TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
SLDC P_Id From Name of SS
1 Chennai 71815 207 230 KV SIRUSERI 230 KV
2 Chennai 72406 Jun-18 EE/O/KTR 230 KV KORATTUR 230 KV3 Chennai 72696 1 EE/O/Arani 110 KV ARNI 230 KV
4 Chennai 72700 1 EE/O/Arani 110 KV ARNI230KV
5 Chennai 73005 1 EE/O/KDP 230 KV KADAPPERI 230 KV6 Chennai 71744 1 EE/O/TMY 230 KV THARAMANI 230 KV7 Chennai 71769 20 EE/O/KITS SS 230 KV KITS 230 KV
8 Chennai 72293 1 EE O OMEGA SS 230 KV OMEGA230KV
9 Chennai 72023 1 EE/O/TPT SS 230 KV TONDIARPET 230 KV10 Chennai 72322 1 EE/O/SPR 400 KV Sriperumbudur 400 KV
11 Chennai 72914 1 eeovpm 230 KV VILLUPURAM 230 KV
12 Chennai 72459 1 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
13 Chennai 72706 2 EE/O/Arani 230 KV ARNI 230 KV
14 Chennai 72709 3 EE/O/Arani 230 KV ARNI 230 KV
15 Chennai 72715 4 EE/O/Arani 230 KV ARNI 230 KV
16 Chennai 72730 6 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
17 Chennai 72968 15 eeovpm 110 KV Villapuram 110 KV
18 Chennai 73204 89 EE/O/MOSUR 230 KV MOSUR 230 KV
19 Chennai 73223 107 EE/O/MOSUR 230 KV MOSUR 230 KV
20 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
S. No.
Message No
Type of SS
EE/OPN/230KV Siruseri SS
21 Chennai 73027 13 EE/O/KDP 230 KV KADAPPERI 230 KV
22 Chennai 71883 5 EE / O / BBSS 230 KV BASIN BRIDGE(GMRVASA
23 Chennai 71956 18 230 KV KOYAMBEDU 230 KV
24 Chennai 72325 2 EE/O/SPR 400 KV Sriperumbudur 400 KV
25 Chennai 72327 3 EE/O/SPR 400 KV Sriperumbudur 400 KV26 Chennai 73136 83 EE/O/KLPK 230 KV KILPAUK 230 KV27 Chennai 73139 86 EE/O/KLPK 230 KV
28 Chennai 71884 10 EE / O / BBSS 230 KV BASIN BRIDGE(GMRVASA29 Chennai 72969 16 eeovpm 110 KV Villapuram 110 KV
30 Chennai 73009 3 EE/O/KDP 230 KV KADAPPERI 230 KV
31 Chennai 71816 208 230 KV SIRUSERI 230 KV
32 Chennai 71876 44 05.06.1018 230 KV Ulundurpet 230 KV
33 Chennai 71931 209 230 KV ACHRAPAKKAM 230 KV
34 Chennai 72026 2 EE/O/TPT SS 230 KV TONDIARPET 230 KV35 Chennai 72330 4 EE/O/SPR 400 KV Sriperumbudur 400 KV
36 Chennai 72855 1032 230 KV THIRUVALAM 230 KV
37 Chennai 72368 97 EE/O/ECHUR 230 KV ECHUR 230 KV
38 Chennai 72466 2 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
39 Chennai 72604 1023 230 KV THIRUVALAM 230 KV
40 Chennai 72720 5 EE/O/Arani 230 KV ARNI 230 KV
41 Chennai 72737 7 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
EE/O/KOYAMBEDU
Sunguvarchatram 400 KV SS
EE/OPN/230KV Siruseri SS
EE/O/230KVSS/ACK
EE/O/230KV SS/Thiruvalam
EE/O/TVLM/230KVSS
42 Chennai 72798 1 EE OPERATION 230 KV ORAGADAM 230 KV
43 Chennai 72922 2 eeovpm 230 KV VILLUPURAM 230 KV
44 Chennai 72995 28 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
45 Chennai 73077 100 EE/O/VRPM 230 KV VEERAPURAM 230 KV
46 Chennai 73205 90 EE/O/MOSUR 230 KV MOSUR 230 KV
47 Chennai 73224 108 EE/O/MOSUR 230 KV MOSUR 230 KV48 Chennai 71696 87 400 KV 400/230kv Thiruvalam SS
49 Chennai 71745 2 EE/O/TMY 230 KV THARAMANI 230 KV50 Chennai 71771 21 EE/O/KITS SS 230 KV KITS 230 KV
51 Chennai 72017 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
52 Chennai 72690 230 KV KADAPPERI 230 KV53 Chennai 72725 6 EE/O/Arani 230 KV ARNI 230 KV
54 Chennai 72928 3 eeovpm 230 KV VILLUPURAM 230 KV
55 Chennai 73012 4 EE/O/KDP 230 KV KADAPPERI 230 KV56 Chennai 73079 101 EE/O/VRPM 230 KV VEERAPURAM 230 KV
57 Chennai 73126 428 230 KV MYLAPORE 230 KV
58 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
59 Chennai 71698 89 400 KV 400/230 KV Thiruvalam SS
60 Chennai 71817 209 230 KV SIRUSERI 230 KV
61 Chennai 72294 2 EE O OMEGA SS 110 KV OMEGA230KV
EE O 400kv Thiruvalam
EE/O/MYLAPORE 230 KV GIS SS
EE O 400kv Thiruvalam
EE/OPN/230KV Siruseri SS
62 Chennai 72332 5 EE/O/SPR 400 KV Sriperumbudur 400 KV63 Chennai 72888 1 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
64 Chennai 72894 2 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
65 Chennai 72900 3 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
66 Chennai 72908 4 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
67 Chennai 72912 5 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
68 Chennai 72437 426 230 KV SPR SIPCOT(MAMBAKKA
69 Chennai 72472 3 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV70 Chennai 72742 8 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
71 Chennai 72931 4 eeovpm 230 KV VILLUPURAM 230 KV
72 Chennai 72936 5 eeovpm 230 KV VILLUPURAM 230 KV
73 Chennai 72941 6 eeovpm 230 KV VILLUPURAM 230 KV
74 Chennai 72973 17 eeovpm 110 KV Villapuram 110 KV
75 Chennai 73013 5 EE/O/KDP 230 KV KADAPPERI 230 KV76 Chennai 73171 13 EE/O/ATHIPET 230 KV ATHIPET 230 KV
77 Chennai 73206 91 EE/O/MOSUR 230 KV MOSUR 230 KV
78 Chennai 73214 99 EE/O/MOSUR 230 KV MOSUR 230 KV
79 Chennai 73225 109 EE/O/MOSUR 230 KV MOSUR 230 KV80 Chennai 72333 6 EE/O/SPR 400 KV Sriperumbudur 400 KV81 Chennai 72375 98 EE/O/ECHUR 230 KV ECHUR 230 KV
82 Chennai 72918 5 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
83 Chennai 72411 Jun-18 EE/O/KTR 230 KV KORATTUR 230 KV
EE/ O/ 230KV SIPCOT Mambakkam SS
84 Chennai 72476 4 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
85 Chennai 72694 2 230 KV KADAPPERI 230 KV
86 Chennai 72736 7 EE/O/Arani 230 KV ARNI 230 KV
87 Chennai 72750 9 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
88 Chennai 72944 9 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
89 Chennai 72945 7 eeovpm 230 KV VILLUPURAM 230 KV
90 Chennai 72949 8 eeovpm 230 KV VILLUPURAM 230 KV
91 Chennai 73082 102 EE/O/VRPM 230 KV VEERAPURAM 230 KV92 Chennai 73222 106 EE/O/MOSUR 230 KV MOSUR 230 KV93 Chennai 73226 110 EE/O/MOSUR 230 KV MOSUR 230 KV94 Chennai 72462 90 230 KV Thiruvalam230kv
95 Chennai 72028 3 EE/O/TPT SS 230 KV TONDIARPET 230 KV
96 Chennai 72859 1033 400 KV Thiruvalam 400 KV
97 Chennai 72862 1034 230 KV THIRUVALAM 230 KV
98 Chennai 72865 1035 230 KV THIRUVALAM 230 KV
99 Chennai 72615 1024 230 KV THIRUVALAM 230 KV
100 Chennai 73008 2 EE/O/KDP 230 KV KADAPPERI 230 KV
101 Chennai 72019 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
102 Chennai 73016 6 EE/O/KDP 230 KV KADAPPERI 230 KV
EE/O/KDP 230 KV SS
EE O 400kv Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/TVLM/230KVSS
103 Chennai 72295 3 EE O OMEGA SS 230 KV OMEGA230KV
104 Chennai 72336 7 EE/O/SPR 400 KV Sriperumbudur 400 KV105 Chennai 72482 5 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
106 Chennai 72925 6 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
107 Chennai 72955 9 eeovpm 230 KV VILLUPURAM 230 KV
108 Chennai 72975 18 eeovpm 110 KV Villapuram 110 KV
109 Chennai 73207 93 EE/O/MOSUR 230 KV MOSUR 230 KV110 Chennai 73227 111 EE/O/MOSUR 230 KV MOSUR 230 KV111 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S112 Chennai 71877 44 Ulundurpet230KV 230 KV Ulundurpet 230 KV
113 Chennai 71932 210 230 KV ACHRAPAKKAM 230 KV
114 Chennai 72031 4 EE/O/TPT SS 230 KV TONDIARPET 230 KV115 Chennai 72338 8 EE/O/SPR 400 KV Sriperumbudur 400 KV
116 Chennai 72804 2 EE Operation 230 KV ORAGADAM 230 KV117 Chennai 72379 99 EE/O/ECHUR 230 KV ECHUR 230 KV
118 Chennai 72770 10 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
119 Chennai 72938 7 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
120 Chennai 72951 10 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
121 Chennai 72957 10 eeovpm 230 KV VILLUPURAM 230 KV
EE/O/230KVSS/ACK
122 Chennai 71885 18 EE / O / BBSS 230 KV BASIN BRIDGE(GMRVASA123 Chennai 71937 26/2018 230 KV THIRUVERKADU 230 KV
124 Chennai 71746 3 EE/O/TMY 230 KV THARAMANI 230 KV125 Chennai 72340 9 EE/O/SPR 400 KV Sriperumbudur 400 KV
126 Chennai 72487 6 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
127 Chennai 72701 3 230 KV KADAPPERI 230 KV
128 Chennai 72739 8 EE/O/Arani 230 KV ARNI 230 KV129 Chennai 72789 11 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
130 Chennai 72956 11 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
131 Chennai 73017 7 EE/O/KDP 230 KV KADAPPERI 230 KV132 Chennai 73083 103 EE/O/VRPM 230 KV VEERAPURAM 230 KV
133 Chennai 73127 429 230 KV MYLAPORE 230 KV
134 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
135 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
136 Chennai 72296 4 EE O OMEGA SS 230 KV OMEGA230KV
137 Chennai 72024 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
138 Chennai 72813 3 EE Operation 230 KV ORAGADAM 230 KV139 Chennai 72383 136 EE/O/230KV GIS 230 KV CMRL 230 KV
140 Chennai 72441 427 230 KV SPR SIPCOT(MAMBAKKA
141 Chennai 72491 7 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
142 Chennai 72744 9 EE/O/Arani 230 KV ARNI 230 KV
143 Chennai 72748 10 EE/O/Arani 230 KV ARNI 230 KV
EE/Operation/Thiruverkadu
EE/O/KDP 230 KV SS
EE / O / MYLAPORE 230 KV GIS SS
EE/ O/ 230KV SIPCOT Mambakkam SS
144 Chennai 72958 12 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
145 Chennai 72962 13 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
146 Chennai 72996 29 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
147 Chennai 73173 14 EE/O/ATHIPET 230 KV ATHIPET 230 KV
148 Chennai 73208 94 EE/O/MOSUR 230 KV MOSUR 230 KV149 Chennai 73209 95 EE/O/MOSUR 230 KV MOSUR 230 KV150 Chennai 73228 112 EE/O/MOSUR 230 KV MOSUR 230 KV151 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
152 Chennai 71773 22 EE/O/KITS SS 230 KV KITS 230 KV
153 Chennai 72027 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
154 Chennai 72032 5 EE/O/TPT SS 230 KV TONDIARPET 230 KV155 Chennai 72342 10 EE/O/SPR 400 KV Sriperumbudur 400 KV
156 Chennai 73019 8 EE/O/KDP 230 KV KADAPPERI 230 KV157 Chennai 73137 84 EE/O/KLPK 230 KV KILPAUK 230 KV158 Chennai 72998 31 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
159 Chennai 71697 88 400 KV 400/230 KV Thiruvalam SS
160 Chennai 71747 4 EE/O/TMY 230 KV THARAMANI 230 KV161 Chennai 71758 64 230 KV Guindy 230 KV
EE O 400kv Thiruvalam
EE/O/Guindy GIS SS
162 Chennai 71775 23 EE/O/KITS SS 230 KV KITS 230 KV
163 Chennai 72033 6 EE/O/TPT SS 230 KV TONDIARPET 230 KV
164 Chennai 72802 12 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
165 Chennai 72807 12 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
166 Chennai 72811 13 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
167 Chennai 72819 4 EE OPERATION 230 KV ORAGADAM 230 KV
168 Chennai 72867 1036 400 KV Thiruvalam 400 KV
169 Chennai 72869 1037 230 KV THIRUVALAM 230 KV
170 Chennai 72871 1038 230 KV THIRUVALAM 230 KV
171 Chennai 72382 100 EE/O/ECHUR 230 KV ECHUR 230 KV
172 Chennai 72416 Jun-18 EE/O/KTR 230 KV KORATTUR 230 KV
173 Chennai 72470 91 230 KV Thiruvalam230kv
174 Chennai 72496 8 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
175 Chennai 72636 1025 230 KV THIRUVALAM 230 KV
176 Chennai 72704 4 230 KV KADAPPERI 230 KV
177 Chennai 72971 14 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE O 400kv Thiruvalam
EE/O/TVLM/230KVSS
EE/O/KDP 230 KV SS
178 Chennai 72974 14 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
179 Chennai 72976 16 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
180 Chennai 72977 19 eeovpm 110 KV Villapuram 110 KV
181 Chennai 72979 17 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
182 Chennai 72982 17 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
183 Chennai 72997 30 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
184 Chennai 73021 9 EE/O/KDP 230 KV KADAPPERI 230 KV185 Chennai 73210 96 EE/O/MOSUR 230 KV MOSUR 230 KV186 Chennai 73211 97 EE/O/MOSUR 230 KV MOSUR 230 KV187 Chennai 73229 113 EE/O/MOSUR 230 KV MOSUR 230 KV188 Chennai 73230 114 EE/O/MOSUR 230 KV MOSUR 230 KV189 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
190 Chennai 71886 27 EE / O / BBSS 230 KV BASIN BRIDGE(GMRVASA
191 Chennai 71959 20 230 KV KOYAMBEDU 230 KV
192 Chennai 72343 11 EE/O/SPR 400 KV Sriperumbudur 400 KV
193 Chennai 72873 1039 230 KV THIRUVALAM 230 KV
EE/O/KOYAMBEDU
EE/O/230KV SS/Thiruvalam
194 Chennai 72699 1030 230 KV THIRUVALAM 230 KV
195 Chennai 73022 10 EE/O/KDP 230 KV KADAPPERI 230 KV196 Chennai 72959 11 eeovpm 230 KV VILLUPURAM 230 KV
197 Chennai 72986 19 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
198 Chennai 73024 11 EE/O/KDP 230 KV KADAPPERI 230 KV199 Chennai 73175 15 EE/O/ATHIPET 230 KV ATHIPET 230 KV
200 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
201 Chennai 71878 44 Ulundurpet230KV 230 KV Ulundurpet 230 KV
202 Chennai 71933 211 230 KV ACHRAPAKKAM 230 KV
203 Chennai 72815 14 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
204 Chennai 72825 5 EE OPERATION 230 KV ORAGADAM 230 KV
205 Chennai 72874 1040 230 KV ARNI 230 KV
206 Chennai 72445 428 230 KV SPR SIPCOT(MAMBAKKA
207 Chennai 72498 9 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
208 Chennai 72713 5 230 KV KADAPPERI 230 KV
209 Chennai 72751 11 EE/O/Arani 230 KV ARNI 230 KV
210 Chennai 73084 104 EE/O/VRPM 230 KV VEERAPURAM 230 KV211 Chennai 73212 98 EE/O/MOSUR 230 KV MOSUR 230 KV212 Chennai 71748 5 EE/O/TMY 230 KV THARAMANI 230 KV213 Chennai 72345 12 EE/O/SPR 400 KV Sriperumbudur 400 KV
214 Chennai 72385 101 EE/O/ECHUR 230 KV ECHUR 230 KV
215 Chennai 72502 10 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
EE/O/TVLM/230KVSS
EE/O/230KVSS/ACK
EE/O/230KV SS/Thiruvalam
EE/ O/ 230KV SIPCOT Mambakkam SS
EE/O/KDP 230 KV SS
216 Chennai 72718 6 230 KV KADAPPERI 230 KV
217 Chennai 72756 12 EE/O/Arani 230 KV ARNI 230 KV
218 Chennai 72961 12 eeovpm 230 KV VILLUPURAM 230 KV
219 Chennai 72987 20 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
220 Chennai 72999 32 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
221 Chennai 73025 12 EE/O/KDP 230 KV KADAPPERI 230 KV222 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
223 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
224 Chennai 72046 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
225 Chennai 72823 15 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
226 Chennai 72828 6 EE OPERATION 230 KV ORAGADAM 230 KV
227 Chennai 72831 16 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230
228 Chennai 72835 7 EE OPERATION 230 KV ORAGADAM 230 KV
229 Chennai 72875 1041 230 KV THIRUVALAM 230 KV
230 Chennai 72885 1042 110 KV Kanji 110 KV
231 Chennai 72889 1043 230 KV THIRUVALAM 230 KV
232 Chennai 72504 11 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
233 Chennai 72650 1026 230 KV THIRUVALAM 230 KV
234 Chennai 72980 20 eeovpm 110 KV Villapuram 110 KV
EE/O/KDP 230 KV SS
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/TVLM/230KVSS
235 Chennai 73180 16 EE/O/ATHIPET 230 KV ATHIPET 230 KV
236 Chennai 73215 100 EE/O/MOSUR 230 KV MOSUR 230 KV237 Chennai 73216 101 EE/O/MOSUR 230 KV MOSUR 230 KV
238 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
239 Chennai 72052 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
240 Chennai 71778 24 EE/O/KITS SS 230 KV KITS 230 KV
241 Chennai 72050 Jun-18 EE/O/Alamathy 400 KV Alamathy 400 KV
242 Chennai 72898 1046 230 KV ARNI 230 KV
243 Chennai 72505 12 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
244 Chennai 72758 13 EE/O/Arani 230 KV ARNI 230 KV
245 Chennai 73030 14 EE/O/KDP 230 KV KADAPPERI 230 KV246 Chennai 73218 102 EE/O/MOSUR 230 KV MOSUR 230 KV247 Chennai 73231 115 EE/O/MOSUR 230 KV MOSUR 230 KV248 Chennai 71819 210 230 KV SIRUSERI 230 KV
249 Chennai 71820 211 230 KV SIRUSERI 230 KV
250 Chennai 72418 Jun-18 EE/O/KTR 230 KV KORATTUR 230 KV
251 Chennai 72510 13 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV252 Chennai 72722 7 230 KV KADAPPERI 230 KV
253 Chennai 73032 15 EE/O/KDP 230 KV KADAPPERI 230 KV254 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchavarchatram 40
255 Chennai 71821 212 230 KV SIRUSERI 230 KV
256 Chennai 71961 21 230 KV KOYAMBEDU 230 KV
257 Chennai 72731 8 230 KV KADAPPERI 230 KV
EE/O/230KV SS/Thiruvalam
EE/OPN/230KV Siruseri SS
EE/OPN/230KV Siruseri SS
EE/O/KDP 230 KV SS
EE/OPN/230KV Siruseri SS
EE/O/KOYAMBEDU
EE/O/KDP 230 KV SS
258 Chennai 73034 16 EE/O/KDP 230 KV KADAPPERI 230 KV259 Chennai 73138 85 EE/O/KLPK 230 KV KILPAUK 230 KV260 Chennai 72902 1047 230 KV THIRUVALAM 230 KV
261 Chennai 72906 1048 230 KV THIRUVALAM 230 KV
262 Chennai 72664 1028 230 KV THIRUVALAM 230 KV
263 Chennai 72988 21 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
264 Chennai 71879 44 Ulundurpet230KV 230 KV Ulundurpet 230 KV
265 Chennai 71934 212 230 KV ACHRAPAKKAM 230 KV
266 Chennai 72298 6 EE O OMEGA SS 110 KV OMEGA230KV
267 Chennai 72833 17 EE/O/T.V.Malai 230 KV THIRUVANNAMALAI 230268 Chennai 72842 8 EE OPERATION 230 KV ORAGADAM 230 KV
269 Chennai 72910 1049 400 KV Thiruvalam 400 KV
270 Chennai 72388 102 EE/O/ECHUR 230 KV ECHUR 230 KV
271 Chennai 72479 92 230 KV Thiruvalam230kv
272 Chennai 72512 14 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV
273 Chennai 72666 1029 230 KV THIRUVALAM 230 KV
274 Chennai 72989 22 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
275 Chennai 72990 23 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
276 Chennai 73035 17 EE/O/KDP 230 KV KADAPPERI 230 KV
277 Chennai 73085 105 EE/O/VRPM 230 KV VEERAPURAM 230 KV278 Chennai 73219 103 EE/O/MOSUR 230 KV MOSUR 230 KV
EE/O/230KV SS/Thiruvalam
EE/O/230KV SS/Thiruvalam
EE/O/TVLM/230KVSS
EE/O/230KVSS/ACK
EE/O/230KV SS/Thiruvalam
EE O 400kv Thiruvalam
EE/O/TVLM/230KVSS
279 Chennai 71887 37 EE / O / BBSS 230 KV BASIN BRIDGE(GMRVASA280 Chennai 71749 6 EE/O/TMY 230 KV THARAMANI 230 KV
281 Chennai 72347 13 EE/O/SPR 400 KV Sriperumbudur 400 KV
282 Chennai 72741 9 230 KV KADAPPERI 230 KV
283 Chennai 72760 14 EE/O/Arani 230 KV ARNI 230 KV
284 Chennai 72983 21 eeovpm 110 KV Villapuram 110 KV
285 Chennai 72991 24 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
286 Chennai 73139 86 EE/O/KLPK 230 KV Sunguvarchatram 400 KV S
287 Chennai 72297 5 EE O OMEGA SS 230 KV OMEGA230KV
288 Chennai 72349 14 EE/O/SPR 400 KV Sriperumbudur 400 KV289 Chennai 72391 103 EE/O/ECHUR 230 KV ECHUR 230 KV
290 Chennai 72513 15 EE/O/SPKOIL 230 KV S.P.KOIL 230 KV291 Chennai 72992 25 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
292 Chennai 72993 26 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
293 Chennai 73220 104 EE/O/MOSUR 230 KV MOSUR 230 KV294 Chennai 73232 116 EE/O/MOSUR 230 KV MOSUR 230 KV295 Chennai 72893 1045 230 KV THIRUVALAM 230 KV
296 Chennai 72658 1027 230 KV THIRUVALAM 230 KV
297 Chennai 72350 15 EE/O/SPR 400 KV Sriperumbudur 400 KV
EE/O/KDP 230 KV SS
EE/O/230KV SS/Thiruvalam
EE/O/TVLM/230KVSS
298 Chennai 72994 27 EE/O/Cuddalore 230 KV CUDDALORE 230 KV
299 Chennai 73036 18 EE/O/KDP 230 KV KADAPPERI 230 KV
300 Chennai 73221 105 EE/O/MOSUR 230 KV MOSUR 230 KV301 Chennai 73233 117 EE/O/MOSUR 230 KV MOSUR 230 KV302 Chennai 71880 44 Ulundurpet230KV 230 KV Ulundurpet 230 KV
303 Chennai 71750 7 EE/O/TMY 230 KV THARAMANI 230 KV304 Chennai 71760 65 230 KV Guindy 230 KV
305 Chennai 71781 25 EE/O/KITS SS 230 KV KITS 230 KV
306 Chennai 72916 1050 400 KV Thiruvalam 400 KV
307 Chennai 72419 Jun-18 EE/O/KTR 230 KV KORATTUR 230 KV
308 Chennai 72753 10 230 KV KADAPPERI 230 KV
309 Chennai 72762 15 EE/O/Arani 230 KV ARNI 230 KV310 Chennai 72964 13 eeovpm 230 KV VILLUPURAM 230 KV
311 Chennai 72966 14 eeovpm 230 KV VILLUPURAM 230 KV
312 Chennai 73039 19 EE/O/KDP 230 KV KADAPPERI 230 KV
313 Chennai 73086 106 EE/O/VRPM 230 KV VEERAPURAM 230 KV314 Chennai 73139 86 EE/O/KLPK 230 KV KILPAUK 230 KV
EE/O/Guindy GIS SS
EE/O/230KV SS/Thiruvalam
EE/O/KDP 230 KV SS
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
Feeder Equipment Purpose
110KV SHOLINGANALLUR #
110 KV KTR-ANNANAGAR# For General Maintenance workFor monthly Maintenance work
For monthly Maintenance work
110KV Tharamnai- Velachery # OH Line maintenance work110 KV perungudi I feeder Maintenance works110KV WIPRO QUARTERLY MAINTANANCE
230/110KV,100MVA Auto Transformer-I
230 KV NCTPS Feeder 2 Routine Maintenance work100KV SVC-Kanchi feeder Line maintenance work
230KV Bus Coupler
100MVA AUTO TR.I
For monthly Maintenance work
110KV Arani link CTs, CBs Isolator Switch For monthly Maintenance work.
For monthly Maintenance work.
Monthly maintenance work
110KV GC Breaker
110kv Thiruvallur feeder breaker and its cts For monthly maintance works
110kv THIRUVALLUR FEEDER LINES EHT LINE MAINTANCE WORKS
Maintenance work & GRT Annual relay Test
110 KV Arani-Santhavasal - CTs, CBs Isolator Switch
110 KV Arani-Santhavasal - CTs, CBs Isolator Switch
230/110KV,100MVA Auto Transformer-I (HV&LV Breakers,CT’s and Isolators)
To carry out Breaker and CT’s Monthly Maintenance Work.
FOR MONTHLY MAINTENANCE WORK
110KV Arani-Singarpet –I - CTs, CBs Isolator Switch
AutoTransformer –II , HV II, LV II, Breaker, CT's CTs, Isolator Switches
110 KV T.V.Malai-Villupuram #, Breaker, CT's and Line Isolator
Breaker CTs & Line side isolator maintenance works.
110 KV Suguvarchatram - Kanchi feeder breaker, CTs and line isolator
Line maintenance work & Quarterly maintenance work
230KV Kalivanthapattu - Siruseri # Line maintenance work.
110 KV Bus Section I complete Half yearly maintenance wokk
23o KV KOYAMBEDU -CMRL FEEDER For Monthly Maintenance Works.
Auto Transformer-2 ,400/230KV-315MVA Monthly maintenance work
230KV Nokia -SVC feeder Line maintenance work230KV NCTPS feeder Routine Maintenance work
110 KV High court # Monthly maintenance work110KV Villupuram- Neyveli- I #
110KV Siruseri -ETL # Line maintenance work.
110KV MAMBAKKAM # Maintenance work
Ulundurpet 230 /110 KV Auto Transformer
100 MVA AUTO Transformer I Routine maintenance230KV Suryadev Feeder Quarterly and line maintenance work
230KV Thiruvalam – Mosur feeder entire For EHT Line maintenance work.
Auto Transformer I
230KV SPK-ORAGADAM FEEDER
For Monthly Maintenance Works
For monthly Maintenance work.
Monthly maintenance work
110 KV Sriperumbudur - Sunguvarchatram - Mosur-II feeder breaker, CTs and line isolator
Monthly maintenance and line maintenance work
Breaker CTs & Line side isolator maintenance works.
Monthly maintenance work for HV/LV Breakers , Isolators, Checking of bolt &nuts inspection of jumper joints and bus bar.
100MVA Autotransformer-1 (HV & LV) Breaker & CT's
To Carryout Monthly Maintenance Work
Monthly Maintenace work in Auto Transformer I
FOR QUARTERLY MTCE WORK AND LINE MTCE WORK
Mosur feeder Breakers and its CT’s and Line Isolators
230 KV Arani – Bhavini - I # CTs, CBs Isolator Switchs
230 KV T.V.Malai - Neyveli #, Breaker, CT's and Line Isolator
230KV ORAGADAM S P KOIL FEEDER Quarterly maintenance
110KV 110KV Madurapakkam-I#
Monthly Maintenance
230kvThiruvalam feeder breaker and its cts For monthly maintance
230kv thiruvalam fdr lines EH LINE Mtc400/230KV,315 MVA, ICT II Monthly maintenance work
50 MVA Power Transformer I Maintenance works100MVA AUTO TRANSFORMER-1
400KV Thiruvalam-II feeder Routine Maintenance Work
16 MVA PR.TR I Monthly Maintenance worksFor monthly Maintenance work.
110KV Madurapakkam II
110KV KITS- Perumbakkam # I Line maintenance work.230 KV KVPT # OCC Approval Quarterly Maintenance
315 MVA, 400/ 230 KV Auto-Transformer-I Monthly maintenance work
400 KV Alamathy II Feeder Breaker
230KV BHAVINI-I # Maintenance work
To carry out Breaker and CT’s Monthly Maintenance Work.
110KV Deviakurichi feeder I & II in between Neyveli TS-I and KO.Poovanur.
For erection of 1no MD+12M tower under the existing 110KV Deviyakurichi feeder I & II (Loc.No.267-268)and to link the proposed Neyveli 230/110 KVSS. (Approved vide TANTRANSCO Proceedings No 65 dated 25.07.2015).
110KV Thiruporur #, 110KVGC and 25MVA Power Tr-I&II
MONTHLY MAINTANANCE WORK
110KV Arani-Thayanur , CTs, CBs Isolator Switch
To carry out Breaker ,Line side Isolator and CT’s Monthly Maintenance Work
230 / 110 KV ,100 MVA AUTO TRANSFORMER -I
For attending the monthly maintenance work by JE /MTCE /230/110 KV GIS SS MYLAPORE
400 KV Alamathy II Breaker & isolators Monthly maintenance work
110KV-Mambakkam FDR (Breakers,CT’s and Isolators)& Bus coupler-I (Breakers,CT’s and Isolators)
110KV-Mambakkam FDR Monthly Maintenance (Breakers,CT’s and Isolators)& Bus coupler-I (Breakers,CT’s and Isolators)
230KV sipcot feeder Quarterly maintenance work
For Monthly Maintanence works.
For monthly maintenance works.
230KV SPK-KLPKM-I FEEDER FOR LINE MTCE WORKAutotransformer-I, Breakers, CT's and LAS Monthly maintenance work
230KV Villupuram – Cuddalore #
110KV Villupuram – Acharapakkam – II #
110KV Villupuram- Neyveli- II #
230KV Ottiyambakkam - Siruseri # Line maintenance work
For monthly maintance works
For monthly maintance
110KV PALLUR Fdr LINES EHT LINES Mtc110Kv Arani Feeder Quarterly maintenance workAuto Transformer II
230KV TAQA-Perambalur
110 KV KTR-KADAPPERI # II For General Maintenance work.
110 Kv cuddalore-Lanco feeder (section between B.Mutlur to Chidambaram)
For Checking of Jumper tightness and arcing horns in various Locations.
230 KV Cuddalore-Villupuram breaker& 230 KV Bus –B Isolator
For Monthly Maintanence works. For Checking of Jumper tightness in various Locations.
Auto transformer III HV & LV breakers with CTs & 230 KV Bus –B Isolator
110 KV Neyveli-Aduthurai feeder Section between TSI to Uthangal SS
For strengthening of weak jumper and Jumper tightness checking at various locations.
110kv Neyveli-Aduthurai feeder (section between TSI to Srimushanam)
For Checking of Jumper tightness in various Locations.
230KV SIPCOT Mambakkam - Sriperumbudur feeder - Breaker, Current Transformers & Line side isolator only.
To carry Breaker and CT’s Monthly Maintenance Work and Replacement of corroded arcing horns at location No.72.
To carry out Breaker and CT’s Monthly Maintenance Work.
110KV Villupuram – Acharapakkam – II #(between Villupuram & Elamangalam)
Replacement of flashed over insulator at location No. 17 off Chendur LILO
Breaker CTs & Line side isolator maintenance works.
230KV Athipattu - Mosur feeder Breaker, CTs and Line isolator.
For attending routine Maintenance work and Annual Relay Testing work.
110kv pallur feeder breaker and its cts /Auto Tr4 /lv4 and breaker and its cts
Auto tr 4 HV4 LV4 BREAKER AND ITS CTS
Monthly Maintenace work in Auto Transformer II
For Checking of Jumper tightness in various Locations and replacement of flash over insulators.
230KV SPK-VEERAPURAM FEEDER FOR QUARTERLY MTCE WORK
100 MVA Auto Tr - I Monthly maintenance work
For monthly Maintenance work.
Monthly maintenance work
230KV Villupuram – Thiruvannamalai #
230KV S.P Koil Quarterly Maintenance110kv salai fdr breaker and its cts For monthly maintance110kv salai Fdr Lines EHT LINE Mtc230KV Thiruvalam link I # Breaker
Routine maintenance
230KV Thiruvalam - Link I feeder. For EHT Line Maintenance Works
For EHT Line Maintenance Works.
For EHT Line Maintenance Works
for monthly maintenance work
230KV Kalivanthapattu - Tharamani # Line maintenance work
230KV Thiruverkadu feeder
230KV Kalivanthapattu - Tharamani # Line maintenance work
110KV Arani-Singarpet –II CTs, CBs Isolator Switch
230 KV T.V.Malai-Villupuram #, Breaker, CT's and Line Isolator
230KV Cuddalore- Neyveli TS-1# , breaker,Ct’s with line side isolator & 230 KV Bus –A Isolator.
For monthly maintenance works & 1) Damaged insulator replacement 2) jumper tightness checking in various locations
To carry out Breaker and CT’s Monthly Maintenance Work.
110 KV - Thirukoilur - Deviyakuruchi # ( between 230 KV Deviyakuruchi SS and 110 KV E.V.Natham SS )
For providing repair sleeves for the strand cut in the panther conductor between location No. 94 & 95
230KV Thiruvalam link I # Breaker & isolators Monthly maintenance work
50 MVA Power Transformer I and II and 33 KV Toll Gate and 33 KV OHP Feeder one by one
110 KV Thiruvalam – Vellore I feeder (In between 230 KV Thiruvalam SS to 110KV Vellore SS ).
110 KV Thiruvalam – Gudiyatham feeder entire
On Auto Transformer –II, HV-II, LV-II , Breakers and its Cts II) On 230KV Link I # Breakers and its CT’s and Line Isolators ii)On 110KV Vellore –I feeder breaker and CT’s, m iii)On 110KV Gudiyatham feeder Breaker and its CT’s AND line isolators
Tan delta test and routine maintenance work
230 KV OMEGA-S.P.KOIL FDR
230KV Nokia feeder Quarterly maintenance work
110KV Villupuram Link #
110KVVillupuram Link Auto #
110kv Mosur link 1 breaker and cts For mothly maintance works110KV MOSUR LINK 1AND LINK2 EHT LINE Mtc110 KV Bus A Monthly maintenance work230KV Cuddalore feeder
100 MVA AUTO Transformer II Routine maintenance worksQuarterly & Line maintenance work
230KV Sriperumbudur Feeder Quarterly Maintenance110 KV Echur - Mazhaiyur #.
Monthly maintenance work
230 KV TSII-Kadalangudy
230KV Villupuram – Acharapakkam
230 KV OMEGA-S.P.KOIL FDR (Breakers,CT’s and Line Isolators) Quarterly maintenance work
1)400KV PUGALUR-KVPT-I FEEDER 2)230KV SPK-OMEGA FEEDER
1)FOR LINE MTCE WORK 2)FOR QUARTERLY MTCE WORK
110 KV CUD-Chitharasur # Breaker, CT’s & Line side isolator.
For monthly maintenance works & 1)Jumper arc rectification works at 1,7.and 11. 2)Jumper tightness rectification
To carry out Breaker and CT’s Monthly Maintenance Work .
Breaker, CT’s & Line Side isolator Maintenance Works.
Monthly maintenance work 230KV Cuddalore feeder Breaker, Isolators, Checking of Bolt &nuts and bus bar.
110KV S.P.KOIL Feeder - I Breaker and CT’S With Line side isolator
To Carryout Monthly maintenance Work
230Kv Oragadam feeder & 110KV porur-2 Feeder
Monthly Maintenance work carried in all Cts and isolators in 110 KV Echur - Mazhaiyur #.
110 Kv T.V.Malai - Thandrampet #, Breaker, CT's & Line Isolator
230 KV Ulundhurpettai- Cuddalore & 230 KV Bus –A Isolator
For monthly maintenance works & For Checking of Jumper tightness in various Locations.
1. Replacement of flash over insulators in loc no 374 (T) 2. Replacement of weak jumpers at loc no 348 (T) Railway crossing 3. To check jumper tightness at various locations Request to arrange for LC has been communicated to SE/O/Trichy from SE/O/VPM
To carry Breaker and CT’s Monthly Maintenance Work
110 KV BBGTPS II feeder Monthly Maintenance Work100MVA,230/110kV Auto transformer - I Routine maintenance work.
110 KV Tidel park II feeder Maintenance work400KV HV-3 (1652) Breaker Quarterly maintenance work
110KV SPK-ACKPM-II FEEDER FPOR QUARTERLY MTCE WORK
16 MVA PR.TR II Monthly maintenance work
110KV Arani-Kanchipuram # For Monthly Maintenance work.Monthly maintenance work
110 KV Bus coupler breaker and CT
110KV Tharamani -ETL # Line maintenance work.100MVA Auto Tr –I. Tan delta Test& Monthly Maintenance
400KV Tie IV Breaker (Auto- I & II)
230/110KV,100MVA AutoTr-II
400KV Sunguvarchatram -I feeder
110KV S P KOIL I FEEDER Monthly Maintenance work100MVA Auto transformer - I Monthly maintenance
For monthly maintenance works.
230KV SPK-KLPKM-II FEEDER
For monthly Maintenance work.
For Monthly Maintenance work.
110KV T.V.Malai-Vinnavanur #,Breaker,CT's & Line Isolator
1. Replacement of flash over insulators in loc no 374 (T) For monthly maintenance works
230 /33 KV 100 MVA POWER TRANSFORMER -I
For attending the monthly maintenance work by JE /MTCE /230/110 KV GIS SS MYLAPORE
1. 315 MVA, 400/ 230 KV Auto-Transformer-II2. 400 KV Sunguvarchatram - Alamathy-I & II feeder breaker, CTs and line isolator
Monthly maintenance work & Quarterly maintenance work
Monthly maintenance work & Quarterly maintenance work
230/110KV,100MVA AutoTr-II (HV&LV Breakers,CT’s and Isolators) Monthly Maintenance
Routine Maintenance and GRT relay testing work
230KV SIPCOT Mambakkam - SV.Chatram feeder - Breaker, Current Transformers & Line side isolator only.
FOR QUARTERLY MTCE WORK AND LINE MTCE WORK
230 KV Arani – Singarapet, CTs, CBs Isolator Switch
110KV Arani-Sirungattur, CTs, CBs Isolator Switch
110kv Itchipudur breaker and its cts For monthly maintance worksAuto tr III /LVIII /HVIII breaker For monthly maintace works110KV ITCHIPUDUR Fdr EHT LINE Mtc
Quarterly maintenance work
80MVA AUTO TRANSFORMER -II
230KV Koyambedu Feeeder
100 MVA AUTO Transformer III Routine maintenance works230KV Hyundai Feeder Quarterly maintenance work
230KV KITS - Tharamani # Line maintenance work.110KV Kilpauk Water Works feeder I Routine Maintenance work
400 KV Palavadi II Feeder Breaker
230 KV Mylapore feeder Maintenance workVelachery 110 KV Feeder Annual Relay Test
110 KV Cuddalore – Kulanchavadi # breaker with CT’s and line side isolator
1. Replacement of flash over insulators in loc no 374 (T) For monthly maintenance works
110 KV Cuddalore - Nathapattu # breaker with CT’s and Line side isolator.
1. Replacement of flash over insulators in loc no 374 (T) For monthly maintenance works& 1.For Checking of Jumper tightness in various Locations
230KV SC line in between Neyveli TS-I and Eachangadu 230KV SS
For stringing of Zebra conductor to link the proposed Neyveli 230/110KV SS to the existing 230KV Eachangadu line (Loc.No.10-11)
230KV Athipattu - NCTPS feeder Breaker, CTs & Line isolator
For attending routine Maintenance work.
230 KV Sunguvarchatram - Mambakkam feeder breaker, CTs and line isolator
MONTHLY MAINTANANCE WORK
Routine Maintenance work and Tan delta testing work
230 KV Neyveli-(Villiyanur)Pondy SC line (LOC No.154-155) Pondy Government.
For carrying out stringing of zebra conductor for 230KV cuddalore-Veerapuram DC line (Loc.No.18/0-19/0)over the existing 230KV Neyveli-(Villiyanur)Pondy SC line(LOC No.154-155)
400 KV Palavadi II Feeder Breaker & isolators Monthly maintenance work
110KV CTS
110 KV Vyasarpadi Feeder Routine maintenance
Monthly maintenance work
Monthly maintenance work
Monthly maintenance work
MONTHLY MAINTENANCE
230KV Thiruvalam - Link II feeder For EHT Line Maintenance Works.
For EHT Line Maintenance Works.
