep

(s)

Without Floor With Floor Floor and Partitions

Figure 8: Average Smoke Reading in rig with varying setups

• Barriers to movement

• Levels of circulation

• Smoke Screen effects

41

Page 42: ES410 Air Quality: smoke control

SIMULATIONS

CCM+Simulation ResultsAnalysis

42

Page 43: ES410 Air Quality: smoke control

Simulation Summary

• The need for CFD• Star CCM+• CFD Solvers• Results and Analysis:

– PIV vs CFD– Phase 1– Phase 2– Phase 3

• Further Work

43

Page 44: ES410 Air Quality: smoke control

The Need For CFD

• Inconsistent environment in physical rig• Stable and versatile environment• Able to visualise the Propagation• Accurate Temperature Plots• Scalable Model

44

Page 45: ES410 Air Quality: smoke control

The Simulation Testing Plan

• Systematic Approach• Broken into Phases• Create an animation

for each

45

Page 46: ES410 Air Quality: smoke control

Star CCM+

• Powerful CFD software• Allows us to use exact Solid Works CAD

drawing• Use of an unsteady Solver

46

Page 47: ES410 Air Quality: smoke control

CFD Solvers

• Implicit Unsteady allows us to:– Observe a time-step solution– High Accuracy over Explicit

• Spalart-Allmaras turbulence model allows us to:– Observe detailed Detached Eddy formations– Create accurate at-wall viscous effects

47

Page 48: ES410 Air Quality: smoke control

Results And Analysis:PIV VS CFD

• Similar wall-effect

• Similar re-circulation

48

Page 49: ES410 Air Quality: smoke control

CFD Results

49

Page 50: ES410 Air Quality: smoke control

Phase 1

• Aim – choose the ideal fan configuration when a fire starts in the corner of a room.

• Method – Run simulations on possible fan configurations

50

Page 51: ES410 Air Quality: smoke control

Fan 1 as an Inlet

51

Page 52: ES410 Air Quality: smoke control

Best fan configurations

52

Page 53: ES410 Air Quality: smoke control

Best fan configurations (cont)

53

Page 54: ES410 Air Quality: smoke control

Phase 2

• A best fan configuration was not found due to incomplete simulations.

• Comparisons between phases 1 and 2 possible.

• Detailed look at the temperature changes in the room.

• More difficult problem than in phase 1.

54

Page 55: ES410 Air Quality: smoke control

Phases 1 and 2 Comparison

55

Page 56: ES410 Air Quality: smoke control

Scalar Temperature Animation

56

Page 57: ES410 Air Quality: smoke control

Phase 3

• Shows dynamic similarity between test rig and scaled room.• Further tests need to be done on good fan configurations

from small scale simulations.

0.5m 3.0m

57

Page 58: ES410 Air Quality: smoke control

Further work

• Phase 4 – Simulations on realistic room• Introduction of partitions and screens• Multiple storeys• Seeing the effects of including the ducting

system in the simulations• Run simulations for much longer

58

Page 59: ES410 Air Quality: smoke control

ARCHITECTURAL INTEGRATION

Full Scale SystemBuilding Control

59

Page 60: ES410 Air Quality: smoke control

Full Scale System

Standard Room

Supply Fan

Extract Fan

(SHEV)

Normal Balanced

Ventilation

Sensor Network Fire Rated Data Cable

Protected damper control and power supply cables

Protected fan control and power supply cables

SmokeControlSystem

Power Supply

Linked Systems

Fire Alarm & Notification

System

Other Fire Related Control Systems

Fire Data Output to Emergency Services

60

Page 61: ES410 Air Quality: smoke control

Building ControlFailsafe Smoke and Fire Rated

Control Dampers

Standard Supply Ventilation Plant

Smoke and Fire Rated

Extraction Ventilation Ductwork

Supply Ventilation Ductwork

Smoke and Fire Rated

Control Dampers

Fire Rated Ceiling Ventilation Grilles

High Temperature Smoke Heat Extraction Ventilation Unit

61

Page 62: ES410 Air Quality: smoke control

CONCLUSIONS

Continued DevelopmentConclusions

62

Page 63: ES410 Air Quality: smoke control

Continued Development

• The project is useful and viable• Minimising losses to human life as well as

financial losses for companies is an important area

• Laid the Foundations• Already evidence of interest• Other Avenues

63

Page 64: ES410 Air Quality: smoke control

Conclusions

• Project an overall Success• Dynamic Similarity between the test rig scale

and life size• CFD analysis provided an intelligent response• The system provides an intelligent response to

detected environmental changes

64

Page 65: ES410 Air Quality: smoke control

Thank You For Your Attention

Questions Please?

65