ERODE DISTRICT
Kudimaramath works for the
year
2020-21
Sl.No 1
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in B.P.Agraharam Branch canal from mile 0/0 to 2/0 in
Bhavani Distributory under the jurisdiction of the "M-1 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Thayirpalayam village in Erode Taluk"
Estimate Amount (Rs. In
lakhs)
28.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.03 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-1 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 2
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Erode Distributory from mile 0/0 to 3/0 and
Distributory from mile 54/0 to mile 55/0 of LBP Main Canal under the
jurisdiction of the "M-4 Keel Bhavani Murai neer pasana vivasaigal sabai"
in Lower Bhavani Irrigation system in Mullampatty and Nasiyanur Village in
Perundurai taluk of Erode District "
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
22-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
26.1 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-4 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 3
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of 2-1-60 Branch in Kugalur Distributory of
LBP Main canal under the jurisdiction of "U-5 Keel Bhavani Murai neer
pasana vivasaigal sabai" in Gobichettipalayam Taluk of Erode District."
Estimate Amount (Rs. In
lakhs)
40.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
35.04 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-5 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 4
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Mettupalayam Distributory from mile 0/0 to mile 2/0
under the jurisdiction of the "U-10 Keel Bhavani Murai neer pasana
vivasaigal sabai" in Lower Bhavani Irrigation system in Pallapalayam
Village in Perundurai taluk "
Estimate Amount (Rs. In
lakhs)
45.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
40.39 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-10 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 5
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and
Cross masonry structures in Erode Distributory fro mile 3/0 to 4/0 and
ondikkaranpalayam sub branch canal under the jurisdiction of the "M-5
Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani
Irrigation system in Nasiyanur Village in Erode taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
43.00 Date of
commencement
21-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.58 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-5 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 6
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures from mile 7/0 to Tailend of Kugalur distributory
and 6-5-158 Branch, 7-1-400 Rightside parallel channel of Kugalur
Distributory of LBP Main canal under the jurisdiction of U-6 Keel
Bhavani Murai neer pasana vivasaigal sabai" in Gobichettipalayam Taluk
of Erode District. "
Estimate Amount (Rs. In
lakhs)
39.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
34.67 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-6 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 7
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Bhavani Distributory from mile 9/3 to tail end,
Vyramangalam branch and Siraimeetanpalayam branch under the
jurisdiction of the "M-3 Keel Bhavani Murai neer pasana vivasaigal sabai"
in Lower Bhavani Irrigation system in Periyapuliyur village in Bhavani
Taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
28.50 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.54
Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-3 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 8
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of 34-7-170 Distributory , Sub Branches 0-5-0
and 1-5-215 of 35-7-255 Distributory of LBP Main canal under the
jurisdiction of "U-7 Keel Bhavani Murai neer pasana vivasaigal sabai" in
Lower Bhavani Irrigation system in Gobichettipalayam Taluk of Erode
District.
Estimate Amount (Rs. In
lakhs)
45.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
40.41 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-7 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 9
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of 3-2-415 distributory, 3-5-490 direct sluice,
Bommanur and Koonamolai Branches of 6-4-055 Distributory and mile 3/7
to 5/5 of LBP Main canal under the jurisdiction of "U-1 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Sathyamangalam Taluk of Erode District.
"
Estimate Amount (Rs. In
lakhs)
28.75 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.79 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-1 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 10
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and
Cross masonry structures in Moolakkarai, Vannankattuvalasu,
Nanjanapuram Branch Canal in Thindal Distributory under the jurisdiction
of the "M-6 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower
Bhavani Irrigation system in Nanjanapuram Village in Erode taluk of Erode
District"
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
26.08 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-6 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 11
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in 1-0-349 (R ) branch canal and 0-4-520 (R ) sub
branch of 2-2-70 (L) branch of Unjalur Distributary under the jurisdiction of
the "M-7 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower
Bhavani Irrigation System In Perundurai and Modakuruchi of Erode District
Estimate Amount (Rs. In
lakhs)
28.00 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.17 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-7 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 12
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures from mile 2/2 to Tailend of 30-4-300
Distributory and from mile 29-7-000 to 30-6-000 of LBP Main canal under
the jurisdiction of "U-4 Keel Bhavani Murai neer pasana vivasaigal sabai"
in Lower Bhavani Irrigation system in Gobichettipalayam Taluk of Erode
District.