For EHT Line Maintenance Works
110 KV Echur - Vandavasi #.
For General Maintenance work
230 kv Thiruvalam link II # Breaker
for monthly maintenance work
100 MVA Auto Tr - II Monthly maintenance work
QUARTERLY MAINTANANCE WORK
110 Kv T.V.Malai Link #,Breaker,CT's &Line Isolator
110 Kv T.V.Malai Link #,Breaker,CT's &Line Isolator
Autotransformer-II, Breakers, CT's and LAS only
ALL 11KV FEEDERS AND POWER TRANSFORMER I, II, III
110 KV Thiruvalam – Vellore II feeder (In between 110KV Katpadi SS to230KV Thiruvalam SS).
110 KV Thiruvalam – Karnambut feeder (In between 230 KV Thiruvalam SS to 110KV Thimiri SS )
Monthly Maintenance work carried in all Cts and isolators in 110 KV Echur - Vandavasi #.
100 MVA 230/110 KV Auto Transformer No.I
230 kv Thiruvalam link II # Breaker & isolators monthly maintenance work
1)230KV KLPKM-ACKPM FEEDER 2)100MVA AUTO TR.II
FOR LINE MTCE AND MTCE WORK
i) On Auto Transformer –III, HV-III, LV-III , Breakers and its Cts II) On 230KV LinkII #, Breakers and its CT’s and Line Isolators ii)On 110KV Vellore –II and Karnambut feeder breaker and CT’s,
Auto transformer I HV & LV breakers with CTs& 230 KV Bus –A Isolator
1. Replacement of flash over insulators in loc no 374 (T) For monthly maintenance works&
110 KV Panruti – Chitarasur
110KV Villupuram – Acharapakkam-I #
230 KV TAQA –Deviakurichi
230KV Sriperumbudur - Kadapperi # I Line maintenance work.110kv Thiruthni feeder breaker and its cts For monthly maintance230/110kv Auto tr2 and its cts For monthly maintance110kv thiruthani Fdr lines EHT LINE Mtc110KV SHOLINGUR fDR LINES EHT LINE Mtc
Monthly maintenance work
110 KV Bus section II complete Half yearly maintenance work
100 MVA AUTO TRANSFORMER -I For Monthly Maintenance works.
Auto Transformer-4 400/110KV,200MVA Monthly Maintenance work
For EHT Line Maintenance work.
110 KV Panruti Bahoor feeder (section between Nallathur to Bahoor& 110 kV Semmandalam LILO
1) Flash over insulator replacement in loc. 18(DP) 2) Jumper tightness checking checking at various locations 3) For jumper tightness in semmandalam LILO
1.For Checking of Jumper tightness in various Locations and replacement of Flashed over insulators.
Breaker CTs & Line side isolator maintenance works
110 KV CuddaloreLanco feeder section between Chidambaram to LANCO
1)Flash over insulator replacement in loc. 30 2) Jumper tightness checking at various locations
For Checking of Jumper tightness in various Locations.
110KV Aduthurai feeder in between Neyveli TS-I and U.Mangalam110KV SS.
For erection of 1no MD+12M under the existing 110KV Aduthurai feeder (Loc.No.14-15)and to link the proposed Neyveli 230/110 KVSS. (Approved vide TANTRANSCO Proceedings No 65 dated 25.07.2015). Concurrence to be obtained from EE/O/kadalangudy
1. 110 KV Sunguvarchatram - Palayaseevaram feeder breaker, CTs and line isolator2. 110 KV Sunguvarchatram - Orikkai feeder breaker, CTs and line isolator
110 KV Thiruvalam – Kaveripakkam feeder (In between 230 KV Thiruvalam SS and 110 KV Kaveripakkam SS).
For monthly maintenance
230KV Sriperumbuudr - Kadapperi # II Line maintenance work.
110KV Siruseri - ETL # Line maintenance work.
110 KV Bus B Quarterly maintenance work
110KV Ko.Poovanur feeder
110 KV Bus Section Breaker and CT's only Monthly maintenance work
110KV SP KOIL FEEDER II QUARTERLY MAINTENANCE
For monthly maintenance works.
110KV SPK-VRPM-II FEEDER FOR QUARTERLY MTCE WORK
11 KV entire bus Bus maintenance work
For monthly Maintenance work.
110 KV S.P.Koil - II # Monthly Maintenance230kv tie breaker and its cts For monthly maintance110 KV Siruseri OH feeder Maintenance work400KV Bus-1 Half yearly maintenance work
230 KV Echur - Arani #.
11OKV SPK-VRPM-I FEEDER FOR QUARTERLY MTCE WORK
On Auto Tr. –I,HV-I,LV-I Breaker and CT’s. ii)On 110KV Kaveripakkam Feeder, Breaker and CT’s for monthly maintenance work
110 KV - Thirukoilur - Deviyakuruchi # ( between Manalurpet and Sankarapuram SS
Replacement of the flashed over 90 KN disc @ location No. 6 off Ariyalur LILO
110 kV Neyveli –Vadakuthu feeder (Section between Vadakuthu to Sethiyathoppu )
1.For replacement of flash over insulator in main line loc 69 (S) . 2. For Checking of Jumper tightness in various Locations
230KV Bus-I (Main) entire & 230KV Bus-I PTs
For routine maintenance work and insulator cleaning works.
110 KV Ko-poovanur SS total shutdown Maintanance work
100MVA Auto transformer – II (Breaker’s & CT’s)
To Carryout Monthly Maintenace Work
110 KV Arani - Kaveripakkam feeder(LC in between from 110 KV Timiri SS to 110 KV Kaveripakam SS).
For attending arcing horn tightness checking work
100MVA, 230/110 KV Auto Transformer-II - HV & LV Breakers and Current Transformers only.
110KV Arani-Kaveripakkam CTs, CBs Isolator Switch
Monthly Maintenance work carried in all Cts and isolators in 230 KV Echur - Arani #.
16 MVA PR.TR III Monthly maintenance work
For monthly Maintenance work.
110KV KITS- Madambakkam # Line maintenance work.Monthly maintenance work
400 KV Tie-III breaker (Auto- III & IV) Monthly Maintenance work
400/230KV ICT-3(315mva) Routine Maintenance Work
Monthly maintenance work
QUARTERLY MAINTENANCE
Monthly maintenance work
230KV SUNGUVARCHATRAM FEEDER QUARTERLY MAINTENANCE
For EHT Line maintenance work.
For EHT Line Maintenance work
110 KV Railway I feeder For EHT Line Maintenance Works
110KV SPK-CHENGALAPTTU FEEDER FOR QUARTERLY MTCE WORK
for monthly maintenance work
110 KV Villupuram- Kandamangalam #
230KV Arani – Echur CTs, CBs Isolator Switch
Auto Transformer–II ,Northern Bus,110Kv ThiruKoilur & Thayanur #
1. Auto Tfr –II Monthly maintenance work. 2.To carry out HV II,LV II, Thirukoilur & Thayanur Breaker and CT’s Monthly Maintenance Work
The 110KV Cuddalore – LANCO # breaker with CT’s line side isolator
For monthly maintenance works & 1.For replacement of flash over insulator in loc 10. 2.Rectification of jumper arc in loc 11
230 KV Neyveli-Bahoor SC line (Loc No.117 – 118) Pondy government.
For carrying out stringing of zebra conductor for 230KV cuddalore-Veerapuram DC line (LOC No.AP 7/0 – AP 8/0) over the existing 230KV Neyveli-Bahoor SC line (LocNo.117-118
200 MVA, 400/ 110 KV Auto-Transformer-III
110 KV T.V.Malai - Kanji #, Breaker, CT's and line Isolartor
110KV KADAPERI FEEDER 110KV PALAYASEEVARAM FEEDER
230 KV T.V.Malai- singarapet #, Breaker, CT's and Line Isolator
110 KV Thiruvalam – M.V.Puram feeder entire
110 KV Kanchipuram – Kaveripakkam feeder (In between 110 KV Pallur SS and 110 KV Damal SS).
i) On Auto Tr. –IV, HV-IV, LV-IV Breaker and CT’s. ii) On 110KV MV PURAM Feeder, Breaker and CT’s
Breaker CTs & Line side isolator maintenance works.
110kv Sholingar feeder breaker and its cts FORmonthly maintance worksFor monthly maintance works
Quarterly maintenance work
400KV Sunguvarchatram Tie Bay(852)
100MVA AUTO TRANSFORMER III
110KV HVF feeder
For EHT Line Maintenance work.
11OKV SPK-ORAGADAM-II FEEDER FOR QUARTERLY MTCE WORK
For monthly Maintenance work.
230KV Ottiyambakkam - Siruseri # Line maintenance work.230kv Athipattu fdr breaker and its cts For monthly maintance works230kv ATHIPATTU Fdr lines EHT LINE Mtc230KV EASTERN BUS # Maintenance work
100MVA AUTO TRANSFORMER-I Maintenance & Painting works
For General Maintenance work
230KV KLPKM-ECHUR FEEDER FOR LINE MTCE WORK100 MVA Auto Tr - III Monthly maintenance work
230KV Ottiyambakkam - KITS # Line maintenance work.Monthly maintenance work
100MVA AUTO TRANSFORMER-I Painting works
110 KV K.K.Nagar Feeder For Monthly maintenance works.
Bus maintenance work
100MVA Auto Transformer, HV& LV breaker &CT’s
Annual relay testing work and routine Maintenance work in Auto Transformer.
230/110KV AUTO TR1 HV1 /LV1 AND ITS CTS /breaker
230 KV Sunguvarchatram - Oragadam feeder breaker, CTs and line isolator
Routine Maintenance work and CT tandelta testing
MONTHLY MAINTANANCE WORK
Routine Maintenance work and tandelta test
110 KV Arani - Kanamangalam feeder in between 110 KV Kilpalipet and 110 KV Thorapadi SS.
110KV Arani-Kannamangalam CTs, CBs & Isolator Switch
100 MVA 230/110 KV Auto Transformer No.II
110 KV Sunguvarchatram - Vallam Vadagal feeder breaker, CTs and line isolator
230 KV western bus Consists of 230 KV Spdr-II, 230 KV Alandur, Auto Tr II & III.
230KV Sriperumbuudur - Tharamani # Line maintenance work.110KV Eastern Bus Routine Maintenance work110 KV Railway II feeder. For EHT Line Maintenance Works.
110 KV Sugar Mill feeder entire For EHT Line Maintenance Works
For monthly maintenance work
230KV Neyveli TS-II feeder
To Carryout Maintenance Work
110KV-Hitachi FDR
230 KV Bus Coupler Breaker and CVT-I Monthly maintenance work.AUTO TRANSFORMER I 100MVA
For EHT Line Maintenance work
110 KV Echur - Kaliyampoondi #
230kv singarapet # breaker
100MVA AUTO TR.IV FOR QUARTERLY MTCE WORK
For monthly maintenance work
For monthly maintenance works
230KV Neyveli TS-II-Ulundhurpet feeder
230KV Kalivanthapattu - Tharamani # Line maintenance work.
100MVA Auto Tr –II Monthly Maintenance110kv bus coplur breaker and its cts For monthly maintance
Railway-II Feeder and Sugar mill feeder Breaker and CT’s
110 KV Cuddalore Lanco feeder section between Semmankuppam to B.mutlur
1.For replacement of flash over insulator in loc55&74. 2. Shoe set changing in loc 24,26. 3. Loc 53-54 conductor strand cut rectification works
Monthly maintenance work 230KV Neyveli TS-II feeder Breaker , Isolators, Checking of bolt &nuts .inspection of jumper joints and bus bar.
110KV Vandavasi # Breaker’s & CT’s With Line side isolator
110KV-Hitachi FDR (Breaker,CT’s and Isolators) Monthly Maintenance
OTHER TWO AUTO TRANSFORMER WILL BE IN SERVICE
230KV Thiruvalam – Singarapet feeder entire.
Monthly Masintenance work in all CTs and Isolators in 110 KV Echur - Kaliyampoondi #
230kv singarapet # breaker & isolators monthly maintenance work
i) 110KV Capacitor Bank-I and 110KV Capacitor Bank -II Breaker and CT’s one by one ii)On Railway-I Feeder Breaker and CT’s
Auto transformer II HV & LV breakers with CTs& 230 KV Bus –B Isolator
1.For Checking of Jumper tightness in various Locations .
110 KV Chindadiripet # Monthly maintenance work110 KV Faery estate EHT feeder Maintenance works
400KV TIE -1 Breaker (352) Quarterly Maintenance work
Quarterly maintenance work
For monthly Maintenance work.
110KV Villupuram – Thiruvananamalai#
For monthly maintenance works
Monthly maintenance work
230 KV BUS-II& 230 KV BUS COUPLER
230KV Taramani feeder Quarterly maintenance work230 KV Echur - Kalpakkam #.
230KV SPR-THARAMANI FEEDER FOR LINE MTCE WORK
For monthly maintenance works
230KV Alamathy fdr breaker and its cts For monthly maintance230kv Alamathy FDR LINES EHT LINE Mtc230KV Thiruvalam - Chittoor feeder entire For EHT Line Maintenance Works
For Monthly Maintenance Works
110Kv IG Kottai feeder Quarterly and line Maintenance work
110 KV kadapperi - KORATTUR-II feeder's Breaker, CTs and LAS.
230 KV Arani – Sriperumpudur CTs, CBs Isolator Switch
Breaker CTs & Line side isolator maintenance works.
110 KV Cuddalore - Spic Pharma # breaker, CT’s & Line side isolator
200 MVA, 400/ 110 KV Auto-Transformer-IV
230 KV BUS-II& 230 KV BUS COUPLER (Breakers,CT’s and Isolators) Monthly Maintenance
Monthly Maintenance work carried in all Cts and isolators in 230 KV Echur - Kalpakkam #.
110 kV Tholudur Spur line and in 110 KV NeyveliDeviakurichi feeder II section between Veppur SS to Deviakurichi SS
1.For replacement of flash over insulator in main line loc 135(S),118(S),& 85(S). 2. For replacement of flash over insulator in Tholudur line 31 (S) ,33 (T),74(S). 3. For Checking of Jumper tightness in various Locations
110 KV Cuddalore - J.K. Pharma # breaker, CT’s., Line side isolator
230KV Chittoor interstate feeder Breakers and its CT’s and Line Isolators
230KV Kalivanthapattu - Kadapperi # Line maintenance work.
110kv spr feeder breaker and its cts For monthly maintance110kv SPR Fdr lines EHT LINE Mtc110KV Ulundurpet feeder
100 MVA Auto Tr.II Maintenance worksAuto Transformer-II
110KV HCL
For EHT Line maintenance work.
For General Maintenance works.
Quarterly maintenance work
230KV Tie Breaker For monthly Maintenance work.
Line maintenance work.
110KV Kits Park# Monthly Maintenance110KV Cooks Road Feeder Routine Maintenance work
110 KV Chinna Salem Spur line and in 110 KV NeyveliDeviakurichi feeder I section between Adari and Pethasamutram SS
1. For replacement of flash over insulator in main line loc 83 (S) 2. For replacement of Flash over insulators in chinnasalem spur line Loc no 5 ,14,21. 3. For Checking of Jumper tightness in various
Monthly maintenance work 110KV Ulundurpet feeder Breaker, Isolators and CT’S, Checking of Bolt &nuts and bus bar.
Monthly Maintenance and Annual Relay Test
QUARTERLY MAINTANANCE WORK
230KV Thiruvalam – S.P.Koil feeder entire
100 MVA 230/110 KV Auto Transformer No.III
110 KV Kadapperi - PALLAVARAM Feeder's breaker, CTs and LAS.
Auto Transformer – I ,Southern Bus and 110KV T.V.Nallur #
1.Auto Tfr – I Monthly maintenance work. 2.To carry out HV I, LV I & T.V Nallur Breaker and CT’s Monthly Maintenance Work.
110 KV Madurapakkam – Thiruchitrambalam #(110KV Villupuram- Madurapakkam-II#
For cutting the high casuarina and bamboo trees between location No. 55 & 56
110KV Siruseri - TCS feeder from 110KV Siruseri SS
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
Condition From date To date To time
During the period of shutdown, Fri,Jun 1,2018 10:00 Fri,Jun 1,2018 17:00 1
During the period of S/D, 1. 1 Fri,Jun 1,2018 9:00 Fri,Jun 1,2018 17:00 1110 KV Santhavalsal SS availing Fri,Jun 1,2018 9:00 Fri,Jun 1,2018 17:00 1
110 KV Santhavalsal SS availing Fri,Jun 1,2018 9:00 Fri,Jun 1,2018 17:00 1
idle charged feeder Fri,Jun 1,2018 9:00 Fri,Jun 1,2018 14:00 1110 KV Perungudi II feeder will Sat,Jun 2,2018 10:00 Sat,Jun 2,2018 17:00 1DURING THE PERIOD OF SH Sat,Jun 2,2018 10:00 Sat,Jun 2,2018 17:00 1
Auto TRF-II in service(110K Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
230 KV NCTPS Feeder 2 will no Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 14:00 1All other 110KV feeder are in e Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
1. Bus coupler Breaker H/T . 2. Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
DURING THE PERIOD OF SH Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
110 KV Polur SS availing total Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
110 KV Arani SS availing total Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
Auto Transformer I & III will be Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
During the period of L/C time, Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
1.Villupuram 110KVSS is availi Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
During period of shut down 110 Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 14:00 1
During the period of sd 110kv Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 14:00 1
Sat,Jun 2,2018 9:00 Sat,Jun 2,2018 17:00 1
From time
No. of days
230KV Bhaavani I & II feeder wi Sat,Jun 2,2018 5:00 Sat,Jun 2,2018 9:00 1
Auto Transformer I, 110 KV Vya Sun,Jun 3,2018 5:00 Sun,Jun 3,2018 12:00 1
The SS Load will be restricte Sun,Jun 3,2018 10:00 Sun,Jun 3,2018 17:00 1
Auto transformer -1&3 will be i Sun,Jun 3,2018 9:00 Sun,Jun 3,2018 17:00 1
230KV Nokia -SPR will be in s Sun,Jun 3,2018 9:00 Sun,Jun 3,2018 17:00 1During the period of shutdown, Sun,Jun 3,2018 9:00 Sun,Jun 3,2018 16:00 1
Sun,Jun 3,2018 9:00 Sun,Jun 3,2018 17:00 1
110 KV High court # only will n Sun,Jun 3,2018 5:00 Sun,Jun 3,2018 8:00 11. The 110KV AB Swith at Thirup Mon,Jun 4,2018 9:00 Mon,Jun 4,2018 16:00 1
110KV ETL SS loads transferre Mon,Jun 4,2018 9:00 Mon,Jun 4,2018 14:00 1
During the period of shutdown, Tue,Jun 5,2018 10:00 Tue,Jun 5,2018 17:00 1
It is proposed to avail total Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
1.100MVA Autotransformer-II W Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 16:00 1
100 MVA AUTO Transformer I wi Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1All other 230KV feeders will be Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
During the period of LC i. 230 Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 14:00 1
At the Time of LC 1.Auto Tr I H Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
DURING THE PERIOD OF SH Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
i) Auto-Tr-I ,HV-I,LV-I , Auto- Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
All other 4 Nos 230KV feeders w Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
During the period of L/C time, Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
All other 230KV feeders will be Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
1. The 110 KV Villupuram - Ma Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 16:00 1
In FDR I-110 KV Pethasamuthram Tue,Jun 5,2018 9:00 Thu,Jun 7,2018 17:00 3
1).110KV-TKM SS and Anjur SS& Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 1
During period of shut down 230k Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 14:00 1
sd availed in 230kv mosurss Tue,Jun 5,2018 9:00 Tue,Jun 5,2018 17:00 11)400 kv HV II Breaker off con Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 17:00 1
50 MVA power Transformer II wi Wed,Jun 6,2018 10:00 Wed,Jun 6,2018 17:00 1AUTO TRANFORMER-II AND Wed,Jun 6,2018 10:00 Wed,Jun 6,2018 17:00 1
400KV Thiruvalam -II feeder wil Wed,Jun 6,2018 10:00 Wed,Jun 6,2018 17:00 1
Pr Tr II and III will be in servic Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 13:00 1Tie will be opened at 230KV Ara Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 17:00 1
1.) The 110 KV Villupuram - Ma Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 14:00 1
110KV KITS- Perumbakkam # II Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 14:00 1230 KV S.P.Koil # will be in se Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 14:00 1
During the above shutdown peri Wed,Jun 6,2018 5:00 Wed,Jun 6,2018 10:00 1
Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 17:00 1
1)400 KV Alamathy II Feeder Br Wed,Jun 6,2018 9:00 Wed,Jun 6,2018 17:00 1
During the period of shutdown Thu,Jun 7,2018 10:00 Thu,Jun 7,2018 17:00 1
110KV-Mambakkam SS, 110KV Ne Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
All other 230KV feeder will be Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1110 KV Semmankuppam,chemplas Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
230 KV TAQA#, 230 KV Neyveli Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
110 KV SrimushnamSS and 110 K Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
110 KV Uthangal SS to avail Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
110 KV Uthangal SS and 110 K Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
During the period of shutdow Thu,Jun 7,2018 10:00 Thu,Jun 7,2018 17:00 1
DURING THE PERIOD OF S Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1During the period of L/C time, 1 Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
1.Both ends will be H/T and ke Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
1. Chendur SS availing Total s Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
1. Chendur SS availing Total s Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
1. The 110KV AB Switch at Arasu Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 16:00 1
230KV Kalivanthapattu - Siruser Thu,Jun 7,2018 5:00 Thu,Jun 7,2018 9:00 1During the period of Shutdown Thu,Jun 7,2018 10:00 Thu,Jun 7,2018 17:00 1
During the period of sd 110kv p Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 14:00 1
During period of sd 230/110 auto Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 17:00 1
During the period 110kv pallur/ Thu,Jun 7,2018 9:00 Thu,Jun 7,2018 14:00 1110KV neervalur loads will be t Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1At the Time of LC 2.Auto Tr II Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
230 KV PerambalurSS breaker Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
During the period of S/D,the 1 Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
DURING THE PERIOD OF SH Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
110 kv s p koil # and korattur-I Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 13:00 1
Tie already opened at 230KV Ara Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
During the period of L/C time, Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
All the loads will be transfe Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
1.Both ends will be H/T and ke Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 17:00 1
1.) The 110 KV line isolator t Fri,Jun 8,2018 10:00 Fri,Jun 8,2018 14:00 1
230 KV KVPT # will be in serv Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 14:00 1Breaker out of service Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 14:00 1TOTAL Sd availed salai Fdr Fri,Jun 8,2018 9:00 Fri,Jun 8,2018 14:00 11)230KV Thiruvalam link I # Bre Sat,Jun 9,2018 9:00 Sat,Jun 9,2018 17:00 1
50 MVA Power Transformer I an Sat,Jun 9,2018 7:00 Sat,Jun 9,2018 17:00 1
During the period of LC i. 230 Sat,Jun 9,2018 9:00 Sat,Jun 9,2018 14:00 1
During the period of LC i The Sat,Jun 9,2018 9:00 Sat,Jun 9,2018 17:00 1
During the period of LC i. 11 Sat,Jun 9,2018 9:00 Sat,Jun 9,2018 17:00 1
i) 110KV sathuvachari SS,110 K Sat,Jun 9,2018 9:00 Sat,Jun 9,2018 17:00 1
230KV Sriperumbudur- Tharaman Sun,Jun 10,2018 6:00 Sun,Jun 10,2018 13:00 1
230KV Thiruverkadu feeder will Sun,Jun 10,2018 10:00 Sun,Jun 10,2018 17:00 1
230KV Sriperumbudur - Tharama Sun,Jun 10,2018 6:00 Sun,Jun 10,2018 13:00 1
230 KV Kalivanthapattu FDR, wi Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 1
230KV Nokia -SVC will be in s Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 11)DURING THE PERIOD OF Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 1
The 110 KV Chitharasur SS will Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 1
1. Both ends Breaker H/T and b Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 1
1. Both ends Breaker H/T and b Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 14:00 1
during the period of sd 110kv li Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 14:00 1Total SD availed 110KV LINK Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 14:00 1
Mon,Jun 11,2018 9:00 Mon,Jun 11,2018 17:00 1It is proposed to avail line c Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1
1.110KV S.P.koil -I Feeder Wi Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 16:00 1
100 MVA AUTO Transformer II w Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1All other 230KV Feeder will be Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1
Station load will be catered Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1At the time of LC 1.110 KV Ech Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 14:00 1
During the period of L/C time : Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 15:00 1
230 KV TAQA#, 230 KV Neyveli Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1
Alternate source from Thiruvar Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1
1. The feeder will be Kept OFF Tue,Jun 12,2018 9:00 Tue,Jun 12,2018 17:00 1
110 KV BBGTPS II # only will no Wed,Jun 13,2018 5:00 Wed,Jun 13,2018 8:00 1During the period of shutdown Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
110 KV Tidel park I feeder will Wed,Jun 13,2018 10:00 Wed,Jun 13,2018 17:00 1Tie will feeds Auto-3 Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
DURING THE PERIOD OF S Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
16 Mva pr Tr.I &III will be in s Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 13:00 1
i) 110KV Vembakkam SS & MangaWed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1During the period of L/C time Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 15:00 1
110 KV Bus A & B will be indep Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
110KV ETL SS loads fed from Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 14:00 1100MV Auto Tr-II will be in se Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
During the above shutdown peri Wed,Jun 13,2018 5:00 Wed,Jun 13,2018 10:00 1
Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
Wed,Jun 13,2018 9:00 Wed,Jun 13,2018 17:00 1
Auto TRF-I in service (110K Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
During the period of shutdown Thu,Jun 14,2018 10:00 Thu,Jun 14,2018 17:00 1
110KV S.P.KOIL FEEDER to be Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 11.No Load Transfer required 2. Thu,Jun 14,2018 10:00 Thu,Jun 14,2018 17:00 1
During the period of shutdow Thu,Jun 14,2018 10:00 Thu,Jun 14,2018 17:00 1
DURING THE PERIOD OF S Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
All other 4 Nos 230KV feeders w Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
110KV Sirungattur SS & 110KV Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
110 KV Kullanchavadi SS will b Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
The 110 KV Nathapattu SS will Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
GRID FEEDER .Alternate sup Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
During the period of Shutdown Thu,Jun 14,2018 10:00 Thu,Jun 14,2018 15:00 1
DURING PERIOD of sd 110kv itc Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 14:00 1During period of sd Auto tr124 i Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1Total SD availed in 110kv itchi Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
Thu,Jun 14,2018 9:00 Thu,Jun 14,2018 17:00 1
AUTO TRANSFORMER -I AND Fri,Jun 15,2018 10:00 Fri,Jun 15,2018 17:00 1
During the period of shutdown Fri,Jun 15,2018 0:00 Fri,Jun 15,2018 0:00 1
100 MVA AUTO Transformer I Fri,Jun 15,2018 9:00 Fri,Jun 15,2018 17:00 1All other 230Kv Feeders will be Fri,Jun 15,2018 9:00 Fri,Jun 15,2018 17:00 1
230KV Kalivanthapattu - Thara Fri,Jun 15,2018 5:00 Fri,Jun 15,2018 9:00 1During the period of shutdown o Fri,Jun 15,2018 9:00 Fri,Jun 15,2018 14:00 1This line does not come under Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
1)400 KV Palavadi II Breaker o Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
Other four 230 KV feeders will Sat,Jun 16,2018 10:00 Sat,Jun 16,2018 17:00 1Load will be transferred to othe Sat,Jun 16,2018 10:00 Sat,Jun 16,2018 15:00 1
110 KV CTS FEEDER WILL Sat,Jun 16,2018 10:00 Sat,Jun 16,2018 17:00 1
110 KV Vyasarpadi feeder will n Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
During the period of L/C time, Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 15:00 1
During the period of L/C time, Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 15:00 1
During the period of L/C time, 1 Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
NIL Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
During the period of LC i. 230K Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1
During the period of LC i. 110 Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1
During the period of LC i The Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
110 KV Echur - Vandavasi # At Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1
During the period of S/D, Othe Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
1)230 kv Thiruvalam link II # Br Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
1)DURING THE PERIOD OF Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
1. 110KV Vellore SS ,Karnambutt Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
110 kv s p koil # and korattur-I Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 13:00 1
The 110 KV semmandalam, panrut Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
Semmanalam to avail TSD. 110 Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
110 KV Panruti urban SS to av Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
1.110KV AB Switch at Tindivana Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 16:00 1
110 KV Chidambaram to avail Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
Alternate sources 230 KV K.R. Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
The 110 KV UthangalSS ,Srimu Sat,Jun 16,2018 9:00 Wed,Jun 20,2018 17:00 5
230KV Sriperumbudur - Kadapper Sat,Jun 16,2018 5:00 Sat,Jun 16,2018 9:00 1During the period of sd 110kv t Sat,Jun 16,2018 0:00 Sat,Jun 16,2018 0:00 1During the period of sd 230/110k Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1Total Sd availed 110kv Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1Total Sd availed 110kv sholingu Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 14:00 1
Sat,Jun 16,2018 9:00 Sat,Jun 16,2018 17:00 1
110 KV BBGTPS II #, 110 KV Chi Sun,Jun 17,2018 5:00 Sun,Jun 17,2018 12:00 1
The SS Load may be restricted w Sun,Jun 17,2018 10:00 Sun,Jun 17,2018 17:00 1
Auto-5 Will be inservice Sun,Jun 17,2018 9:00 Sun,Jun 17,2018 17:00 1
During the period of LC i The Sun,Jun 17,2018 9:00 Sun,Jun 17,2018 17:00 1
i) The 110KV Kaveripakkam SS a Sun,Jun 17,2018 9:00 Sun,Jun 17,2018 17:00 1
230KV Sriperumbuudr - Kadapper Sun,Jun 17,2018 5:00 Sun,Jun 17,2018 9:00 11.) The 110 KV line isolator to Mon,Jun 18,2018 10:00 Mon,Jun 18,2018 14:00 1
110 KV Vadakuthu ,M.T.Kuppam Mon,Jun 18,2018 9:00 Mon,Jun 18,2018 17:00 1
110KV ETL SS loads fed from Mon,Jun 18,2018 9:00 Mon,Jun 18,2018 14:00 1During the period of Shutdown Mon,Jun 18,2018 10:00 Mon,Jun 18,2018 16:00 1
Mon,Jun 18,2018 9:00 Mon,Jun 18,2018 17:00 1
110 KV Ko.Poovanur feeder bre Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
1.100MVA Autotransformer-I Wi Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 16:00 1
During the period of L/C time, A Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 14:00 1
110 KV S P KOIL FEEDER I Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
During the period of LC i110 K Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
1.The 100MVA Auto Transformer Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
DURING THE PERIOD OF SH Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
TOTAL SHUT DOWN SUBJE Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 15:00 1
110KV Thimiri SS availing total Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 17:00 1
110 KV S.P.Koil # I Tied condi Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 14:00 1230kv alamathy /athipattu thiru Tue,Jun 19,2018 9:00 Tue,Jun 19,2018 14:00 1Idly charged feeder Wed,Jun 20,2018 10:00 Wed,Jun 20,2018 17:00 1400KV Bus-2 will be in service Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
At the time of LC 1.230 KV Echu Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
DURING THE PERIOD OF SH Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
16 Mva pr Tr.I &II will be in se Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 13:00 1
All other 4 Nos 230KV feeders w Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
1. Thirukoilur # H/T at 230 Kv Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
The 110 KV Semmankuppam SS, wWed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
This line does not come under Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 18:00 1
110KV Madambakkam SS loads Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 14:00 1Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
Wed,Jun 20,2018 9:00 Wed,Jun 20,2018 17:00 1
During the period of shut down Thu,Jun 21,2018 10:00 Thu,Jun 21,2018 17:00 1
During the period of L/C time, Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
lc will be taken one by one Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
During the period of L/C time, Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
230KV SP KOIL FEEDER TO Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
During the period of LC i. 11 Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 14:00 1
During the period of LC i The Thu,Jun 21,2018 0:00 Thu,Jun 21,2018 0:00 1
During the period of LC i. 110 Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 14:00 1
DURING THE PERIOD OF S Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
i)The 110KV M.V Puram SS, 110K Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
1.110KV AB Switch at Valavanu Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 16:00 1
i) Both the 230KV feeders wil Thu,Jun 21,2018 11:00 Thu,Jun 21,2018 17:00 1
During the period sd 110 s Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 14:00 1During the period of sd 110kv Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 14:00 1
Thu,Jun 21,2018 9:00 Thu,Jun 21,2018 17:00 1
during the period of shutdown Thu,Jun 21,2018 10:00 Thu,Jun 21,2018 17:00 1
AUTO TRANSFORMER I AND Fri,Jun 22,2018 10:00 Fri,Jun 22,2018 17:00 1
during the period of shutdown Fri,Jun 22,2018 10:00 Fri,Jun 22,2018 17:00 1
During the period of LC i. 110 Fri,Jun 22,2018 9:00 Fri,Jun 22,2018 15:00 1
DURING THE PERIOD OF S Fri,Jun 22,2018 9:00 Fri,Jun 22,2018 17:00 1
110 KV Kannamangalam SS & 110 Fri,Jun 22,2018 9:00 Fri,Jun 22,2018 17:00 1
230KV Kalivanthapattu - Siruser Fri,Jun 22,2018 5:00 Fri,Jun 22,2018 9:00 1During period of sd 230kv alama Fri,Jun 22,2018 9:00 Fri,Jun 22,2018 14:00 1Sd availed in 230kv Mosur ss Fri,Jun 22,2018 9:00 Fri,Jun 22,2018 14:00 1During the period of shutdow Sat,Jun 23,2018 9:00 Sat,Jun 23,2018 17:00 1
During the period of shutdown, Sat,Jun 23,2018 9:00 Sat,Jun 23,2018 17:00 1
During the period S/D, Other 2 Sat,Jun 23,2018 13:00 Sat,Jun 23,2018 17:00 1
DURING THE PERIOD OF SH Sat,Jun 23,2018 9:00 Sat,Jun 23,2018 17:00 1110 kv s p koil # and korattur-I Sat,Jun 23,2018 8:00 Sat,Jun 23,2018 13:00 1
230KV KITS - Tharamani # will Sat,Jun 23,2018 5:00 Sat,Jun 23,2018 9:00 1Sat,Jun 23,2018 9:00 Sat,Jun 23,2018 17:00 1
During the period of shutdown, Sun,Jun 24,2018 9:00 Sun,Jun 24,2018 17:00 1
The 110 KV K.K.Nagar Feeder lo Sun,Jun 24,2018 10:00 Sun,Jun 24,2018 17:00 1
230 KV Sriperumbudur - I, 230 Sun,Jun 24,2018 7:00 Sun,Jun 24,2018 10:00 1
230KV Kalivanthapattu - Thara Sun,Jun 24,2018 9:00 Sun,Jun 24,2018 13:00 1During the period of shutdown Sun,Jun 24,2018 9:00 Sun,Jun 24,2018 17:00 112. During the period of LC iii. Mon,Jun 25,2018 9:00 Mon,Jun 25,2018 15:00 1
During the period of LC i. 110 Mon,Jun 25,2018 9:00 Mon,Jun 25,2018 14:00 1
i) Auto-Tr-I ,HV-I,LV-I, Auto-T Mon,Jun 25,2018 9:00 Mon,Jun 25,2018 17:00 1
110 Kv B.mutlur to avail TSD Mon,Jun 25,2018 9:00 Mon,Jun 25,2018 17:00 1
It is proposed to avail line c Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
1.110KV ACK-Vandavasi Feeder Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 16:00 1
No Supply to 110KV Hitachi HT Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
During the period of L/C time, Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 14:00 1EITHER 110 KV SP KOIL I, Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
During the period of LC i. 230K Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
At the Time of LC 1. The 110 K Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 14:00 1
1)230kv singarapet # breaker off Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
DURING THE PERIOD OF SH Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
) Auto-Tr-I ,HV-I,LV-I, Auto-T Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
The 110 KV Capperhills SS will Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
Monthly maintenance work for Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 17:00 1
230KV Sriperumbudur - Tharama Tue,Jun 26,2018 5:00 Tue,Jun 26,2018 9:00 1
100MV Auto Tr-I will be in ser Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 14:00 1230/110kv auto tr 1/2/3/4/ in se Tue,Jun 26,2018 9:00 Tue,Jun 26,2018 14:00 1
110 KV Chindadiripet # only wil Wed,Jun 27,2018 5:00 Wed,Jun 27,2018 8:00 1EHT feeder. Company will be Wed,Jun 27,2018 10:00 Wed,Jun 27,2018 17:00 1
Other TIE will be in service Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 17:00 1
110 KV Kadapperi - Korattur-II Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 13:00 1
All other 4 Nos 230KV feeders w Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 17:00 1
1.The 110KV isolator switch at Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 16:00 1
Spic Pharma - Under D.C. from Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 17:00 1
Wed,Jun 27,2018 9:00 Wed,Jun 27,2018 17:00 1
230 KV Bus- I will be in servic Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1
All other 230Kv Feeders will br Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1At the time of LC 1.230 KV Ech Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1
DURING THE PERIOD OF SH Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1110 TSD of Veppur&Tholudur SS. Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1
J.K. Pharma - Under D.C. from Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 17:00 1
During the period of sd 230kvatt Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 14:00 1Sd availed in 230kv mosur ss Thu,Jun 28,2018 9:00 Thu,Jun 28,2018 14:00 1During the period of LC i. 230K Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 14:00 1
i) Auto-Tr-I ,HV-I,LV-I, Auto-T Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 17:00 1
110Kv Pillaipakkam ss will fe Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 17:00 1
110 kV chinnasalem SS TSD to a Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 17:00 1
230KV Sriperumbudur - Kadapper Fri,Jun 29,2018 5:00 Fri,Jun 29,2018 9:00 1
Feeder idly charged Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 14:00 1Sd availed in 230kv Mosur SS Fri,Jun 29,2018 9:00 Fri,Jun 29,2018 14:00 1Ulundurpet 110 KV SS Total sh Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1
Other three Auto Trs. will be in Sat,Jun 30,2018 10:00 Sat,Jun 30,2018 17:00 1Load take care by other two tran Sat,Jun 30,2018 7:00 Sat,Jun 30,2018 15:00 1
110KV HCL FEEDER WILL B Sat,Jun 30,2018 10:00 Sat,Jun 30,2018 17:00 1
During the period of LC i. 230K Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 0:00 1
