ERS Process Brief

Embed Size (px)

Citation preview

  • 7/24/2019 ERS Process Brief

    1/12

    ERS Process

    Evaluated ReceiptSettlement11th March 2015

  • 7/24/2019 ERS Process Brief

    2/12

    Snapshot of Shipmentdocument

    This document iwhile DO prepar

    Factory or at De

    dispatch

    This contains ro

    Shipping type, V

    Shipment type ufreight determin

    liability creation

    T- Code - VT01

  • 7/24/2019 ERS Process Brief

    3/12

    Snapshot of Shipment COST Document

    This document is prepared within the next hour of Invoice or PGI creati

    This contains the reference of shipment document, Vendor code, Freigh

    and details, G/L and Business area details with reference of the PO.

    T- Code VI01/03

  • 7/24/2019 ERS Process Brief

    4/12

    Snapshot of Service PO for vendor

    Auto genera

    creation of S

    doc

    Contains ve

    with ERS ac

    and tax code T- Code M

  • 7/24/2019 ERS Process Brief

    5/12

    Snapshot of POD updated shipment docume

    Updated by Logis

    accounts after phy

    verification of PO

    checking of shipm

    doc T- Code VT

    Mass update possanother T Code V

  • 7/24/2019 ERS Process Brief

    6/12

    POD update for shortage

    Document will contain the Shortage brief and corresponding Invoice

    number to Transporter

    For STO also the POD shall be updated to track the POD submission and

    billing has been done

    T- Code VT06

  • 7/24/2019 ERS Process Brief

    7/12

    Snapshot of POD tracking repor

    Report for POD tracking and Shortage details as entered by Logistic

    T- Code VT10

  • 7/24/2019 ERS Process Brief

    8/12

    Snapshot of ERS Screen-Test Run

    Proposed to be generated after 1 hour of POD update or after GRN at

    the Vendor wise shipment documents and status of the posting of docu

    ERS.

    T- Code - MRRL

  • 7/24/2019 ERS Process Brief

    9/12

    Snapshot of Documents posting through ER

    Posted when ERS is done every hour on POD update or GRN at

    depot

    Contains the FI or MIRO document generated for possible entries.

    T- Code - MRRL

  • 7/24/2019 ERS Process Brief

    10/12

    Snapshot of follow on document and a/c ent

    In Non Trade only pay

    appearing

    TDS Codes picked fro

    Master-need to mainta

    correctly

    T- Code Clicking on

    MRRL

  • 7/24/2019 ERS Process Brief

    11/12

  • 7/24/2019 ERS Process Brief

    12/12

    thankyou