Estimate Amount (Rs. In
lakhs)
42.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
37.43 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-4 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 13
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Mosakkaradu Branch from mile 2/4 to tail end and
pudur sub branch under the jurisdiction of the "M-2B Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Elavamalai village in Erode Taluk"
Estimate Amount (Rs. In
lakhs)
45.60 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
39.78 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-2B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 14
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of pasur branch canal,chinnamapuram sub
branch, uthandipalyam branch canal of kuraganpallam canal and desilting
in kuraganpallam anicut under the jurisdiction of the " M-10A Keel Bhavani
Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System
In Modakuruchi And Kodumudi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
28.50 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.63 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-10A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 15
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures from of mile 48-6-540, 49-1-095 & 50-5-575
Distributories LBP Main canal under the jurisdiction of "U-9 Keel Bhavani
Murai neer pasana vivasaigal sabai" in Perundurai Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
45.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
40.43 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-9 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 16
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures from mile 0/0 to mile 3/5 and mile 1-5-120
subbranch of 41-2-078 Distributory of LBP Main canal under the
jurisdiction of "U-8A Keel Bhavani Murai neer pasana vivasaigal sabai" in
Bhavani Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
49.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
44.04 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-8A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 17
Name of work Clearing the jungles, removal of shoals and repairs to sluices & the cross
masonry structures from mile 23/3 to 24/4 and 25/3 to 26/5 of LBP Main
canal under the jurisdiction of "U-3B Keel Bhavani Murai neer pasana
vivasaigal sabai" in Nambiyur Taluk of Erode District. "
Estimate Amount (Rs. In
lakhs)
39.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
34.78 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-3B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 18
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Kalingarayan channel from mile 12/4 to 19/2 under
the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai
no.1" in S.S.Agraharam village in Erode Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
24.8 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
21.14 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.1
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 19
Name of work Clearing the jungles , removal of shoals and repairs to the sluices and
cross masonry structures in 0-3-070 (L) sub branch canal and mile 0/0 to
1-2-160 of 7-0-225 ( R ) branch canal of Chennasamudram Distributory
under the juridication of the "L 5 Keel Bhavani Murai Neer Pasana
Vivasaigal Sabai " in Lower Bhavani Irrigation System in Kodumudi Taluk
of Erode District
Estimate Amount (Rs. In
lakhs)
44.00 Date of
commencement
18.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.12 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 5 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 20
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures of 14-6-100(L) branch canal and drop @ mile 13-6-
360,drop@ mile 15-7-420 of Unjalur Distributary under the jurisdiction of
the "M-11A Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" In Lower
Bhavani Irrigation System in Modakuruchi and Kodumudi Taluks of Erode
District
Estimate Amount (Rs. In
lakhs)
28.00 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.18 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-11A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 21
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures in Bhavani Distributory from mile 3/2 to 4/0,
Nadukkalipalayam branch and Semboothamapalayam branch under the
jurisdiction of the "M-2A Keel Bhavani Murai neer pasana vivasaigal sabai"
in Lower Bhavani Irrigation system in Pallapalayam village in Perundurai
Taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
43.00 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.61
Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-2A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 22
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures of 16-1-203(L) branch canal,18-4-620(L) branch canal
and drop @ mile 16-6-180,drop@ mile 18-6-20 of Unjalur Distributary
under the jurisdiction of the "M-11B Keel Bhavani Murai Neer Pasana
Vivasaigal Sabai" in Lower Bhavani Irrigation System in Kodumudi Taluk
of Erode District
Estimate Amount (Rs. In
lakhs)
27.95 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.12 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-11B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 23
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in 11-4-589(L) branch canal of Unjalur
Distributary under the jurisdiction of the "M-10 Keel Bhavani Murai Neer
Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System In
Modakuruchi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
26.09 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-10 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 24
Name of work Clearing the jungles , removal of shoals and repairs to the sluices and