During the period of S/D, othe Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1
Pallavaram ss load will be trans Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 12:00 1
Northern Bus will be in service Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 11. T.V.Nallur # & Villupuram L Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1
1.110KV Madurapakkam Thiruchi Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1
TCS SS loads fed from 230KV S Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 14:00 1
110 KV Kits park feeder load Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1During the period of shutdow Sat,Jun 30,2018 9:00 Sat,Jun 30,2018 17:00 1
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
Recomendation Remarks
Possible Approved
Possible ApprovedPossible Approved
Repeat LC Cancelled
Possible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
SE Approval
(*Subject to Remarks)
Subject to EHT concurrence
Subject to Kanchi Total SD
Possible Approved
Possible Approved
Possible Approved
Approved
Possible ApprovedPossible ApprovedPossible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPending Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
No OCC Approval SRLDC Postponed
Possible Approved
OCC Appd116/ 143rd OCC
Subject to CBD concurrence
Approved:147/143 rd OCC
Subject to EHT concurrence
Subject to Generation Backdown in that area
Subject to load condition
Possible Both end LC Approved
Possible Approved
Inter sldc Approved
Possible Both end LC Approved
Possible Both end LC Approved
Possible ApprovedApproved
Possible ApprovedPossible Approved
Approved
Possible ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
SRLDC Approved
SRLDC Approved
Approved
Possible Approved
Subject to TAQA Generation
OCC Approved on 7.06.18/176/143rd
Approved:129/143 rd OCC
Midreview approved
Approved:167/143 rd OCC
OCC Appd 129/143rd OCC
Approved:132/143 rd OCC
Subject to load condition
Possible ApprovedInter sldc Approved
Possible Approved
Possible Approved
Possible Approved
Inter sldc Postponed
Possible Both end LC Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible Approved
No total shutdown
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Both end LC ApprovedPossible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Approved
Pending
Approved
Program with total SD
OCC Approved on 10.06.18
Subject to Grid Condition
Approved:137/143 rd OCC
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Both end LC Approved
Inter sldc Postponed
Possible Approved
1) No OCC Approval2) possible
Addressed to SRLDC
Subject to CBD concurrence
No total shutdown
Possible ApprovedPossible Approved
Possible ApprovedApproved
Possible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
SRLDC
SRLDC Approved
Possible Approved
Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Approved:197/143 rd OCC
Subject to ETL Concurrence
1) Approved: 199/143 rd OCC 2) No OCC Approval
1)Approved 2) Addressed to SRLDC
Approved:198/143 rd OCC
Approved:152/143 rd OCC
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible ApprovedPossible ApprovedPossible Approved
Possible Approved
Pending
Possible ApprovedPossible Approved
Possible ApprovedPossible ApprovedPending
Possible
Possible ApprovedPossible Approved
Postponed to Sunday (17.06.18)
Subject to EE/SLDC/ CNI
Subject to Hyundai concurrence
Addressed to SRLDC
Both circuit LC requested on 16 to 18.05.2018
Addressed to SRLDC
Subject to CBD concurrence
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible 13-17 Approved
Possible Approved
Approved
Possible Approved
Pending ktr auto lc Approved
Possible Approved
Subject to EHT CTS concurrence
Subjecto to CBD concurrence
11 KV Total shutdown
1) Possible2) possible
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Inter sldc Postponed
Possible ApprovedPossible ApprovedPossible ApprovedPossible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible Approved
Approved
Possible Approved
Subject to CBD concurrence
Approved:207/143 rd OCC
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible GC total SD Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible ApprovedPossible Approved
Approved
Possible Approved
Possible Approved
Sub to Bus A availability
Approved:219/143 rd OCC
Possible Approved
Possible Both end LC Approved
Possible Approved
Possible Approved
Possible
Possible ApprovedSRLDC Approved
SRLDC Approved
Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Addressed to SRLDC
Approved:221/143 rd OCC
Approved:220/143 rd OCC
Approved:224/143 rd OCC
Possible Approved
Possible ApprovedPossible Approved
Possible SLC Approved
SRLDC Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible ApprovedPossible Approved
Approved
Possible Approved
Possible 1/1 Approved
Possible ApprovedPossible 1/1 Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
OCC Approved on 21.06.18/223/143rd
Subject to HVF concurrence
Approved:186/143 rd OCC
Subject to CBD concurrence
Subject to CBD concurrence
Possible ApprovedPossible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
No OCC Approval
Possible ApprovedPossible Approved
Subject to HITACH Concurrence
Addressed to SRLDC
Possible ApprovedPossible Approved
SRLDC Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
SRLDC Approved
Possible Approved
Possible 5-9 hrs ApprovedPossible Approved
Possible 5-9 hrs ApprovedPossible Approved
Possible Approved
Possible ApprovedPossible Approved
Approved
Approved
Possible Approved
Subject to EHT concurrence
Approved:251/143 rd OCC
Approved:252/143 rd OCC
Subject to load condition
OCC Approved on 29.06.18/205/143rd
OCC Approved on 29.06.18/205/143rd
Possible Approved
No OCC Approval SRLDC
Possible ApprovedPossible ApprovedPossible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible Approved
Possible Approved
Possible Approved
Possible ApprovedPossible Approved
Addressed to SRLDC
Subject to EHT concurrence
Subject to CBD concurrence
S. No. SLDC P_Id From Name of SS
1 ERODE 71837 1 AEE/Mtce/2230 KV
2 ERODE 71838 2 AEE/Mtce/230 KV SS
3 ERODE 71699 14 AEE / O /GENERATING STATIONS
4 ERODE 71756 43106 EE/O/ANT 230 KV
5 ERODE 71784 1 EE/O/OKM 230 KV
6 ERODE 72015 2007 EE/O/ASR 230 KV
7 ERODE 72299 1 EE O TDL 230 KV
8 ERODE 72021 2008 EE/O/ASR 230 KV
9 ERODE 72559 258 EE/O/Karuv 230 KV
10 ERODE 72562 259 EE/O/Karuv 230 KV
Message No
Type of SS
VALAYAPATTY230KV
Valayapatty 230 KV SS
LOWER METTUR 1
ANTHIYUR 230 KV
OTHAKKAL MANDABAM 230 KV
ARASUR 230 KV
THUDIALUR 230 KV
ARASUR 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
11 ERODE 72682 1 EE/O/GOBI 230 KV GOBI 230 KV
12 ERODE 72774 1 EE/O/GOBI 230 KV GOBI 230 KV
13 ERODE 71891 43 EE/O/DEV 230 KV
14 ERODE 71765 1 EE/URBA 110 KV Erode 110 KV
15 ERODE 71985 1 EE/O/PKP 230 KV
16 ERODE 71786 2 EE/O/OKM 230 KV
17 ERODE 71787 3 EE/O/OKM 230 KV
18 ERODE 72035 1 EE/O/400K 400 KV
DEVIAKURICHI 230 KV
PALLAKAPALAYAM 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
Palavadi 400 KV
19 ERODE 72043 18 EE/O/Sale 230 KV
20 ERODE 72077 1 EE/O/Sing 230 KV
21 ERODE 72357 6 EE/O/VI 230 KV
22 ERODE 72204 1 EE/O/KRT 400 KV Salem 400 KV
23 ERODE 72234 72 EE/o/230kv 230 KV
24 ERODE 72235 72 EE/o/230kv 230 KV
SALEM AUTO 230 KV
SINGAPURAM 230 KV
VINNAMANGALAM 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
25 ERODE 72461 J01 EE/O/Singa 230 KV
26 ERODE 72237 72 EE/o/230kv 230 KV
27 ERODE 72238 72 EE/o/230kv 230 KV
28 ERODE 72266 17 43253GENERATING STATIONSPYKARA
29 ERODE 72892 1 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
30 ERODE 73091 1 EE/O/UDT 230 KV
31 ERODE 73146 12 EE/O/SAE 230 KV
SINGARAPET 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
UDUMALPET 230 KV
SALEM AUTO 230 KV
32 ERODE 73190 235 EE/O/HOS 230 KV
33 ERODE 72521 555 EE/O/Mtr 230 KV
34 ERODE 72565 260 EE/O/Karuv 230 KV
35 ERODE 72570 261 EE/O/Karuv 230 KV
36 ERODE 72575 138/2018 EE/O/Pall 230 KV
37 ERODE 72579 262 EE/O/Karuv 230 KV
38 ERODE 72583 262 EE/O/Karuv 230 KV
HOSUR 230 KV
METTUR AUTO 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
PALLADAM 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
39 ERODE 72587 139/2018 EE/O/Pall 230 KV
40 ERODE 72597 140/2018 EE/O/Pall 230 KV
41 ERODE 72624 3 EE/O/GOBI 230 KV GOBI 230 KV
42 ERODE 72630 1 EE/O/KA 230 KV
43 ERODE 72669 2 EE/O/GOBI 230 KV GOBI 230 KV
44 ERODE 72738 323 EE/O/MYV 400 KV
45 Erode 72851 1031 230 KV VINNAMANGAL
PALLADAM 230 KV
PALLADAM 230 KV
KARIAMANGALAM 230 KV
Udumalpet 400 KV
EE/O/230KV SS/Thiruvalam
46 ERODE 71701 1 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
47 ERODE 72008 106 EE MOYAGENERATING STATIONSMOYAR
48 ERODE 72009 106 EE MOYAGENERATING STATIONSMOYAR
49 ERODE 73235 462 EE/KPH2GENERATING STATIONSKUNDAH PH2
50 ERODE 73236 462 EE/KPH2GENERATING STATIONSKUNDAH PH2
51 ERODE 70556 11 AEE / O /GENERATING STATIONS
52 ERODE 71895 44 EE/O/DEV 230 KV
53 ERODE 71923 1 MTPS-IGENERATING STATIONSMTPS
54 ERODE 71757 43137 EE/O/ANT 230 KV
55 ERODE 71766 2 EE/URBA 110 KV Erode 110 KV
LOWER METTUR 1
DEVIAKURICHI 230 KV
ANTHIYUR 230 KV
56 ERODE 71788 4 EE/O/OKM 230 KV
57 ERODE 72030 2009 EE/O/ASR 230 KV
58 ERODE 72044 2009 EE/O/ASR 230 KV
59 ERODE 72045 2009 EE/O/ASR 230 KV
60 ERODE 72341 3 EE/EM/MTGENERATING STATIONSMTPSII
61 ERODE 72081 2010 EE/O/ASR 230 KV
62 ERODE 72082 2 EE/O/Sing 230 KV
63 ERODE 72366 1 EE/O/Thing 230 KV
OTHAKKAL MANDABAM 230 KV
ARASUR 230 KV
ARASUR 230 KV
ARASUR 230 KV
ARASUR 230 KV
SINGAPURAM 230 KV
THINGALUR 230 KV
64 ERODE 72367 2 EE/O/Thing 230 KV
65 ERODE 72424 37043 EE/O/ALI 230 KV
66 ERODE 72809 9 EE/O/ING 230 KV INGUR 230 KV
67 ERODE 72897 2 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
68 ERODE 72765 2 EE/O/GOBI 230 KV GOBI 230 KV
69 ERODE 72782 M.18 EE/O/ING 230 KV INGUR 230 KV
70 ERODE 72901 3 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
71 ERODE 71839 3 AEE/Mtce/230 KV /Valayapatty
72 ERODE 71890 25 Udumalpet 110 KV
73 ERODE 71727 61 EE/O/Anik 400 KV
THINGALUR 230 KV
ALIYAR 230 KV
Udumalpet 110 KV
Anaikadavu 400 KV
74 ERODE 71755 4 EE / O / Gu 230 KV
75 ERODE 71942 1 EE/Oprn./P 230 KV
76 ERODE 71789 5 EE/O/OKM 230 KV
77 ERODE 72047 19 EE/O/Sale 230 KV
GURUPARAPALLI 230 KV
PUDHANCHANTHAI 230 KV
OTHAKKAL MANDABAM 230 KV
SALEM AUTO 230 KV
78 ERODE 72344 4 EE/EM/MTGENERATING STATIONSMTPSII
79 ERODE 72085 3 EE/O/Sing 230 KV
80 ERODE 72099 2011 EE/O/ASR 230 KV
81 ERODE 72110 2010 EE/O/ASR 230 KV
82 ERODE 72209 3 EE/O/KRT 400 KV Salem 400 KV
83 ERODE 72267 18 43256GENERATING STATIONSPYKARA
84 ERODE 72276 1 EE/O/UNJ 230 KV
SINGAPURAM 230 KV
ARASUR 230 KV
ARASUR 230 KV
UNJANAI 230 KV
85 ERODE 72866 71 EE/O/SPT 110 KV
86 ERODE 73080 219 EE/PHS/MGENERATING STATIONSMETTUR TPH
87 ERODE 73094 3 EE/O/UDT 230 KV
88 ERODE 73148 13 EE/O/SAE 230 KV
89 ERODE 73160 4 EE/O/SAE 230 KV
Singarapet 110 KV
UDUMALPET 230 KV
SALEM AUTO 230 KV
DEVIAKURICHI 230 KV
90 ERODE 72465 J02 EE/O/Singa 230 KV
91 ERODE 73195 236 EE/O/HOS 230 KV
92 ERODE 73234 248 EE/O/PH5GENERATING STATIONSKUNDAH PH5
93 ERODE 72545 1 EE/O/SA 230 KV
94 ERODE 72591 264 EE/O/Karuv 230 KV
95 ERODE 72010 107 EE MOYAGENERATING STATIONSMOYAR
96 ERODE 71889 2 110 KV
SINGARAPET 230 KV
HOSUR 230 KV
SADAYAMPALAYAM 230 KV
KARUVALUR 230 KV
Bhavanisagar 110 KV
97 ERODE 71893 25 Udumalpet 110 KV
98 ERODE 71894 25 Udumalpet 110 KV
99 ERODE 71704 4 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
100 ERODE 71736 1 EE/O/400K 400 KV
101 ERODE 71924 1 MTPS-IGENERATING STATIONSMTPS
102 ERODE 71759 43165 EE/O/ANT 230 KV
103 ERODE 71951 2 EE/Oprn./P 230 KV
104 ERODE 71790 6 EE/O/OKM 230 KV
105 ERODE 72335 1 EE/EM/MTGENERATING STATIONSMTPSII
Udumalpet 110 KV
Udumalpet 110 KV
Palavadi 400 KV
ANTHIYUR 230 KV
PUDHANCHANTHAI 230 KV
OTHAKKAL MANDABAM 230 KV
106 ERODE 72359 6 EE/O/VI 230 KV
107 ERODE 72119 2013 EE/O/ASR 230 KV
108 ERODE 72121 2014 EE/O/ASR 230 KV
109 ERODE 72125 2015 EE/O/ASR 230 KV
110 ERODE 72133 12 EE/O/Sing 230 KV
111 ERODE 72212 4 EE/O/KRT 400 KV Salem 400 KV
112 ERODE 72428 37408 EE/O/ALI 230 KV
113 ERODE 72262 59 EE/O/230 230 KV
114 ERODE 72278 2 EE/O/UNJ 230 KV
115 ERODE 72816 10 EE/O/ING 230 KV INGUR 230 KV
VINNAMANGALAM 230 KV
ARASUR 230 KV
ARASUR 230 KV
ARASUR 230 KV
SINGAPURAM 230 KV
ALIYAR 230 KV
METTUR AUTO 230 KV
UNJANAI 230 KV
116 ERODE 72872 72 EE/O/SPT 110 KV
117 ERODE 73081 220 EE/PHS/MGENERATING STATIONSMETTUR TPH
118 ERODE 73095 4 EE/O/UDT 230 KV
119 ERODE 73128 223 EE/PHS/MGENERATING STATIONSMETTUR TPH
120 ERODE 72469 J04 EE/O/Singa 230 KV
121 ERODE 72524 556 EE/O/Mtr 230 KV
122 ERODE 72652 5 EE/O/GOBI 230 KV GOBI 230 KV
Singarapet 110 KV
UDUMALPET 230 KV
SINGARAPET 230 KV
METTUR AUTO 230 KV
123 ERODE 72665 4 EE/O/GOBI 230 KV GOBI 230 KV
124 ERODE 72776 3 EE/O/GOBI 230 KV GOBI 230 KV
125 ERODE 72788 M.19 EE/O/ING 230 KV INGUR 230 KV
126 ERODE KUNDAH PH 1
127 ERODE 73092 2 EE/O/UDT 230 KV
128 ERODE 71840 4 AEE/Mtce/230 KV /Valayapatty
129 ERODE 71728 62 EE/O/Anik 400 KV
130 ERODE 71898 45 EE/O/DEV 230 KV
131 ERODE 71737 2 EE/O/400K 400 KV
132 ERODE 71770 4 EE/URBA 110 KV Erode 110 KV
133 ERODE 72005 3 EE/O/PKP 230 KV
EE/GEN KPH1
UDUMALPET 230 KV
Anaikadavu 400 KV
DEVIAKURICHI 230 KV
Palavadi 400 KV
PALLAKAPALAYAM 230 KV
134 ERODE 72301 3 EE O TDL 230 KV
135 ERODE 72048 20 EE/O/Sale 230 KV
136 ERODE 72090 4 EE/O/Sing 230 KV
137 ERODE 72370 3 EE/O/Thing 230 KV
138 ERODE 72127 2016 EE/O/ASR 230 KV
139 ERODE 72214 5 EE/O/KRT 400 KV Salem 400 KV
140 ERODE 72254 78 EE/O/230 230 KV
141 ERODE 72268 19 43258GENERATING STATIONSPYKARA
142 ERODE 72830 11 EE/O/ING 230 KV INGUR 230 KV
THUDIALUR 230 KV
SALEM AUTO 230 KV
SINGAPURAM 230 KV
THINGALUR 230 KV
ARASUR 230 KV
METTUR AUTO 230 KV
143 ERODE 72903 4 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
144 ERODE 72915 249 EE/O/CBE 230 KV
145 ERODE 73097 5 EE/O/UDT 230 KV
146 ERODE 73145 10 EE/O&M/ 110 KV
147 ERODE 73150 14 EE/O/SAE 230 KV
148 ERODE 72474 J05 EE/O/Singa 230 KV
149 ERODE 73237 249 EE/O/PH1/GENERATING STATIONSKUNDAH PH5
150 ERODE 72599 6 EE/O/GOBI 230 KV GOBI 230 KV
151 ERODE 72792 M.20 EE/O/ING 230 KV INGUR 230 KV
COIMBATORE 230 KV
UDUMALPET 230 KV
Thirupathur 110 KV
SALEM AUTO 230 KV
SINGARAPET 230 KV
152 ERODE 72467 J03 EE/O/Singa 230 KV
153 ERODE 72300 2 EE O TDL 230 KV
154 ERODE 70564 12 AEE / O /GENERATING STATIONS
155 ERODE 71901 46 EE/O/DEV 230 KV
156 ERODE 71925 1 MTPS-IGENERATING STATIONSMTPS
157 ERODE 71962 3 EE/Oprn./P 230 KV
158 ERODE 71791 7 EE/O/OKM 230 KV
159 ERODE 72302 4 EE O TDL 230 KV
SINGARAPET 230 KV
THUDIALUR 230 KV
LOWER METTUR 1
DEVIAKURICHI 230 KV
PUDHANCHANTHAI 230 KV
OTHAKKAL MANDABAM 230 KV
THUDIALUR 230 KV
160 ERODE 72093 5 EE/O/Sing 230 KV
161 ERODE 72371 4 EE/O/Thing 230 KV
162 ERODE 72216 6 EE/O/KRT 400 KV Salem 400 KV
163 ERODE 72432 37773 EE/O/ALI 230 KV
164 ERODE 72460 534 EE O KA 230 KV
165 ERODE 72249 72 EE/O/230 230 KV
166 ERODE 72279 3 EE/O/UNJ 230 KV
167 ERODE 72935 250 EE/O/CBE 230 KV
168 ERODE 73098 6 EE/O/UDT 230 KV
SINGAPURAM 230 KV
THINGALUR 230 KV
ALIYAR 230 KV
KARAMADAI 230 KV
METTUR AUTO 230 KV
UNJANAI 230 KV
COIMBATORE 230 KV
UDUMALPET 230 KV
169 ERODE 72596 265 EE/O/Karuv 230 KV
170 ERODE 72602 267 EE/O/Karuv 230 KV
171 ERODE 72647 2 EE/O/KA 230 KV
172 ERODE 72659 2 EE/O/KA 230 KV
173 ERODE 72746 324 EE/O/MYV 400 KV
174 ERODE 72797 M.21 EE/O/ING 230 KV INGUR 230 KV
175 ERODE 72303 5 EE O TDL 230 KV
176 ERODE 72463 187 EE/PHs/PHGENERATING STATIONSKUNDAH PH6
177 ERODE 72605 263 EE/O/Karuv 230 KV
178 ERODE 72011 108 EE MOYAGENERATING STATIONSMOYAR
KARUVALUR 230 KV
KARUVALUR 230 KV
KARIAMANGALAM 230 KV
KARIAMANGALAM 230 KV
Udumalpet 400 KV
THUDIALUR 230 KV
KARUVALUR 230 KV
179 ERODE 72291 70 AEE/O/PUGENERATING STATIONSPUSHEP
180 ERODE 73239 462 EE/KPH2GENERATING STATIONSKUNDAH PH2
181 ERODE 71902 47 EE/O/DEV 230 KV
182 ERODE 71738 3 EE/O/400K 400 KV
183 ERODE 71926 1 MTPS-IGENERATING STATIONSMTPS
184 ERODE 71795 8 EE/O/OKM 230 KV
185 ERODE 72129 2017 EE/O/ASR 230 KV
186 ERODE 72161 TM EE/O&M/O 110 KV
187 ERODE 72217 7 EE/O/KRT 400 KV Salem 400 KV
188 ERODE 72443 38139 EE/O/ALI 230 KV
189 ERODE 72250 73 EE/O/230 230 KV
DEVIAKURICHI 230 KV
Palavadi 400 KV
OTHAKKAL MANDABAM 230 KV
ARASUR 230 KV
Sandinallah 110 KV
ALIYAR 230 KV
METTUR AUTO 230 KV
190 ERODE 72251 73 EE/O/230 230 KV
191 ERODE 72269 20 43262GENERATING STATIONSPYKARA
192 ERODE 72805 M.23 EE/O/ING 230 KV INGUR 230 KV
193 ERODE 72899 65 EE/O/230 230 KV
194 ERODE 72907 5 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
195 ERODE 73078 10 eeopnpm 230 KV
196 ERODE 73100 7 EE/O/UDT 230 KV
197 ERODE 73124 221 EE/PHS/MGENERATING STATIONSMETTUR TPH
198 ERODE 73161 5 EE/O/SAE 230 KV
199 ERODE 73242 462 EE/KPH2GENERATING STATIONSKUNDAH PH2
METTUR AUTO 230 KV
METTUR AUTO 230 KV
PONNAPURAM 230 KV
UDUMALPET 230 KV
DEVIAKURICHI 230 KV
200 ERODE 72509 535 EE O KA 230 KV
201 ERODE 72525 557 EE/O/Mtr 230 KV
202 ERODE 72616 141/2018 EE/O/Pall 230 KV
203 ERODE 72627 268 EE/O/Karuv 230 KV
204 ERODE 72638 269 EE/O/Karuv 230 KV
205 ERODE 72672 7 EE/O/GOBI 230 KV GOBI 230 KV
206 ERODE 72800 M.22 EE/O/ING 230 KV INGUR 230 KV
207 ERODE 71729 63 EE/O/Anikadavu
208 ERODE 71896 25 Udumalpet 110 KV
KARAMADAI 230 KV
METTUR AUTO 230 KV
PALLADAM 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
Anaikadavu 400 KV
Udumalpet 110 KV
209 ERODE 71965 4 EE/Oprn./P 230 KV
210 ERODE 71772 5 EE/URBA 110 KV Erode 110 KV
211 ERODE 71984 13 EE/O/ING 230 KV INGUR 230 KV
212 ERODE 72096 6 EE/O/Sing 230 KV
213 ERODE 72130 2018 EE/O/ASR 230 KV
214 ERODE 72372 5 EE/O/Thing 230 KV
215 ERODE 72218 8 EE/O/KRT 400 KV Salem 400 KV
216 ERODE 72257 79 EE/O/230 230 KV
217 ERODE 72270 21 43263GENERATING STATIONSPYKARA
218 ERODE 72808 M.24 EE/O/ING 230 KV INGUR 230 KV
219 ERODE 72836 12 EE/O/ING 230 KV INGUR 230 KV
PUDHANCHANTHAI 230 KV
SINGAPURAM 230 KV
ARASUR 230 KV
THINGALUR 230 KV
METTUR AUTO 230 KV
220 ERODE 72913 6 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
221 ERODE 72978 188 EE/PHs/PHGENERATING STATIONSKUNDAH PH6
222 ERODE 72477 J06 EE/O/Singa 230 KV
223 ERODE 72481 J07 EE/O/Singa 230 KV
224 ERODE 72528 558 EE/O/Mtr 230 KV
225 ERODE 72547 2 EE/O/SA 230 KV
SINGARAPET 230 KV
SINGARAPET 230 KV
METTUR AUTO 230 KV
SADAYAMPALAYAM 230 KV
226 ERODE 72667 3 EE/O/KA 230 KV
227 ERODE 72514 536 EE O KA 230 KV
228 ERODE 72001 2 EE/O/PKP 230 KV
229 ERODE 72317 1 EE/OPERA 230 KV
230 ERODE 72207 2 EE/O/KRT 400 KV Salem 400 KV
231 ERODE 71843 5 AEE/Mtce/230 KV /Va
232 ERODE 71730 64 EE/O/Anikadavu
233 ERODE 71739 4 EE/O/400K 400 KV
234 ERODE 71906 48 EE/O/DEV 230 KV
235 ERODE 71927 1 MTPS-IGENERATING STATIONSMTPS
236 ERODE 71966 5 EE/Oprn./P 230 KV
237 ERODE 72006 4 EE/O/PKP 230 KV
KARIAMANGALAM 230 KV
KARAMADAI 230 KV
PALLAKAPALAYAM 230 KV
UNJANAI 230 KV
Valayapatty 230 KV SS
Anaikadavu 400 KV
Palavadi 400 KV
DEVIAKURICHI 230 KV
PUDHANCHANTHAI 230 KV
PALLAKAPALAYAM 230 KV
238 ERODE 71802 9 EE/O/OKM 230 KV
239 ERODE 72012 110 EE MOYAGENERATING STATIONSMOYAR
240 ERODE 72304 5 EE O TDL 230 KV
241 ERODE 72305 6 EE O TDL 230 KV
242 ERODE 72319 2 EE/OPERA 230 KV
243 ERODE 72051 21 EE/O/Sale 230 KV
244 ERODE 72100 7 EE/O/Sing 230 KV
245 ERODE 72123 37 EE/PHs/BPGENERATING STATIONS
246 ERODE 72374 6 EE/O/Thing 230 KV
247 ERODE 72446 38504 EE/O/ALI 230 KV
248 ERODE 72242 74 EE/O/230 230 KV
OTHAKKAL MANDABAM 230 KV
THUDIALUR 230 KV
THUDIALUR 230 KV
UNJANAI 230 KV
SALEM AUTO 230 KV
SINGAPURAM 230 KV
LOWER METTUR 3
THINGALUR 230 KV
ALIYAR 230 KV
METTUR AUTO 230 KV
249 ERODE 72280 4 EE/O/UNJ 230 KV
250 ERODE 72984 189 EE/PHs/PHGENERATING STATIONSKUNDAH PH6
251 ERODE 73088 206 EE/PHs/PHGENERATING STATIONSKUNDAH PH1
252 ERODE 73101 8 EE/O/UDT 230 KV
253 ERODE 73102 9 EE/O/UDT 230 KV
254 ERODE 73131 224 EE/PHS/MGENERATING STATIONSMETTUR TPH
255 ERODE 73151 15 EE/O/SAE 230 KV
256 ERODE 72533 559 EE/O/Mtr 230 KV
257 ERODE 72629 8 EE/O/GOBI 230 KV GOBI 230 KV
258 ERODE 72749 325 EE/O/MYV 400 KV
UNJANAI 230 KV
UDUMALPET 230 KV
UDUMALPET 230 KV
SALEM AUTO 230 KV
METTUR AUTO 230 KV
Udumalpet 400 KV
259 ERODE 72321 3 EE/OPERA 230 KV
260 ERODE 72326 5 EE/OPERA 230 KV
261 ERODE 72331 7 EE/OPERA 230 KV
262 ERODE 71774 6 EE/URBA 110 KV Erode 110 KV
263 ERODE 71986 14 EE/O/ING 230 KV INGUR 230 KV
264 ERODE 71807 10 EE/O/OKM 230 KV
265 ERODE 71808 11 EE/O/OKM 230 KV
266 ERODE 71809 12 EE/O/OKM 230 KV
267 ERODE 72306 7 EE O TDL 230 KV
UNJANAI 230 KV
UNJANAI 230 KV
UNJANAI 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
THUDIALUR 230 KV
268 ERODE 72131 2019 EE/O/ASR 230 KV
269 ERODE 72162 TM EE/O&M/O 110 KV
270 ERODE 72376 7 EE/O/Thing 230 KV
271 ERODE 72219 9 EE/O/KRT 400 KV Salem 400 KV
272 ERODE 72449 38869 EE/O/ALI 230 KV
273 ERODE 72810 M.25 EE/O/ING 230 KV INGUR 230 KV
274 ERODE 72838 13 EE/O/ING 230 KV INGUR 230 KV
275 ERODE 73103 9 EE/O/UDT 230 KV
276 ERODE 72483 J08 EE/O/Singa 230 KV
277 ERODE 73238 250 EE/O/PH1/GENERATING STATIONSKUNDAH PH5
278 ERODE 72518 537 EE O KA 230 KV
ARASUR 230 KV
Sandinallah 110 KV
THINGALUR 230 KV
ALIYAR 230 KV
UDUMALPET 230 KV
SINGARAPET 230 KV
KARAMADAI 230 KV
279 ERODE 71740 5 EE/O/400K 400 KV
280 ERODE 71810 13 EE/O/OKM 230 KV
281 ERODE 72954 251 EE/O/CBE 230 KV
282 ERODE 73105 10 EE/O/UDT 230 KV
283 ERODE 73132 13 EE/O/OKM 230 KV
284 ERODE 72645 270 EE/O/Karuv 230 KV
285 ERODE 72651 271 EE/O/Karuv 230 KV
Palavadi 400 KV
OTHAKKAL MANDABAM 230 KV
COIMBATORE 230 KV
UDUMALPET 230 KV
OTHAKKAL MANDABAM 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
286 ERODE 72657 272 EE/O/Karuv 230 KV
287 ERODE 72671 273 EE/O/Karuv 230 KV
288 ERODE 71908 49 EE/O/DEV 230 KV
289 ERODE 71928 1 MTPS-IGENERATING STATIONSMTPS
290 ERODE 71761 43196 EE/O/ANT 230 KV
291 ERODE 71762 43226 EE/O/ANT 230 KV
292 ERODE 71776 7 EE/URBA 110 KV Erode 110 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
DEVIAKURICHI 230 KV
ANTHIYUR 230 KV
ANTHIYUR 230 KV
293 ERODE 71989 15 EE/O/ING 230 KV INGUR 230 KV
294 ERODE 72007 5 EE/O/PKP 230 KV
295 ERODE 71811 14 EE/O/OKM 230 KV
296 ERODE 72307 8 EE O TDL 230 KV
297 ERODE 72362 6 EE/O/VI 230 KV
PALLAKAPALAYAM 230 KV
OTHAKKAL MANDABAM 230 KV
THUDIALUR 230 KV
VINNAMANGALAM 230 KV
298 ERODE 72136 13 EE/O/Sing 230 KV
299 ERODE 72163 TM EE/O&M/O 110 KV
300 ERODE 72378 8 EE/O/Thing 230 KV
301 ERODE 72414 62 EE/BKBPHGENERATING STATIONSBKB - 2
302 ERODE 72812 M.26 EE/O/ING 230 KV INGUR 230 KV
303 ERODE 72817 M.27 EE/O/ING 230 KV INGUR 230 KV
304 ERODE 72841 14 EE/O/ING 230 KV INGUR 230 KV
305 ERODE 72960 252 EE/O/CBE 230 KV
SINGAPURAM 230 KV
Sandinallah 110 KV
THINGALUR 230 KV
COIMBATORE 230 KV
306 ERODE 72486 J09 EE/O/Singa 230 KV
307 ERODE 72536 560 EE/O/Mtr 230 KV
308 ERODE 72626 142/2018 EE/O/Pall 230 KV
309 ERODE 72646 143/2018 EE/O/Pall 230 KV
310 ERODE 72674 274 EE/O/Karuv 230 KV
311 ERODE 72680 275 EE/O/Karuv 230 KV
312 ERODE 72757 326 EE/O/MYV 400 KV
313 ERODE 71702 2 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
314 ERODE 72287 69 AEE/O/PUGENERATING STATIONSPUSHEP
SINGARAPET 230 KV
METTUR AUTO 230 KV
PALLADAM 230 KV
PALLADAM 230 KV
KARUVALUR 230 KV
KARUVALUR 230 KV
Udumalpet 400 KV
315 ERODE 72661 144/2018 EE/O/Pall 230 KV
316 ERODE 72014 112 EE MOYAGENERATING STATIONSMOYAR
317 ERODE 71812 15 EE/O/OKM 230 KV
318 ERODE 71731 65 EE/O/Anikadavu
319 ERODE 71909 50 EE/O/DEV 230 KV
320 ERODE 71929 1 MTPS-IGENERATING STATIONSMTPS
321 ERODE 72346 5 EE/EM/MTGENERATING STATIONSMTPSII
PALLADAM 230 KV
OTHAKKAL MANDABAM 230 KV
Anaikadavu 400 KV
DEVIAKURICHI 230 KV
322 ERODE 72104 8 EE/O/Sing 230 KV
323 ERODE 72132 2020 EE/O/ASR 230 KV
324 ERODE 72164 TM EE/O&M/O 110 KV
325 ERODE 72221 11 EE/O/KRT 400 KV Salem 400 KV
326 ERODE 72451 39234 EE/O/ALI 230 KV
327 ERODE 72261 58 EE/O/230 230 KV
328 ERODE 72271 22 43269GENERATING STATIONSPYKARA
329 ERODE 72824 M.28 EE/O/ING 230 KV INGUR 230 KV
330 ERODE 73140 15 EE/O/OKM 230 KV
SINGAPURAM 230 KV
ARASUR 230 KV
Sandinallah 110 KV
ALIYAR 230 KV
METTUR AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
331 ERODE 73141 15 EE/O/OKM 230 KV
332 ERODE 73153 17 EE/O/SAE 230 KV
333 ERODE 72522 538 EE O KA 230 KV
334 ERODE 72692 9 EE/O/GOBI 230 KV GOBI 230 KV
335 ERODE 71813 16 EE/O/OKM 230 KV
336 ERODE 71847 6 AEE/Mtce/230 KV /Va
337 ERODE 71897 25 Udumalpet 110 KV
338 ERODE 71967 6 EE/Oprn./P 230 KV
OTHAKKAL MANDABAM 230 KV
SALEM AUTO 230 KV
KARAMADAI 230 KV
OTHAKKAL MANDABAM 230 KV
Valayapatty 230 KV SS
Udumalpet 110 KV
PUDHANCHANTHAI 230 KV
339 ERODE 72018 6 EE/O/PKP 230 KV
340 ERODE 72309 10 EE O TDL 230 KV
341 ERODE 72056 23 EE/O/Sale 230 KV
342 ERODE 72134 2021 EE/O/ASR 230 KV
343 ERODE 72167 1 EE/O/KUR 230 KV
344 ERODE 72168 2 EE/O/KURUKATHI
345 ERODE 72169 3 EE/O/KURUKATHI
346 ERODE 72222 12 EE/O/KRT 400 KV Salem 400 KV
347 ERODE 72272 23 43270GENERATING STATIONSPYKARA
348 ERODE 72281 5 EE/O/UNJ 230 KV
349 ERODE 72289 69 AEE/O/PUGENERATING STATIONSPUSHEP
350 ERODE 72856 M.33 EE/O/ING 230 KV INGUR 230 KV
PALLAKAPALAYAM 230 KV
THUDIALUR 230 KV
SALEM AUTO 230 KV
ARASUR 230 KV
KURUKATHI230KV
KURUKATHI230KV
KURUKATHI230KV
UNJANAI 230 KV
351 ERODE 73069 3 EEOPNPM 230 KV
352 ERODE 73106 11 EE/O/UDT 230 KV
353 ERODE 73143 16 EE/O/OKM 230 KV
354 ERODE 73144 16 EE/O/OKM 230 KV
355 ERODE 73154 18 EE/O/SAE 230 KV
356 ERODE 73240 251 EE/O/PH1/GENERATING STATIONSKUNDAH PH5
357 ERODE 72548 3 EE/O/SA 230 KV
PONNAPURAM 230 KV
UDUMALPET 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
SALEM AUTO 230 KV
SADAYAMPALAYAM 230 KV
358 ERODE 72572 562 EE/O/Mtr 230 KV
359 ERODE 72759 327 EE/O/MYV 400 KV
360 ERODE 71733 67 EE/O/Anikadavu
361 ERODE 71814 17 EE/O/OKM 230 KV
362 ERODE 71741 6 EE/O/400K 400 KV
363 ERODE 71930 1 MTPS-IGENERATING STATIONSMTPS
364 ERODE 71763 43257 EE/O/ANT 230 KV
365 ERODE 71764 43287 EE/O/ANT 230 KV
366 ERODE 71767 43318 EE/O/ANT 230 KV
METTUR AUTO 230 KV
Udumalpet 400 KV
Anaikadavu 400 KV
OTHAKKAL MANDABAM 230 KV
Palavadi 400 KV
ANTHIYUR 230 KV
ANTHIYUR 230 KV
ANTHIYUR 230 KV
367 ERODE 71970 7 EE/Oprn./P 230 KV
368 ERODE 71779 8 EE/URBA 110 KV Erode 110 KV
369 ERODE 72013 111 EE MOYAGENERATING STATIONSMOYAR
370 ERODE 72020 7 EE/O/PKP 230 KV
371 ERODE 72311 12 EE O TDL 230 KV
372 ERODE 72312 13 EE O TDL 230 KV
373 ERODE 72058 24 EE/O/Sale 230 KV
374 ERODE 72339 2 EE/EM/MTGENERATING STATIONSMTPSII
375 ERODE 72106 9 EE/O/Sing 230 KV
PUDHANCHANTHAI 230 KV
PALLAKAPALAYAM 230 KV
THUDIALUR 230 KV
THUDIALUR 230 KV
SALEM AUTO 230 KV
SINGAPURAM 230 KV
376 ERODE 72126 38 EE/PHs/BPGENERATING STATIONS
377 ERODE 72135 2022 EE/O/ASR 230 KV
378 ERODE 72223 13 EE/O/KRT 400 KV Salem 400 KV
379 ERODE 72224 14 EE/O/KRT 400 KV Salem 400 KV
380 ERODE 72256 55 EE/EL/BPGENERATING STATIONS
381 ERODE 72259 80 EE/O/230 230 KV
382 ERODE 72260 80 EE/O/230 230 KV
LOWER METTUR 3
ARASUR 230 KV
LOWER METTUR 4
METTUR AUTO 230 KV
METTUR AUTO 230 KV
383 ERODE 72282 6 EE/O/UNJ 230 KV
384 ERODE 72827 M.29 EE/O/ING 230 KV INGUR 230 KV
385 ERODE 72878 73 EE/O/SPT 110 KV
386 ERODE 72963 253 EE/O/CBE 230 KV
387 ERODE 73074 8 eeopnpm 230 KV
388 ERODE 73125 222 EE/PHS/MGENERATING STATIONSMETTUR TPH
389 ERODE 73155 19 EE/O/SAE 230 KV
390 ERODE 73181 2030 EE/O/ARA 230 KV
391 ERODE 72488 J10 EE/O/Singa 230 KV
UNJANAI 230 KV
Singarapet 110 KV
COIMBATORE 230 KV
PONNAPURAM 230 KV
SALEM AUTO 230 KV
ARASUR 230 KV
SINGARAPET 230 KV
392 ERODE 72580 563 EE/O/Mtr 230 KV
393 ERODE 72609 10 EE/O/GOBI 230 KV GOBI 230 KV
394 ERODE 72684 276 EE/O/Karuv 230 KV
395 ERODE 72381 9 EE/O/Thing 230 KV
396 ERODE 71818 18 EE/O/OKM 230 KV
397 ERODE 71822 19 EE/O/OKM 230 KV
398 ERODE 71849 7 AEE/Mtce/230 KV /Valayapatty
399 ERODE 71732 66 EE/O/Anikadavu
METTUR AUTO 230 KV
KARUVALUR 230 KV
THINGALUR 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
400 ERODE 71978 8 EE/Oprn./P 230 KV
401 ERODE 71780 9 EE/URBA 110 KV Erode 110 KV
402 ERODE 72323 4 EE/OPERA 230 KV
403 ERODE 72137 2023 EE/O/ASR 230 KV
404 ERODE 72165 TM EE/O&M/O 110 KV
405 ERODE 72225 15 EE/O/KRT 400 KV Salem 400 KV
406 ERODE 72453 39600 EE/O/ALI 230 KV
407 ERODE 72455 39965 EE/O/ALI 230 KV
408 ERODE 72457 40330 EE/O/ALI 230 KV
409 ERODE 72273 24 43272GENERATING STATIONSPYKARA
PUDHANCHANTHAI 230 KV
UNJANAI 230 KV
ARASUR 230 KV
Sandinallah 110 KV
ALIYAR 230 KV
ALIYAR 230 KV
ALIYAR 230 KV
410 ERODE 72283 7 EE/O/UNJ 230 KV
411 ERODE 72843 M.30 EE/O/ING 230 KV INGUR 230 KV
412 ERODE 72845 M.31 EE/O/ING 230 KV INGUR 230 KV
413 ERODE 72848 15 EE/O/ING 230 KV INGUR 230 KV
414 ERODE 73075 9 eeopnpm 230 KV
415 ERODE 73107 12 EE/O/UDT 230 KV
416 ERODE 73133 225 EE/PHS/MGENERATING STATIONSMETTUR TPH
417 ERODE 72489 J11 EE/O/Singa 230 KV
418 ERODE 72526 539 EE O KA 230 KV
419 ERODE 72589 564 EE/O/Mtr 230 KV
UNJANAI 230 KV
PONNAPURAM 230 KV
UDUMALPET 230 KV
SINGARAPET 230 KV
KARAMADAI 230 KV
METTUR AUTO 230 KV
420 ERODE 72670 145/2018 EE/O/Pall 230 KV
421 ERODE 72683 11 EE/O/GOBI 230 KV GOBI 230 KV
422 ERODE 72763 328 EE/O/MYV 400 KV
423 ERODE 71705 5 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
424 ERODE 71823 20 EE/O/OKM 230 KV
425 ERODE 71900 25 Udumalpet 110 KV
426 ERODE 71914 52 EE/O/DEV 230 KV
427 ERODE 72022 8 EE/O/PKP 230 KV
428 ERODE 72310 11 EE O TDL 230 KV
429 ERODE 72059 25 EE/O/Sale 230 KV
PALLADAM 230 KV
Udumalpet 400 KV
OTHAKKAL MANDABAM 230 KV
Udumalpet 110 KV
DEVIAKURICHI 230 KV
PALLAKAPALAYAM 230 KV
THUDIALUR 230 KV
SALEM AUTO 230 KV
430 ERODE 72138 2024 EE/O/ASR 230 KV
431 ERODE 72139 2025 EE/O/ASR 230 KV
432 ERODE 72397 10 EE/O/Thing 230 KV
433 ERODE 72226 16 EE/O/KRT 400 KV Salem 400 KV
434 ERODE 72284 8 EE/O/UNJ 230 KV
435 ERODE 72849 M.32 EE/O/ING 230 KV INGUR 230 KV
436 ERODE 73109 13 EE/O/UDT 230 KV
437 ERODE 73197 237 EE/O/HOS 230 KV
ARASUR 230 KV
ARASUR 230 KV
THINGALUR 230 KV
UNJANAI 230 KV
UDUMALPET 230 KV
HOSUR 230 KV
438 ERODE 73241 252 EE/O/PH1/GENERATING STATIONSKUNDAH PH5
439 ERODE 72529 540 EE O KA 230 KV
440 ERODE 72549 4 EE/O/SA 230 KV
441 ERODE 72673 4 EE/O/KA 230 KV
442 ERODE 72679 146/2018 EE/O/Pall 230 KV
443 ERODE 72691 147/2018 EE/O/Pall 230 KV
444 ERODE 72693 12 EE/O/GOBI 230 KV GOBI 230 KV
KARAMADAI 230 KV
SADAYAMPALAYAM 230 KV
KARIAMANGALAM 230 KV
PALLADAM 230 KV
PALLADAM 230 KV
445 ERODE 72227 17 EE/O/KRT 400 KV Salem 400 KV
446 ERODE 72490 J12 EE/O/Singa 230 KV
447 ERODE 72494 J13 EE/O/Singa 230 KV
448 ERODE 72766 329 EE/O/MYV 400 KV
449 ERODE 72308 9 EE O TDL 230 KV
SINGARAPET 230 KV
SINGARAPET 230 KV
Udumalpet 400 KV
THUDIALUR 230 KV
450 ERODE 73243 462 EE/KPH2GENERATING STATIONSKUNDAH PH2
451 ERODE 71703 3 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
452 ERODE 72292 70 AEE/O/PUGENERATING STATIONSPUSHEP
453 ERODE 72702 148/2018 EE/O/Pall 230 KV
454 ERODE 71824 21 EE/O/OKM 230 KV
455 ERODE 71852 8 AEE/Mtce/230 KV /Valayapatty
456 ERODE 71974 9 EE/Oprn./P 230 KV
457 ERODE 71777 43349 EE/O/ANT 230 KV
458 ERODE 71783 10 EE/URBA 110 KV Erode 110 KV
PALLADAM 230 KV
OTHAKKAL MANDABAM 230 KV
PUDHANCHANTHAI 230 KV
ANTHIYUR 230 KV
459 ERODE 72060 26 EE/O/Sale 230 KV
460 ERODE 72328 6 EE/OPERA 230 KV
461 ERODE 72228 18 EE/O/KRT 400 KV Salem 400 KV
462 ERODE 72274 25 43276GENERATING STATIONSPYKARA
463 ERODE 72286 9 EE/O/UNJ 230 KV
464 ERODE 72861 M.34 EE/O/ING 230 KV INGUR 230 KV
465 ERODE 72896 75 EE/O/SPT 110 KV
466 ERODE 73073 7 eeopnpm 230 KV
467 ERODE 73110 14 EE/O/UDT 230 KV
SALEM AUTO 230 KV
UNJANAI 230 KV
UNJANAI 230 KV
Singarapet 110 KV
PONNAPURAM 230 KV
UDUMALPET 230 KV
468 ERODE 73156 20 EE/O/SAE 230 KV
469 ERODE 72464 40695 EE/O/ALI 230 KV
470 ERODE 73170 1 EE/O/PNP 230 KV
471 ERODE 72601 565 EE/O/Mtr 230 KV
472 ERODE 72632 14 EE/O/GOBI 230 KV GOBI 230 KV
473 ERODE 72677 5 EE/O/KA 230 KV
474 ERODE 72716 149/2018 EE/O/Pall 230 KV
475 ERODE 71825 22 EE/O/OKM 230 KV
476 ERODE 71742 7 EE/O/400K 400 KV
SALEM AUTO 230 KV
ALIYAR 230 KV
PONNAPURAM 230 KV
METTUR AUTO 230 KV
KARIAMANGALAM 230 KV
PALLADAM 230 KV
OTHAKKAL MANDABAM 230 KV
Palavadi 400 KV
477 ERODE 71782 43379 EE/O/ANT 230 KV
478 ERODE 72025 9 EE/O/PKP 230 KV
479 ERODE 72063 27 EE/O/Sale 230 KV
480 ERODE 72348 6 EE/EM/MTGENERATING STATIONSMTPSII
481 ERODE 72363 6 EE/O/VI 230 KV
482 ERODE 72111 10 EE/O/Sing 230 KV
ANTHIYUR 230 KV
PALLAKAPALAYAM 230 KV
SALEM AUTO 230 KV
VINNAMANGALAM 230 KV
SINGAPURAM 230 KV
483 ERODE 72115 36 EE/PHs/BPGENERATING STATIONS
484 ERODE 72229 19 EE/O/KRT 400 KV Salem 400 KV
485 ERODE 72252 75 EE/O/230 230 KV
486 ERODE 72253 75 EE/O/230 230 KV
487 ERODE 72263 60 EE/O/230 230 KV
488 ERODE 72264 60 EE/O/230 230 KV
489 ERODE 72275 26 43277GENERATING STATIONSPYKARA
490 ERODE 72868 18 EE/O/ING 230 KV INGUR 230 KV
LOWER METTUR 3
METTUR AUTO 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
491 ERODE 72904 76 EE/O/SPT 110 KV
492 ERODE 73067 1 EE O PNP 230 KV
493 ERODE 73112 15 EE/O/UDT 230 KV
494 ERODE 73142 18 EE/O/GOBI 230 KV GOBI 230 KV
495 ERODE 73157 21 EE/O/SAE 230 KV
496 ERODE 72471 41061 EE/O/ALI 230 KV
497 ERODE 72495 J14 EE/O/Singa 230 KV
498 ERODE 72532 541 EE O KA 230 KV
499 ERODE 72554 5 EE/O/SA 230 KV
500 ERODE 72611 566 EE/O/Mtr 230 KV
Singarapet 110 KV
PONNAPURAM 230 KV
UDUMALPET 230 KV
SALEM AUTO 230 KV
ALIYAR 230 KV
SINGARAPET 230 KV
KARAMADAI 230 KV
SADAYAMPALAYAM 230 KV
METTUR AUTO 230 KV
501 ERODE 72612 15 EE/O/GOBI 230 KV GOBI 230 KV
502 ERODE 72686 6 EE/O/KA 230 KV
503 ERODE 72689 277 EE/O/Karuv 230 KV
504 ERODE 72729 150/2018 EE/O/Pall 230 KV
505 ERODE 72754 151/2018 EE/O/Pall 230 KV
506 ERODE 72771 330 EE/O/MYV 400 KV
507 ERODE 72778 5 EE/O/GOBI 230 KV GOBI 230 KV
508 ERODE 73176 2029 EE/O/ARA 230 KV
KARIAMANGALAM 230 KV
KARUVALUR 230 KV
PALLADAM 230 KV
PALLADAM 230 KV
Udumalpet 400 KV
ARASUR 230 KV
509 ERODE 71826 23 EE/O/OKM 230 KV
510 ERODE 71856 9 AEE/Mtce/230KV SS/Valayapatty
511 ERODE 71706 6 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
512 ERODE 71903 25 Udumalpet 110 KV
513 ERODE 71734 68 EE/O/Anikadavu
514 ERODE 71983 10 EE/Oprn./P 230 KV
515 ERODE 72016 113 EE MOYAGENERATING STATIONSMOYAR
OTHAKKAL MANDABAM 230 KV
Udumalpet 110 KV
Anaikadavu 400 KV
PUDHANCHANTHAI 230 KV
516 ERODE 72065 28 EE/O/Sale 230 KV
517 ERODE 72140 2026 EE/O/ASR 230 KV
518 ERODE 72170 4 EE/O/KURUKATHI
519 ERODE 72230 20 EE/O/KRT 400 KV Salem 400 KV
520 ERODE 72290 69 AEE/O/PUGENERATING STATIONSPUSHEP
521 ERODE 72853 16 EE/O/ING 230 KV INGUR 230 KV
522 ERODE 72863 M.35 EE/O/ING 230 KV INGUR 230 KV
523 ERODE 73070 4 EE O PNP 230 KV
524 ERODE 73089 206 EE/PHs/PHGENERATING STATIONSKUNDAH PH1
525 ERODE 73135 226 EE/PHS/MTR METTUR PH
SALEM AUTO 230 KV
ARASUR 230 KV
PONNAPURAM 230 KV
526 ERODE 72475 41426 EE/O/ALI 230 KV
527 ERODE 72535 542 EE O KA 230 KV
528 ERODE 72623 567 EE/O/Mtr 230 KV
529 ERODE 72708 13 EE/O/GOBI 230 KV GOBI 230 KV
530 ERODE 72761 152/2018 EE/O/Pall 230 KV
531 ERODE 72053 22 EE/O/Sale 230 KV
532 ERODE 72220 10 EE/O/KRT 400 KV Salem 400 KV
533 ERODE 73152 16 EE/O/SAE 230 KV
534 ERODE 71827 24 EE/O/OKM 230 KV
535 ERODE 71785 43410 EE/O/ANT 230 KV
ALIYAR 230 KV
KARAMADAI 230 KV
METTUR AUTO 230 KV
PALLADAM 230 KV
SALEM AUTO 230 KV
SALEM AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
ANTHIYUR 230 KV
536 ERODE 72068 29 EE/O/Sale 230 KV
537 ERODE 72141 2027 EE/O/ASR 230 KV
538 ERODE 72398 11 EE/O/Thing 230 KV
539 ERODE 72231 21 EE/O/KRT 400 KV Salem 400 KV
540 ERODE 72288 10 EE/O/UNJ 230 KV
541 ERODE 72858 17 EE/O/ING 230 KV INGUR 230 KV
542 ERODE 72919 7 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
543 ERODE 73071 5 EEOPNPM 230 KV
544 ERODE 73158 22 EE/O/SAE 230 KV
SALEM AUTO 230 KV
ARASUR 230 KV
THINGALUR 230 KV
UNJANAI 230 KV
PONNAPURAM 230 KV
SALEM AUTO 230 KV
545 ERODE 72497 J15 EE/O/Singa 230 KV
546 ERODE 72540 543 EE O KA 230 KV
547 ERODE 72634 569 EE/O/Mtr 230 KV
548 ERODE 72687 16 EE/O/GOBI 230 KV GOBI 230 KV
549 ERODE 72775 331 EE/O/MYV 400 KV
550 ERODE 72784 6 EE/O/GOBI 230 KV GOBI 230 KV
551 ERODE 71828 25 EE/O/OKM 230 KV
552 ERODE 71905 25 Udumalpet 110 KV
553 ERODE 71735 69 EE/O/Anikadavu
SINGARAPET 230 KV
KARAMADAI 230 KV
METTUR AUTO 230 KV
Udumalpet 400 KV
OTHAKKAL MANDABAM 230 KV
Udumalpet 110 KV
Anaikadavu 400 KV
554 ERODE 71987 11 EE/Oprn./P 230 KV
555 ERODE 72351 7 EE/EM/MTGENERATING STATIONSMTPSII
556 ERODE 72079 30 EE/O/Sale 230 KV
557 ERODE 72114 11 EE/O/Sing 230 KV
558 ERODE 72143 2028 EE/O/ASR 230 KV
559 ERODE 72400 12 EE/O/Thing 230 KV
560 ERODE 72232 22 EE/O/KRT 400 KV Salem 400 KV
561 ERODE 72233 23 EE/O/KRT 400 KV Salem 400 KV
PUDHANCHANTHAI 230 KV
SALEM AUTO 230 KV
SINGAPURAM 230 KV
ARASUR 230 KV
THINGALUR 230 KV
562 ERODE 72240 76 EE/o/230k 230 KV
563 ERODE 72265 61 EE/O/230 230 KV
564 ERODE 72870 19 EE/O/ING 230 KV INGUR 230 KV
565 ERODE 73068 2 EE O PNP 230 KV
566 ERODE 72644 570 EE/O/Mtr 230 KV
567 ERODE 72779 332 EE/O/MYV 400 KV
568 ERODE 72796 7 EE/O/GOBI 230 KV GOBI 230 KV
569 ERODE 71912 51 EE/O/DEV 230 KV
570 ERODE 73162 6 EE/O/SAE 230 KV
571 ERODE 71829 26 EE/O/OKM 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
PONNAPURAM 230 KV
METTUR AUTO 230 KV
Udumalpet 400 KV
DEVIAKURICHI 230 KV
DEVIAKURICHI 230 KV
OTHAKKAL MANDABAM 230 KV
572 ERODE 71830 27 EE/O/OKM 230 KV
573 ERODE 71990 12 EE/Oprn./P 230 KV
574 ERODE 72034 10 EE/O/PKP 230 KV
575 ERODE 72313 14 EE O TDL 230 KV
576 ERODE 72236 24 EE/O/KRT 400 KV Salem 400 KV
577 ERODE 72277 27 43281GENERATING STATIONSPYKARA
578 ERODE 72924 8 EE/PHs/PHGENERATING STATIONSKUNDAH PH3
579 ERODE 72967 254 EE/O/CBE 230 KV
OTHAKKAL MANDABAM 230 KV
PUDHANCHANTHAI 230 KV
PALLAKAPALAYAM 230 KV
THUDIALUR 230 KV
COIMBATORE 230 KV
580 ERODE 73072 6 EE O PNP 230 KV
581 ERODE 73159 23 EE/O/SAE 230 KV
582 ERODE 72499 J16 EE/O/Singa 230 KV
583 ERODE 72614 17 EE/O/GOBI 230 KV GOBI 230 KV
584 ERODE 72654 571 EE/O/Mtr 230 KV
585 ERODE 72773 153/2018 EE/O/Pall 230 KV
586 ERODE 72787 333 EE/O/MYV 400 KV
PONNAPURAM 230 KV
SALEM AUTO 230 KV
SINGARAPET 230 KV
METTUR AUTO 230 KV
PALLADAM 230 KV
Udumalpet 400 KV
Feeder Equipment Purpose From date
Fri,Jun 1,2018
Fri,Jun 1,2018
Bhavanisagar RBCPH UNIT-2 Entire Fri,Jun 1,2018
Monthly Maintenance works Fri,Jun 1,2018
Fri,Jun 1,2018
Fri,Jun 1,2018
For Monthly maintenance works Fri,Jun 1,2018
Monthly maintenance works Fri,Jun 1,2018
Fri,Jun 1,2018
Fri,Jun 1,2018
110 KV VLPT - Namakkal # CB,CT's and Line Isolators
Routine Monthly Maintenance Works
110 KV VLPT - Pudhansanthai # CB,CTs and Line Isolators
Routine Monthly Maintenance Works
For ANNUAL OVER HAULING Works From 01.06.2018 to 30.06.2018 30 days
110KV Thalavaipettai feeder Breaker CT and Line switch only.
