EROWA MTS Tooling on Large Machine tables
MTS Application for Milling Cast Aluminum parts
iGUZZINI
COMPANY SEGMENT MACHINE PROCESSING TOOLING HANDLING
Production, Lighting Technology 5 AXIS M/C MillingMTSMANUAL (with forklift)
iGUZZINI
Machine is a 5 axis milling machine with 10,000 mm X-axis
iGUZZINI
60 Pallets customer made Spigot spacing of 350x500mm
350mm
500mm
500mm
500mm
iGUZZINI
Two MTS Integral chucks in four customer-constructed base plates at two pallet locations for a total of sixteen MTS chucks.
iGUZZINI
While the machining center is processing parts on the next pallet, the operator changes the pallet containing the previously finished parts.
1 2
1
2
CNC Processing Area
Changing pallet Area
iGUZZINI Benefit
Without EROWA MTS
Setup time: 6-8 hours Setup per weeks: 2 Number of pieces limited to
number of available vises No flexibility to modify
production schedule after set-up has been completed without repeating 6-8 hour set-up.
With EROWA MTSWith EROWA MTS
Setup time: 30 min.Time savings per week: 2 x 6 hours
Total = 12 hours per weekMultiple pieces on palletsChanges in production schedules
can be easily accommodated with minimal impact on productivity.
Reduced lead-times and work-in-process inventory levels