cross masonry structures in between mile 0/0 to 0-5-550 and 0-5-500 (L)
sub branch canal of 9-7-320 (L) branch canal of Chennasamudram
Distributory under the juridication of the "L 6 Keel Bhavani Murai Neer
Pasana Vivasaigal Sabai " in Lower Bhavani Irrigation System in
Kodumudi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
44.00 Date of
commencement
18.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.48 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 6 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 25
Name of work aring the jungles, removal of shoals and repairs to the sluices and cross
masonry structures in 2-3-290 (L) sub branch, and in between mile 0/0 to
2/0 of 1-4-644 Elumathur branch of Chennasamudram Distributory under
the jurisdiction of the “L2 Keel Bhavani Murai Neer Pasana Vivasaigal
Sabai” in Lower Bhavani Irrigation system in Modakuruchi Taluk of Erode
District
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
22.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
24.82 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 2 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 26
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in 9-0-180(L) and 7-1-380 (L) and 0/7 to 1/7 of 6-
2-275(L) branch canal of Unjalur Distributary under the jurisdiction of the
"M-9 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani
Irrigation System in Modakuruchi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
25.75 Date of
commencement
24-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
23.16 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-9 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 27
Name of work Clearing the jungles , removal of shoals and repairs to the cross masonry
structures from mile 15/0 to 18/5 of Chennasamudram Distributory under
the juridication of the "L 8 Keel Bhavani Murai Neer Pasana Vivasaigal
Sabai " In Lower Bhavani Irrigation System in Kodumudi Taluk of Erode
District
Estimate Amount (Rs. In
lakhs)
45.00 Date of
commencement
22.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
39.71
Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 8 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 28
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of 7-7-420 distributory and from mile 0/0 to 1/5
of 10-0-195 Distributory, 6-5-595 and 10-6-640 direct sluices and mile
12/2 to 13/4 of LBP Main canal under the jurisdiction of "U-2 Keel
Bhavani Murai neer pasana vivasaigal sabai" in Sathyamangalam Taluk of
Erode District. "
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
26.02 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-2 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 29
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures from mile 3/5 to tail end of mile 41-2-078
Distributory of LBP Main canal under the jurisdiction of "U-8B Keel Bhavani
Murai neer pasana vivasaigal sabai" in Bhavani Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
28.00 Date of
commencement
20-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.03 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-8B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 30
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures of 74/5-060 distributory and 0/0 to 0/2-400 and
0/2 subbranch in 75/3-570 distributory under the jurisdiction of the "L-9
Keel Bhavani Muraineer pasana vivasalgal sabai" in Lower Bhavani
irrigation system in Modakuruchi and Perundurai Taluks of Erode District.
Estimate Amount (Rs. In
lakhs)
21.00 Date of
commencement
18.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
18.8 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 9 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 31
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in 2-6-500 (L) sub branch, in between mile 1/0 to
2/5 of 0-5-042 Kongudaiyampalayam branch canal and mile 0-3-156
Distributory of Chennasamudram Distributory under the Jurisdiction of the
"L-1 Keel Bhavani Murai Neer Pasana Vivasigal Sabai" in Lower Bhavani
Irrigation System in Modakuruchi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
16.00 Date of
commencement
8.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
13.58 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 1 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 32
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures from mile 0-1-140 sub branch and from mile 2-7-400 to
5-0-000 of 5-0-30 (L) branch canal of Unjalur Distributary under the
jurisdiction of the "M-8B Keel Bhavani Murai Neer Pasana Vivasaigal
Sabai" in Lower Bhavani Irrigation System in Modakuruchi Taluk of Erode
District
Estimate Amount (Rs. In
lakhs)
43.50 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
39.14
Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-8B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 33
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in mile 0/0 to 0-7-180 of 67-0-290 Poondurai
Distributory under the jurisdiction of the "M-12 Keel Bhavani Murai neer
pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Perundurai
and Modakuruchi taluk of Erode District
Estimate Amount (Rs. In
lakhs)
26.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
22.80 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-12 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 34
Name of work Reparis to the sluices and cross masonry structures and protection wall
Kalingarayan Channel from mile 32/31/2 to 35/0 and 40/0 to 41/3 and
retaining wall at mile 37/4, 38/3 and Malaiyamapalayam Branch Channel
outlet at 4/1 under the jurisdiction of the ''Kalingarayan Madhagu Pasana
Vivasaigal Sabai No.4" in Kolanalli Village in Kodumudi Taluk of Erode
District.