110 KV TDLR –OKM II # section between 230KV TDLR SS to 110KV S.N.Palayam SS .
For PMI and tree cutting work by Lines /TDLR wing
230/110 KV Auto Transformer - III, HV III, LV III breakers, it's CTs and LAS
Monthly maintenance works & Annual relay testing works by P & C wing
110 KV GC BREAKER WITH CTs, BUS PT - II
110 KV Arasur-Somanur Feeder Breaker&CTS
230 Kv Karuvalur - PGCIL feeder Breaker with Line switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam
230 KV Bus Coupler Breaker, CT with Bus-A
For Monthly maintenance work of Bus Coupler Breaker, CT and Bus-A
Fri,Jun 1,2018
Fri,Jun 1,2018
Monthly Maintenance Sat,Jun 2,2018
Sat,Jun 2,2018
110 KV Barrage-IV# CT,Breaker Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
110 kV Vellichandai# monthly maintenance Sat,Jun 2,2018
110 KV ANTHIYUR FEEDER BREAKER AND CT'S WITH LINE SWITCH
FOR MONTHLY MAINTENANCE WORK
110 KV ANTHIYUR - THALAVAIPETTAI FEEDER ENTIRE LINE
MONTHLY LINE MAINTENANCE WORK
110 KV Capacitor bank II Breaker CTs, Capacitor side Isolator, LAS
110 KV CAPACITOR BANK BRAEKER AND ITS CELL
CONDUCTING OF ANNUAL RELAY TEST BY AEE/P&C/EROODE AND MONTHLY MAINTENANCE WORK
For attending the monthly maintenance work
110 KV OKM-Udumalpet 2 Feeder section between 110KV Negamam SS to 110KV Kongalnagaram SS
For PMI and tree cutting work by Lines /UDPT wing
110KV OKM-R.S.Puram-1 Feeder Entire (Breaker, CT's, Line switch)
Monthly Maintenance work and for PMI tree cutting work by Lines /TDLR
Monthly Maintenance works Sat,Jun 2,2018
Auto Transformer- II HV CTs & LV CTs. Sat,Jun 2,2018
Sat,Jun 2,2018
Monthly Maintenance Work Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
110KV K.R.Thoppur feeder - I Breaker & CT’s
SFRA and TAN-DELTA Value Measurement by P&C Gobi
AUTO I,HV I,LV I ,110KV AMBUR FEEDER & EASTERN BUS.
For routine mtce works and jumper tightening works
230 KV SALEM STEEL PLANT - II # CT, BREAKER, BUS & LINE SWITCHES
230kv K.R.thoppur.Salem steel plant#2 entire
For Jumpercone tightness checking work at Tension Towers between Tlocono:11_20 and also tree cutting work between TLOCOno:12_15
230kv K.R.thoppur.Salem steel plant#2 entire
For Jumpercone tightness checking work at Tension Towers between Tlocono:11_20 and also tree cutting work between TLOCOno:12_15
Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
Unit 02 (7810 kVA) Monthly Maintenance Work Sat,Jun 2,2018
230KV KPH3-Karamadai# Sat,Jun 2,2018
110KV Eastern Bus For Monthly maintenance Sat,Jun 2,2018
110KV Salem – KR Thoppur I feeder jumper tightness work Sat,Jun 2,2018
110KV SSREL # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
230kv K.R.thoppur.Salem steel plant#2 entire
For Jumpercone tightness checking work at Tension Towers between Tlocono:11_20 and also tree cutting work between TLOCOno:12_15
230kv K.R.thoppur.Salem steel plant#2 entire
For Jumpercone tightness checking work at Tension Towers between Tlocono:11_20 and also tree cutting work between TLOCOno:12_15
For Pre-Monsoon Inspection Work
Sat,Jun 2,2018
230KV Hosur Feeder entire Sat,Jun 2,2018
For Monthly maintenance work Sat,Jun 2,2018
For Monthly maintenance work Sat,Jun 2,2018
Sat,Jun 2,2018
110KV Main Bus II For Monthly maintenance Sat,Jun 2,2018
Sat,Jun 2,2018
AUTO-I,110KV KEMPATTY,110KV UDDANAPALLY,110KV ZUZUVADI,230KV METTUR FEEDER
MONTHLY MAINTENANCE AND LINES WORK
Monthly Maintenance work and GRT relay testing work.
230/110 KV Auto transformer - II, HV, LV, Breaker, CT’s and LAS
110 KV Karuvalur- Arasur I feeder Breaker, CTs., CVT and Line Switch
110 KV PALLADAM- VEERAPANDY feeder Breaker & CT's and Line Entire
To carry out monthly maintenance on equipments by AEE/Maintenance/Palladam and PMI work on EHT line by AEE/ Lines/Palladam.
230 KV Bus Coupler Breaker, CT with Bus-A,203-89A
For Monthly maintenance work of Auto II Bus-A switch 203-89A
Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
Sat,Jun 2,2018
Monthly maintenance work Sat,Jun 2,2018
110 KV Anaicut – V.Patty feeder entire. Sat,Jun 2,2018
Auto Transformer - I and its HV & LV side breaker,CT's and LAS etc.,
To carryout Monthly maintenance work on equipments of Auto Transformer - I by AEE/Maintenance/Palladam
110 KV PALLADAM - PALLADAM feeder Breaker & CT's and Line entire
To carryout monthly maintenance work on equipments by AEE/Maintenance/Palladam and PMI work on EHT lines by AEE/Lines/Palladam (
AUTO TRANSFORMER I HV,LV BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
110 KV Vellichandai - Pennagaram feeder( Line between 110 KV Vellichandai SS - Pennagaram SS)
To carryout Arching rod providing work between Loc:50-70 by karimangalam Lines wing
110 KV PERIYAKODIVERY FEEDER BREAKER AND CT'S
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
230KV Myvadi-Kadamparai-1 Beaker ,CTs & Line entire
For EHT Line Maintenance Works.
Unit I Monthly Maintenance work Sun,Jun 3,2018
Generator Unit 1 Monthly maintanance Sun,Jun 3,2018
Generator Unit 1 Monthly maintanance Sun,Jun 3,2018
for monthly maintenance work Sun,Jun 3,2018
For monthly maintenance work Sun,Jun 3,2018
Bhavanisagar RBCPH Units 1&2 Mon,Jun 4,2018
Mon,Jun 4,2018
Anthiyur 230KV SS Feeder Mon,Jun 4,2018
Monthly Maintenance works. Mon,Jun 4,2018
Mon,Jun 4,2018
unit-1 sf6 breaker generator ,transformer and its accessori
unit-1 sf6breaker,generator,transformer,and its accessiories
ANNUAL RELAY TEST BY GRT
110 KV Thalaivasal Feeder Breaker, CTs and Line Isolator & 110KV Eastern bus,To check the tightness of jumper in Eastern bus. To check TAN-DELTA value by P&C Gobi.
Monthly Maintenance and to check tan delta value by P&C Gobi
1. Monthly maintenance work 2. New CVT Erection work
230KV MTPS feeder Breaker CT and Line switch
110 KV THIRUVACHI AND SWTP FEEDER BREAKER AND CT WITH LINE AND LI AND LO
MONTHLY MAINTENANCE WORK
Mon,Jun 4,2018
PMI works in the line Mon,Jun 4,2018
PMI works in the line Mon,Jun 4,2018
PMI works in the line Mon,Jun 4,2018
400/230KV ICT-I Mon,Jun 4,2018
Monthly maintenance works Mon,Jun 4,2018
CTs Mon,Jun 4,2018
Mon,Jun 4,2018
110kv OKM-Udumalpet 1 Feeder section between 110KV Kinathukadavu SS to 110KV Gomangalam Pudur SS
For PMI and tree cutting work by Lines /UDPT wing
110 KV Arasur-Karamadai I FEEDER(section between 230 KV Arasur SS & 110 KV Kaduvettipalayam SS)
110 KV Arasur-Karamadai I FEEDER(section between 230 KV Arasur SS & 110 KV Kaduvettipalayam SS)
110 KV Arasur-Karamadai I FEEDER(section between 230 KV Arasur SS & 110 KV Kaduvettipalayam SS)
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC.
110 KV Arasur- Karamadai I feeder Breaker & CTs
TAN-DELTA Value Measurement by P&C Gobi
1. 230KV Bus I entire.(For HV I Isolator alignment work.) 2. Auto Transformer I,HV I & LV I Breakers with CTs
Hot spot attending, Monthly Maintenance & GRT relay testing work
Mon,Jun 4,2018
230KV ALR-KPH # CB, CT& Line Entire Monthly mtce work Mon,Jun 4,2018
Mon,Jun 4,2018
230KV KPH3-Karamadai# Mon,Jun 4,2018
Mon,Jun 4,2018
110KV Capacitor Bank I entire Mon,Jun 4,2018
230KV KPH3-Karamadai# Mon,Jun 4,2018
Tue,Jun 5,2018
Tue,Jun 5,2018
ICT-2 400 KV/110 KV 200MVA Monthly Maintenance Thu,Jun 7,2018
110KV Arasur feeder Breaker, CTs and line Isolator with section between 230KV Thingalur SS and 110KV perumanallur SS
Monthly Maintenance & GRT relay testing work
110KV Ingur – Thiruvachi - Erode # Section between Erode and Thiruvachi SS
For attending mattukkadai LILO jumper tightness work taken by Ingur lines wing
For Pre-Monsoon Inspection Work
230 KV ANTHIYUR - MTPS FEEDER ENTIRE LINE
MONTHLY LINE MAINTENANCE WORK
MONTHLY MAINTENANCE WORKS
For Pre-Monsoon Inspection Work
110 KV VLPT - Thottium # CB,CT's,& Line isolators
Routine Monthly Maintenance Works
110 KV UDT –Link – I #rs breaker, CT’s and Entire line
Monthly Maintenance Work ,SF6 Gas top up.and rectify the Oil leakage at R Q Primary side
Tue,Jun 5,2018
Tue,Jun 5,2018
Monthly Maintenance work Tue,Jun 5,2018
Monthly Maintenance works Tue,Jun 5,2018
230KV Soolagiri, Singarapet and Palavadi # breakers, 230KV Bus A&B, Bus coupler, HV I, HV II Breakers, Auto I & II, 110KV LV I, II, Bus coupler and 110KV entire Bus, 110KV Karimangalam, Hosur # Breakers, GC I and GC II Breakers and 110/33-11KV SS Equipments.
1. Monthly maintenance works in SS Equipments. Attending of Hotspots in 230KV Bus. LILO works by SS Erection wing for 2 Nos new 110KV Breakers.
110KV Pudhansandai 110KV feeder CB,CTs and Line Switch. 110KV West Bus, its PTs & West Bus Side Switches.-5 Nos.
For attending hot Spots and monthly maintenance works.
230KV OKM-Coimbatore Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
110KV Capacitor Bank-I & II Breakers, CTs, Line Isolators and Capacitors.
230KV METTUR AUTO SS FEEDER Tue,Jun 5,2018
Monthly Maintenance Both end. Tue,Jun 5,2018
Tue,Jun 5,2018
Monthly maintenance works Tue,Jun 5,2018
Monthly Maintenance Work Tue,Jun 5,2018
Monthly Maintenance Work Tue,Jun 5,2018
Tue,Jun 5,2018
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
230KV Salem400 # Breaker, CT, Line Isolator
230/110 KV Auto Transformer-IV,HV IV Breaker & ITs CTs&LAS
Monthly maintenance works & Anual relay testing works by P&C wing
110 KV Arasur-Palladam feeder Breaker& CTs
230 KV SINGAPURAM # CT, BREAKER, BUS & LINE SWITCHES
110 kV Pyk-BB1 # (Breaker with line upto Kattabettu Serial Switch)
1.110KVCAPACITOR BANK NO :I BREAKER,CTS ,CELLS AND CELL ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
110KV SOUTHERN BUS For monthly maintenance work Tue,Jun 5,2018
230kv bus entire Tue,Jun 5,2018
For Monthly Maintenance works Tue,Jun 5,2018
230 KV K.R.Thoppur - Singapuram-Feeder jumper tightness work Tue,Jun 5,2018
230 KV K.R.Thoppur - Singapuram-Feeder jumper tightness work Tue,Jun 5,2018
for annual maintenance(for 3days and it is due)
110KV Sempatty # Breaker & Line section up to Elayamuthur
Tue,Jun 5,2018
Tue,Jun 5,2018
Tue,Jun 5,2018
Tue,Jun 5,2018
For Monthly maintenance work . Tue,Jun 5,2018
Pykara 1 feeder entire Tue,Jun 5,2018
110 KV MICRO PH #CB Relay test work by GRT /Gobi Wed,Jun 6,2018
110KV Link I # Breaker and CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
1) AUTO-II, 2) 110KV BAGALUR, 3)110KV GURUBARAPALLY
MONTHLY MAINTENANCE WORK AND LINES WORK
110KV POWER HOUSE 5 TO POWER HOUSE 1-#1
ANNUAL RELAY TESTING BY GRT KUNDAH
Power transformer I, HV LV Breakers and Isolators.
Monthly maintenance and P&C Check.
110 KV Karuvalur-Thekkalur feeder Breaker ,line switch and Its CTs.
Line maintenance work along with breaker monthly maintenance
Wed,Jun 6,2018
Wed,Jun 6,2018
230KV PH3 to PH2 FEEDER Monthly Maintenance work Wed,Jun 6,2018
400KV MTPS II - 1# monthly maintenance work Wed,Jun 6,2018
Ingur 230KV SS Feeder Wed,Jun 6,2018
Monthly Maintenance works. Wed,Jun 6,2018
Wed,Jun 6,2018
For Monthly Maintenance works Wed,Jun 6,2018
400KV PALAVADI-I FEEDER Wed,Jun 6,2018
110 KV UDT –Link – II #r breaker, CT’s and Entire line
Monthly Maintenance Work ,Rectify the Oil leakage at B Q Primary side & Monthly Maintenance Work
110 KV UDT – Gudimangalam # breaker, CT’s and line between UDT and Gudimangalam
Monthly Maintenance Work ,And Conductor replacement work by AE/Lines Udumalpet
1. Monthly maintenance work 2. New CVT Erection work
110KV Mettur Feeder Breaker CT and Line Switch.
230KV Pugalur feeder CB, CTs, CVTs, Wave Traps and 230KV isolators. 230KV Pugalur feeder Bay idle Bus side Switch.
For attending hot spots and regular monthly maintenance works.
110KV OKM-Thudiyalur 2 Feeder (Breaker, CT's and Line Switch)
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC.
Wed,Jun 6,2018
Monthly maintenance works Wed,Jun 6,2018
Monthly maintenance works Wed,Jun 6,2018
Monthly maintenance works Wed,Jun 6,2018
CTs Wed,Jun 6,2018
Monthly Maintenance Work Wed,Jun 6,2018
Quarterly mtce work Wed,Jun 6,2018
230KV MTPS1-Ingur Feeder entire Wed,Jun 6,2018
Wed,Jun 6,2018
230KV MTPS – Ingur # entire Wed,Jun 6,2018
230 KV Singarapet Feeder Breaker and its CT's
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV Vinnamangalam -Singarapet #
110 KV Arasur-Karamadai-II Feeder ( Section between 110 KV kalapatty SS& 110 KV Neelambur SS)
110 KV Arasur -Karamadai II feeder Breaker & CTs
110KV Arasur- Thingalur feeder Breaker& CTs
TAN-DELTA Value Measurement by P&C Gobi
400 / 230 KV ICT - I HV & LV SIDE, LAS, CTs, BREAKERS, JUMPERS & SWITCHES
110KV ALR-Udumalpet-II # CB, CT& Line sec betw ALR & Dev.pudur SS
230KV EHT-110KV EHT Clearance rectification work to be Attended by TLC / Erode at TLONO : 510-511 in 230KV MTPS1 - Ingur Feeder
110KV CAPACITOR NO :II BREAKER, CTS ,CELLS AND CELL ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
For PMI work & Line maintenance work by Ingur wing
110KV Pochampalli SIPCOT # for monthly mtc work. Wed,Jun 6,2018
230kv bus entire for annual maitnenance (it is due) Wed,Jun 6,2018
110KV Udt link I # Breaker & Line entire For Monthly Maintenance works Wed,Jun 6,2018
For Monthly Maintenance Works. Wed,Jun 6,2018
Wed,Jun 6,2018
110 KV Anthiyur # (LC) Entire Monthly Maintenance work Wed,Jun 6,2018
Wed,Jun 6,2018
Machine-1 Generator, Power Transformer & its Auxiliaries
230KV Vinnamangalam # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
110 KV BUS COUPLER BREAKER AND CT'S
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
Wed,Jun 6,2018
Wed,Jun 6,2018
Wed,Jun 6,2018
Unit 3 mtce work Wed,Jun 6,2018
230KV Aliyar # Breaker & Line entire For Monthly Maintenance works Thu,Jun 7,2018
Thu,Jun 7,2018
Monthly maintenance Thu,Jun 7,2018
Monthly Maintenance Thu,Jun 7,2018
ICT- 2 (315MVA, 400/230KV) Palavadi monthly maintenance work Thu,Jun 7,2018
Thu,Jun 7,2018
230 KV Gobi#-CTs,Breakers and Switches Thu,Jun 7,2018
110 KV BHAVANI SAGAR FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK
110 KV ANTHIYUR - METTUR (MALCO) FEEDER ENTIRE LINE
MONTHLY LINE MAINTENANCE WORK
230KV MTPS # Breaker, CT’s and Line side Isolator
MONTHLY MAINTENANCE WORKS
230 KV Bus Coupler Breaker ,CT's & 230 KV Bus - II
Routine Monthly Maintenance Works
230KV Anikadavu -Regen feeder Breaker,CT Line entire
110 KV Thammampatty Feeder Breaker and CTs.
110 KV THINGALORE I FEEDER BREAKER AND CT WITH LI AND LO
MONTHLY MAINTENACE WORK
For attending the monthly maintenance work
For Monthly maintenance works Thu,Jun 7,2018
230KV Singarapet Feeder Monthly Maintenance works Thu,Jun 7,2018
Monthly Maintenance Thu,Jun 7,2018
Thu,Jun 7,2018
Monthly maintenance works. Thu,Jun 7,2018
Monthly Maintenance Work Thu,Jun 7,2018
Thu,Jun 7,2018
Unit 05 (12500 kVA) Monthly Maintenance Work Thu,Jun 7,2018
110KV Ingur – Sipcot – II # entire . Thu,Jun 7,2018
110 KV Arasur feeder line section between TDLR- Mylampatty with Breaker, CTs & 110 Bus coupler Breaker with CTs
110 D' Kurichi # 2 Breaker, CT, Line Isolator & sec b/w Singapuram and PG Palayam
110KV Erode I feeder Breaker, CTs and line Isolator
Monthly Maintenance & GRT relay testing work
110 KV Arasur - Thudialur feeder (section between 230 KV Thudialur SS & 110 KV Mylampatty SS)
230 KV SALEM STEEL PLANT - I # CT, BREAKER, BUS & LINE SWITCHES
230KV K.R.Thoppur salem steel plant -1 Feeder entire
For Jumpercone Tightness checking work at Tension Towers between TLONO:11 -20 and also tree cutting work between TLONO:12-15
For attending jumper tightness work and tower maintenance work taken by Ingur lines wing
230KV KPH3-Karamadai# Thu,Jun 7,2018
1.Monthly maintenance. Thu,Jun 7,2018
110KV Udt link II # Breaker & Line entire For Monthly Maintenance works Thu,Jun 7,2018
110KV Railway feeder I&II Thu,Jun 7,2018
230 KV Salem-Singarapet Feeder jumper tightness work Thu,Jun 7,2018
230KV Salem # Breaker, CTs & line isolator Thu,Jun 7,2018
POWER HOUSE 5 UNIT NO 1 Thu,Jun 7,2018
Thu,Jun 7,2018
Thu,Jun 7,2018
For Pre-Monsoon Inspection Work
1. 110Kv CBE -Peelamedu# Breaker & CT's. 2.Auto TRFR II HV-II, LV-II, Breakers & CT's, LAS.
Annual EHT meter calibration including CTs and PTs and relay test
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
ANNUAL REALY TESTING BY GRT KUNDAH
230 KV PALLAKAPALAYAM FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
110KV Sipcot II Breaker & CT’s &iSOLATOS
MONTHLY MAINTENANCE WORKS
Fri,Jun 8,2018
230 KV PH-IV Breaker with CTs For Monthly maintenance works Fri,Jun 8,2018
Bhavanisagar RBCPH Units 1&2 Fri,Jun 8,2018
Monthly Maintenance Fri,Jun 8,2018
Salem 400KV SS-I Feeder Fri,Jun 8,2018
Fri,Jun 8,2018
Monthly Maintenance work Fri,Jun 8,2018
110 KV BB-II feeder Breaker with CTs For Monthly maintenance works Fri,Jun 8,2018
230KV Gurubarapally # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
ANNUAL RELAY TEST BY GRT
110 KV Thirukovilur feeder Breaker and CTs.
1. Monthly maintenance work 2. New CVT Erection work
1) 110KV Namakkal feeder CB, CTs & Line Switch. 2) Auto-I, HV&LV-I CBs, CTs, LASs & Switches. 230KV HV-I side idle Bus Switch.
For connecting ABT meters in 110KV Namakkal feeder and HV & LV side of Auto-I and annual Reley Test. To attend hot Spots and regular maintenance works.
230/110 KV Auto Transformer-2 (HV & LV Breakers, CT's & LAS, 89M1, 89M2 isolators)
Monthly Maintenance. Fri,Jun 8,2018
Fri,Jun 8,2018
Monthly Maintenance Work Fri,Jun 8,2018
Monthly mtce work Fri,Jun 8,2018
230 KV Karamadai-Karuvalur feeder Fri,Jun 8,2018
230KV K.R.Thoppur-MTPS-1 Feeder entire Fri,Jun 8,2018
Fri,Jun 8,2018
1.110KV CBE- ARasur # Breaker & CT's. Monthly maintenance works Fri,Jun 8,2018
110KVPonnapuram # Line Upto Patspin For Monthly Maintenance Fri,Jun 8,2018
230KV Main Bus, Bus Couplers, Breaker & Isolators
230KV Ingur feeder Breaker and CTs with line Isolator
( Monthly Maintenance & GRT relay testing work)
230 KV MTPS I # CT, BREAKER, BUS & LINE SWITCHES
ALR-Udumalpet-I # CB, CT& Line sec betw ALR & Poolankinaru SS.
For Monthly maintenance of Breaker, CTs, line side CVT, Isolators
Jumper come Tightness checking work at Tension TOwers between 1-62
1) 230KV AND 2) 110KV BUS SECTION BREAKERS , CTS ONLY
FOR MONTHLY MAINTENANCE WORK
For Monthly Maintenance Work Fri,Jun 8,2018
Fri,Jun 8,2018
Fri,Jun 8,2018
Fri,Jun 8,2018
Monthly Maintenance work Fri,Jun 8,2018
Fri,Jun 8,2018
110 KV Sandinallah feeder Breaker with CTs For Monthly maintenance works Sat,Jun 9,2018
30 MW UNIT IN KPH6 Sat,Jun 9,2018
Sat,Jun 9,2018
Generator Unit 3 monthly maintence Sun,Jun 10,2018
230 Kv Karuvalur - Karmadai feeder Breaker with Line switch
230 KV Bus Coupler Breaker, CT with Bus-A and 201-89A
For Monthly maintenance work of 230KV Karamadai # Bus-A switch 201-89A
1.110 KV SSREL feeder breaker,CTs, Line switch and Line between Karimangalam to Pochampalli . 2.Auto Transformer - I with HV- I Breaker and CTs & LV- I Breaker CTs
To carry out Monthly maintenance work of 110 KV SSREL # and Auto Transformer - I by Maintenance wing and GRT testing work,Tree cutting work between Loc.94 to 108 by Karimangalam Lines wing
1.110 KV SSREL feeder breaker,CTs, Line switch and Line between 20 KVSS Karimangalam to 110 KVSS Pochampalli . 2.Auto Transformer - I with HV- I Breaker and CTs & LV- I Breaker CTs
To carry out Monthly maintenance work of 110 KV SSREL # and Auto Transformer - I by Maintenance wing and GRT testing work,Tree cutting work between Loc.94 to 108 by lines wing.
230KV Myvadi-Kadamparai-2 Breaker,CTS & line entire
230KV Thingalur # Breaker, CT’s and Line side IsolatoR
MONTHLY MAINTENANCE WORKS
Monthly maintenance LC for unit in ph6
230 Kv Karuvalur - PGCIL feeder Breaker with Line switch
For Erection of 2 Nos Tower and arrangements To connect the line in gantry for Gobi-Arasur 230 KV feeder at PGCIL campus at Arasur requested by EE/TLC/Coimbatore
UNIT - 1 Sun,Jun 10,2018
Sun,Jun 10,2018
Monthly Maintenance Mon,Jun 11,2018
ICT- 3 (200MVA , 400/110KV) monthly maintenace work Mon,Jun 11,2018
Salem 400KV SS-II Feeder Mon,Jun 11,2018
Mon,Jun 11,2018
Monthly maintenance works. Mon,Jun 11,2018
110 KV Sandynallah-Power House-5 Feeder Annual Relay Testing Work Mon,Jun 11,2018
Monthly Maintenance Work Mon,Jun 11,2018
Monthly mtce work Mon,Jun 11,2018
Mon,Jun 11,2018
NEED BASED MAINTENANCE WORKS 1. THRUST COOLERS CLEANING WORK.
110kv kundah feeders 1&2 sf6 breaker and its accessories one by one
For monthly maintenance work one by one
110 KV Capacitor bank I Breaker CTs, Capacitor side Isolator, LAS
1. Monthly maintenance work 2. New CVT Erection work
230KV OKM-Ponnapuram Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
Monthly Maintenance work and 89 T switch fixing work and For PMI and tree cutting work by Lines /UDPT wing
110 KV Arasur - Karamadai I feeder(section between 110 KV Kaduvettipalayam SS & 110 KV EllapalaVyam SS).
230 KV MTPS II # CT, BREAKER, BUS & LINE SWITCHES
230KV ALR-Udumalpet # CB, CT& Line Entire
230KV K.R.Thoppur MTPS_2 one by one feeder
For Jumpercone Tightness checking at Tension TOwers between TLONO:11-28 and also tree cutting work between TLONO:13-15
Mon,Jun 11,2018
Unit 03 (7810 kVA) Monthly Maintenance Work Mon,Jun 11,2018
Mon,Jun 11,2018
Mon,Jun 11,2018
230KV KPH3-Karamadai# Mon,Jun 11,2018
230 kv Okm # CT,Bkr, all switches Normal monthly maintenance Mon,Jun 11,2018
Auto transformer.NoIII , HV.III, LV.III For Monthly Maintenance works Mon,Jun 11,2018
For Monthly Maintenance works. Mon,Jun 11,2018
jumper tightness work Mon,Jun 11,2018
Mon,Jun 11,2018
230KV K.R.Thoppur MTPS_2 one by one feeder
For Jumpercone Tightness checking at Tension TOwers between TLONO:11-28 and also tree cutting work between TLONO:13-15
Auto Transformer III and its HV & LV Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
230KV METTUR -TUNNEL POWER HOUSE FEEDER ENTIRE
Arching Rod Tightness Checking at LocNO :46 is 230KV Mettur -TUNNEL POWER HOUSE FEEDER ENTIRE
For Pre-Monsoon Inspection Work
230 KV MTPH-AUTO SS Feeder (Breaker,CT'S) And Northen Bus.
110 KV Thammampatty -Koppampatty Feeder
unit-2 SF6 Breaker, Generator, Transformer and its accessories.
For monthly maintenance work and inspection of butterfly valve.Oil cooler of the power transformer valve in closed condition- rectification work
1. 110 KV Karamadai - Gobi 2. Auto Tr - I Mon,Jun 11,2018
230KV MTPH Feeder Entire Mon,Jun 11,2018
Mon,Jun 11,2018
For Monthly maintenance work. Mon,Jun 11,2018
Mon,Jun 11,2018
Mon,Jun 11,2018
Mon,Jun 11,2018
ICT-5 400 KV/230 KV 315 MVA Monthly maintenance Tue,Jun 12,2018
Monthly Maintenance Work , Tue,Jun 12,2018
1.For Monthly maintenance of Breaker, CTs, line side CVT, Isolators. 2. Monthly maintenance of HV & LV Breakers, CT & LAS and OLDC oil changing
Monthly Maintenance work and GRT relay testing work.
110 KV PALLADAM-SIPCOT II feeder Breaker & CT's and 110 KV Line section between 230 KV Palladam SS and 110 KV Alagumalai SS
To carryout monthly maintenance work on equipments by AEE/Maintenance/Palldam and PMI on EHT line by AEE/Lines/Palladam
230 KV -Karuvalur -Shenbagapudur # Breaker,CTs LAS and its lines switch
230 KV Bus Coupler Breaker, CT with Bus-A and 202-89A
For Monthly maintenance work of 230KV Shenbagapudur # Bus-A switch 202-89
110 KV GOBI FEEDER BREAKER AND CT'S ENTIRE LINE
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
110KV Thiruvachi # Breaker, CTs and Line side Isolator
MONTHLY MAINTENANCE WORKS
110 KV UDT –Aliyar – I #r breaker, CT’s and section between UDT – Poolanginar SS.
For monthly maintenance works. Tue,Jun 12,2018
Tue,Jun 12,2018
110KV Erode – Thingalur II # entire Tue,Jun 12,2018
CTs, Tue,Jun 12,2018
Monthly maintenance works. Tue,Jun 12,2018
Monthly Maintenance work Tue,Jun 12,2018
Monthly Maintenance Work Tue,Jun 12,2018
Tue,Jun 12,2018
Monthly Maintenance Work Tue,Jun 12,2018
110KV Capacitor Bank II entire Tue,Jun 12,2018
Tue,Jun 12,2018
110KV Rasipuram feeder CB, CTs & Line Switch.
110 KV THINGALORE II FEEDER BREAKER AND CT WITH LI AND LO
MONTHLY MAINTENANCE WORK
For PMI work & Line maintenance work
TAN-DELTA Value Measurement by P&C Gobi
110 KV Arasur- Coimbatore feeder Breaker & CTs
110KV Erode II feeder Breaker, CTs and line Isolator with section between 230KV Thingalur SS and 110KV Ganthi nagar SS.
230 KV THINGALUR # CT, BREAKER, BUS & LINE SWITCHES
230KV K.R. Thoppur - Thingalur Feeder entire
For Jumpercone Tightness checking work at Tension Towers between TLONO:110-199
110kV Pyk-S.Nallah # (Breaker with Entire Line)
MONTHLY MAINTENANCE WORKS
110KV Ingur – Thingalur # section between Kunnathur SS
Work taken by TLC wing Perundurai at 110/11KV Kunnathur Bus section
230KV KPH3-Karamadai# Tue,Jun 12,2018
PH6 TO PH5 FEEDER IN KHPH6 Tue,Jun 12,2018
Tue,Jun 12,2018
Auto transformer II & LV II Breaker Tue,Jun 12,2018
100MVA Auto Transformer- I Tue,Jun 12,2018
Tue,Jun 12,2018
For Pre-Monsoon Inspection Work
Annual relay testing of feeder equipments
110KV Ramiyanahalli # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
Monthly Maintenance work and GRT relay testing work.
Power transformer IV HV,LV breakers and Isolators.
Monthly maintenance and P&C check.
Tue,Jun 12,2018
400 KV PGCIL (Arasur)- II feeder Tue,Jun 12,2018
Wed,Jun 13,2018
Wed,Jun 13,2018
Monthly Maintenance Work Wed,Jun 13,2018
Wed,Jun 13,2018
For Monthly Maintenance work Wed,Jun 13,2018
400KV Thiruvalam - 1# monthly maintenance work Wed,Jun 13,2018
Monthly Maintenance Wed,Jun 13,2018
Salem 230KV SS Feeder Wed,Jun 13,2018
For monthly maintenance works. Wed,Jun 13,2018
Wed,Jun 13,2018
1.110 KV Vellichandai feeder breaker,CTs, Line switch and Line between Karimangalam to Vellichandai 2.230 KV Palavadi feeder and breaker CT`s, Line switch and Line Between 230 KV Karimangalam SS to 400 KV Palavadi SS.
To Carryout Monthly Maintenance works by Maintenance wing , GRT testing work and provinding Loop jumper between Circuit - I and II for back feeding arrangement to Karimangalam 110 KV SS
For Monthly maintenance of Main & Tie Breaker's & CTs, line side CVT, Isolators
230 KV K.R.Thoppur# - CT, Breaker and Switches
For attending the monthly maintenance work
230KV Pallakapalayam-K.R Thoppur # Line Entire
1) Multi ckt tower defective disc replacement work.
230 KV PALLAKAPALAYAM # CT, BREAKER, BUS & LINE SWITCHES
230 KV VLPT - Deviakurichi # CB, CT's & Line Isolators.
Routine Monthly Maintenance Works
230KV Anikadavu -Myvadi feeder Breaker,CT Line entire
230 KV Deviyakurichy – Valayapatty # Breaker, CTs, and Line side isolator both end
1. Monthly maintenance work 2. New CVT Erection work
110KV Namagiripettai feeder CB, CTs & Line Switch.
Auto transformerII- entire HV &LV side, CTs, LAS, Breakers and Switches
For attending the monthly maintenance work and replacement of all three phase LV-II CTs
Wed,Jun 13,2018
Pykara 2 feeder entire Wed,Jun 13,2018
110 KV Sandinallah feeder Breaker with CTs For Monthly maintenance works Wed,Jun 13,2018
For Monthly maintenance works Wed,Jun 13,2018
Wed,Jun 13,2018
Monthly Maintenance works Wed,Jun 13,2018
Wed,Jun 13,2018
Wed,Jun 13,2018
Wed,Jun 13,2018
Quarterly mtce work Wed,Jun 13,2018
Wed,Jun 13,2018
110 KV OKM-R.S.Puram-2 Feeder section between 110KV Sidco SS to 110 KV R.S.Puram SS
For PMI tree cutting work by Lines /TDLR
Line maintenance and breaker monthly maintenance
110 KV Karamadai-II feeder Breaker with CTs
230KV Pallakkapalayam – Gobi and Pallakapalayam-K.R Thoppur # Line Entire
Multi ckt tower defective disc replacement work.
230KV MTPS feeder Breaker, CT’s & LineIsolator
Auto Transformer II HV Breaker, LV Breaker, CTs,LAS.
OLTC Oil Replacement work, GRT Testing Work & Monthly Maintenance.
On 110KV BPH3-BPH2 # BKR, CT, Line isolator.
To carry out the Monthly maintenance work.
110KV Kavundapadi feeder Breaker, CTs and line Isolator with section between 230KV Thingalur SS and 110KV Kavundapadi SS
Monthly Maintenance & GRT relay testing work
110KV ALR-Aliyar Link- I # CB,CT and line Entire
230 KV MTPS1 _ Salem 230KVSS feeder entire
For checking of jumpercone tightness at Tension Towers between TLCNO: 42 _ 119
Wed,Jun 13,2018
Wed,Jun 13,2018
Unit No:02 For Monthly Maintenance work Wed,Jun 13,2018
230KV Idukki # Breaker & Line entire . For Monthly Maintenance works Wed,Jun 13,2018
Autotransformer.NoI , HV.I, LV.I entire. For Monthly maintenance works Wed,Jun 13,2018
For Monthly Maintenance Works. Wed,Jun 13,2018
230 KV Salem-MTPS Feeder jumper tightness work Wed,Jun 13,2018
110 KV RC Plant # (LC) Monthly Maintenance work Wed,Jun 13,2018
Wed,Jun 13,2018
Monthly Maintenance Wed,Jun 13,2018
1.AUTO TR NO :I BREAKERS AND ITS CT'S ONLY. 2.110KV UNJANAI - BKB-II BREAKER, CTS AND LINESIDE ISOLATOR ONLY.
1. FOR MONTHLY MAINTENANCE WORK AND GRT ANNUAL RELAY TESTING WORK 2 .FOR MONTHLY MAINTENANCE WORK
110 KV PH6 TO SANDINALLAH FEEDER IN KHPH6
Annual relay testing for feeder equipments
Machine-2 Generator, Power Transformer &its Auxiliaries
AUTO TRANSFORMER II HV,LV BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
230KV MYvadi-Anikadavu feeder Breaker ,Cts & Line entire
Wed,Jun 13,2018
Wed,Jun 13,2018
Wed,Jun 13,2018
Thu,Jun 14,2018
Thu,Jun 14,2018
Thu,Jun 14,2018
Thu,Jun 14,2018
Monthly Maintenance work Thu,Jun 14,2018
For Monthly maintenance works Thu,Jun 14,2018
230KV Pallakapalayam-K.R Thoppur # Line Entire
Multi ckt tower defective disc replacement work
230KV Pallakapalayam-K.R Thoppur # Line Entire
Multi ckt tower defective disc replacement work
230KV Pallakapalayam-K.R Thoppur # Line Entire
Multi ckt tower defective disc replacement work
110 KV ELUMATHUR FEEDER BREAKER AND CT WITH LI AND LO
MONTHLY MAINTENACE WORK
110KV Elumathur – Pugalur # section between 110KV Elumathur SS & 110KV Kodumudi SS
Work done by P&E Perundurai wing 110KV Bus Extension for 110/33KV at sivagiri 110KV SS work done by Lines wing For PMI Work & Line maintenance work
110KV OKM-TDLR 1 Feeder section between 110KV MDK SS to 230KV TDLR SS
For PMI tree cutting work by Lines /TDLR
230/110 KV Auto Transformer-1 (HV & LV Breakers, CT's & LAS, 89M1, 89M2 isolators)
1).Monthly Maintenance work and OLTC Oil changing work , 2).Anual Relay testing work by P&C /TDLR wing
110 KV OKM-Sulur feeder Breaker, CT's ONLY
230/110 KV Auto Tranformer 1 with HV & LV Breaker CTs
Thu,Jun 14,2018
110 KV Sandynallah-Pykara Feeder Annual Relay Test Work Thu,Jun 14,2018
Thu,Jun 14,2018
Monthly Maintenance Work Thu,Jun 14,2018
Quarterly mtce work Thu,Jun 14,2018
Thu,Jun 14,2018
230KV Ingur – Karamadai # entire Thu,Jun 14,2018
Auto transformer.NoI , HV.I, LV.I For Monthly Maintenance works Thu,Jun 14,2018
Thu,Jun 14,2018
110 KV PH5 TO SANDINALLAH FEEDER Thu,Jun 14,2018
110 KV Karamadai-Arasur II feeder Thu,Jun 14,2018
230/110 KV Auto Transformer - I, HV I, LV I breakers, it's CTs and LAS
Monthly maintenance works.&Annual Relay testing works by P& C wing
110KV Ingur feeder Breaker, CTs and line Isolator with section between 230KV Thingalur SS and 110KV P.G.Palayam SS
Monthly Maintenance & GRT relay testing work
400 / 230 KV ICT II HV & LV SIDE TRANSFORMER, LAS, CTs, BREAKERS, JUMPERS & SWITCHES
110KV ALR-Aliyar Link- II # CB,CT and line Entire
230KV Karamadai # Breaker, CT’s and Line side Isolator
MONTHLY MAINTENANCE WORKS
For PMI work & Line maintenance work by Ingur lines section
230KV Arani # Breaker and CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
ANNUAL RELAY TESTING BY GRT KUNDAH
For Monthly maintenance of Breaker & CTs.
400KV Rasipalayam- 2# monthly maintenance work Fri,Jun 15,2018
Fri,Jun 15,2018
Fri,Jun 15,2018
Auto transformer.NoII , HV.II, LV.II For Monthly maintenance works Fri,Jun 15,2018
Fri,Jun 15,2018
For Monthly maintenance work Fri,Jun 15,2018
For Monthly maintenance work Fri,Jun 15,2018
230 KV OKM-TDLR feeder and OKM-CBE feeder
1. Erection of MD tower between loc 83 to 84 to accommodate 230 KV Thudiyalur - O.K.Mandapam feeder and 230 KV Coimbatore to O.K.Mandapam feeder and to make LILO of 110 Thudiyalur – O.K.Mandapam feeder – I at 110KV K.G. Chavadi SS. 2).230 KV OKM-CBE # Main 2 protection relay replacing work by P&C TDLR Wing
1. 230KV CBE - OKM Feeder Entire ( Breaker, CT's)
1. Monthly mtce works 2. Erection of MD tower between loc 83 to 84 to accommodate 230 KV Thudiyalur – O.K.Mandapam feeder and 230 KV Coimbatore to O.K.Mandapam feeder and to make LILO of 110 Thudiyalur – O.K.Mandapam feeder – I
230/110 KV Auto Transformer-3 (HV & LV Breakers, CT's & LAS, 89M1, 89M2 isolators)
Monthly Maintenance work and OLTC Oil Changing works.
230/110 KV Auto transformer I ,HV,LV BKR,CTs and LAS
110 KV Karuvalur-Arasur-II feeder breaker , CT's, CVT and Line Side Switch
Fri,Jun 15,2018
Fri,Jun 15,2018
Monthly Maintenance Sat,Jun 16,2018
Singarapet 230KV SS Feeder Sat,Jun 16,2018
Monthly Maintenance works Sat,Jun 16,2018
110KV Bus Coupler Breaker & CT only Monthly Maintenance Works Sat,Jun 16,2018
110 KV BUS ERODE SS Sat,Jun 16,2018
110KV Annur # breaker, CT with line switch and CVT
Monthly maintenance work and Line maintenance by AEE/Lines/Palladam
230 KV Bus Coupler Breaker, CT with Bus-A and 205-89A
For Monthly maintenance work of Auto I Bus-A switch 205-89A
230 KV Deviyakurichy – STCMS # Breaker, CTs, and Line side isolator both end
1. Monthly maintenance work 2. New CVT Erection work
110KV Anthiyur feeder Breaker CT and Line switch only.
MONTHLY MAINTENANCE WORK
110KV Erode – Elumathur # entire Sat,Jun 16,2018
110 KV BKB-I #,CT and Breaker Sat,Jun 16,2018
Sat,Jun 16,2018
230 KV OKM feeder Breaker with CTs For Monthly maintenance works Sat,Jun 16,2018
Sat,Jun 16,2018
For PMI work & Line maintenance work
For attending Monthly maintenance work
230KV Western Bus Section upto 89 MB isolators. (230KV OKM-Thudiyalur #, Coimbatore #, 230/110 KV Auto Tr-I, TBC Breaker, 230 KV PT-I)
(1) To replace the defective "R" phase switch end clamp and release the bypass jumper in 230KV OKM-Thudiyalur feeder bus side. (2) To replace the defective "B" phase switch end clamp in 89MA isolators. (3) For Annual maintenance works.
Auto Transformer-II, HV-II, LV-II,110KV Western bus, 110KV V.Patty feeder breaker, 110KV Thirupattur feeder breaker and its CT's
For replacing the defective surge monitors in 230/110 KV LAS of HV-II and routine monthly maintenance works.
CTs Sat,Jun 16,2018
Annual Relay Test Work Sat,Jun 16,2018
Sat,Jun 16,2018
Sat,Jun 16,2018
Sat,Jun 16,2018
Sat,Jun 16,2018
110KV Ingur – Erode II # entire Sat,Jun 16,2018
Monthly maintenance works Sat,Jun 16,2018
TAN-DELTA Value Measurement by P&C Gobi
110 KV Sandynallah- Power House-6 Feeder.
Auto Transformer II,HV II & LV II Breakers with CTs
Monthly Maintenance & GRT relay testing work
Zone 1 - 110 KV Bus entire and allied feeders entire ( 110 KV Unjanai , Thiruchenkode , BKB PH 3 , Ponni Sugars and Vendipalayam SS) at BKB-2
For complete maintenance , Testing and Tan Delta measurement works.
110KV Kurukathi # I Breaker, CTs, Isolators and Line side Isolator
MONTHLY MAINTENANCE WORKS
Autotransformer II and its HV & LV I Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
For attending jumper tightness work taken by Ingur lines wing
1. 110KV CBE # Breaker & CT's 2. Auto TRfrs - I , HV -I, LV -I, Breaker's , CT's & LAS.
230KV MTPS # Breaker, CTs& line isolator Sat,Jun 16,2018
230KV PALAVADI #(LC) Entire Sat,Jun 16,2018
Sat,Jun 16,2018
Sat,Jun 16,2018
Monthly maintenance work Sat,Jun 16,2018
Sat,Jun 16,2018
Monthly Maintenance Sat,Jun 16,2018
Unit II Monthly Maintenance work Sun,Jun 17,2018
UNIT-III Sun,Jun 17,2018
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet and to carryout the following works at various locations by AEE/Lines/Karimangalam. 1) Loc No: 182 & 277 – Birds nest to be removed. 2) Loc No :162 – Earth bond opened to be attended. 3) Loc: 145 Arching rod providing work
Monthly Maintenance work and GRT relay testing work.
110 KV PALLADAM-SANTHAIPET feeder Breaker& CT's and Line Entire
To carry out monthly maintenance on equipments by AEE/maintenance/Palladam and PMI work on EHT line by AEE/Lines/Palladam
230 KV PALLADAM -PGCIL feeder Breaker & CT'S and Line Entire
To carryout Monthly maintenance on equipments by AEE/Maintenance/Palladam and PMI work on EHT line by AEE/Lines/Palladam.
230KV Suzlon # breaker, CT, LAS and Line switch
230 KV Bus Coupler Breaker, CT with Bus-A and 206-89A
For Monthly maintenance work of 230KV Suzlon # Bus-A switch 206-89A
230KV Myvadi-Sempatty feeder Beaker,CT's & Line entire
MONTHLY MAINTENANCE WORKS
Sun,Jun 17,2018
Unit 1,2 &3 Sun,Jun 17,2018
Monthly Maintenance work Mon,Jun 18,2018
For Monthly Maintenance work Mon,Jun 18,2018
Monthly Maintenance Mon,Jun 18,2018
MTPS-II Link Feeder Mon,Jun 18,2018
230KV MTPS-I FEEDER Mon,Jun 18,2018
AUTO TRANSFORMER II and its HV & LV side breaker,CT's and LAS etc.,
To carryout Monthly maintenance on Auto Transformer II equipments by AEE/Maintenance/Palladam
Cooling water sump , and cooling water pipe repairing work
110KV OKM-Udumalpet 1 Feeder (Breaker, CT's)
230KV Anikadavu -Vestas Periyapatti feeder Breaker,CT Line entire
100 MVA Auto Transformer – II HV & LV Breakers and CTs
1. Monthly maintenance work 2. New CVT Erection work
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
110KV Salem #1 Breaker,CT, Line Isolator Monthly Maintenance. Mon,Jun 18,2018
Mon,Jun 18,2018
All 110 KV Feeders One by One Mon,Jun 18,2018
Monthly Maintenance Work Mon,Jun 18,2018
Monthly mtce work Mon,Jun 18,2018
230KV MTPS1- MTPS2 Feeder entire Mon,Jun 18,2018
Monthly Maintenance Work Mon,Jun 18,2018
110KV Thingalur - # breaker, CT’s Mon,Jun 18,2018
Mon,Jun 18,2018
110 KV Arasur Local SS GCCB and 110 KV Capacitor Bank - III
Total shutdown works and monthly maintenance works.
TAN DELTA Testing works. ( One by One )
110 KV THUMBIPADY # CT, BREAKER, BUS & LINE SWITCHES
230/110KV Auto Transformer-II with HV and LV CB,CTs
Jumpercone Tightness checking at 230 MTPS1 - MTPS2 Feeder Tension Towers end 230KV MTPS1,MTPS2 Bay
110 kV GC Breaker (66 kV Calicut # and 66 kV Cannanore #)
MONTHLY MAINTENANCE WORKS
110KV OKM-Sulur feeder section between 230KV OKM SS and 110KV Peedampalli SS
For providing loop between loc 20 & 21 on 110KV OKM-Sulur feeder and 110KV OKM-Irugur#.At Loc 20 jumper to be opened on 110KV OKM-Sulur #
Mon,Jun 18,2018
jumper tightness work Mon,Jun 18,2018
110 KV Karamadai-BBPH II feeder Mon,Jun 18,2018
Mon,Jun 18,2018
For Monthly Maintenance work Tue,Jun 19,2018
Tue,Jun 19,2018
Monthly Maintenance Work , Tue,Jun 19,2018
Tue,Jun 19,2018
110KV OKM-Irugur feeder section between 110KV Podanur SS and 110KV Irugur SS
For providing loop between loc 20 & 21 on 110KV OKM-Irugur feeder and 110KV OKM -Sulur #.
110KV Salem - Singapuram I feeder (Section between Salem- Udaiyapatty )
For Monthly maintenance of Breaker & CTs.
110 KV CAPACITOR BANK I BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
110KV OKM-Negamam 1# feeder (Breaker, CT's)
230/110KV Auto-II HV,LV Breakers and 110KV Bus entire 110KV VLPT - Valayapatty # CB,CTs & Line Isolators
Routine Monthly Maintenance Works
110 KV UDT –O.K.M -I #r breaker, CT’s and line. Between UDT and Anthiyur
110KV Valayapatty feeder CB, CTs and Line Switch.
For attending monthly maintenance works.
Tue,Jun 19,2018
For Monthly maintenance works Tue,Jun 19,2018
Monthly Maintenance works Tue,Jun 19,2018
Tue,Jun 19,2018
For Monthly maintenance work. Tue,Jun 19,2018
For Monthly maintenance work. Tue,Jun 19,2018
For Monthly maintenance work. Tue,Jun 19,2018
Monthly Maintenance Work Tue,Jun 19,2018
Tue,Jun 19,2018
Tue,Jun 19,2018
230 KV PUSHEPH - ARASUR # Tue,Jun 19,2018
Tue,Jun 19,2018
230 KV Main Bus I-PTs and 230 KV Bus coupler's CTs,Breaker and Switches
For carrying out monthly maintenance
230/110 KV Auto Transformer-III with HV & LV Breaker & CTs
230 KV Link - II feeder Breaker & CT’s, line isolators
230 KV Arasur - PUSHEP feeder Breaker & CTs and line entire.
Monthly maintenance works & PMI works in the line.
110 KV Ingur 2 # Breaker with Cts, Switches.
110 KV Ingur I # Breaker with Cts, Switches.
110 KV Rasi Palayam # Breaker with Cts, Switches.
230 KV LINK II # CT, BREAKER, BUS & LINE SWITCHES
110 kV Pyk-Moyar # 1 (Breaker with Entire Line)
Monthly Maintenance Work and Annual Relay Testing Work by AEE/P&C/Msg.
1. AUTO TR NO :II BREAKERS AND ITS CTS ONLY. 2.110KV SOUTHERN BUS ENTIRE
1. FOR MONTHLY MAINTENANCE WORK AND GRT ANNUAL RELAY TESTING WORK 2. ANNUAL MAINTENANCE WORK
MONTHLY MAINTENANCE WORKS
110KV Erode II # Breaker, CTs, Isolators and Line side Isolator
MONTHLY MAINTENANCE WORKS
230kV Sadayapalayam # CT,Bkr,all switches Normal monthly maintenance Tue,Jun 19,2018
For Monthly Maintenance works Tue,Jun 19,2018
Tue,Jun 19,2018
Tue,Jun 19,2018
230 KV Salem- KR Thoppur Link II Feeder jumper tightness work Tue,Jun 19,2018
110KV PH5 TO PH6 FEEDER Tue,Jun 19,2018
Tue,Jun 19,2018
230KV Myvadi link I # Breaker & Line entire
110KV Western Bus Section including 110KV Bus Section Breaker
For dismantling of 110KV Sulur feeder bus switch , bus bars and bus droppers and 110kv Western bus maintenance work.
110KV OKM-Sulur feeder section between 230KV OKM SS and Loc 20 and 110KV Sulur # breaker
Dismantling of 110KV Sulur feeder equipments and shifted and Re-erected for new bays of 110KV OKM-Udumalpet-2 # (Excluding P&C Testing)
ANNUAL RELAY TESTING BY GRT KUNDAH
230 KV Sadayapalayam-Ponnapuram feeder breaker, CTs and line entire and Eastern bus.
Monthly maintenance and P&C check.
110KV Main bus MBS1 to western side Quarterly Maintenance work Tue,Jun 19,2018
Monthly maintenance Tue,Jun 19,2018
For Monthly Maintenance work Tue,Jun 19,2018
For Monthly Maintenance work Wed,Jun 20,2018
400KV MTPS II - 2# monthly maintenance work Wed,Jun 20,2018
MTPH Feeder Wed,Jun 20,2018
Wed,Jun 20,2018
Monthly Maintenance works. Wed,Jun 20,2018
Monthly maintenance works Wed,Jun 20,2018
230 KV Myvadi-Link-1 feeder Breaker,CT's& Line entire
400KV Anikadavu -Rasipalayam I feeder Breaker,CT Line entire
110 KV OKM-Irugur feeder entire (Breaker, CT's, with Line switch)
1. Monthly maintenance work 2. New CVT Erection work
230KV Bus section I Entire.(Including 230KV Bus coupler Breaker)
Half yearly Maintenance of 230KV Bus section I
230KV Gobi feeder Breaker CT and Line switch
230/110 KV Auto Transformer I HV and LV breakers & CTs only
Wed,Jun 20,2018
Wed,Jun 20,2018
Moyar - Bhavanisagar 110 kv feeder Wed,Jun 20,2018
Wed,Jun 20,2018
For Monthly maintenance works Wed,Jun 20,2018
110 KV Karamadai - I feeder Breaker & CTs For Monthly maintenance works Wed,Jun 20,2018
Monthly Maintenance works Wed,Jun 20,2018
400KV PALAVADI-II FEEDER Wed,Jun 20,2018
230KV KRT #Breaker,CT, Line Isolator Monthly Maintenance Both end. Wed,Jun 20,2018
Auto-II, HV&LV-II CBs, CTs, LASs & Switches. 230KV HV-II side idle Bus Switch.
For connecting ABT meters in 110KV Namakkal feeder and HV & LV side of Auto-II and annual Reley Test. To attend hot Spots and regular maintenance works.
110 kv ingur feeder and ct WITH LI AND LO
MONTHLY MAINTENACE WORK
feeder breaker monthly maintenance
Auto transformerI, HV and LV side CTs, breaker, switches and LAS
For carrying out monthly maintenance and replacement of LV-I CT
110 KV Coimbatore - I feeder Breaker & CTs
110 KV Rasipuram feeder breaker, CTS & line isolators
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC.
Wed,Jun 20,2018
Monthly maintenance works Wed,Jun 20,2018
Monthly Maintenance Work Wed,Jun 20,2018
Monthly Maintenance Work Wed,Jun 20,2018
For Quarterly maintenance Work. Wed,Jun 20,2018
Wed,Jun 20,2018
Wed,Jun 20,2018
On 110KV BPH3-BPH4 # BKR, CT, Line isolator, entire line.
To carry out the Monthly maintenance work.
230 KV PGCIL - Arasur Link 1 feeder Breaker, CTs
110 KV VEMBADITHALAM # CT, BREAKER, BUS & LINE SWITCHES
110 KV BARRIAGE II # CT, BREAKER, BUS & LINE SWITCHES
110KV BPH4 - BPH3# Breaker, CT'S, line isolators, entire line
110KV K.R.Thoppur -Barrage -2 Feeder section between 110KV Jalagandapuram O/g Isolator and 110 KV Poolampatty SS I/C Isolator
For checking of Jumpercone Tightness at Tension Towers between JalagandapuramSS and PoolampattySS
110KV K.R.Thoppur -Barrage -2 Feeder section between 110KV Jalagandapuram O/g Isolator and 110 KV Poolampatty SS I/C Isolator
For checking of Jumpercone Tightness at Tension Towers between JalagandapuramSS and PoolampattySS
Wed,Jun 20,2018
Wed,Jun 20,2018
110KV LINK_ II # OMCB Bkr & CTS only For monthly mtc work Wed,Jun 20,2018
1.110KC CBE-TDLR-I # BREaker & CT's . Monthly maintenance works. Wed,Jun 20,2018
110 kv Ingur 1 # CT,Bkr,all switches Normal monthly maintenance Wed,Jun 20,2018
For Monthly Maintenance Works. Wed,Jun 20,2018
jumper tightness work Wed,Jun 20,2018
Wed,Jun 20,2018
Wed,Jun 20,2018
1.110KV UNJANAI - T.GODE FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WOK
110KV Ponnapuram # II Breaker, CTs, Line side Isolator
MONTHLY MAINTENANCE WORKS
230 KV MTPH-MTPS FEEDER (BKR,CT'S )And Southern BUS
110KV Salem - Rasipuram feeder (Section between Salem SS to Mallur SS)
110 KV Arasur - Karuvalur I feeder (section between 230 KV Arasur SS & 110 KV Vanjipalayam SS & 110 KV Avinashi SS)
for conducting premonsoon inspection of the line.
110KV Link II # Breaker and CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
110 KV MDPH # II Monthly Maintenance work . Wed,Jun 20,2018
Wed,Jun 20,2018
Wed,Jun 20,2018
Monthly Maintenance work Thu,Jun 21,2018
Thu,Jun 21,2018
Thu,Jun 21,2018
Thu,Jun 21,2018
ICT-4 400 KV/230 KV 315 MVA For Monthly Maintenance work Thu,Jun 21,2018
230 KV ANTHIYUR FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
110KV Arasur-Karuvalur I feeder Section between 230KV Arasur SS, 110KV Vanjipalayam SS and 110KV Avinashi SS
For PMI Lines Work by AEE/Lines/Palladam
230KV KR Thoppur feeder Breaker and CTs with line Isolator.
110KV OKM-TDLR 1 Feeder section between 230 KV OKM SS to 110KV MDK SS.
Monthly Maintenance work and for PMI tree cutting work by Lines /TDLR
230/110 KV Auto Transformer-3 (HV & LV Breakers, CT's & LAS, 89M1, 89M2 isolators)
Monthly Maintenance work and OLTC Oil Changing work
230 KV VLPT - Pudhansanthai # CB, CTs & Line Isolators.
Routine Monthly Maintenance Works
Thu,Jun 21,2018
Thu,Jun 21,2018
1) Jumper Tightness Checking Thu,Jun 21,2018
Monthly maintenance works Thu,Jun 21,2018
110 KV Sandynallah-Thudiyalur Feeder Annual Relay Testing work Thu,Jun 21,2018
Monthly Maintenance Work Thu,Jun 21,2018
CT Replacement Work Thu,Jun 21,2018
CT Replacement Work Thu,Jun 21,2018
110KV ALR-Skpy # CB,CT& Line Entire CT Replacement Work Thu,Jun 21,2018
Unit 06 (16000 kVA) Monthly Maintenance Work Thu,Jun 21,2018
230KV Valayapatty # CB, CTs, CVTs, Wave Traps and 230KV Switches. 230KV Valayapatty # idle Bus Side Switch.
For attending Hot Spots, Twist & Turn problem in Bus-B Switch and monthly maintenance works.
110 KV INGUR 3 FEEDER BREAKER AND CT WITH LI AND LO
MONTHLY MAINTENACE WORK
230KV Pudhansanthai - Valayapatty # line Entire.
230 KV Arasur - Karamadai feeder Breaker & CTs and line entire
110 KV NANGAVALLY # CT, BREAKER, BUS & LINE SWITCHES
110KV ALR- Negamam # CB, CT& Line sec betw ALR & Muthur ss
110KV ALR- SPH I # No.I CB,CT & Line Entire
Thu,Jun 21,2018
Thu,Jun 21,2018
Thu,Jun 21,2018
Ingur – Erode III # entire Thu,Jun 21,2018
110 kv ingur 2# CT,but,all switches Normal monthly maintenance Thu,Jun 21,2018
For Monthly Maintenance works Thu,Jun 21,2018
For Monthly Maintenance Works. Thu,Jun 21,2018
Thu,Jun 21,2018
230 KV Karamadai-Arasur feeder Thu,Jun 21,2018
Quarterly Maintenance work . Thu,Jun 21,2018
1.110KV UNJANAI - NALLUR FEEDER BREAKER , CTS AND LINE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
110KV Erode III # Breaker, CTs, Line side Isolator
MONTHLY MAINTENANCE WORKS
Auto Transformer I and its HV & LV Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
For attending jumper tightness work by Ingur lines wing
230KV Myvadi link II # Breaker & Line entire
Machine-3 Generator, Power Transformer &its Auxiliaries
230KV Tiruvannamalai # Breaker & CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
For Monthly maintenance of Breaker , CTs,line side CVT,Isolators
110KV Main bus portion between MBS2 to eastern side
Thu,Jun 21,2018
Thu,Jun 21,2018
Monthly Maintenance Thu,Jun 21,2018
230KV PH3 to PH4 FEEDER Monthly Maintenance work Fri,Jun 22,2018
For Monthly Maintenance work Fri,Jun 22,2018
Monthly Maintenance Work , Fri,Jun 22,2018
Monthly Maintenance Fri,Jun 22,2018
Fri,Jun 22,2018
For Monthly maintenance works Fri,Jun 22,2018
Monthly Maintenance works Fri,Jun 22,2018
110 KV BUS COUPLER Breaker & CT's Only
To carryout Monthly Maintenance work on equipments by AEE/Maintenance/Palladam
110 KV KAVUNDAPADI FEEDER BREAKER AND CT'S WITH LINE SWITCH
FOR MONTHLY MAINTENANCE WORK
230KV Myvadi-Link-2 feeder breaker,CT's & Line entire
110KV OKM-Negamam 2 # feeder (Breaker, CT's)
110 KV UDT –Link –III #rs breaker, CT’s and Entire line
100 MVA Auto Transformer – I HV & LV Breakers and CTs
110 KV Thevur feeder and 110 KV Sangagiri-II feeder(one after another)- CTs Breakers and Switches
For carrying out monthly maintenance work
230/110 KV Auto Transformer-II with HV & LV Breaker & CTs
100MVA Auto Transformer-I, HV-I, LV-I Breakers and their CTs
Montly maintenance works Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
Monthly Maintenance Work Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
110KV Udt link III # Breaker & Line entire For Monthly Maintenance works Fri,Jun 22,2018
Sat,Jun 2,2018
110 KV Arasur - Kaniyur feeder Breaker & CTs
230/110 KV Auto Transformer - II, HV II, LV II breakers, it's CTs and LAS
Monthly maintenance works & Annual relay testing works by P & C wing
110KV Thingalur Link feeder Breaker, CTs and line Isolator.
Monthly Maintenance work and GRT relay testing work
230 KV UNJANAI # CT, BREAKER, BUS & LINE SWITCHES
1.230KV UNJANAI - SALEM 400KVSS 230KV FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY. 2.230KV AND 110KV NORTHERN BUS. 3. 110KV UNJANAI - SANKARI FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY
1. FOR MONTHLY MAINTENANCE WORK AND MAIN-I REALY REPLACING WORK BY GRT WING /ERODE AS PER THE CEA REGULATIONS. 2.FOR ANNUAL MAINTENANCE WORK 3.FOR MONTHLY MAINTENANCE WORK
230 kv bus coupler, CT, Breaker, Isolator and also Auxillary Bus
MONTHLY MAINTENANCE WORKS
1) 230KV SHOOLAGIRI FEEDER, 2) 230KV YERRANDAHALLY FEEDER, 3)110/11 & 33KV GC,AUTO-III
MONTHLY MAINTENANCE AND LINES WORK
110KV PH5 TO PH 1 #2 Fri,Jun 22,2018
110 KV Karamadai-Arasur I feeder Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
Fri,Jun 22,2018
ANNUAL RELAY TESTING BY GRT KUNDAH
For Monthly maintenance of Breaker , CTs.
230 KV Sadayapalayam-Palladam feeder breaker, CTs and line entire and Western bus.
Monthly maintenance and P&C check.
1. Auto Transformer - II with HV- II Breaker and CTs & LV- II Breaker CTs 2.110 KV Bargur feeder breaker, CTs & Line switch and Line Between 230 KV Karimangalam SS to 110KV Bargur SS.
To carry out Monthly maintenance work of 110 KV Bargur # and Auto Transformer - II by Maintenance wing, GRT testing work and Loc.94 jumper tightness work by Lines wing.
110 KV PALLADAM - ELAVANTHY feeder Breaker & CT's and Line Entire
To carryout monthly maintenance work on equipments by AEE/Maintenance/Palladam and PMI work on EHT line by AEE/lines/Palladam.
230 KV PALLADAM -SADAYAPALAYAM feeder Breaker & CT's and Line Entire
To carryout Monthly maintenance on equipments by AEE/Maintenance/Palladam , PMI on EHT line by AEE/Lines/Palladam and relay tests by AEE/P&C palladam
110 KV CAPACITOR BANK II BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
Monthly Maintenance Work Sat,Jun 23,2018
Sat,Jun 23,2018
Sat,Jun 23,2018
Monthly Maintenance Sat,Jun 23,2018
For Monthly maintenance works Sun,Jun 24,2018
400 / 110 KV ICT III HV & LV SIDE TRANSFORMER, LAS, CTs, BREAKERS, JUMPERS & SWITCHES
110KV Tirupattur # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
230/110KV Auto transformer I and 110KV LV I breaker and CTs
To carry monthly maintenance work by AEE/MTC/230KV SS / SPT
230KV Myvadi-Pugalur feeder Breaker,CT's & Line Entre
110 KV Geddai I & II feeder Breaker with CTs
Sun,Jun 24,2018
Unit III Monthly Maintenance work Sun,Jun 24,2018
UNIT- II Sun,Jun 24,2018
Sun,Jun 24,2018
For Monthly Maintenance work Mon,Jun 25,2018
Mon,Jun 25,2018
Mon,Jun 25,2018
Monthly maintenance works Mon,Jun 25,2018
Mon,Jun 25,2018
110kV BUS LC: Unit 1 to 5, all 110kV feeders and its accessories.
For top Bus PT commissioning work along with selector switch erection work and Unit-4 monthly maintenance work.
NEED BASED MAINTENANCE WORKS 1. ROTOR CLEANING WORK 2. THYRISTOR STACK CLEANING WORK 3. NOZZLE SERVOMOTOR CHEVRON PACKING REPLACEMENT WORK.
AUTO TRANSFORMER IV and its HV & LV side breaker,CT's and LAS etc.,
To carryout Monthly maintenance on Auto Transformer IV equipments by AEE/Maintenance/Palladam.
230KV OKM-Palladam Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
110 KV VLPT - Erumapatty # CB, CTs & Line Isolators.
Routine Monthly Maintenance Works
230KV Unjanai# CB, CTs, CVTs, Wave Traps & 230KV Switches. 230KV Unjanai # idle Bus side Switch.
For replacing broken worm wheel in the MoM Gear Box of 189B Switch. For replacing defective PDR, attending Hot Spots and monthly maintenance works.
230/110 KV Auto Transformer II HV and LV breakers & CTs only
110 KV BKB I FEEDER BREAKER AND CT
MONTHLY MAINTENACE WORK
Monthly Maintenance works Mon,Jun 25,2018
Jungle clearance work Mon,Jun 25,2018
Monthly Maintenance Work Mon,Jun 25,2018
Unit 07 (16000 kVA) Monthly Maintenance Work Mon,Jun 25,2018
Mon,Jun 25,2018
110 KV Bus Coupler Breaker and CT’s Mon,Jun 25,2018
110KV Samalpatti Railway#I Bkrs & CT's for monthly mtc work Mon,Jun 25,2018
110 kv Maruthur # CT,Bkr,all switches Normal monthly maintenance Mon,Jun 25,2018
For Monthly Maintenance works Mon,Jun 25,2018
110 KV K.R.Thoppur – II feeder breaker & CTS, Line isolators.
110KV pugalur-valavanthi feeder line portion between kabilarmalai and p.velur Ss
230 KV BUS B PT, Bus Coupler Breaker & �CTs PTs, CT, BREAKER, SWITCHES & JUMPERS
1.230KV UNJANAI - P.CHANTHAI FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY. 2.230KV SOUTHERN BUS
1. FOR MONTHLY MAINTENANCE WORK AND 230KV "B" PHASE CVT ERECTION WORK 2. FOR ANNUAL MAINTENANCE WORK
MONTHLY MAINTENANCE WORKS
110KVPoolavady #Breakerand Lines bet Udumalpet&Thungavi .
jumper tightness work Mon,Jun 25,2018
Haly Yearly mtce work Mon,Jun 25,2018
230KV PNPM-MYVADI-I & II #S ENTIRE Mon,Jun 25,2018
110KV Singarapet I #, Breaker CT Monthly Maintenance work . Mon,Jun 25,2018
Mon,Jun 25,2018
Mon,Jun 25,2018
Mon,Jun 25,2018
For Monthly Maintenance work Tue,Jun 26,2018
monthly maintenace work Tue,Jun 26,2018
110KV Salem- KR Thoppur II feeder (Section between Salem Ss to Kandampatty SS)
110KV ALR-SPH I # No.II CB,CT & Line Entire
For Stringing of 400KV Thappakundu to Anikkadavu DC line in between Loc 54 to 55 Crossing of Myvadi -Ponnapuram Feeder I & II .
AUTO TRANSFORMER III HV,LV BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
Shoolagiri 230KV feeder breaker CT`s, Line switch, and Transfer Switch
To carry out Monthly maintenance work by Maintenance wing
230 KV PALLADAM-OTHAKALMANDAPAM feeder Breaker & CT's and Line Entire
To carryout Monthly maintenance on equipments by AEE/Maintenance/Palladam, P&C relay test by AEE/P&C/Palladam, PMI on EHT line by AEE/lines/Palladam.
110KV OKM-Udumalpet 2 Feeder (Breaker, CT's)
400KV - 125 MVAR BUS REACTOR - 2 , Paalavadi
Monthly Maintenance works. Tue,Jun 26,2018
110 KV Bus coupler's CTs and breaker Tue,Jun 26,2018
Monthly Maintenance works Tue,Jun 26,2018
230KV GOBI FEEDER Tue,Jun 26,2018
Tue,Jun 26,2018
110KV Salem #2 Breaker,CT, Line Isolator. Tue,Jun 26,2018
110KV Barrage III Feeder breaker CT and Line Switch.
For carrying out monthly maintenance work
100MVA Auto Transformer-II, HV-II, LV-II Breakers and their CTs Singapuram-II feeder breaker & CTS.
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
230 KV Shoolagiri feeder breaker and its CT's
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV Vinnamangalam -Shoolagiri #.
Monthly Maintenance at both ends
Tue,Jun 26,2018
Monthly Maintenance Work Tue,Jun 26,2018
230KV MTPS-2 -Gobi Feeder entire Tue,Jun 26,2018
230KV MTPS-2 -Gobi Feeder entire Tue,Jun 26,2018
230KV MTPS2 -GOBI Feeder entire Tue,Jun 26,2018
230KV MTPS2 -GOBI Feeder entire Tue,Jun 26,2018
Tue,Jun 26,2018
230KV MTPS II - Gobi # entire Tue,Jun 26,2018
On 110KV BPH 3-Anthiyur # breaker, Line Isolator, CTs only
To carryout Monthly maintenance works.
400 KV Bus Section I CVTs, BREAKER, SWITCHES & JUMPERS
For checking of Jumpercone Tightness at River crossing TLONO:143 and other Tension Towers between TLONO :87-143
For checking of Jumpercone Tightness at River crossing TLONO:143 and other Tension Towers between TLONO :87-143
For checking of Jumpercone at MTPS2 switchyard Bay and Tension Towers in 230KV MTPS2 -GOBI Feeder
For checking of Jumpercone at MTPS2 switchyard Bay and Tension Towers in 230KV MTPS2 -GOBI Feeder
110 kV Pyk-Moyar # 2 (Breaker with Entire Line)
Monthly Maintenance Work and Annual Relay Testing by AEE/P&C/Msg.
For PMI work & Line maintenance work by Erode lines section
110KV Samalpatti# II Bkr & CT's for monthly mtc work Tue,Jun 26,2018
230kV Myvadi 1 # Bkr ,CT, all switches Normal monthly maintenance Tue,Jun 26,2018
For Monthly Maintenance works Tue,Jun 26,2018
Tue,Jun 26,2018
jumper tightness work Tue,Jun 26,2018
Haly Yeaely mtce work Tue,Jun 26,2018
Tue,Jun 26,2018
Tue,Jun 26,2018
230 KV TBC breaker and Isolators. Tue,Jun 26,2018
Quarterly Maintenance work Tue,Jun 26,2018
110KVRanganathapuram # Breaker & Line sec bet Udt&Melkaraipatty
230 KV BUS COUPLER BREAKER AND CT.S ONLY
FOR REPLACING AND TESTING OF TRIP TRANSFER SWITCH IN 230 KV MTPS II FEEDER WITH 230 KV BUS
110KV Salem - Singapuram II feeder (Section between Salem- Singapuram)
1)110KV Bus Coupler and 2)110KV Western Bus Mtce
230KV Thiruvalam # Breaker, CTs & line isolator
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
1) 315 MVA, 400/230 KV, ICT III & 2) 230 KV Bus A
For Monthly maintenance of HV & LV breaker's, CTs & rectification of defective isolatorof 203- 89 A
Monthly maintenance and P&C check.