Estimate Amount (Rs. In
lakhs)
22.50 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
20.04 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.4
PHOTOS
The photos before execution and after execution should be in the same location &
orientation.
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No 35
Name of work Rehabilitation of Thadapalli channel flood damaged portion from mile 10/4 to 12/0 including construction of flood protection wall and bund strengthening in Gobi Taluk of Erode district.
Estimate Amount (Rs. In lakhs)
49.00
Date of commencement
24.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
43.90 Date of completion (If the work is in progress, mention the probable date of completion)
06.01.2021
Nature of work
Cleaning jungle and protection wall
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Thadapalli vaigal pasana sabai T3, Lakkampatti, Gobi.
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 36
Name of work Clearing the jungles , removal of shoals and repairs to the sluices and
cross masonry structures in 3-3-380 (L) and 5-5-473 (L) sub branch canals
of Chennasamudram Distributory under the juridication of the "L 4 Keel
Bhavani Murai Neer Pasana Vivasaigal Sabai " in Lower Bhavani Irrigation
System in Kodumudi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
43.00 Date of
commencement
18.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.14 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 4 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 38
Name of work Reparis to the sluices and cross masonry structures and protection wall
Kalingarayan Channel from mile 26/0 to 27/6 and 29/2 to 32/31/2 under
the jurisdiction of the ''Kalingarayan Madhagu Pasana Vivasaigal Sabai
No.3" in Kangayampalayam Village in Modakurichi Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
23.00 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
20.48 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.3
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 39
Name of work Clearing the jungles, removal of shoals and repairs to the cross masonry
structures from mile 19/3 to 20/5 and 21/5 to 22/2 of LBP Main canal
under the jurisdiction of "U-3A Keel Bhavani Murai neer pasana
vivasaigal sabai" in Nambiyur Taluk of Erode District. "
Estimate Amount (Rs. In
lakhs)
40.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
35.73 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
U-3A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No 40
Name of work Rehabilitation of LMC at L.S. 2.00 km to 3.00 km of PRS dam of left side main canal water users sabai of Kemmanaikanpalayam village in Sathy Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
36.00 Date of commencement
27.05.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
32.27 Date of completion (If the work is in progress, mention the probable date of completion)
04.11.2020
Nature of work RR wall with pointing and plastering
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Perumpallam anai idadhupura kalvai pasana vivasaigal sangam Reg.No.SRG/ Gobi/58/2020.
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No 41
Name of work Rehabilitation of LMC at LS 3.0 km to 4.0 km of PRS dam of left side main canal water users sabai of Kemmanaikanpalayam village in sathy taluk of Erode district.
Estimate Amount (Rs. In lakhs)
29.50 Date of commencement
27.05.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
26.4 Date of completion (If the work is in progress, mention the probable date of completion)
04.11.2020
Nature of work RR wall with pointing and plastering
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Perumpallam anai idadhupura kalvai pasana vivasaigal sangam Reg.No.SRG/ Gobi/58/2020.
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No. 42
Name of work Rehabilitation of Thadapalli channel - Kugalur Branch channel flood damaged portion from mile 6/0 to 7/0 and 24/0 to 26/0 of Thadapalli channel including construction of flood protection wall and bund strengthening in Gobi Taluk of Erode district.
Estimate Amount (Rs. In lakhs)
Rs. 55.00 Lakhs Date of commencement
24.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
Rs. 49.37 Lakhs Date of completion (If the work is in progress, mention the probable date of completion)
10.02.2021
Nature of work
1.Sluice Reconstruction 2.Bridge Widening 3.Desilting channels 4.Flood Protection wall
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Kodiveri Anicut - Thadapalli Vaikkal muraineer Pasana Vivasaigal Sangam T6
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 43
Name of work Reparis to the sluices and cross masonry structures and protection wall
Kalingarayan Channel from mile 41/3 to 42/0 and 44/0 to 45/0 and 48/2 to
49/1 and retaining wall at mile 42/3 under the jurisdiction of the
''Kalingarayan Madhagu Pasana Vivasaigal Sabai No.5" in
Vadakkupudupalayam Village in Kodumudi Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
22.00 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
19.66 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.5
PHOTOS
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No 44
Name of work Rehabilitation of Thadapalli channel flood damaged portion from mile 6/4 to 10/4 including construction of flood protection wall and bund strengthening in Gobi Taluk of Erode district.