110KV Aux bus portion between ABS1 to eastern side
Tue,Jun 26,2018
Tue,Jun 26,2018
Tue,Jun 26,2018
Tue,Jun 26,2018
Tue,Jun 26,2018
monthly Maintenance Tue,Jun 26,2018
Tue,Jun 26,2018
Wed,Jun 27,2018
230 KV MTPS II FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
1. Auto Transformer - III with HV- III Breaker and CTs & LV- III Breaker CTs 2.110 KV Ramiyanahally feeder breaker, CTs & Line switch and Line Between 230 KV Karimangalam SS to 110KV RamiyanahallySS.
To carry out Monthly maintenance work of 110 KV Ramiyanahally # and Auto Transformer - III by Maintenance wing, GRT testing work and Loc.30 Switch maintenance work by Lines wing.
110 KV Nambiyur Breaker, CTs with Line switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam.
110 KV PALLADAM- TIRUPPUR feeder Breaker and CT's with Line
To carryout monthly maintenance on equipments by AEE/Maintenance/Palladam and PMI work on EHT line by AEE/Lines/Palladam
AUTO TRANSFORMER III and its HV & LV side breaker,CT's,LAS etc.,
To carryout Monthly maintenance work on Auto Transformer III equipments by AEE/Maintenance/Palladam. and relay test by P&C wing
230KV Myvadi-Ponnapuram-2 Breaker,CT's & Line entirer
110 KV ANTHIYUR - BARRAGE IV FEEDER ENTIRE LINE
MONTHLY LINE MAINTENANCE WORK
230 KV Arasur - PGCIL Link 2 feeder Breaker and CTs
to rectify the troublesome spring charging mechanism in the B phase limb of the Breaker by AEE/SF6/Trichy.
Wed,Jun 27,2018
Wed,Jun 27,2018
230KV PH3 to KARAMADAI FEEDER Monthly Maintenance work Wed,Jun 27,2018
Monthly Maintenance Work , Wed,Jun 27,2018
ICT-3 400 KV /230 KV 315 MVA For Monthly Maintenance work Wed,Jun 27,2018
Wed,Jun 27,2018
Breaker monthly maintenance Wed,Jun 27,2018
110 KV OKM-TDLR 2 Feeder section between 110KV KMTR SS to 110KV S.N.Palayam SS.
For PMI tree cutting work by Lines /TDLR
110 KV VLPT - Valavanthi # CB, CTs & Line Isolators
Routine Monthly Maintenance Works
110 KV UDT –Aliyar – II #r breaker, CT’s and line. between Udt and Devanoorputhur SS
1) 110KV KN Patty feeder CB,CTs and Line Switch. 2) 110KV East Bus, its PTs & East Bus Side Switches-5 Nos.
For attending Hot Spots and regular maintenance works.
Moyar - periya Kodivery 110 kv feeder breaker
Monthly Maintenance works Wed,Jun 27,2018
Montly maintenance works Wed,Jun 27,2018
Wed,Jun 27,2018
Monthly Maintenance Work Wed,Jun 27,2018
230 KV PUSHEPH - KARAMADAI # Wed,Jun 27,2018
Wed,Jun 27,2018
Wed,Jun 27,2018
Auto 1 # HV ,LV Bkr ,CT, all switches Normal monthly maintenance Wed,Jun 27,2018
Unit No:01 For Monthly Maintenance work Wed,Jun 27,2018
For Monthly Maintenance Works. Wed,Jun 27,2018
100MVA Auto Transformer-III, HV-III, LV-III Breakers and their CTs,
230 KV PGCIL - Arasur Link 2 feeder Breaker, CTs
1) 230 Kv Kurukathi - Palladam feeder Breaker with Line switch,230 Kv Bus, 2) Auto Transformer I with Hv, Lv Breakers with associated Cts, Pts, and Switches.
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam
110 KV SALEM I # CT, BREAKER, BUS & LINE SWITCHES
MONTHLY MAINTENANCE WORKS
110KV Ingur – Thingalur # section between Kunnathur SS & Thingalur SS.
For attending PG Palayam LILO jumper tightness work by Ingur lines wing
110KV Railway traction – I # Breaker, CTs, and Line side Isolator by Ingur maintenance wing
MONTHLY MAINTENANCE WORKS
Machine-4 Generator,Power Transformer & its Auxiliaries
Monthly mtce work Wed,Jun 27,2018
230 KV Karamadai-PUSHEP feeder Wed,Jun 27,2018
Half yearly maintenance Wed,Jun 27,2018
Wed,Jun 27,2018
Wed,Jun 27,2018
Monthly Maintenance works Thu,Jun 28,2018
Monthly Maintenance Work Thu,Jun 28,2018
230 KV Salem- KR Thoppur Link I Feeder jumper tightness work Thu,Jun 28,2018
Thu,Jun 28,2018
Monthly Maintenance works. Thu,Jun 28,2018
110KV ALR- Angalakurichi # CB, CT& Line sec betw ALR & AKY SS
For Monthly maintenance of Breaker, CTs, line side CVT, Isolators
230KV Auxiliary bus entire with 230KV bus coupler breaker
230 KV BUS COUPLER BREAKER AND CT'S
FOR MONTHLY MAINTENANCE WORK
230 KV PALLADAM - KURUKATHI feeder Breaker & CT's and line entire
To carryout Monthly maintenance on equipments by AEE/Maintenance/Palladam and PMI work on EHT line by AEE/lines/Palladam
230 KV Link – I feeder Breaker & CT’s, Line isolators
230 KV LINK I # CT, BREAKER, BUS & LINE SWITCHES
230KV OKM - Myvadi feeder entire line.(Breaker ,CTs and 89M1,89M2 and 89L)
Monthly Maintenance work and For PMI and tree cutting work by Lines /UDPT wing
110KV Gobi Feeder breaker CT and Line Switch.
110KV Sankagiri feeders Breaker & CT’s Monthly Maintenance works Thu,Jun 28,2018
Montly maintenance works Thu,Jun 28,2018
Monthly Maintenance work Thu,Jun 28,2018
Monthly Maintenance Work Thu,Jun 28,2018
Thu,Jun 28,2018
Thu,Jun 28,2018
230KV KPH2 – KPH3# Thu,Jun 28,2018
Auto 2 # both HV,LV Bkr ,CT,all switches Normal monthly maintenance Thu,Jun 28,2018
jumper tightness work Thu,Jun 28,2018
110 KV Arasur - Karuvalur I feeder Breaker & CTs
110KV Gobi feeder Breaker, CTs and line Isolator with section between 230KV Thingalur SS and 230KV Gobi SS
110 KV BUS B PTs, Bus Coupler �BREAKER PTs, BREAKER, SWITCHES & JUMPERS
1.110KV UNJANAI - ELANAGAR 110KV FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY. 2.110KV UNJANAI -PARUTHIPALLY 110KV FEEDER BREAKER, CTS AND LINESIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
110KV Gobi - Thingalur # section between Kunnathur & Getticheviyer
For attending jumper tightness work by Ingur lines wing
For Pre-Monsoon Inspection Work
110KV Salem - Sankari feeder (Section between Salem SS to Veerapandy)
Auto transformer III & LV III Breaker Thu,Jun 28,2018
110 KV Karamadai-Irumbarai feeder Thu,Jun 28,2018
half yearly maintenance work Thu,Jun 28,2018
Thu,Jun 28,2018
Monthly maintenance work Thu,Jun 28,2018
Thu,Jun 28,2018
Fri,Jun 29,2018
Monthly Maintenance Work , Fri,Jun 29,2018
For Monthly Maintenance work Fri,Jun 29,2018
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
For Monthly maintenance of Breaker, CTs, line side CVT, Isolators
230KV Auxiliary bus entire with 230kv bus coupler breaker
110 KV THINGALUR FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK
230KV Myvadi-OKM feeder Breaker,CT's & Line entire
110 KV ANTHIYUR - GOBI FEEDER SECTION BETWEEN ANTHIYUR 230 KV SS TO 110 KV T N PALAYAM SS
MONTHLY LINE MAINTENANCE WORK
230KV OKM-Anikadavu Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
Monthly Maintenance work and For PMI and tree cutting work by Lines /UDPT wing
110 KV UDT –Okm – II #r breaker, CT’s and Section between UDT and Kongalnagaram.
230KV Anikadavu -O.K.Mandabam feeder Breaker,CT Line entire
110KV Bus Coupler CB and CTs Only. For regular maintenance works. Fri,Jun 29,2018
230KV THINGALUR FEEDER Fri,Jun 29,2018
Fri,Jun 29,2018
Monthly Maintenance Fri,Jun 29,2018
Montly maintenance works Fri,Jun 29,2018
Monthly Maintenance work Fri,Jun 29,2018
Monthly Maintenance Work Fri,Jun 29,2018
Monthly Maintenance Work Fri,Jun 29,2018
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
110 KV southern bus from bus coupler switch 1989 and singapuram feeder – I breaker and CTs.
Monthly Maintenance works and hot spot rectification works
110 KV Northern Bus & 110KV Southern Bus, 110KV Bus Coupler Breaker, CT, Isolators and Jumpers
110 KV Arasur - Thudialur feeder Breaker & CTs
230KV MTPS II feeder Breaker and CTs with line Isolator.
110 KV SALEM II # CT, BREAKER, BUS & LINE SWITCHES
400 KV Bus Section II CVTs, BREAKER, SWITCHES & JUMPERS
230Kv MTPS 2-Thingalur feeder entire Fri,Jun 29,2018
230KV MTPS2-Thingalur Feeder entire Fri,Jun 29,2018
230KV MTPS II - Thingalur # entire. Fri,Jun 29,2018
230 kv myvadi 2 # CT,Bkr,all switches Normal monthly maintenance Fri,Jun 29,2018
110 KV MDPH # I Entire Monthly Maintenance work Fri,Jun 29,2018
Monthly maintenance work Fri,Jun 29,2018
Fri,Jun 29,2018
Monthly Maintenance Sat,Jun 30,2018
230 KV Deviyakurichy - Singapuram-Feeder jumper tightness work Sat,Jun 30,2018
For Monthly Maintenance work Sat,Jun 30,2018
ForJumperconTightness checking work at Tension Towers between 87-143
For checking the Jumpercone at MTPS2 switchyard Bay and Tension Towers in MTPS2 -Thingalur Feeder
For PMI work & Line maintenance work by Erode lines section
230KV Myvadi-Ponnapuram-1 Breaker,CT's & Line Entire
110 KV BHAVANI SAGAR MICRO PH -MOYAR PH FEEDER ENTIRE LINE
TO INSERT 1 NO.NEW 110 KV TOWER IN THALAVADI SPUR LINE BT TLC/METTUPALAYAM WING
230 KV Deviyakurichy – Singipuram # Breaker, CTs and Line side isolator both end.
110KV OKM -R.S.Puram -2 Feeder breaker and CTs only
For Monthly Maintenance work Sat,Jun 30,2018
Sat,Jun 30,2018
For carrying out TAN Delta test Sat,Jun 30,2018
Sat,Jun 30,2018
Monthly Maintenance Work Sat,Jun 30,2018
Unit 01 (7810 kVA) Monthly Maintenance Work Sat,Jun 30,2018
230KV KPH2-KPH3 # Sat,Jun 30,2018
Sat,Jun 30,2018
230KV TBC Breaker, 89M and 89MT Switch
230KV idle Bus, its PTs, Bus Coupler CB, CTs and idle Bus side Switch in 230KV Bus Coupler Bay.
For monthly maintenance works and attending Hot Spots.
TAN Delta testing in 110 KV Sangagiri-I, Barrage IV,BKB I feeders, 110 KV bus coupler,Auto Transformer-I HV and LV and 230 KV KR Thoppur feeder (one after another)
110 KV Coimbatore - II feeder Entire Line with Breaker & CTs
For Monthly maintenance works & PMI works by AE/L/CBE
400 / 110 KV ICT IV HV & LV SIDE TRANSFORMER, LAS, CTs, BREAKERS, JUMPERS & SWITCHES
For Pre-Monsoon Inspection Work
1.110KV CBE-TDLR # Entire , Breaker & CT's
1. Monthly maintenance works 2. PMI works & Tree cutting works by AE/Lines/CBE
Auto 3 # both HV,LV bkr,CT,all switches Normal monthly maintenance Sat,Jun 30,2018
jumper tightness work Sat,Jun 30,2018
Sat,Jun 30,2018
Sat,Jun 30,2018
100MVA Auto Transformer- II Sat,Jun 30,2018
Sat,Jun 30,2018
230KV Myvadi Bus coupler Breaker Monthly Maintenance work Sat,Jun 30,2018
110KV Salem - KR Thoppur II feeder (Section between Karuppur SS to Hasthampatty Ss)
110KV Capacitor bank II Breaker, CTs and Capacitor units
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
230 KV ARASUR FEEDER BREAKER AND CT'S WITH ENTIRE LINE
FOR ANNUAL RELAY TESTING WORK BY P&C/GOBI WING AND FOR MONTHLY MAINTENANCE WORK
Monthly Maintenance work and GRT relay testing work.
230 KV TBC BREAKER and 230 KV Transfer BUS
To carryout monthly maintenance work on equipment by AEE/Maintenance/Palladam
To date to time Remarks
9:00 Fri,Jun 1,2018 17:00 1 possible Approved
9:00 Fri,Jun 1,2018 17:00 1 possible Approved
9:00 Sun,Jun 3,2018 18:00 3 possible Approved
9:00 Fri,Jun 1,2018 15:00 1 possible Approved
9:00 Fri,Jun 1,2018 17:00 1 possible Approved
9:00 Fri,Jun 1,2018 16:00 1 possible Approved
9:00 Fri,Jun 1,2018 16:00 1 possible Approved
9:00 Fri,Jun 1,2018 12:00 1 possible Approved
9:00 Fri,Jun 1,2018 17:00 1 possible occ approved Approved
9:00 Fri,Jun 1,2018 14:00 1 possible Approved
From time
No. of days
Recomendation
SE Approval (*Subject to Remarks)
subject to thalavaipettai ss tsd
subject to somayampalayam ss tsd
subject to the other auto trs loading limit after tsd
subject to thudiyalur ss tsd
subject to somanur ss availing tsd
bus B to be in service
9:00 Fri,Jun 1,2018 17:00 1 possible Approved
9:00 Fri,Jun 1,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 14:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 postponed
subject to kugalur ss tsd and the feeder being kept radial from anthiyur ss end after that
subject to thalavaipettai ss tsd
subject to the voltage profile in the grid
subject to the voltage profile in the grid
subject to uratchikottai ss availing tsd
subject to the condition existing
subject to ukkadam ss tsd
lc recommended for karimangalam ss end
Subject to EE/SLDC/ERD concurrence
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
8:00 Sat,Jun 2,2018 17:00 1 postponed
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 repeat LC Cancelled
subject to traction supply change over to feeder 2
to be scheduled with tsd relief
Subject to EE/SLDC/ ERD concurrence
subject to the realization of tsd relief only
other feeder will be in service
other feeder will be in service
9:00 Sat,Jun 2,2018 14:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 repeat LC Cancelled
9:00 Sat,Jun 2,2018 17:00 1 repeat LC Cancelled
8:00 Sat,Jun 2,2018 17:00 1 possible Approved
8:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 16:00 1 postponed Postponed
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
breaker already kept open
subject to the load condition
cannot be issued during wind season
subject to transfer of traction supply to feeder 2
9:00 Sat,Jun 2,2018 18:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 14:00 1 possible Approved
9:00 Sat,Jun 2,2018 16:00 1 possible Approved
9:00 Sat,Jun 2,2018 12:00 1 possible Approved
9:00 Sat,Jun 2,2018 16:00 1 possible Approved
9:00 Sat,Jun 2,2018 14:00 1 possible Approved
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the realization of tsd relief only and the feeders being kept radial from other end
subject to the realization of tsd relief only
subject to the realization of tsd relief only and the feeders being kept radial from other end
bus A to be in service
9:00 Sat,Jun 2,2018 16:00 1 possible Approved
12:00 Sat,Jun 2,2018 16:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 17:00 1 possible Approved
9:00 Sat,Jun 2,2018 16:00 1 possible Approved
9:00 Sat,Jun 2,2018 14:00 1 Possible Approved
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the realization of tsd relief only
subject to the load condition
8:00 Sun,Jun 3,2018 17:00 1 possible Approved
9:00 Sun,Jun 3,2018 17:00 1 possible Approved
9:00 Sun,Jun 3,2018 17:00 1 repeat LC Cancelled
9:00 Sun,Jun 3,2018 17:00 1 possible Approved
9:00 Sun,Jun 3,2018 17:00 1 repeat LC Cancelled
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 17:00 1
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 15:00 1 possible Approved
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
1)possible 2)postponed
Only thalaivasal feeder maintenance is permitted subject to thalaivasal ss availing tsd; the tandelta testing to be done only with tsd relief in the respective feeders
1)Approved 2)Postponed
subject to the load condition
subject to the load condition
subject to mettukadai ss tsd; the other feeder is already under long lc
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 16:00 1 possible Approved
9:00 Mon,Jun 4,2018 16:00 1 repeat LC Cancelled
9:00 Mon,Jun 4,2018 16:00 1 repeat LC Cancelled
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 12:00 1 possible Approved
8:00 Mon,Jun 4,2018 17:00 1 postponed Postponed
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
subject to the wind generation and the other feeder loading limit
subject to the realization of tsd relief and the load condition existing after that
subject to the other ICT loading limit
subject to the realization of tsd relief and the load condition existing after that
230 kv bus lc recommended at thingalur ss
subject to the tsd relief and the load condition existing
9:00 Mon,Jun 4,2018 14:00 1 possible Approved
9:00 Mon,Jun 4,2018 16:00 1 possible Approved
10:00 Mon,Jun 4,2018 14:00 1 possible Approved
8:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 17:00 1 possible Approved
9:00 Mon,Jun 4,2018 14:00 1 possible Approved
8:00 Mon,Jun 4,2018 17:00 1 Possible Approved
9:00 Tue,Jun 5,2018 17:00 1 possible idle feeder Approved
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
9:00 Thu,Jun 7,2018 17:00 1 possible Approved
subject to the tsd relief and the rest of the loads being transferred to arasur ss
subject to the load condition
subject to mettukadai ss tsd
subject to mettukadai ss tsd
subject to the load condition
subject to the voltage profile in the grid
Sub to load condition
subject to the other two link feeders loading limit
subject to the wind generation; occ approval to be obtained
9:00 Tue,Jun 5,2018 17:00 1 Approved
9:00 Tue,Jun 5,2018 15:00 1
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
to be discussed with CE Grid Operation
1)possible 2)postponed
1. subject to puthansanthai ss availing tsd; 2. to be scheduled with tsd
1)Approved 2)Postponed
subject to the load condition
subject to the voltage profile in the grid
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
8:00 Tue,Jun 5,2018 17:00 1 Possible Approved
9:00 Tue,Jun 5,2018 16:00 1 possible Approved
11:00 Tue,Jun 5,2018 13:00 1 possible Approved
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
8:00 Tue,Jun 5,2018 17:00 1 possible Approved
9:00 Tue,Jun 5,2018 14:00 1 possible Approved
subject to the load condition
Sub to 230KV DVK - TAQA Tie and load condition
subject to other auto trs loading limit only
subject to transfer of loads after tsd
subject to the load condition
subject to the load condition
subject to the voltage profile in the grid
9:00 Tue,Jun 5,2018 17:00 1 postponed no tsd scheduled Postponed
7:00 Tue,Jun 5,2018 17:00 1 postponed Postponed
9:00 Tue,Jun 5,2018 16:00 1 possible Approved
9:00 Tue,Jun 5,2018 17:00 1 possible Approved
9:00 Tue,Jun 5,2018 17:00 1 Possible Approved
issued several times in May 2018
subject to wind generation
subject to the load condition
Sub to 230KV DVK - TAQA Tie and load condition
9:00 Tue,Jun 5,2018 14:00 1 Possible Approved
9:00 Tue,Jun 5,2018 18:00 1 1,2,3) Possible Approved
8:00 Tue,Jun 5,2018 17:00 1 Possible Approved
10:00 Tue,Jun 5,2018 17:00 1 Possible Approved
9:00 Tue,Jun 5,2018 14:00 1 Possible Sub to load transfer Approved
9:00 Tue,Jun 5,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 possible Approved
Sub to #2 load condition
1)Sub to other Autos loads after Min nagar TSD. 2)Sub to TSD. 3)Idle Bkr
Sub to grid condition
Sub to other Pr. Transformer loads and wind generation
Sub to load condition
Sub to TSD relif and load condition
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
8:00 Wed,Jun 6,2018 17:00 1 possible Approved
9:00 Wed,Jun 6,2018 17:00 1 postponed No OCC approval Postponed
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 14:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 postponed No OCC approval Postponed
Sub to other #s loading condition and wind generation
Sub to # kept radial from other end
Sub to load condition
Sub to load condition
Sub to load condition
Sub to other #s load condition
Sub to # kept radial from other end
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 16:00 1 Possible Approved
9:00 Wed,Jun 6,2018 11:00 1 Possible Approved
11:00 Wed,Jun 6,2018 13:00 1 Possible Sub to load transfer Approved
8:00 Wed,Jun 6,2018 17:00 1 LC not clear Wrong Entry
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 14:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 14:00 1 Approved Sub to grid voltage Approved
10:00 Wed,Jun 6,2018 15:00 1 Possible Approved
Sub to load condition
Sub to TSD and transfer of loads to other end
Sub to TSD and transfer of loads to other end
Sub to Auto 2 load condition (Approved in 143rd OCC / Sl no.163)
Sub to TSD and # kept radial from other end.
Sub to load condition
Sub to load condition
9:00 Wed,Jun 6,2018 15:00 1 Possible Sub to TSD Approved
7:00 Wed,Jun 6,2018 17:00 1 postponed Postponed
9:00 Wed,Jun 6,2018 16:00 1 Possible Approved
7:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 14:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
230KV Mtps1 - Ingur # lc recommeneded
Sub to oyher #s load condition
Standby unit and subject to PWD demand
Sub to load condition
Sub to load condition
Sub to TSD and equql division of loads
9:00 Wed,Jun 6,2018 17:00 1 Possible Sub to TSD Approved
9:00 Wed,Jun 6,2018 17:00 1 Possible Approved
9:00 Wed,Jun 6,2018 17:00 1 Repeat Cancelled
9:00 Wed,Jun 6,2018 17:00 Possible Approved
9:00 Thu,Jun 7,2018 16:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 possible Approved
9:00 Thu,Jun 7,2018 17:00 1 postponed No OCC Approval Postponed
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
Sub to load condition
Sub to kadamparai generation
Sub to load condition and Bus 1 will be in service
Sub to Regen concurrence and wind generation
Sub to TSD and transfer of loads to other end
Sub to load condition
Sub to other #s load condition
9:00 Thu,Jun 7,2018 14:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
8:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 14:00 1 Possible Approved
9:00 Thu,Jun 7,2018 16:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
8:00 Thu,Jun 7,2018 17:00 1 Possible Standby unit Approved
10:00 Thu,Jun 7,2018 15:00 1 Possible Approved
Sub to Saravanampatty TSD and # kept radial from other end
Other #s will cater the load
Sub to # kept radial from other end
Sub to load condition
Sub to Saravanampatty TSD and # kept radial from other end
# 2 will be in service and sub to SSP EHT concurrence
# 2 will be in service and sub to SSP EHT concurrence
Sub to PLDM bus voltage
8:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 16:00 1 1,2) Possible Approved
9:00 Thu,Jun 7,2018 16:00 1 Possible Approved
11:00 Thu,Jun 7,2018 14:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 14:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 17:00 1 Possible Approved
9:00 Thu,Jun 7,2018 14:00 1 Possible Approved
Sub to load condition
Sub to TSD and Auto load condition
Sub to other #s load condition
Sub to SRLY concurrence
Sub to load condition
Sub to load condition
Sub to grid condition
Sub to load condition
Sub to PLDM bus voltage
9:00 Fri,Jun 8,2018 15:00 1 Possible Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
9:00 Fri,Jun 8,2018 18:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 1,2) Possible Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
10:00 Fri,Jun 8,2018 12:00 1 Possible Sub to TSD Approved
Sub to load condition
Sub to load condition
Sub to PWD demand
Sub to # kept radial from other end
#2 will cater the load
Sub to TSD and transfer of loads to other end
Sub to other autos load condition and wind generation
8:00 Fri,Jun 8,2018 17:00 1 postponed TSD insufficient
9:00 Fri,Jun 8,2018 17:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 Possible Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Sub to TSD Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 1,2) Possible
9:00 Fri,Jun 8,2018 16:00 1 Possible Approved
9:00 Fri,Jun 8,2018 16:00 1 Possible Approved
Subject to EE/SLDC/ERD concurrence
Other #s will cater the load
#2 will cater the load
Sub to karuvalur fed from PGCIL
#2 will cater the load
1)Sub to 230 KV DKchi - TAQA Tie and 230KV PSI - PGLR # load and 2) sub to division of loads
Subject to EE/SLDC/ERD concurrence
Sub to TSD and transfer of loads to other end
Sub to # kept radial from other end
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 1,2) Possible Approved
9:00 Fri,Jun 8,2018 17:00 1 Repeat Cancelled
9:00 Fri,Jun 8,2018 16:00 1 Possible Approved
9:00 Fri,Jun 8,2018 14:00 1 Possible Approved
10:00 Sat,Jun 9,2018 12:00 1 Possible Approved
9:00 Sat,Jun 9,2018 17:00 1 Possible Approved
8:00 Tue,Jun 12,2018 17:00 4 postponed
9:00 Sun,Jun 10,2018 17:00 1 Possible Approved
230kV Karuvalur-PGCIL # will be in service
BUS - B will be in service
1)Sub to TSD and transfer of loads. 2) sub to other Autos load condition
Sub to kadamparai generation
Other #s will cater the load
Sub to TSD and inter loads fed from Snallah end.
Sub to grid condition
1)230KV PLDM - ASR PGCIL # lc not applied . 2)230 KV ASR -ASR PGCIL #1 & 2 lc not applied with TSD.
Subject to EE/SLDC/ERD concurrence
Sub to availbilty of other two units
9:00 Tue,Jun 12,2018 17:00 3 Possible Approved
9:00 Sun,Jun 10,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 postponed No OCC Approval Postponed
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 14:00 1 Possible Approved
10:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 16:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
Sub to grid condition
Sub to grid condition
subject to bus voltage
subject to #1 loading
other feeder will be in service
subject to load transfer
subject to feeder kept radail from other end
subject to #1 loading
subject to Kadamparai generation
subject to #1 loading
9:00 Mon,Jun 11,2018 17:00 1 repeat lc Cancelled
8:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 14:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
8:00 Mon,Jun 11,2018 17:00 1 Possible Approved
10:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 16:00 1 Possible Approved
7:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible idly charged feeder Approved
9:00 Wed,Jun 13,2018 17:00 3 Possible Approved
all units in standby condition
subject to other auto trs loading limit only
other feeder will be in service
other feeder will be in service
other feeder will be in service
subject to other auto trs loading limit only
230kv MTPH - MTPS1# will be in service
subject to Grid condition
9:00 Mon,Jun 11,2018 14:00 1 1&2) possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible Approved
9:00 Mon,Jun 11,2018 16:00 1 Possible Approved
9:00 Mon,Jun 11,2018 14:00 1 Possible idly charged feeder Approved
9:00 Mon,Jun 11,2018 14:00 1 Possible Approved
9:00 Mon,Jun 11,2018 17:00 1 Possible subject to TSD Approved
9:00 Mon,Jun 11,2018 14:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
1) subject to TSD 2)subject to other auto trs loading limit only
other feeder will be in service
subject to Alugumalai ss TSD and Mudalipalayam ss load transfer to Ingur 230
Bus B will be in service
#3 will be tied and subject to kept radial form Erd end
Approved in 143rd OCC/ vide Sl.no: 191
subject to feeder kept radail from other end
9:00 Tue,Jun 12,2018 15:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible subject to TSD Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible subject to TSD Approved
8:00 Tue,Jun 12,2018 17:00 1 Wrong entry Wrong entry Cancelled
9:00 Tue,Jun 12,2018 14:00 1 Possible Approved
9:00 Tue,Jun 12,2018 14:00 1 Possible subject to TSD Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
8:00 Tue,Jun 12,2018 17:00 1 Postponed
9:00 Tue,Jun 12,2018 14:00 1 Possible Approved
10:00 Tue,Jun 12,2018 15:00 1 Possible subject to TSD Approved
subject to load transfer
subject to TSD and feeder kept redaol from ther end
other feeder will be in service
other feeder will be in service
110KV KPH5 - kph6 lc recommended.
Subject to EE/SLDC/ERD concurrence
subject to Grid voltage
8:00 Tue,Jun 12,2018 17:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
9:00 Tue,Jun 12,2018 14:00 1 Possible subject to TSD Approved
9:00 Tue,Jun 12,2018 14:00 1 Possible Approved
9:00 Tue,Jun 12,2018 17:00 1 Possible Approved
10:00 Tue,Jun 12,2018 17:00 1 Possible Approved
other feeder will be in service
Sub to load condition
subject to other auto trs loading limit only
subject to other auto trs loading limit only
subject to wind generation
9:00 Tue,Jun 12,2018 17:00 1 1&2) possible 1&2) one by one Approved
10:00 Tue,Jun 12,2018 16:00 1 possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 postponed No OCC approval
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 15:00 1 Possible subject to TSD Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
Approved in 143rd OCC/ vide Sl.no: 146
Sub to load condition
Sub to load condition
Sub to load condition
subject to 230kv DKY - TAQA # in tied condition
subject to wind generation
Programmed on 16-18th June 2018
subject to 230kv DKY - TAQA # in tied condition
other feeder will be in service
Auto 1 will be in service to cater the load
9:00 Wed,Jun 13,2018 14:00 1 Possible subject to TSD Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
10:00 Wed,Jun 13,2018 12:00 1 Possible subject to TSD Approved
12:00 Wed,Jun 13,2018 14:00 1 Possible subject to TSD Approved
9:00 Wed,Jun 13,2018 17:00 1 postponed
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
8:00 Thu,Jun 14,2018 17:00 2 postponed
9:00 Wed,Jun 13,2018 17:00 1 postponed
9:00 Wed,Jun 13,2018 14:00 1 Possible Approved
9:00 Wed,Jun 13,2018 16:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
other feeder will be in service
to be scheduled with tsd relief
Subject to EE/SLDC/ERD concurrence
other feeder will be in service
to be scheduled with tsd relief
Subject to EE/SLDC/ERD concurrence
Auto 2 LC recommended at Pallakkapalayam 230
Subject to EE/SLDC/ERD concurrence
subject to Kavundapadi ss fed from other end
other feeder will be in service
other feeder will be in service
9:00 Wed,Jun 13,2018 17:00 1 1&2) Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 postponed
8:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 16:00 1 Possible Approved
9:00 Wed,Jun 13,2018 16:00 1 Possible Approved
7:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 16:00 1 Possible Approved
1) subject to TSD 2)subject to other auto trs loading limit only
110kv TDLR - S'nallah#LC
Subject to EE/SLDC/ERD concurrence
all units in standby condition
Approved in 143rd OCC/ vide Sl.no: 147
subject to other auto trs loading limit only
subject to PWD demand
other feeder will be in service
subject to load transfer
subject to other auto trs loading limit only
subject to wind generation
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Wed,Jun 13,2018 17:00 1 Possible Approved
9:00 Thu,Jun 14,2018 17:00 1 postponed
9:00 Thu,Jun 14,2018 17:00 1 Possible Approved
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
9:00 Thu,Jun 14,2018 15:00 1 Possible Approved
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
10:00 Thu,Jun 14,2018 14:00 1 Possible Approved
Sub to load condition
Sub to load condition
Sub to load condition
110kv Elumathur - PGLR # sec b/w Elumathur to Kodumudi ss LC
Subject to EE/SLDC/ERD concurrence
Sub to TSD of interload SS
Sub to TSD of interload SS and Madhukarai fed from OKM 230
Sub to TSD relief and other Autos load condition
Sub to peedampalli TSD and M/S L & T EHT fed thro 110KV OKM - NGMM #2
Sub to other auto load condition
9:00 Thu,Jun 14,2018 16:00 1 Possible Approved
10:00 Thu,Jun 14,2018 17:00 1 Postponed
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
9:00 Thu,Jun 14,2018 17:00 1 Possible Approved
9:00 Thu,Jun 14,2018 16:00 1 Possible Approved
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
10:00 Thu,Jun 14,2018 15:00 1 Possible Approved
9:00 Thu,Jun 14,2018 16:00 1 Possible Approved
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
9:00 Thu,Jun 14,2018 17:00 1 Possible Approved
9:00 Thu,Jun 14,2018 14:00 1 Possible Approved
Sub to TSD relief and other Autos load condition
110KV KPH5 - Sandinallah lc recommended.
Subject to EE/SLDC/ERD concurrence
Sub to TSD and # kept radial from other end.
Approved in 143rd OCC / Sl no:203
Aliyar unit under breakdown. #1 will be in service.
Other #s will cater the load
Other #s will cater the load
Sub to other autos load condition and wind generation
Sub to availing at both ends
Sub to load condition
Sub to TSD relief and # kept radial from other end.
9:00 Fri,Jun 15,2018 17:00 1 Possible Approved
8:00 Sun,Jun 17,2018 17:00 3 Possible Approved
8:00 Sun,Jun 17,2018 17:00 3 Possible Approved
9:00 Fri,Jun 15,2018 16:00 1 Possible Approved
9:00 Fri,Jun 15,2018 17:00 1 Possible Approved
9:00 Fri,Jun 15,2018 16:00 1 Possible Approved
9:00 Fri,Jun 15,2018 14:00 1 Possible Sub to TSD relief Approved
Approved in 143rd OCC / Sl no:155
Sub to load condition
Sub to load condition
Other autos will cater the load
Sub to other autos load condition and wind generation
Sub to TSD relief and load condition
9:00 Fri,Jun 15,2018 14:00 1 Possible Sub to TSD relief Approved
9:00 Fri,Jun 15,2018 14:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 15:00 1 Possible Sub to TSD Approved
12:00 Sat,Jun 16,2018 15:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
Bus - B will be in service
Sub to TAQA generation
Other #s will be in service
Sub to equal division of loads.
Sub to Erode110 TSD and #s kept radial from other end.
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 postponed
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
10:00 Sat,Jun 16,2018 14:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
Sub to TSD relief and # kept radial from other end.
Erode110 and BKB2 bus lc recommended
Subject to EE/SLDC/ERD concurrence
During LC period, 1).230KV OKM-TDLR # & 230KV OKM-cbe # under LC from 15.06.2018 to 17.06.2018 for TLC work. (2) Auto Tr-I under lc. (3) 230KV OKM-Pldm # already substituted with TBC breaker to retain its original condition. (4) The # already under lc at other for 3 days.
Sub to TSD relief and Auto 1 load condition
8:00 Sat,Jun 16,2018 17:00 1 Wrong entry Cancelled
10:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
8:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 14:00 1 Possible Approved
9:00 Sat,Jun 16,2018 14:00 1 Possible Approved
10:00 Sat,Jun 16,2018 15:00 1 Possible Approved
9:00 Sat,Jun 16,2018 16:00 1 1,2) Possible Approved
Sub to load condition
Sub to TSD relief and Auto 1 load condition
Sub to #s kept radial from other end and concurrence of SPB and Ponni sugars.
Sub to # kept radial from other end
Sub to TSD relief and other Autos load condition
Sub to Erode110 TSD
Sub to TSD and other auto's load condition
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 17:00 1 Possible Approved
9:00 Sat,Jun 16,2018 16:00 1 Possible Sub to TSD relief Approved
9:00 Sat,Jun 16,2018 16:00 1 Possible Approved
9:00 Sat,Jun 16,2018 14:00 1 Possible Approved
9:00 Sat,Jun 16,2018 14:00 1 Possible Approved
9:00 Sat,Jun 16,2018 16:00 1 Possible Approved
8:00 Sun,Jun 17,2018 17:00 1 Possible Approved
9:00 Sun,Jun 17,2018 17:00 1 Possible Approved
Other #s will cater the load
Other #s will cater the load
Approved in 143rd OCC / Sl no. 157
Sub to Suzlon concurrence
Bus B will be in service
Sub to load condition
Sub to Grid condition
Sub to Grid condition
9:00 Sun,Jun 17,2018 16:00 1 Possible Approved
9:00 Sun,Jun 17,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 14:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
Sub to other autos load condition and wind generation
Sub to Grid condition
Sub to # kept radial from other end
Sub to VESTAS concurrence
Sub to Auto1 load condition (with all 110#s kept in Tie condition)
Sub to load condition
Sub to load condition
8:00 Mon,Jun 18,2018 13:00 1 Possible Approved
9:00 Mon,Jun 18,2018 16:00 1 Possible Sub to TSD Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
9:00 Mon,Jun 18,2018 16:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Possible Approved
8:00 Mon,Jun 18,2018 17:00 1 Possible Sub to TSD Approved
9:00 Mon,Jun 18,2018 14:00 1 Possible Approved
9:00 Mon,Jun 18,2018 14:00 1 Postponed To be discussed Postponed
Sub to TSD and # kept radial from other end.
Sub to load condition
Sub to Thumbipady fed from Mettur230
Sub to load condition
Sub to load condition
Sub to # kept radial from other end
9:00 Mon,Jun 18,2018 14:00 1 Postponed To be discussed Postponed
13:00 Mon,Jun 18,2018 17:00 1 possible Approved
9:00 Mon,Jun 18,2018 14:00 1 Possible Approved
9:00 Mon,Jun 18,2018 17:00 1 Approved Sub to bus voltage Approved
9:00 Tue,Jun 19,2018 14:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Sub to TSD relief Approved
May be issued after normalisation of lc at singapuram end
Sub to TSD and # kept radial from other end.
Sub to other #s loading condition
Sub to TSD and #s kept radial from other end.
Sub to other #s loading condition
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
10:00 Tue,Jun 19,2018 14:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 16:00 1 Possible Approved
9:00 Tue,Jun 19,2018 11:00 1 Possible Sub to TSD Approved
11:00 Tue,Jun 19,2018 13:00 1 Possible Approved
13:00 Tue,Jun 19,2018 15:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
8:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 1,2) Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 14:00 1 Possible Approved
Loads kept in Bus 2
Sub to other autos load condition
#1 will cater the load
Sub to load condition
Sub to # kept radial from other end
Sub to # kept radial from other end
#1 will cater the load
Sub to load condition
Sub to TSD and sub to transfer of loads to other end
Sub to load condition
# 3 will be in tied condition
10:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 16:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Postponed To be discussed Postponed
9:00 Tue,Jun 19,2018 17:00 1 Postponed To be discussed Postponed
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Possible Approved
10:00 Tue,Jun 19,2018 17:00 1 Possible Approved
Sub to load condition and wind generation
Sub to load condition and wind generation
#1 will cater the load
Sub to load condition
Sub to load condition and wind generation
8:00 Tue,Jun 19,2018 17:00 1 Possible Approved
9:00 Tue,Jun 19,2018 16:00 1 Possible Approved
9:00 Tue,Jun 19,2018 17:00 1 Approved Approved
9:00 Wed,Jun 20,2018 14:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed No OCC approval Postponed
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed No TSD Relief.
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed No TSD relief
Sub to load condition
Sub to load condition
143rd OCC approved Sl no.167
Sub to TSD and load transfer.
Sub to load condition
Subject to EE/SLDC/ERD concurrence
Sub to load condition
Subject to EE/SLDC/ERD concurrence
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Wrong entry Cancelled
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed No TSD relief
10:00 Wed,Jun 20,2018 14:00 1 Possible Sub to TSD relief Approved
10:00 Wed,Jun 20,2018 14:00 1 Possible Sub to TSD Relief Approved
9:00 Wed,Jun 20,2018 17:00 1 Possible Sub to TSD Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed No OCC approval Postponed
8:00 Wed,Jun 20,2018 17:00 1 Possible Approved
Sub to TSD and other auto load condition
Sub to # kept radial from other end
Subject to EE/SLDC/ERD concurrence
Sub to load condition
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 16:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Postponed
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Repeat Cancelled
Sub to load condition
Approved in 143rd OCC / Sl no. 171
Sub to Vembadithalam TSD
# section lc recommended
Subject to EE/SLDC/ERD concurrence
Sub to load condition
Sub to Edapady110 TSD
9:00 Wed,Jun 20,2018 14:00 1 Postponed No TSD
9:00 Wed,Jun 20,2018 14:00 1 Possible Approved
9:00 Wed,Jun 20,2018 15:00 1 Possible Approved
9:00 Wed,Jun 20,2018 16:00 1 Possible Sub to TSD Approved
10:00 Wed,Jun 20,2018 17:00 1 Possible Approved
7:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 16:00 1 Possible Approved
9:00 Wed,Jun 20,2018 14:00 1 Possible Approved
Subject to EE/SLDC/ERD concurrence
Sub to # kept radial from other end
Sub to #1 load condition
Sub to load condition and wind generation
Other #s will cater the load
Sub to inter load TSD
Sub to TSD and # kept radial from other end.
Sub to #1 load condition
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 17:00 1 Possible Approved
9:00 Wed,Jun 20,2018 16:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
Sub to load condition
Sub to load condition
Sub to TSD and # kept radial from other end.
230KV KRT - Singapuram lc recommended
Sub to TSD and inter loads fed from other end.
Sub to TSD relief and other Autos load condition
Other #s will cater the load
Sub to other ICTs load condition. (Approved in 143rd OCC / Sl no. 221)
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Sub to TSD Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 16:00 1 Possible Approved
10:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 16:00 1 Possible Approved
9:00 Fri,Jun 22,2018 16:00 2 Possible Approved
9:00 Fri,Jun 22,2018 16:00 2 Possible Approved
8:00 Thu,Jun 21,2018 17:00 1 Possible Standby unit Approved
Other #s will cater the load
Other #s will cater the load
Other #s will cater the load
Sub to load condition
Sub to JSW concurrence and loads fed from mettur end
Sub to Pollachi TSD
Sub to SPH1 and SPH2 generation
Sub to SKPathy PH gen
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
10:00 Thu,Jun 21,2018 15:00 1 Possible Approved
10:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 16:00 1 Possible Approved
7:00 Thu,Jun 21,2018 17:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
9:00 Thu,Jun 21,2018 14:00 1 Possible Approved
8:00 Thu,Jun 21,2018 17:00 1 Possible Approved
Sub to load condition
Sub to inter load TSD
Sub to TSD and other auto load condition
Sub to inter load TSD
Sub to load condition and wind generation
Sub to load condition
Sub to PWD demand
Other #s will cater the load
Other #s will cater the load
Sub to load condition
9:00 Thu,Jun 21,2018 16:00 1 Possible Approved
9:00 Thu,Jun 21,2018 17:00 1 Possible Sub to TSD Approved
9:00 Thu,Jun 21,2018 16:00 1 Possible Approved
8:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 14:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 1,2) Postponed
10:00 Fri,Jun 22,2018 14:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 Postponed
Sub to division of loads and wind generation
Other #s will cater the load
Sub to load condition
Sub to TSD and # kept radial from other end.
Sub to other 2 #s load condition and wind generation
Other Auto and 110 Tie #s will cater the load
1) No TSD relief. 2) Unjanai 110KV bus sec lc recommended
Subject to EE/SLDC/ERD concurrence
Other autos will cater the load
TSD insufficient and Unjanai 110KV bus sec lc recommended
Subject to EE/SLDC/ERD concurrence
9:00 Fri,Jun 22,2018 11:00 1 Possible Sub to TSD Approved
9:00 Fri,Jun 22,2018 16:00 1 POssible Approved
9:00 Fri,Jun 22,2018 14:00 1 Possible Sub to TSD Approved
9:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 1,2,3) Possible Approved
9:00 Fri,Jun 22,2018 14:00 1 Possible Approved
9:00 Fri,Jun 22,2018 16:00 1 Possible Approved
9:00 Sat,Jun 2,2018 18:00 1 Approved
Sub to other autos load condition and wind generation
Sub to 230KV Dvkurichi - TAQA # tie .
1)Sub to 230KV Dvkurichi - TAQA # tie . 2,3)Sub to TSD and divition of loads
Main bus will be in service
Other 2 #s will cater the load
1,2,3) Postponed
No OCC approval (Approved on 02.06.2018 Sl no. 111/112)
9:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 14:00 1 Possible Approved
10:00 Fri,Jun 22,2018 17:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 1,2) Possible Approved
9:00 Fri,Jun 22,2018 16:00 1 Possible Sub to TSD relief Approved
9:00 Fri,Jun 22,2018 16:00 1 Possible Approved
9:00 Fri,Jun 22,2018 17:00 1 Approved Sub to bus voltage Approved
Sub to load condition
Sub to # kept radial from other end
Sub to load condition and wind generation
Sub to TSD relief and other Autos load condition
Sub to load and wind generation
9:00 Sat,Jun 23,2018 17:00 1 Possible Approved
9:00 Sat,Jun 23,2018 14:00 1 Possible Approved
9:00 Sat,Jun 23,2018 14:00 1 Possible Approved
9:00 Sat,Jun 23,2018 16:00 1 Possible Approved
10:00 Sun,Jun 24,2018 14:00 1 Possible Approved
Sub to availability of ICT 4 (143rd OCC approved Sl no.240)
Sub to TSD and transfer of traction loads
Sub to other autos load condition
143rd OCC approved Sl no.187
Sub to Grid condition
9:00 Sun,Jun 24,2018 17:00 1 Possible Approved
8:00 Sun,Jun 24,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 3 Possible Approved
9:00 Sun,Jun 24,2018 16:00 1 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Sub to TSD Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 15:00 1 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
Sub to grid condition. Kundha palam level kapt at minimum level and and Pegumbellah level to be kept at FRL
Sub to grid condition
Sub to grid condition
Sub to other autos load condition and wind generation
Sub to load condition and wind generation
Sub to load condition
Sub to other auto load condition
Sub to load condition
9:00 Mon,Jun 25,2018 17:00 1 Possible Sub to TSD Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Sub to TSD Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
8:00 Mon,Jun 25,2018 17:00 1 Possible Standby unit Approved
9:00 Mon,Jun 25,2018 17:00 1
9:00 Mon,Jun 25,2018 14:00 1 Possible Approved
9:00 Mon,Jun 25,2018 15:00 1 Possible Approved
10:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 16:00 1 Possible Approved
230KV Bus A will be in service
1)Possible 2)Postponed
1) Sub to load condition. 2) No TSD relief
1Approved 2. Postponed
Sub to equal division of loads.
Sub to SRLY concurrence and #2 will be in service
Sub to wid generation
Sub to # kept radial from other end
9:00 Mon,Jun 25,2018 17:00 1 Possible Sub to TSD Approved
8:00 Mon,Jun 25,2018 16:00 1 Possible Approved
8:00 Wed,Jun 27,2018 17:00 3 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 17:00 1 Possible Approved
9:00 Mon,Jun 25,2018 16:00 1 Possible Approved
9:00 Tue,Jun 26,2018 14:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Postponed No OCC approval
Sub to SPH1 and SPH2 generation
Sub to continuous wind generation
Sub to TSD and # kept radial from other end.
Sub to other Autos load condion
143rd OCC approved Sl no.190
Sub to load condition and wind generation
Sub to load condition and wind generation
Subject to EE/SLDC/ERD concurrence
9:00 Tue,Jun 26,2018 15:00 1 Possible Sub to TSD Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
8:00 Tue,Jun 26,2018 17:00 1 Possible Approved
Sub to equal division of loads.
Sub to TSD and other auto load condition
Sub to load condition
143rd OCC approved Sl no. 195
Sub to TSD and # kept radial from other end.
9:00 Tue,Jun 26,2018 17:00 1 Possible Sub to TSD Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Repeat Cancelled
9:00 Tue,Jun 26,2018 17:00 1 Repeat Cancelled
9:00 Tue,Jun 26,2018 17:00 1 Repeat Cancelled
8:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
143rd OCC approved Sl no. 243
Sub to load condition
Sub to load condition
Sub to load condition
9:00 Tue,Jun 26,2018 15:00 1 Possible Approved
10:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 16:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Possible Sub to TSD Approved
9:00 Tue,Jun 26,2018 14:00 1
9:00 Tue,Jun 26,2018 14:00 1 Possible Approved
10:00 Tue,Jun 26,2018 16:00 1 1,2) Possible Approved
10:00 Tue,Jun 26,2018 17:00 1 Possible Approved
8:00 Tue,Jun 26,2018 17:00 1 Possible Approved
Sub to SRLY concurrence and #1 will be in service
Sub to wid generation
Sub to # kept radial from other end
Sub to load condition
1)Possible 2)Postponed
1) Sub to Auto 1 load conditionwith SPH1 & SPH2 Gen 2) No TSD relief
1)Approved 2)Postponed
Other # s will cater the load
1) 143rd OCC approved Sl no. 246. 2) Bus B will be in service
Sub to load condition
Sub to load condition
9:00 Tue,Jun 26,2018 17:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 1,2) Possible Approved
9:00 Tue,Jun 26,2018 14:00 1 Possible Idle line Approved
9:00 Tue,Jun 26,2018 16:00 1 Possible Approved
9:00 Tue,Jun 26,2018 16:00 1 Possible Sub to TSD relief Approved
9:00 Tue,Jun 26,2018 16:00 1 Possible Approved
9:00 Tue,Jun 26,2018 17:00 1 Wrong entry Cancelled
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
Sub to load condition
1,2) Sub to TSD and load condition
Sub to TSD and load transfer.
Sub to wind generation
No OCC approval (Approved on 143rd OCC / Slno. 198)
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
8:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
Sub to TSD and load transfer.
Sub to # kept radial from other end
Sub to load condition
Sub to # kept radial from other end
143rd OCC approved Sl no. 250
1)Possible 2)Postponed
1) Sub TSD . 2)TSD insufficient
1)Approved 2)Postponed
Sub to load condition
9:00 Wed,Jun 27,2018 17:00 1 Possible TSD insufficient Approved
9:00 Wed,Jun 27,2018 16:00 1 Possible Approved
9:00 Wed,Jun 27,2018 16:00 1 1,2) Postponed No TSD relief
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
10:00 Wed,Jun 27,2018 15:00 1 Possible Sub to TSD Approved
9:00 Wed,Jun 27,2018 14:00 1 Possible Approved
10:00 Wed,Jun 27,2018 17:00 1 Possible Approved
8:00 Wed,Jun 27,2018 17:00 1 Possible Approved
7:00 Wed,Jun 27,2018 17:00 1 Possible Approved
143rd OCC approved Sl no.198
Subject to EE/SLDC/ERD concurrence
Sub to load condition
Sub to PUSHEP generation
Sub to SRLY concurrence. Traction tfrd to #2
Sub to wind generation
Sub to grid condition
Sub to PWD demand
9:00 Wed,Jun 27,2018 16:00 1 Postponed
9:00 Wed,Jun 27,2018 14:00 1 Possible Approved
8:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 17:00 1 Possible Approved
9:00 Wed,Jun 27,2018 16:00 1 Postponed No TSD relief
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 15:00 1 Possible Approved
TSD Relief in sufficient
Subject to EE/SLDC/ERD concurrence
Sub to PUSHEP generation
Main bus will be in service
Sub to load condition
Subject to EE/SLDC/ERD concurrence
Sub to load condition
Sub to load condition
Sub to load condition
Sub to load and wind generation
Sub to load condition
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 12:00 1 Possible Approved
9:00 Thu,Jun 28,2018 14:00 1 Possible Sub to TSD Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 1,2) Sub to TSD Approved
10:00 Thu,Jun 28,2018 15:00 1 Possible Sub to TSD Approved
8:00 Thu,Jun 28,2018 17:00 1 Possible Approved
10:00 Thu,Jun 28,2018 17:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Approved
Sub to TSD and load condition
Sub to # kept radial from other end
110 KV BUS A WILL BE IN SERVICE
1,2) pOSSIBLE
Sub to load condition
Sub to wind generation
Sub to TSD and # kept radial from other end.
9:00 Thu,Jun 28,2018 14:00 1 Possible Approved
9:00 Thu,Jun 28,2018 14:00 1 Possible Sub to TSD Approved
8:00 Thu,Jun 28,2018 17:00 1 Repeat Cancelled
9:00 Thu,Jun 28,2018 17:00 1 Repeat Cancelled
9:00 Thu,Jun 28,2018 16:00 1 Possible Approved
9:00 Thu,Jun 28,2018 17:00 1 Possible Sub to TSD Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
Sub to other Autos load condition
Sub to wind generation
Sub to load condition
Sub to load condition and wind generation
Sub to load condition
9:00 Fri,Jun 29,2018 14:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Postponed TSD insufficient
8:00 Fri,Jun 29,2018 17:00 1 Postponed TSD insufficient
9:00 Fri,Jun 29,2018 12:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
Sub to equal division of loads.
Sub to load condition
Subject to EE/SLDC/ERD concurrence
Subject to EE/SLDC/ERD concurrence
Sub to # kept radial from other end
Sub to load condition
Sub to TSD and transfer of Hasthampatty to Slm230
143rd OCC approved Sl no. 258
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
10:00 Fri,Jun 29,2018 17:00 1 Postponed
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Fri,Jun 29,2018 16:00 1 Postponed
9:00 Fri,Jun 29,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 12:00 1 Possible Sub to load transfer Approved
Sub to load condition
Sub to load condition
Sub to load condition
Already 3 days approved from 25.06.2018 to 27.06.2018
Subject to EE/SLDC/ERD concurrence
Sub to TSD and load condition
Already 3 days approved from 25.06.2018 to 27.06.2018
Subject to EE/SLDC/ERD concurrence
Sub to Thalavadi TSD
Sub to 230KV Dvkurichi - TAQA # tie .
Sub to 230KV Dvkurichi - TAQA # tie .
13:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Idle bus Approved
9:00 Sat,Jun 30,2018 17:00 1 Postponed
10:00 Sat,Jun 30,2018 16:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Approved
8:00 Sat,Jun 30,2018 17:00 1 Possible Standby unit Approved
8:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 16:00 1 Wrong entry Cancelled
Sub to load condition
To be scheduled with TSD
Subject to EE/SLDC/ERD concurrence
Sub to load condition
143rd OCC approved Sl no.261
Sub to load condition
10:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Sub to TSD Approved
9:00 Sat,Jun 30,2018 15:00 1 Approved Sub to bus voltage Approved
9:00 Sat,Jun 30,2018 17:00 1 Possible Approved
9:00 Sat,Jun 30,2018 17:00 1 Postponed No TSD relief
9:00 Sat,Jun 30,2018 16:00 1 Possible Approved
9:00 Sat,Jun 30,2018 16:00 1 Possible Approved
Sub to wind generation
Sub to load condition
Subject to EE/SLDC/ERD concurrence
Sub to load condition
Sub to load condition
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
P_Id From Feeder Equipment Purpose
1 72408 110 KV Theni - Sempatti II # Line
2 73163 EE/O/SBT 110KV Capacitor bank I & II one by one Monthly maintenance work
3 72200 EE/O/PSQ
4 71935
5 72054 For monthly maintenance .
671707 For Monthly Maintenance Work
7
73000 110KV Capacitor bank II Breaker
S. No.
Name of SS
EE/O/ THENI
then I 230 KV
jumper rectification work at Loc T 27 & Tree cutting work ,
SEMBATTY 230 KV
PASUMALAI 230
KV
1)110 KV Pasumalai - Sembatty Feeder BKR & CT,LI only section between
Pasumalai and Achampathu SSMaintenance Works of BKR &
CT, LI only.
400KV KANARPAT
TIkanarpatti 400 KV
400 kv Abisekapatti # with line Isolator Bay no 401 & 402(entire line)
For Monthly Maintenance Work and Abishekapatti feeder relay
checking.
EE/O/SANKANERI
SANKANERI 230
KV110KV Sankaneri-Udayathur feeder
Breaker CTS&Lineswitches.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400KV Kanarpatti -1 feeder Main Breaker (403-52) & CT only
EE/O/THIRUVARUR
THIRUVARUR 230 KV
Maintenance and anual relay test work
8
73149 EE/O/PDKT AUTO I, HV I, LV I ,
9
71841
10
72358 EE/O/CKNI For Line Maintenance Work
11
72413 Monthly Mtc
PUDUKOTTAI 230 KV
The Existing 100 MVA,230/110/11 kV Auto transformer has to be replaced for placing the new 160 MVA, 230/110 KV Auto transformer.
EE/O/KODIKURICHI
KODIKURICHY 230 KV
1.110 KV Tenkasi - Papanasam # Breaker with CT & Isolators 2.110KV Kodikurichi -Tenkasi - Papanasam # i) Section between Tenkasi - Kadayam
1.For Monthly Maintenance Works. 2.For replacement of defective disc and long rod at Loc No:6,7,9,47,48,50 &65
CHECKANURANI SW STATION 230 KV
230 KV Kinnimangalam-Pasumalai feeder entire
EE/O/ THENI
then I 230 KV
230 KV Auto Transformer I , HV & LV Breaker with CT
12
72421 230KV KNMLM-PASUMALAI # Entire
13
72431 Auto Transformer III
1472055 AUTO TR II HV II&LV II Bkr,CT&LAS Monthly Mtce work.
15
72057 110KV ALKL-PASUMALAI I # Bkr&CT, Monthly Mtce work
16
72061 Tree cutting works
1772515 EE/O/KKDI 110KV KKDI-link # Entire Tower to tower inspection
1873164 EE/O/SBT
1972171
2072192 EE/O/PSQ
21
71881 Monthly Maintenance works.
2271936 For Monthly Maintenance Work
23
72876 EE/O/APKM
EE/O/KNMLM
kinnimangalam 230 KV
Monthly maintenance works for breaker , CT and Line Isolator
EE/O/VALUTHUR
VALUTHUR 230 KV
For Attending Oil leak in Auto Transformer III HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
EE/O/Alagarkoil
ALAGARKOIL 230 KV
EE/O/Alagarkoil
ALAGARKOIL 230 KV
EE/O/Alagarkoil
ALAGARKOIL 230 KV
110KV ALKL-PASUMALAI I # Section bet Alkl and IT PARKSS
KARAIKUDI 230 KV
SEMBATTY 230 KV
230KV SBT - Myvadi # Bkr, CTs and line entire
Erection of 230KV LAS structure under PSDF scheme
EE/O/KAVANOOR
KAVANOOR 230 KV
110KV KAVANOOR-RSMADAI # Section between KAVANOOR R.S.MADAI SS
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
PASUMALAI 230 KV
230 KV Pasumalai - Kinnimangalam # BKR & CT,LI only
Maintenance Works of BKR & CT,LI
EE/D/R/Tirunelveli
Uthumalai 110 KV
110KV Vannikonendal SF6 Breaker with CTs
400KV KANARPATTI SS
Kanarpatti 400 KV
110KV Uthumalai feeder breaker and CT Bay no 108
ANUPPANKULAM 230 KV
110 KV APKM - Thulukkapatti I feeder Br., CT at both ends and Line entire.
(a) For Monthly Maintenance Works (b) For Monthly Maintenance Works at Thulukkapatti SS
24
72550
25
72633 110 KV Kanarpatti Uthumalai feeder
2672698 EE/O/SRP Tree clearance work
27
73116 110KV Kayathar Feeder
28
73118 110KV Melakaloor #
29
72380
30
72384
31
72029
32
72036
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - Eppodhumvendran # breaker with CT
a) Monthly Maintenance work b) Defective disc replacement by Lines and 230KV 10/1 line crossing stringing works loc 102-103by M/S SUZLON
EE/O/Kayathar
KAYATHAR 230 KV
Jumper joint tightness on tension locations
SRPUDUR 230 KV
110 KV KDR-KYTR # section between KDR to Veeranallur and 110 KV KDR-MLKR # section between KDR to MLKR
EE/PHS/KDR
KODAIYAR PH-2
GRT breaker testing and monthly maintenance of breaker, CT
EE/PHS/KDR
KODAIYAR PH-2
GRT breaker testing and monthly maintenance of breaker, CT
EE/O/EACHANGADU
EACHANGADU 230 KV
80 MVA ,Auto Transformer I &HV I, LV I Breaker,CT's & their related Equipments
For Monthly maintenance works.
EE/O/EACHANGADU
EACHANGADU 230 KV
110 kv Pennadam (Radial) Feeder BREAKER , CT'S.
FOR MONTHLY MAINTENANCE WORK.
EE / O / KMU
kumbakonam 230 KV
110 KV Sakkottai I feeder breaker, C.T's, and Line isolator.
To carry out monthly maintenance works.
EE / O / KMU
kumbakonam 230 KV
110 KV Kovilvenni feeder Breaker, C.T's and Line isolator.
To carry out monthly maintenance works.
33
72042
3472507
35
72086
36
72814
EE / O / KMU
kumbakonam 230 KV
110 KV Sakkottai - KGTPS feeder line Loc No: 90 to 144.
For carrying out tree clearance and line maintenance works from Loc No: 90 to 144.
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV KOVILUR TRICHY FEEDER SECTION BETWEEN KOVILUR AND ERIODE
Jumper replacement at location 110/14
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110 KV SMPM-Kallakudi -II # CT's , Breakers and entire line portion (tied feeder) .
1. For monthly maintenance works . 2. EHT Lines inspection Work. 3. GRT relay test
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
110 KV Alundur - Thanjavur Feeder breaker,CT's, and Bus Coupler & Line Section between 110 KV Thiruverumbur SS to 110 KV K.Sathanoor SS.
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work by AEE/Lines/Trichy. c)Relay testing work.
37
72625
38
73001
39
73043
4073117 For monthly maintenance work
41
72144 230KV Eastern side bus LC
42
72146
43
72417 110 KV Theni - Periyar I # entire Line
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A)AUTO TRANSFORMER-II, HV-II, LV-II BREAKERS AND CT's. B) 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-I FEEDER BREAKER, CT's AND LINE ISOLATOR. C) 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-I FEEDER ENTIRE. D) 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-I FEEDER BREAKER, CT's.
A) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI. B) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI. C) FOR PREMONSOON WORK BY AE/LINES /PATTUKKOTTAI. D) ANNUAL RELAY TESTING BY AEE/P&C/THANJAVUR.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Mannarkudy feeder and Breaker
110KV Mannargudy Breaker, CT's & Line side Isolator maintenance work and EHT line pre mansoon work
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur Link - 2 feeder, breaker, CT & LI
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection and rectification works by the AEE/Lines/Thanjavur
EE/O&M/THANJAVUR
Thanjavur 110 KV
110kv TJR-LINK II Feeder Br and its line isolator
EE/O/Kadalangudy
KADALANGUDI 230 KV
To attend glow in y-phase bus side isolator in 230KV Kumbakonam #
EE/O/KADALANGUDY
KADALANGUDI 230 KV
110KV Kadalangudy-KGTPS feeder entire
1)To replace damaged conductor in B-phase line side dropper jumper 2)line inspection work
EE/O/ THENI
then I 230 KV
For rearrangment of jumpers at Tapping switch of KMPM WFSS & Mtce of line tapping switch
44
72442 Auto Transformer II
4572062 Monthly Mtce, line patrol work
46
72516
4772519 EE/O/KKDI
48
73203
4972172 230 KV KAVANOOR-KARAIKUDI #1
50
72193 EE/O/PSQ
5172255 PERIYAR
52
71842 For Monthly Maintenance Work.
53
71844
54
72387 TTPS
EE/O/VALUTHUR
VALUTHUR 230 KV
For Attending Oil leak in Auto Transformer II HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
EE/O/Alagarkoil
ALAGARKOIL 230 KV
230 KV ALKL-Pasumalai # Bkr,CT,&Line entire
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV renganathapuram sempatty I feeder breaker CT and relays
Monthly maintenance of breaker CT GRT relay testing work
KARAIKUDI 230 KV
230KV KKDI- KVNR-‘1’ # Bkr & CT's & line entire
1. Monthly maintenance works of BKR, CT's and GRT relay testing 2. Tower to tower inspection
EE/O/VALUTHUR
VALUTHUR 230 KV
(1)110KV VTR-SAI#2 entire (2)110KV VLTR-CORAMANDAL# entire (3) 110KV VLTR-VGTPS Ph II Line 3 # entire.
For bay shifting works in 110KV Bus @ VALUTHUR 230KV SS. (1)110KV SAI#2 will be shifted from Bay 3 to Bay 4 (2) 110KV CORAMANDAL# will be shifted from Bay 4 to Bay 5 (3) 110KV VGTPS Ph II Line 3 # will be shifted from Bay 5 to Bay 3. To maintain system stabiity , as per request from VGTPS.
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
PASUMALAI 230 KV
1) 230 KV Pasumalai - Alagarkoil # BKR & CT, LI only 2)Line Entire..
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works
EE/PHS/PERIYAR
110 KV PERIYAR-THENI 1 BREAKER CT AND LINE SIDE AB SWITCH
FOR MONTHLY MAINTENANCE WORKS
EE/O/KODIKURICHI
KODIKURICHY 230 KV
230 KV Amuthapuram I # Breaker with CT & Line Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
"110KV Kodikurichi -Tenkasi - Papanasam # i) section between 110 KV Kadayam SS -papanasam PH -Rastha SS "
i) For Replacement of Defective Disc at loc 36,37,41,83,92,93(Main Line)
EE/EM-I/TTPS
230KV TTPS- AUTO SS- I FEEDER ENTIRE
Annual maintenance and testing of WBCT & LAs and quarterly maintenance Work
5571943 EE/O/TTN
56
72401 EE/O/AMPM
57
72879 EE/O/APKM
58
72551
59
72656
6072678 EE/O/TTN On 230KV TTPS - Auto - I feeder Entire.
61
72703 EE/O/SRP
62
71831
63
71968 TRICHY
64
72822
TUTICORIN -AUTO 230 KV
230KV TTN - TTPS - I feeder breaker with CT bus & Line side switches
For Monthly Maintenance Works
AMUTHAPURAM 230 KV
Amuthapuran-Kodikurichi-1 230KV #,breakers,CT's and its isolators
Monthly Maintenance Work and Annual Relay Testing Work
ANUPPANKULAM 230 KV
110 APKM - T. Kallupatti # Br., CT. and line Switch
Monthly Maintenance Works of BKR & CT, Line switch only.
EE/O/Kayathar
KAYATHAR 230 KV
110 KV kayathar - Kodikurichi #, breaker with CT and Lines section between Kayathar and Therkupatty
"a) For monthly maintenance work & line switch maintenance work b) Lines -defective disc replacement work "
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Melakkallur - Sankanery feeder section between Melappalayam and Karisalpatti
defective disc replacement work
TUTICORIN -AUTO 230 KV
Tower to Tower Inspection and Rectification work.
SRPUDUR 230 KV
110 KV SNRI-MLKR # section between Annanager and Vallioor
Monthly Maintanace work,Tree clearance work
EE/O/Mondipatty
Mondipatti 230KV
80MVA, 230/110KV Auto Transformer, HV & LV Breakers and their CT's only
For monthly maintenance works and P&C testing.
TRICHY 230 KV
110KV TRICHY - ALUNDUR I Feeder breaker, CTs and line isolators and line entire
1. For monthly maintenance works . 2. Premonsoon inspection. 3. Relay Testing
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
110KV Alundur - Trichy-I Feeder breaker,CT's, and Line Isolators.
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work. c)Relay testing work.
65
72826
66
73002 230KV Bus coupler breaker
67
72145 230KV Bus bar protection panel
68 72478 Monthly Mtce of breaker & CT
6972064 110KV ALKL-Sembatty I # Bkr with C.T, Monthly Mtce work
70
72527 EE/O/KKDI
71
72552
72
73147 EE/O/PSQ
7372173 230KV/110KV AUTO TRANSFORMER -I
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
100 MVA Auto Transformer - II ,HV-II,LV-II Breaker's, CT's and Isolators.
a) Monthly maintenance work. b) Tan Delta test by the EE/P&C/Madurai. b) Relay Testing work.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
230KV BUS Coupler Breaker LC for maintenance work
EE/O/Kadalangudy
KADALANGUDI 230 KV
To replace the existing static 230KV bus bar protection panel complete set with new 230KV numeric bus bar protection panel
EE/O/ THENI
then I 230 KV
110 KV Theni – SEMPATTY I & II # Breaker with CT One by one
EE/O/Alagarkoil
ALAGARKOIL 230 KVKARAIKUDI 230 KV
110KV KKDI –SVGA# Bkr & Ct’s & S/B KKDI-Mpty SS
1. Monthly maintenance works of bay equipments, annual GRT relay test 2.Tower to tower inspection and tree cutting works
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
1.110 KV renganathapuram - pugalur feeder breaker CT and relays
Monthly maintenance grt relay testing tree cutting
PASUMALAI 230 KV
110 KV Pasumalai - (Tirumangalam)-Kinnimangalam 3 # Line LC section between Kappalur and Tirumangalam SS
Strengthening of SC line on SC towers with Leopard conductor into 110KV SC line on DC towers with panther conductor from Loc.39A (Kappalur SS Tapping Loc) to Tirumangalam SS to be executed by TLC wing
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T
74
72201 EE/O/PSQ
75
71845
76
72393 TTPS 230KV TTPS- STERLITE FEEDER ENTIRE
77
71981 For monthly maintenance work.
7872067 For monthly maintenance .
79
71708 For Monthly Maintenance Work.
80
72880 EE/O/APKM
81
72553
8272881 EE/O/APKM For monthly maintenance work.
PASUMALAI 230 KV
110 KV Pasumalai - (Tirumangalam) -Kinnimangalam 3 # BKR & CT,LI only. section between Pasumalai and Kappalur SS
Maintenance Works of BKR & CT,LI
EE/O/KODIKURICHI
KODIKURICHY 230 KV
"110KV Papanasam -O.T.Patti # i) section between V.K.Puram - Papanasam"
i) For Replacement of Defective Disc at various locations & Restringing of Earth wire at loc 8 to 9
EE/EM-I/TTPS
Annual maintenance and testing of WBCT & LAs and quarterly maintenance Work
EE/O/230KV Sipcot SS/MVTN/TTN
STERILITE SW STATION 230 KV
On 230 KV Sterlite – TTPS feeder breaker with CTs and line isolators only.
EE/O/SANKANERI
SANKANERI 230 KV
230kv Sankaneri - Kayathar # breaker CTs and Line Swiches.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Karaikudi-1-# Main Breaker (407-52), Reactor Breaker (407-52R),REACTOR & CT, CVT and line entire
ANUPPANKULAM 230 KV
110KV APKM - NSPM feeder Breaker and CT at both ends and line entire.
(a) For Monthly Maintenance Work. ( b) For Monthly Maintenance Work at NSPM SS. © For replacement of flash over disk at Loc. No: 2,14.
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Sanganeri # breaker with CT, Lines entire
a) Monthly Maintenance work b) Lines defective disc replacement work and jumper joint rectification work
ANUPPANKULAM 230 KV
110 KV PSQ - Thulukkapatti feeder BKR & CTs only.
8372685 EE/O/TTN On 230KV TTPS - Sterlite feeder Entire.
8472707 EE/O/SRP Tree clearance work
85
73104 110KV Link Feeder
86
71969 TRICHY
87
72088
88
72829
8971792 NT KUDI FEEDER NO II (VIA MADUKKUR)
90
72640
TUTICORIN -AUTO 230 KV
Tower to Tower Inspection and Rectification work.
SRPUDUR 230 KV
110 KV KDR PH I and KDR PH II Link feeder
EE/PHS/KDR
KODAIYAR PH-2
GRT Breaker Testing and Monthly maintenance of breaker, CT
TRICHY 230 KV
230 KV TRICHY - ALUNDUR I Feeder breaker,CTs, Line isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection. 3. Relay Testing
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110KV Samayapuram - Trichy Grid feeder breaker, CT's and line portion between 230KV Samayapuram SS and 110KV Poovalur SS.
1. For monthly maintenance works . 2. EHT Lines inspection Work.
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
230KV Alundur -Trichy I feeder breaker, CT'S, CVT'S and line isolators.
a) Preventive Monthly maintenance work. b) 3 Nos 230 KV CTs replacement work under PSDF scheme. c)premonsoon inspection and tree cutting work. d) Relay Testing Work.
AEE/OPERATION
KOVILKALAPAL
FOR PERIODICAL MAINTENANCE
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
110KV NEMMELI THIPPIYAKUDI-MADUKKUR-THIRUMAKKOTTAI-T(K)GTPS FEEDER (LP: 110KV THIRUMAKKOTTAI SS TO T(K)GTPS).
FOR PREMONSOON INSPECTION BY AE/LINES/PATTUKKOTTAI.
91
73003
92
72147
9372148 110KV Palaiyur-Aduthurai feeder entire Line inspection work
94
72314 EE/O/CKNI 230 KV Bus-A Entire For Monthly Maintenance Work.
9572444 110 KV PENNA-Kavanoor feeder entire
9672485
9772530 EE/O/KKDI Monthly maintenance works
9873165 EE/O/SBT
9972174 110kv KAVANOOR-PENNA #
100
72198 EE/O/PSQ
101
72202 EE/O/PSQ
102
71846
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - KGTPS Express feeder and breaker
110KV KGTPS Breaker, CT's & Line side Isolator maintenance work and EHT line premansoon inspection work
EE/O/KADALANGUDY
KADALANGUDI 230 KV
230KV PPN-Thiruvarur &230KV PPN-Thanjavur feeder entire
1)Insertion of tower between location 54-55 by TLC wing 2)Line inspection work
EE/O/KADALANGUDY
KADALANGUDI 230 KVCHECKANURANI SW STATION 230 KV
EE/O/VALUTHUR
VALUTHUR 230 KV
For attending Tower to Tower Inspection and Tree cutting work
EE/O/ THENI
then I 230 KV
110 KV Theni – SEMPATTY I # Line 110 KV TNI -SPT # Isec bet Theni & ayyampalyam
Monthly Mtce, Tree cutting work & Mtce of Line isolators at Vaigai ss
KARAIKUDI 230 KV
230/110KV, 50MVA AUTO TRANSFORMER-1 & its allied equipments
SEMBATTY 230 KV
110KV SBT - Alagarkovil II # Bkr and CTs only
Monthly maintenance work and attending of oil leak in "R" phase CT primary bushing.
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T
PASUMALAI 230 KV
100 MVA AUTO - 1, HVB - I, LVB - I, CT only.
1) Monthly Maintenance Works 2) Replacement of damaged control cables by new ones from the newly erected junction box to LV breaker, CTs and carrying out other allied testing works by AEE/ P&C wing Pasumalai
PASUMALAI 230 KV
1)110KV Pasumalai - Alagarkoil -1 # BKR & CT, LI . 2) Lines LC section between Pasumalai -Vandiyur SS.
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works and T-T Inspection works.
EE/O/KODIKURICHI
KODIKURICHY 230 KV
"1.230 KV Amuthapuram II # Breaker with CT & Line Isolators 2.230 KV Amuthapuram II # Entire line "
"1.For Monthly Maintenance Work. 2.Replacement of Defetive insulator at various locations "
10371938 For Monthly Maintenance Work
10471945 EE/O/TTN
105
72395 TTPS Quarterly maintenance Work
106
72402 EE/O/AMPM
10771709 For Monthly Maintenance Work
108
72555
109
72556
110
72882 EE/O/APKM For Monthly Maintenance Work.
11172697 EE/O/TTN
400KV KANARPATTI SS
kanarpatti 400 KV
400 kv Future and Tie Breaker with CT Bay no 402 and 403
TUTICORIN -AUTO 230 KV
230KV TTN - TTPS - II feeder breaker with CT bus & Line side switches
For Monthly Maintenance Works
EE/EM-I/TTPS
230KV TTPS- AUTO SS-II FEEDER ENTIRE
AMUTHAPURAM 230 KV
Amuthapuran-Kodikurichi-2 230KV #,breakers,CT's and its isolators
Monthly Maintenance Work and Annual Relay Testing Work
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230KV Sangaraperi 1 # Main Breaker (212-52) & CT,CVT
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Veeranam # breaker with CT
a) Monthly Maintenance work b) Lines premonsoon inspection
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Main Bus beyond switch no.52( Bus controlled by 110 KV SS)
" For monthly maintenance work Line switch Maintenance work "
ANUPPANKULAM 230 KV
100 MVA AUTO TR. II, HV-II and LV-II Breaker with CT only.
TUTICORIN -AUTO 230 KV
230KV TTPS- AUTO SS-II FEEDER ENTIRE
Tower to Tower Inspection and Rectification Work
112
72710 EE/O/SRP
113
72970 EE/O/APKM
114
72239 EE/O/VRNM Monthly maintenance work
115
71892
116
71899
117
71971 TRICHY
11872049
SRPUDUR 230 KV
110 KV SRP-NGL # Br,CT,Line Switch and Line entire
Monthly Maintenance work, Tree clearance work,for providing numerical distance protection relay.
SAVASPURAM
230/ 110KV,100MVA Auto Transformer -I ,230KV HV Breaker & 110KV LV Breaker
To carry out the Monthly Maintanence Works
VEERANAM 230 KV
230kv veeranam-kayathar feeder currenttransformer with lineswitch
EE/O/Pugalur
PUGALUR 230 KV
230 KV Pugalur - Paramathy I feeder Breaker, CT & line switch& entire line only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
230 KV Pugalur - Pudansanthai feeder Breaker, CT, Line switch
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
TRICHY 230 KV
230 KV TRICHY - ALUNDUR II Feeder breaker,CTs, Line isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection. 3. Relay Testing
EE / O / KMU
kumbakonam 230 KV
110 KV Thirupurambiyam feeder breaker, C.T's Line isolator and CVT.
To carry out monthly maintenance works.
119
72832
12072764 EE/O/PBLR
121
73062 monthly maintenance
122
72315 EE/O/CKNI
12372434 Monthly Mtce work
12472066 110KV ALKL-Sembatty 2# Br& CT Monthly Mtce work
12573166 EE/O/SBT 110KV SBT - RNPM I # Bkr and CTs only Monthly maintenance work
126
72175 LINE MAINTENANCE WORK
127
72176 LINE MAINTENANCE WORK
12872194 EE/O/PSQ
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
230KV Alundur -Trichy II feeder breaker, CT'S, CVT'S and line isolators.
a) Preventive Monthly maintenance work. b)premonsoon inspection and tree cutting work. c)Relay Testing work.
PERAMBALUR 230 KV
230KV Perambalur-Jambunathapuram feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance works .
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
230KV Perambalur feeder breaker and CT
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Pasumalai feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
EE/O/ THENI
then I 230 KV
230 KV Auto Transformer II , HV & LV Breaker with CT
EE/O/Alagarkoil
ALAGARKOIL 230 KVSEMBATTY 230 KV
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KAVANOOR-VALINOKKAM-ARKAY # SECTION BETWEEN VALINOKKAM & KEELAKARAI
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KAVANOOR-VALINOKKAM-ARKAY # SECTION BETWEEN VALINOKKAM & KEELAKARAI
PASUMALAI 230 KV
230 KV Pasumalai - Checkanurani # BKR & CT,LI only
Maintenance Works of BKR & CT,LI
129
72203 EE/O/PSQ
130
71848 For Monthly Maintenance Work.
131
71850
13271947 EE/O/TTN
133
72423 EE/O/NNPT 110KV Kodikuruchi # Breaker with CT For Monthly maintenance work
13472452 MTCE & BREAKER TEST
135
71991 For monthly maintenance work.
13672073 For monthly maintenance .
137
71710 For Monthly Maintenance Work.
PASUMALAI 230 KV
1)110KV Pasumalai - Sakthi Sugars # BKR & CT, LI . 2) Line LC section between Pasumalai and Uranganpatty
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works and T-T Inspection works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Kodikurichi WF # Breaker with CT & Line Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV- Kodikurichi Veerasigamani I # (section between Kodikurichi - Eachantha)
For replacement of DEFECTIVE disc at location No.38,47,52,55
TUTICORIN -AUTO 230 KV
110KV TTN - Sipcot- II Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
NALLAPPANAYAKANPATTY 230 KV
EE/O/SANKANERI
UDAYATHUR 230 KV
230/33KV POWERTRANSFORMER IV ,HV & LV BREAKER & Its FEEDERS
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
110KV SIPCOT-TTN#II breaker with CTs only.
EE/O/SANKANERI
SANKANERI 230 KV
110K.V Sankaneri Melakallur # Breaker, CTs and Line Switches.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400KV BUS - 1 & Kanarpatti -1 feeder line entire , Tie Breaker (402-52)
138
71711 For Monthly Maintenance Work.
139
72840 110 KV RAMNAGAR SS(OT PATTY SS)
140
71794 EE/O/NNPT 110KV Kodikuruchi # Breaker with CT For Monthly maintenance work
141
72557
142
72884 EE/O/APKM
143
72712 EE/O/SRP
144
72447 MONTHLY MTCE WORKS
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Karaikudi-2 # Main Breaker (409-52),Reactor Breaker (409-52R),Reactor & CT and Line entire
EE/D/KALLIDAIKURICHI
O.Thulukkapatti 110 KV
1)For annual relay test work 2)Monthly maintenance work
NALLAPPANAYAKANPATTY 230 KV
EE/O/Kayathar
KAYATHAR 230 KV
On 110 KV Kayathar - Arumuganeri # breaker with CT and Lines work section between kayathar to palayamkottai SS
a) Monthly Maintenance work b) Tree clearance
ANUPPANKULAM 230 KV
a) 110 KV NNPTY - Kodikuruchi # section between NNPTY SS & Kadaiyanallore SS b) 110 KV NNPTY - Viswanathaperi # section between 110 KV NNPTY SS & Visvanathaperi SS
(a & b ) Earth wire cut rectification work between Loc No. 40 to 43
SRPUDUR 230 KV
110 KV SRP-KDR I feeder Br,CT,LS, Line section between SR Pudur to TKY Including Cheramangalam,Chemponvilai and Karungal spur line.
Monthly Maintenance work, Tree clearance work,
UDAYATHUR 230 KV
230/33KV POWER TRANSFORMER IV HV &LV BREAKER & ItS FEEDERS
145
71972 TRICHY
146
72072 230 KV Kadalangudy feeder breaker.
147
72089
148
72668
149
73004 110KV Thiruvarur - T.R.Pattinam feeder
150
72149
151 72150
15272883 EE/O/APKM
153
72316 EE/O/CKNI
15472422
TRICHY 230 KV
230 KV Trichy – Samayapuram feeder Breaker,CTs , Line Isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection. 3. Relay Testing
EE / O / KMU
kumbakonam 230 KV
To carry out monthly maintenance works.
EE/O/Samayapuram
SAMAYAPURAM 230 KV
230KV SMPM-TRICHY # Breaker & CT's , Line isolators and entire line portion.
1. For monthly maintenance works . 2. EHT Lines inspection Work. 3. GRT relay test
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A) AUTO TRANSFORMER-I, HV-I, LV-I BREAKERS AND CT's. B) 110KV Pattukkottai -Peravurani - Sethubavachitram Radial feeder. (LP: 110KV Pattukkottai SS to 110KV Sethubavachitram SS ). C) 110KV PERVURANI FEEDER BREAKER AND CT's.
A) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI. B) FOR PREMONSOON WORK BY AE/LINES /PATTUKKOTTAI C) ANNUAL RELAY TESTING BY AEE/GRT/THANJAVUR.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV T.R. Pattinam Breaker, CT's & Line side Isolator maintenance work and EHT line premansoon inspection work
ANUPPANKULAM 230 KV
230 KV Anuppankulam - Madurai feeder Br., CT., and Line switch only.
a) For monthly maintenance work
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani-Indbharath feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
EE/O/KNMLM
kinnimangalam 230 KV
110KV KNMLM - THENI 1 # section between 230KV KNMLM and 110KV CKNI
Monthly maintenance works for breaker, CT and Line Isolator
155
72448
156
72069 Monthly Mtce work
157
72569 EE/O/KKDI 1. Tower to tower inspection
158
72177
15972178 230 KV KAVANOOR-VALUTHUR #
160
72195 EE/O/PSQ
161
71851 For Monthly Maintenance Work.
162
71853
16371940 For Monthly Maintenance Work
16471949 EE/O/TTN
16572473
16671712 230 KV BUS Coupler For Monthly Maintenance Work.