Estimate Amount (Rs. In lakhs)
45.00 Date of commencement
24.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
40.45 Date of completion (If the work is in progress, mention the probable date of completion)
30.09.2020
Nature of work Cleaning jungle & protection wall
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Thadapalli vaigal pasana sabai T2, Solamadeikarai, Gobi.
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 45
Name of work Reparis to the sluices and cross masonry structures and protection wall
Kalingarayan Channel from mile 53/0 to 53/7 and retaining wall at mile
52/2.5 under the jurisdiction of the ''Kalingarayan Madhagu Pasana
Vivasaigal Sabai No.6" in Kodumudi Village in Kodumudi Taluk of Erode
District.
Estimate Amount (Rs. In
lakhs)
19.00 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
17.04 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.6
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 46
Name of work Reparis to the sluices and cross masonry structures and protection wall
Kalingarayan Channel from mile 55/0 to 55/3 and Avudairparai Branch
channel and retaining wall at mile 54/6 under the jurisdiction of the
''Kalingarayan Madhagu Pasana Vivasaigal Sabai No.7" in
Chennasamudram Village in Kodumudi Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
21.5 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
18.92 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.7
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 47
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in 0-1-300 to tail end of 2-5-40 (L) sub branch
of 3-0-138 kagam branch canal of Chennasamudram Distributory under
the jurisdiction of the “L3 Keel Bhavani Murai Neer Pasana Vivasaigal
Sabai” in Lower Bhavani Irrigation system in Modakuruchi Taluk of Erode
District
Estimate Amount (Rs. In
lakhs)
29.00 Date of
commencement
20.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
25.57 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 3 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl.No
48
Name of work Rehabilitation of Thadapalli channel flood damaged portion from mile 2/1 to 5/0 including Reconstruction of Bridge at mile 2/2, construction of flood protection wall and bund strengthening in Gobi Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
49.50 Date of commencement
24.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
44.41 Date of completion (If the work is in progress, mention the probable date of completion)
30.09.2020
Nature of work Reconstruction of Bridge
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
Thadapalli vaigal pasana sabai T1, Singripalayam, Gobi.
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 49
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures from mile 0/0 to 1/0 and 1/3 to 1/5 of 1-2-85 (L) sub
branch canal of 5-0-30 (L) branch canal of Unjalur Distributary under the
jurisdiction of the "M-8A Keel Bhavani Murai Neer Pasana Vivasaigal
Sabai" in Lower Bhavani Irrigation System in Modakuruchi Taluk of Erode
District
Estimate Amount (Rs. In
lakhs)
29.50 Date of
commencement
27-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
26.51 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-8A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 50
Name of work Reparis to the sluices and cross masonry structures and production wall
Kalingarayan Channel from mile 19/2 1/2 to 22/0 under the jurisdiction of
the ''Kalingarayan Madhagu Pasana Vivasaigal Sabai No.2" in
Thasampudur Village in Modakurich Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
20.00 Date of
commencement
03.06.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
17.91 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Madhagu Pasana Vivasaigal Sabai no.2
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 51
Name of work Clearing the jungles, removal of shoals and repairs to the sluices and
cross masonry structures in mile 0-3-347 to 1-5-064 of 70-1-394
Distributory under the jurisdiction of the "M-13 Keel Bhavani Murai neer
pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Perundurai
and Modakuruchi taluk of Erode District
Estimate Amount (Rs. In
lakhs)
26.00 Date of
commencement
18-5-2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
22.93
Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
M-13 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2020-21
Sl.No 52
Name of work Clearing the jungles , removal of shoals and repairs to the sluices and
cross masonry structures in 12-5-504 (L) branch canal of
Chennasamudram Distributory under the juridication of the "L 7 Keel
Bhavani Murai Neer Pasana Vivasaigal Sabai " In Lower Bhavani Irrigation
System in Kodumudi Taluk of Erode District
Estimate Amount (Rs. In
lakhs)
43.00 Date of
commencement
18.05.2020
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
38.32 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.09.2020
Nature of work
clearing
jungle,desiltinge and
sluice cross masonry
repair work.
Progress of work (%
Completed)
Work Completed
Name of the Farmers
Asssociation by which work
has been executed
L- 7 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the year
2020 -21
Sl.No
53
Name of work Rehabilitation of Arakkankottai Channel from mile 14/0 to 16/0 and repair to outlet at mile 14/5 , 15/7 in Gobi Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
49.00 Lakhs Date of commencement 12.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
44.10 Lakhs / 43.97
Date of completion (If the work is in progress, mention the probable date of completion)
09.09.2020
Nature of work
Jungle Clearance , Special Repairs to Sluice, Bund Strengthening and Protection wall construction.
Progress of work (% Completed)
100% Completed
Name of the Farmers Asssociation by which work has been executed
President, KodiveriAnicutThittamArakkankottaiVaikkalMuraiNeerPasanaVivasaigalSangam, PasanaKottam No.4
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020 -21
Sl.No
54
Name of work Rehabilitation of Arakkankottai Channel from mile 19/0 to 20/1 in Gobi Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
42.00 Lakhs Date of commencement 12.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
37.67 Lakhs Date of completion (If the work is in progress, mention the probable date of completion)
09.09.2020
Nature of work
Jungle Clearance, Special Repairs to Sluice, Bund Strengthening and Protection wall construction.
Progress of work (% Completed) 100% Completed
Name of the Farmers Asssociation by which work has been executed
President, KodiveriAnicutThittamArakkankottaiVaikkalMuraiNeerPasanaVivasaigalSangam, PasanaKottam No.4
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020 -21
Sl.No 55
Name of work Rehabilitation of Arakkankottai Channel from mile 8/0 to 10/0 and extension of Bridge at mile 8/4 in Gobi Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
47.00 Lakhs Date of commencement 12.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
42.17 Lakhs Date of completion (If the work is in progress, mention the probable date of completion)
09.09.2020
Nature of work
Jungle Clearance, Special Repairs to Sluice, Bund Strengthening and Protection wall construction.
Progress of work (% Completed) 100% Completed
Name of the Farmers Asssociation by which work has been executed
President, KodiveriAnicutThittamArakkankottaiVaikkalMuraiNeerPasanaVivasaigalSangam, PasanaKottam No.2
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020 -21
Sl.No
56
Name of work Rehabilitation of Arakkankottai Channel from mile 10/0 to 12/0 and repair to outlet at mile 11/2 in Gobi Taluk of Erode District.
Estimate Amount (Rs. In lakhs)
47.00 Lakhs Date of commencement 12.06.2020
Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs)
42.17 Lakhs Date of completion (If the work is in progress, mention the probable date of completion)
09.09.2020
Nature of work
Jungle Clearance, Special Repairs to Sluice, Bund Strengthening and Protection wall construction.
Progress of work (% Completed) 100% Completed
Name of the Farmers Asssociation by which work has been executed
President, KodiveriAnicutThittamArakkankottaiVaikkalMuraiNeerPasanaVivasaigalSangam, PasanaKottam No.2
PHOTOS
The photos before execution and after execution should be in the same location & orientation.
Before Execution After Execution
Kudimaramath works for the year
2020-21
Sl. No. 57
Name of Work Rehabilitation of Field Channel below Sluices of Odathurai Tank in Odathurai Village in Bhavani Taluk of Erode District.
Estimate Amount (Rs. in Lakhs)
Rs.45.00 Lakhs Date of commencement
24.05.2020
Expenditure w.r.t. 90% of Estimate Amount (Rs. in Lakhs)
Rs. 40.47 Lakhs
Date of completion (if the work is in progress, mention the probable date of completion)
12.09.2020
Nature of work Field Channel Lining
Progress of work (% Completed)
100% work Completed
Name of the Farmers Association by which work has been executed.
Odathurai Yeri Neer Pasana Vivasayeegal Sangam
Before Execution After Execution