EE/O/VALUTHUR
VALUTHUR 230 KV
230KV Valuthur - Kavanoor feeder entire
"1. For attending breaker and it's CT's and isolators Monthly Maintenance work. 2. For attending tower to tower inspection work. "
EE/O/Alagarkoil
ALAGARKOIL 230 KV
110KV ALKL-KOTTAMPATTY # (Radial) Bkr with C.T
KARAIKUDI 230 KV
110KV KVNR – SVGA # S/B SVGA – Manamadurai
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KAVANOOR-MMDU-SVGA # SEC. BET. KAVANOOR & MANAMADURAI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
PASUMALAI 230 KV
230 KV Pasumalai - Anupankulam # BKR, CT and LI only
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Veerasigamani II # Breaker with CT & Line Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Veerasigamani - Keelaveeranam # (ection between Veerasigamani - Uthumalai Idel line )
For Replacement of defective disc at loc no: 26,30,31,36
400KV KANARPATTI SS
kanarpatti 400 KV
110KV Alankulam feeder breaker with CT Bay no 111
TUTICORIN -AUTO 230 KV
230KV TTN - Kayathar Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
EE/O/SANKANERI
UDAYATHUR 230 KV
230/33KV POWER TRANSFORMER I HV & LV BREAKER & Its FEEDERS
1.Mtce work 2.Annual relay test & Contact resistance Test in HV breaker by GRT
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
167
72558
16872561
169
72886 EE/O/APKM For Monthly Maintenance Work.
170 72717 EE/O/SRP 100 MVA AUTO TR I HV I & LV I Br Monthly Maintenance work
171
73090 eephsppm For Monthly maintenance work
17272244 EE/O/VRNM Monthly maintenance work
173
71832
17472386 230 KV Bus Coupler Breaker
175
71973 TRICHY
17672087
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - TTN AUTO #, breaker with CT and entire line
a) Monthly Maintenance work b) Lines defective disc replacement work . C) GRT - annual relay test.
EE/O/Kayathar
KAYATHAR 230 KV
on 110 KV Kayathar - N.S.Puram breaker with CT, lines section between kayathar and vijayapuri
" For monthly maintenance work Line switch Maintenance work "
ANUPPANKULAM 230 KV
110 KV APKM - RJPM - I feeder Br., CT. and Line switch only.
SRPUDUR 230 KVPAPANASAM
110KV Papanasam - O.T Patti feeder breaker with CT.
VEERANAM 230 KV
PR TR-IV, HVBR-IV, LVBR-IV & 33KV FEEDERS OF MICON-7, Vestas 1, Vestas 2
EE/O/Mondipatty
Mondipatti 230KV
230 KV Mondipatty - Alundur feeder Breaker,CT's, Line isolator and entire line.
For monthly maintenance works, Line Inspection and P&C testing .
EE/O/EACHANGADU
EACHANGADU 230 KV
MONTHLY MAINTENANCE WORK
TRICHY 230 KV
1. 230KV Trichy - Jambunathapuram feeder Breaker , CTs, Line Isolator and line entire. 1. 230KV Trichy - Jambunathapuram feeder Breaker , CTs, Line Isolator and line entire.
1. Monthly maintenance works. 2. Premonsoon maintenance, 3. Relay Testing
EE / O / KMU
kumbakonam 230 KV
Auto Transformer -I, HV,LV breaker and LAS.
Monthly Maintenance works for Auto Transformer-I,HV,LV and LAS.
177
72092
178
72834
179
73006 230KV BUS II
180
73007
18172767 EE/O/PBLR
182
73060 230Kv Trichy feeder breaker and CT Monthly Maintanance
183 72440 Tree cutting works
18472258 PERIYAR
EE/O/Samayapuram
SAMAYAPURAM 230 KV
A) 110 KV Samayapuram - Siruganur feeder Breaker CT`s and line Isolator and entire line. B) 110KV Northern Bus entire.
1. For monthly maintenance works . 2. EHT Lines inspection Work. 3. GRT relay test
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
L.C. on 230KV Alundur - Mondipatty Feeder Breaker CT'S,CVT's and Line isolators
a) Preventive Monthly Maintenance Work. b) Relay testing Work c) Premonsoon Inspection Work.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
230KV BUS II LC for maintenance work and transfer of 230KV Main Bus I to Main Bus-II
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Narimanam - Nagapattinam feeder
EHT line premonsoon inspection work
PERAMBALUR 230 KV
230KV Perambalur-TAQA feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance works .
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
EE/O/ THENI
then I 230 KV
110 KV Periyar - K.G Patty-kayathar # line sec bet periyar-KG patty
EE/PHS/PERIYAR
110 KV PERIYAR - KG PATTY BREAKER, CT AND LINE SIDE AB SWITCH
FOR MONTHLY MAINTENANCE WORKS
185
72360 EE/O/CKNI For Line Maintenance Work
18672425 230KV KNMLM-TTPS # Entire
187
72456
188
72070 110KV ALKL-KKDI # Bkr with C.T
189
72071 Tree cutting works
19072564 EE/O/KKDI
19172179 230 KV KAVANOOR-KARAIKUDI # 2
19272180 230 KV KAVANOOR-KARAIKUDI # 2
193
71854
194
72403 EE/O/AMPM Monthly Maintenance Work
19571953 EE/O/TTN 80 MVA Auto Transformer- I HV-I, LV-I
CHECKANURANI SW STATION 230 KV
230 KV Kinnimangalam - TTPS feeder entire
EE/O/KNMLM
kinnimangalam 230 KV
Maintenance works of Breaker, CT and Line Isolator
EE/O/VALUTHUR
VALUTHUR 230 KV
110KV Kavanoor-Keelakarai-ARKAY feeder Section between ARKAY-Keelakarai
For attending tower to tower Inspection and Tree cutting work
EE/O/Alagarkoil
ALAGARKOIL 230 KV
Monthly Mtce work & Annual relay testing
EE/O/Alagarkoil
ALAGARKOIL 230 KV
110KV ALKL-KKDI # Section bet Alkl & Nspty
KARAIKUDI 230 KV
230KV KKDI- KVNR-2 # Bkr & CTs and Entire line
1. Monthly mtce works of bay equipments and annual relay test by GRT 2. Tower to tower inspection
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
EE/O/KODIKURICHI
KODIKURICHY 230 KV
On 110KV O.T.Patti-Kayathar # section between O.T.Patti SS - Setharpanallur SS
For Replacement of defective disc at loc no: 83 (R&Y) 102 & 95 (JB).
AMUTHAPURAM 230 KV
230/33KV Power transformer-1 HV,LV Breakers with CT's and its 33KV feeder
TUTICORIN -AUTO 230 KV
For Monthly Maintenance Works
196
71992
197
71993
198
72075 For monthly maintenance .
19972818 TTPS
200
72563
20172890 EE/O/APKM For monthly maintenance work.
20272895 EE/O/APKM 230 KV TTPS - Kinnimagalam # Entire
20372705 EE/O/TTN
20472721 EE/O/SRP
205
71975 TRICHY
206
73010 230KV Thiruvarur - PP.Nallur Breaker
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On230KV IBPGL feeder No 1 breaker with CTs only.
a) For monthly maintenance work. b) New 230KV Busbar Protection Panel Precommissioning work
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On230KV IBPGL feeder No II breaker with CTs only.
a) For monthly maintenance work. b) New 230KV Busbar Protection Panel Precommissioning work
EE/O/SANKANERI
SANKANERI 230 KV
230KV SANKANERI- S.R.PUTHOOR # BREAKER CTs and Line siwcthes.
EE/EM-III/TTPS
230KV TTPS - KINNIMANGALAM FEEDER ENTIRE
1)Erection of CVT's and Maintenance work by EM-III 2)Annual MRT Testing in breaker,CVT and LAS
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - Anupankulam # breaker with CT, Lines section between Kayathar and duraisamypuram SS
" For monthly maintenance work Line switch Maintenance work "
ANUPPANKULAM 230 KV
110 KV APKM- Rajapalayam - II feeder Br., CT. and Line Switch only
ANUPPANKULAM 230 KV
For replacement of flash over disk at Loc. No : 406,407,409,412,413,397,399,388
TUTICORIN -AUTO 230 KV
On 230KV TTPS - Kinnymangalam Feeder entire
Tower to Tower Inspection and Rectification Work
SRPUDUR 230 KV
230 KV SR Pudur-SNRI feeder Br,CT,Lines entire.
Monthly Maintenance work, Tree clearance work,For CVT erection work and testing by P & C.
TRICHY 230 KV
100MVA Auto Transformer I, LV I BR, HV & LV LAS, LV CTs and Isolators.
1. Monthly maintenance works. 2) Relay Testing.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
230KV PPN Breaker, CT's & Line side Isolator maintenance work.230KV Thiruvarur breaker,CTs and CVTs at PPN end
207
73011 110KV Kudavasal - Kovilvenni feeder
208
73014 230KV Bus bar system
209
72772 EE/O/PBLR For monthly maintenance work
21072151 Line inspection work
211
72318 EE/O/CKNI
21272426 AUTO TRANSFORMER I Monthly maintenance work
213
72450
214
72537 EE/O/KKDI
215
73167 EE/O/SBT Monthly maintenance work
EE/O/THIRUVARUR
THIRUVARUR 230 KV
EHT line premansoon inspection work
EE/O/THIRUVARUR
THIRUVARUR 230 KV
cut out of 230KV Bus bar protection for replacement of old version 230KV Bus bar protection by a new version of 230KV Bus bar protection
PERAMBALUR 230 KV
110KV Perambalur-Koothur feeder(Ariyalur) Breaker CT's only
EE/O/KADALANGUDY
KADALANGUDI 230 KV
110KV KGTPS-Kumbakonam feeder portion between KGTPS and urban SS
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani-Theni feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
EE/O/KNMLM
kinnimangalam 230 KV
EE/O/ THENI
then I 230 KV
230 KV Theni-Chekkanurani # Br., C.T and line Isolator
Mtc of entire line For line mtc works & EARTH BONS Replacement &Line side CVT Erection work
KARAIKUDI 230 KV
110KV KKDI-TVNI-VLTR # Bkr & Ct’s & Line section B/W KKDI-TVNI
1. Monthly maintenance works of bay equipments and annual relay test by GRT 2. Tower to tower inspection
SEMBATTY 230 KV
110KV SBT - Alagarkovil I # Bkr and CTs only
216
72199 EE/O/PSQ
21771855 For Monthly Maintenance Work.
21871954 EE/O/TTN
219
71994
220
71995
221
71713 For Monthly Maintenance Work.
222
71796 EE/O/NNPT For Monthly maintenance work
22372566 A) Monthly Maintenance work
22472905 EE/O/APKM For Monthly Maintanance work.
PASUMALAI 230 KV
100 MVA AUTO - 2, HVB - II, LVB - II, CT only.
1) Monthly Maintenance Works 2) Replacement of damaged control cables by new ones from the newly erected junction box to LV breaker, CTs and carrying out other allied testing works by AEE/ P&C wing Pasumalai
EE/O/KODIKURICHI
KODIKURICHY 230 KV
230 KV Veeranam -I # Breaker with CT & Line Isolators
TUTICORIN -AUTO 230 KV
110KV TTN - Sipcot- I Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On 230KV Swamynatham feeder breaker with CTs only.
a)For monthly maintenance work. b)New 230KV Busbar Protection Panel Precommissioning work
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On 230 KV Sipcot-( CKNRI ) Savasapuram feeder breaker with CTs and line isolators only. (Th’ Bus Transfer Breaker)
a) For monthly maintenance work. b) New 230KV Busbar Protection Panel Precommissioning work
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Tie Breaker (408-52) for Karaikudi-1 & Karaikudi-2 Feeder
NALLAPPANAYAKANPATTY 230 KV
110KV Viswanathaperi #breaker with C.T
EE/O/Kayathar
KAYATHAR 230 KV
On 110 KV Kayathar - Gangaikondan # breaker with CT
ANUPPANKULAM 230 KV
100 MVA AUTO TR. III, HV-III and LV-III Breaker and C.T. only.
225
72909 EE/O/APKM
22672711 EE/O/TTN
22772724 EE/O/SRP
228
72972 EE/O/APKM
22973111 PH-2 machine Thrust cooler cleaning
230
73129 EE/O/APKM For monthly maintenance work.
23172241 EE/O/VRNM Monthly maintenance work
232
71904
233
71907
234
71976 TRICHY
ANUPPANKULAM 230 KV
a) 110 KV NNPTY - Kodikuruchi # section between NNPTY SS & Kadaiyanallore SS b) 110 KV NNPTY - Viswanathaperi # section between 110 KV NNPTY SS & Visvanathaperi SS
(a & b ) Earth wire cut rectification work between Loc No. 43 to 46
TUTICORIN -AUTO 230 KV
On 230KV Sipcot - Savasapuram Feeder entire.
Tower to Tower Inspection and Rectification Work
SRPUDUR 230 KV
230 KV SR Pudur-Koodamkulam feeder Br,CT,Lines entire.
Monthly Maintenance work, Tree clearance work,For CVT erection work and testing by P & C.
ANUPPANKULAM 230 KV
230KV Meelavittan - Savasapuram Feeder,230KV Meelavitan Breaker ,CTs , Isolators & line entire.
To carry out the Monthly Maintanence Works
EE/PHS/KDR
KODAIYAR PH-2
ANUPPANKULAM 230 KV
110KV NSPM - Kovilpatti Raliway Traction I feeder, Breaker and CT only at N.Subbiahpuram SS end.
VEERANAM 230 KV
230kv veeranam-kodikurichi-I feeder currenttransformer with lineswitch
EE/O/Pugalur
PUGALUR 230 KV
110 KV Pugalur - Karur feeder Breaker, CTs only.
Monthly Maintenance work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
Auto transformer II, HV II and LV II Breaker,CT's and LAS only.
For Monthly Maintenance work and Annual Relay Test work carried out by P&C wing,Erode.
TRICHY 230 KV
100MVA Auto Transformer II, HV II & LV II BRs, HV II & LV II and their LAS,CTs and isolators.
1. Monthly maintenance works. 2) Relay Testing.
235
72837
23672094
237
72733
238
73015
239
73049 110 KV Thuraiyur feeder breaker monthly maintenance
240
73134
24172112
24272152 Monthly Maintenance work
24372153 110KV KGTPS-Palaiyur feeder entire Line inspection work
244
72320 EE/O/CKNI
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
110KV Capacitor Bank- I & II breaker,CT's, and Isolators.
a) Preventive Monthly maintenance work. b)Relay testing work.
EE/O/Samayapuram
SAMAYAPURAM 230 KV
230KV Bus Coupler Breaker & isolotors (idle)
1. For monthly maintenance works.2.GRT relay test
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A) 110KV NEMMELI THIPPIYAKUDI-PUDUKKOTTAI FEEDER BREAKER, CT's AND LINE ISOLATOR. (NOW RADIAL FROM 230KV NEMMELI THIPPIYAKUDI SS TO 110KV URANIPURAM SS).B) 110KV NEMMELI THIPPIYAKUDI-URANIPURAM FEEDER ENTIRE. (NOW RADIAL FROM 230KV NEMMELI THIPPIYAKUDI SS TO 110KV URANIPURAM SS).
A) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI. B) FOR PREMONSOON INSPECTION BY AE/L/PATTUKKOTTAI.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
230KV Thiruvarur - Kumbakonam feeder
230KV Kumbakonam Breaker, CT's & Line side Isolator maintenance work and EHT line premonsoon inspection work
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Punalkulam - Trichy feeder. (Line portion between 110 KV Veeramarasanpettai SS and 110 KV Vaalavanthankottai SS )
To replace flash over disc identified at loc. no. 134 in 110 KV Punalkulam-Trichy feeder in order to avoid breakdown in near future.
EE / O / KMU
kumbakonam 230 KV
230KV Kumbakonam -Thiruvarur feeder, Breaker, Isolator and Line loc.No. 1-92.
Monthly Maintenance works and tree clearance in the line location 1-92
EE/O/Kadalangudy
KADALANGUDI 230 KV
230KV Kadalangudy- PPN II feeder entire
EE/O/Kadalangudy
KADALANGUDI 230 KVCHECKANURANI SW STATION 230 KV
230 KV Checkanurani-Kinnimanglam feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
24572427 230KV KNMLM – CKNI I # Entire
24672458
24772577 EE/O/KKDI 1. Monthly maintenance works
24873168 EE/O/SBT Monthly maintenance work
249
72205 EE/O/PSQ
25071858 Auto Transformer - I For Monthly Maintenance Work.
251
71941 For Monthly Maintenance Work
252
72405 EE/O/AMPM Monthly Maintenance Work
253
71996
EE/O/KNMLM
kinnimangalam 230 KV
Maintenance works of Breaker , CT and Line Isolator
EE/O/VALUTHUR
VALUTHUR 230 KV
110 KV Valuthur - ARKAY II feeder entire
For attending Tower to Tower Inspection and Tree cutting work
KARAIKUDI 230 KV
230/110KV, 50MVA AUTO TRANSFORMER-2 & its allied equipments
SEMBATTY 230 KV
110KV SBT - Dindigul # Bkr, CTs and line switch
PASUMALAI 230 KV
1)110 KV Pasumalai - Alagarkoil-II # BKR & CT,LI only. 2)Line LC section between Pasumalai - Anaiyur
1)Maintenance Works of BKR & CT, LI only. 2)Tree cutting works and T-T Inspection works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
400KV KANARPATTI SS
kanarpatti400 KV
400/230KV ICT 1 Main, tie Breaker with CT and Transformer(Bay no 404,405,204)
AMUTHAPURAM 230 KV
230/33KV Power transformer-2 HV,LV Breakers with CT's and its 33KV feeder
EE/O/TUTICORIN -SIPCOT
TUTICORIN -SIPCOT 230 KV
On 230 KV SIPCOT-TTPS Feeder breaker with CTs and line isolators only.
a)For monthly maintenance work. b)New 230KV Busbar Protection Panel Precommissioning work
254
71997
255
72078
25671714 110 KV BUS COUPLER For Monthly Maintenance Work.
257
72877 TTPS 230KV TTPS-SIPCOT FEEDER
258
72568 For Monthly Maintenance work
259
72571
260
72639
261
72911 EE/O/APKM
262
72985 TTPS 230KV TTPS-SIPCOT FEEDER
26373093 eephsppm For monthly maintenance work
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On 230 KV Sipcot-KVNR feeder breaker with CTs and line isolators only.
a)For monthly maintenance work. b) New 230KV Busbar Protection Panel Precommissioning work
EE/O/SANKANERI
SANKANERI 230 KV
110KV Sankaneri- koodankulam feeder Breaker CTs & Lineswitches.
For monthly maintenance and GRT Relay test.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
EE/EM-III/TTPS
1)Erection of CVT and Maintenance work by EM-III 2)Annual MRT Testing in WBCT,LAS,CC and breakers
EE/O/Kayathar
KAYATHAR 230 KV
On 230/110 KV Auto Transformer III, HV III and LV III, breaker with CT
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - Suruliyar # breaker with CT, Lines section between Kayathar and sankarankovil
" For monthly maintenance work Line switch Maintenance work "
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Melakkallur - Thalayuthu feeder section between Thalayuthu and Palayapettai
For monthly maintenance work and defective disc replacement work
ANUPPANKULAM 230 KV
110 KV APKM-Thulukkapatti-II feeder Br., CT., and Line entire at both ends.
(a) For Monthly Maintenance Work. (b) For Monthly Maintenance Work at Thulukkapatti SS. ( C) For replacement of flash over disc replacement work ar Loc No. 52
EE/MRT-II/TTPS
Annual Routine Testing and Maintenance of Numerical distance protection Relay Main -I & II
PAPANASAM
110KV Papanasam - KYTR feeder breaker with CT.
264
72142
265
71977 TRICHY
266
72743
267
73018
268
73045
269
72781 EE/O/PBLR
270
71857 For special Line Patrol
EE/O/KODIKURICHI
KODIKURICHY 230 KV
On 230KV Amuthapuram#I,II breaker with CT, 230KV Veeranam#I,II breaker with CT ,Auto-I, Auto-II,Auto-III Breaker with CT OF ONE BY ONE
OLD 230KV BUS BAR PROTECTION PANEL CT WIRE Releasing work by Aee/GRT/THALAIYATHU
TRICHY 230 KV
100MVA Auto Transformer III, LV III BREAKER, LAS, CTs and ,LV III I/C Isolator.
1. Monthly maintenance works. 2) Relay Testing.
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
110KV PATTUKKOTTAI-MADUKKUR FEEDER (VIA: 110/11KV PATTUKKOTTAI URBAN SS). LINE PORTION BETWEEN 110KV PATTUKKOTTAI URBAN SS TO 110KV MADUKKUR SS.
FOR PREMONSOON INSPECTION WORK BY AE/LINES/PATTUKKOTTAI.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Kovilvenni feeder(line portion between 230KV SS Thiruvarur and 110KV SS Kudavasal) and breaker
110KV Kovilvenni Breaker, CT's & Line side Isolator maintenance work and EHT line portion between 230KV SS Thiruvarur and 110KV SS Kudavasal premonsoon inspection work
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur - Alundur feeder, breaker, CT & LI (Line portion between Thanjavur 230 KV SS & Thuvakudi 110 KV SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur
PERAMBALUR 230 KV
1)110KV DSSL Feeder (Krishnapuram) breaker CT's and line PT.2) 110KV DSSL Feeder line portion between Perambalur 230KV SS and A.Mettur 110KV SS
1) For monthly maintenance work at 230KV SS Perambalur.2) ii) For commissioning of Mangalamedu feeder at Krishanapuram SS and for proceeding Erection work for Perambalur feeder for the following TLC and SSEworks are to be done • Removing jumper in the take off tower for perambalur feeder • Providing cut point box structure at
EE/O/KODIKURICHI
KODIKURICHY 230 KV
230 KV Veeranam - Abisegapatti # I entire line
271
72324 EE/O/CKNI
272
72361 EE/O/CKNI For Line Maintenance Work
27372429 110KV KNMLM – PASUMALAI I # Entire
27472454
275
72820 TRICHY
276
72588 EE/O/KKDI 1. Tree cutting works
27773169 EE/O/SBT Monthly maintenance work
278
72206 EE/O/PSQ
27971859 Auto Transformer - II For Monthly Maintenance Work.
280
72404 TTPS
281
71998
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Savasapuram feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
CHECKANURANI SW STATION 230 KV
110 KVAlagarkoil -Sempattti feeder section between sholavanthan to Amainaikanur
EE/O/KNMLM
kinnimangalam 230 KV
Monthly maintenance works for breaker , CT and Line Isolator
EE/O/ THENI
then I 230 KV
230 KV Theni-Sempatty # Br., C.T and line isolator
For line mtc works & attending premonsoon remarks and tree cutting works
TRICHY 230 KV
110KV Karaikudy - Azhagarcoil feeder section between 110KV S.Pudur SS - 110KV Thuvarankurichy line
1) Jumper at terminal tower will be opened towards S.Pudur ss and IT will be provided towards Mondipatty ss. 2) Special cross arm will be erected in Terminal tower towards S.Pudur side. 3) Existing conductor strung in Terminal will be lowered and re strung in proposed special X-arm.
KARAIKUDI 230 KV
110KV KKDI-ALKL# S/B A.Thekkur-Thuvarankurichi
SEMBATTY 230 KV
230KV SBT - Theni # Bkr, CTs and line switch
PASUMALAI 230 KV
1)110 KV Pasumalai - Kinnimangalam - I # BKR & CT,LI only. 2)Line Entire
1)Maintenance Works of BKR & CT,LI 2)Tree cutting works and T-T Inspection works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
EE/EM-I/TTPS
230KV TTPS- KAYATHAR- I FEEDER ENTIRE
Annual maintenance and testing of sf6 circuit breaker and Quarterly maintenance Work
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On 230/110 KV Auto-I, HV-I and LV-I breakers with CTs and LAS ,
a) For monthly maintenance work. b) New 230KV Busbar Protection Panel Precommissioning work
282
71999
28372084 For monthly maintenance.
284
71715 For Monthly Maintenance Work
285
71753 EE/O/VRNM
28672531 MTCE WORK
287
72573
28872917 EE/O/APKM 110 KV Northern side CT Monthly maintenance work
28972920 EE/O/APKM For monthly maintenance work.
29072719 EE/O/TTN
29172728 EE/O/SRP 100 MVA AUTO TR II HV II & LV II Br Monthly Maintenance work
29272981 EE/O/APKM
293
73113 PH-2 machine
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
On 230 /110 KV Auto-II, HV-II and LV-II breakers with CTs and LAS
a)For monthly maintenance work. b)New 230KV Busbar Protection Panel Precommissioning work
EE/O/SANKANERI
SANKANERI 230 KV
230KV Sankaneri-Abisekapatti feeder Breaker CTs&Line switches. .
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV Breaker 101-52, 110 KV Ayyanaroothu Line 1,Line 2 and Keelaveeranam Breaker, 400/110KV ICT1
VEERANAM 230 KV
230KV Veeranam-Abisegapatti-I Feeder CT With line switch
For Half-Yearly and Monthly Maintenance work.
EE/O/SANKANERI
UDAYATHUR 230 KV
230/110KV AUTO TRANSFORMER , HV & LV BREAKER
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - TTPS I #, breaker with CT and entire line
a) For Monthly Maintenance work b) Lines - Defective disc replacement work and premonsoon inspection C) GRT Annual relay testTower to Tower inspection work
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
110 KV Capacitor Bank - II Br., CT. and line switch only.
TUTICORIN -AUTO 230 KV
On 110KV Udayathur - Sanganeri Feeder (Section Between 110 KV Udayathur SS and Navalladi SS)
Tower to Tower Inspection and Rectification Work
SRPUDUR 230 KV
SAVASAPURAM
230KV Checkannorani Breaker,CT and Isolators
To Carryout the Monthly maintenance Work
EE/PHS/KDR
KODAIYAR PH1
Exciter cleaning and allied accessories, 55MVA Generation power Transformer, SF6 110KV Unit breaker, GRT breaker testing
294
73114 PH-2 machine
295
73115 PH-2 machine
296
73130 EE/O/APKM For monthly maintenance work.
297
71833
298
71910
299
71911
30072389
301
71979 TRICHY
EE/PHS/KDR
KODAIYAR PH1
Exciter cleaning and allied accessories, 55MVA Generation power Transformer, SF6 110KV Unit breaker, GRT breaker testing
EE/PHS/KDR
KODAIYAR PH-2
Exciter cleaning and allied accessories, 55MVA Generation power Transformer, SF6 110KV Unit breaker, GRT breaker testing
ANUPPANKULAM 230 KV
110KV NSPM - Kovilpatti Raliway Traction II feeder, Breaker and CT only at N.Subbiahpuram SS end.
EE/O/Mondipatty
Mondipatti 230KV
110KV Mondipatty - Alundur feeder Breaker ,CT's. and entire line section only
For monthly maintenance works, Line inspection and P&C testing.
EE/O/Pugalur
PUGALUR 230 KV
110 KV Pugalur - Elumathur feeder Breaker, CTs.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
110KV Kabilarmalai feeder Breaker,CTs only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/EACHANGADU
EACHANGADU 230 KV
230 KV Eachangadu-Neyvely TS I # Breaker,CT's& Line Isolator
for monthly maintenance & CVT erection work
TRICHY 230 KV
110KV Trichy – Srirangam feeder Breaker, CTs, line isolator and line portion between 230KV Trichy SS and 110KV Kambarasampettai SS only.
For a) Monthly Maintenance works b) Premonsoon inspection. C) Relay test
302
71988 TRICHY
303
72839
304
72844
305
72095
306
73020
307
73047
308
73057 MONTHLY MAINTENANACE
309
72785 EE/O/PBLR
310
73120
TRICHY 230 KV
110KV TRICHY - ALUNDUR II breaker, CTs & Line Isolator and line entire.
"a) For monthly maintenance works. b) Pre monsoon inspection, c) Relay test "
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
110KV Alundur - Trichy-II Feeder breaker,CT's, and Line Isolators.
a)Monthly maintenance work. B)Relay testing work.
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
110KV Alundur - Mondipatty feeder Breaker's,CT'S
a) Monthly maintenance work. b)premonsoon inspection and tree cutting work. c)Relay testing work.
EE/O/Samayapuram
SAMAYAPURAM 230 KV
230KV Samayapuram - Poyyur # Breeaker CT's and Line Isolator and entire line
1. For monthly maintenance works . 2. EHT Lines inspection Work.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Kovilkalappal Express feeder and breaker
110 KV Kovilkalappal Breaker, CT's & Line side Isolator maintenance work and EHT line premansoon inspection work
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur Link - 1 feeder, breaker, CT & LI
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection and rectification works by the AEE/Lines/Thanjavur
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
100 MVA Auto Transformer-I HV- I ,LVI ,CT'S and isolators.
PERAMBALUR 230 KV
1)230/110KV Auto Transformer I (100MVA), HV I Breaker & LV I breaker, CT's, Isolators.
For monthly maintenance work .
EE/O&M/THANJAVUR
Thanjavur 110 KV
110KV TJR-LINK I Feeder Br and its line isolator
For monthly maintenance work .
31172116 230 KV Bus-coupler Breaker.
31272154 230KV Kadalangudy -PPN I feeder entire Monthly Maintenance work
313
72364 EE/O/CKNI For Line Maintenance Work
31472430 110KV KNMLM PASUMALAI III #
315
72480
316
72520 Tree cutting work
31772600 EE/O/KKDI
31872965 EE/O/APKM
319
73172 EE/O/SBT
320
73174 EE/O/SBT
321
72181
322
72208 EE/O/PSQ
EE / O / KMU
kumbakonam 230 KV
To carry out monthly maintenance works.
EE/O/KADALANGUDY
KADALANGUDI 230 KVCHECKANURANI SW STATION 230 KV
110 KV Kinnimangalam-Pasumalai III feeder section between 230 KV Kinnimangalam SS and 110 KV Tirumangalam SS
EE/O/KNMLM
kinnimangalam 230 KV
Monthly maintenance works for breaker, CT and Line Isolator
EE/O/VALUTHUR
VALUTHUR 230 KV
230KV Valuthur - Karaikudi feeder entire
"1. For attending breaker and it's CT's and isolators Monthly Maintenance work. 2. For attending tower to tower inspection work. "
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV renganathapuram sempatty II # Section between renganathapuram and gandhigramam
KARAIKUDI 230 KV
230KV KKDI-VLTR # Bkr & CTs and entire line
1.Tower to tower inspection work 2. Monthly mtce of bay equipments
ANUPPANKULAM 230 KV
110KV Savasapuram -Tamilpadi Feeder,110KV Tamilpadi Breaker ,CTs , Isolators & line entire.
To carry out the Monthly Maintanence Works
SEMBATTY 230 KV
230KV SBT - Myvadi # Bkr, CTs and line entire
1. Monthly maintenance work and erection of LAS in line side under PSDF scheme 2. Tree cutting work
SEMBATTY 230 KV
1. 110KV SBT - Mondipatti # Bkr, CTs and section bet. SBT & Sengurichi SS 2. 110KV SBT - RNPM II # Bkr, CTs and section bet. Gandhigramam SS and RNPM 230KV SS
1.Monthly maintenance work 2. Tree cutting work
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KAVANOOR-KAMUTHI -TAMILPADI # SEC. BET. KAVANOOR & KAMUTHI-TAMILPADI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
PASUMALAI 230 KV
1)110 KV Pasumalai - Anupankulam # BKR & CT, LI only. 2)Line Entire
1)Maintenance Works of BKr & CT,LI 2)Tree cutting works and T-T Inspection works
323
71860 For Monthly Maintenance Work.
324
71861
32571944 For Monthly Maintenance Work
326
72410 TTPS Quarterly maintenance Work
327
71957 EE/O/TTN 110KV northern Bus Entire
328
72000 For monthly maintenance work.
32972091 For monthly maintenance.
33071716 For Monthly Maintenance Work.
33172538 MTCE WORK
33272544 MTCE WORKS
333
72576
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Veerasigamani I # Breaker with CT & Line Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Paanasam- Servalar # I&II Entire line
For Tree clearance work and rectification of Jumper bolt at various locations
400KV KANARPATTI SS
kanarpatti400 KV
110KV Manur feeder breaker with CT & line isolator Bay no 102
EE/EM-I/TTPS
230KV TTPS- KAYATHAR- II FEEDER ENTIRE
TUTICORIN -AUTO 230 KV
1) Auto Tr-I LV side Bus dropper Jumper in Northern bus end will be replaced by new Jumper due to heavy glow. 2) 110KV Sipcot- III bus dropper Jumper (Near switch No.100) to be replaced by a new dropper Jumper due to heavy glow. 3) 110KV Bus-I switch No.28 corroded RCC pole switch structure support replaced by a new RS Joist structure support work carried out by AE/Civil/TEDC/TTN
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
110KV SIPCOT-TTN # III breaker with CTs only
EE/O/SANKANERI
SANKANERI 230 KV
230/33K.V. Powertransformer-III H.V and L.V Breakers.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230 KV Vellappaneri # Main Breaker (210-52), & CT,CVT
EE/O/SANKANERI
UDAYATHUR 230 KV
110KV RADHAPURAM FEEDER BREAKER CT, LINE SWITCH
EE/O/SANKANERI
UDAYATHUR 230 KV
110KV SANKANERI FEEDER BR CT , LINESWITCH
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - TTPS II #, breaker with CT, Lines Inspection
a) For Monthly Maintenance work b) Lines - Defective disc replacement work and premonsoon inspection to Tower inspection work
334
72582
335
72923 EE/O/APKM
33672926 EE/O/APKM For monthly maintenance work.
337
72929 EE/O/APKM
338
72732 EE/O/SRP
33972245 EE/O/VRNM Monthly maintenance work
340
72390
341
72392
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - Papanasam # breaker with CT and line section between Kayathar And rastha
" For monthly maintenance work line switch maintenance work defective disc replacement by lines wing "
ANUPPANKULAM 230 KV
110 KV APKM - MADURAI # Br., CT., and line Entire.
(a) For monthly maintenance work. (b) Flash over disk replacement work at Loc No. 5,24, & Earth wire cut retification work at Loc. No: 189 to 191.
ANUPPANKULAM 230 KV
110 KV APKM - PPTY # Br., CT., and line entire.
ANUPPANKULAM 230 KV
110 KV Anuppankulam - Kayathar feeder Br., CT. and Line section between Kovilpatti SS & Anuppankulam SS.
(a) For monthly maintenance work (B) For flash over disk replacement work at Loc No. 14,2,38,45
SRPUDUR 230 KV
110 KV SRP-KDR II # Br,CT,Lines section entire
Monthly Maintenance work, Tree clearance work
VEERANAM 230 KV
PR TR-II,HVBR-II,LVBR-II & 33KV FEEDER OF RAMCO WINDFARM & ENERCON
EE/O/EACHANGADU
EACHANGADU 230 KV
110 KV VIRUTHACHALAM FEEDER BREAKER,CT's
For MONTHLY MAINTENANCE WORK
EE/O/EACHANGADU
EACHANGADU 230 KV
50 MVA ,Auto Transformer II &HV II, LV II Breaker,CT's & their related Equipments
For Monthly maintenance works.
342
71980 TRICHY
343
71982 TRICHY a) Monthly Maintenance works
344
72846
345
72847
TRICHY 230 KV
110 KV Trichy Link I & II feeder breaker , CTs & Line Isolator and line entire one by one.
For a) Monthly Maintenance works b) Premonsoon inspection. C) Relay test
TRICHY 230 KV
1. 110KV bus isolator maintenance work, 2. 110KV bus PT maintenance work and replacement of 110KV bus PT by new one.
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
"LC On 110KV Vadugapatty Radial Feeder with solar generation. "
a)Preventive Monthly Maintenance work b) Premonsoon inspection work and tree cutting work. C) Tan delta test by EE/P&C/Madurai.
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
100 MVA Auto Transformer - I ,HV-I,LV-I Breaker's, CT's and Isolators.
a) Monthly maintenance work. b) Tan Delta test by the EE/P&C/Madurai.
346
73023 Auto Transformer I & II
347
73026
348
73048
349
72120
350
72155
351
72433 110KV KNMLM – PASUMALAI II # Entire
352
72468
353
72484 Auto Transformer I
354
72617 EE/O/KKDI
EE/O/THIRUVARUR
THIRUVARUR 230 KV
Auto Transformer I & II one by one for HV, LV & CT's maintenance work
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur- Thiruthuraipoondi feeder and breaker
EHT line premansoon inspection work and Breaker, CT's & Line side Isolator maintenance work and GRT annual relay test work
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV & 230 KV Bus-Coupler breakers (one by one)
For monthly maintenance works by the AEE/Mtce/Thanjavur
EE / O / KMU
kumbakonam 230 KV
110 KV Thirupanandal - Thirupurambiyam feeder Loc: 1 to 76.
To carry out Tree clearance and line maintenance works.
EE/O/KADALANGUDY
KADALANGUDI 230 KV
110KV Kadalangudy-Aduthurai-Neyveli TSI# portion between KGDY-Aduthurai- Thirupanandal.
1)Monthly maintenance work 2)Line inspection work
EE/O/KNMLM
kinnimangalam 230 KV
Monthly maintenance works for breaker , CT and Line Isolator
EE/O/ THENI
then I 230 KV
110 KV Theni - Periyar II # Line sec bet Kamatchi puram & Thevaram SS
maintenance of 110 KV C.O Puram ss LILO line isolators
EE/O/VALUTHUR
VALUTHUR 230 KV
For Attending Oil leak in Auto Transformer I, HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
KARAIKUDI 230 KV
110KV KKDI-A.Koil # Bkr & CTs and line S/B KKDI-TPTR
1. Monthly mtce of bay equipments and annual relay test by GRT 2. Tower to tower inspection
355
73177 EE/O/SBT 110KV Capacitor bank I & II with PT III
356
73178 EE/O/SBT
35772182
358
72210 EE/O/PSQ
359
71862
360
72407 EE/O/AMPM Monthly Maintenance Work
361
72002
36272932 EE/O/APKM For monthly maintenance work.
36372097
36472726 EE/O/TTN
36572735 EE/O/SRP 100 MVA AUTO TR III HV III & LV III Br
36672394
SEMBATTY 230 KV
1. Shifting of PT III. 2. CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
110KV SBT - Pasumalai # Bkr and CTs only
1. Monthly maintenance work 2. CT configuration work for implementation of 110KV bus bar protection.
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KAVANOOR-VALINOKKAM-ARKAY # SEC. BET. KAVANOOR & VALINOKKAM
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
PASUMALAI 230 KV
110 KV Pasumalai - Kinnimangalam - 2 # BKR & CT,LI only.
1)Maintenance Works of BKR & CT,LI 2)Tree cutting works and T-T Inspection works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
"1.110 KV Kayathar # Breaker with CT & Line Isolators 2.110 KV Kodikurichi - Kayathar # (section between Kodikurichi - Keelapavoor)"
"1.Monthly maintenance work 2.For Replacement of defective disc at loc no: 32,67."
AMUTHAPURAM 230 KV
230/33KV Power transformer-3 HV,LV Breakers with CT's and its 33KV feeder
EE/O/230KV Sipcot SS/MVTN/TTN
STERILITE SW STATION 230 KV
On 230 KV Sterlite -Annuppankulam feeder breaker with CTs and line isolators only.
For monthly maintenance works.
ANUPPANKULAM 230 KV
230 KV Anuppankulam - Sterlite feeder Br., CT., and Line Entire.
EE/O/SANKANERI
SANKANERI 230 KV
230/110 K.V. AUTO TRANSFORMER -I H.V and L.V Breakers.
For monthly maintenance and GRT Relay test.
TUTICORIN -AUTO 230 KV
On 230KV Sterlite - Anuppankulam Feeder entire.
Tower to Tower Inspection and Rectification Work
SRPUDUR 230 KV
Monthly Maintenance work ,Breaker testing work.
EE/O/EACHANGADU
EACHANGADU 230 KV
110KV ICL-I & ICL-II feeder Breaker and CT's only One by one.
For Monthly maintenance works.
367
72921 EE/O/PDKT
36872098
369
73028
370
73050
371
72329 EE/O/CKNI
37272493 Monthly Mtc
37373179 EE/O/SBT Monthly maintenance work
374
73182 EE/O/SBT
375
73184 EE/O/SBT 230/110KV Auto II, HV II & LV II
PUDUKOTTAI 230 KV
1.110 KV Bus bar protection (out) 2.Auto II, HVII, LVII, Breaker, CT, Isolator And Capacitor Bank I&II
1.110 KV Bus bar protection (out) 2.Monthly maintenance works, Auto II, HVII, LVII, Breaker, Isolator 3.LVII 3 nos CT Replacement work and Capacitor Bank I & II 6 Nos CT Replacement work
EE/O/Samayapuram
SAMAYAPURAM 230 KV
100 MVA Auto Transformer-II, HV-II, LV-II, Breakers , CT's, and isolators
1. For monthly maintenance works.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Narimanam I feeder and breaker
110KV Narimanam I Breaker, CT's & Line side Isolator maintenance work , EHT line premansoon inspection work & GRT relay testing work.
EE/O/Thanjavur
THANJAVUR 230 KV
230 KV Thanjavur - PPN feeder, Breaker, CT, CVT & LI
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur 3) The Shift Manager/PPN Power Plant has requested LC in 230 KV Thanjavur - PPN feeder for maintenance works in bus isolators nos. 5 & 18.
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani -Sembatty feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
EE/O/ THENI
then I 230 KV
230 KV Auto Transformer III , HV & LV Breaker with CT only.
SEMBATTY 230 KV
230KV SBT - CKNI # Bkr, CTs and line entire
SEMBATTY 230 KV
110KV SBT - RNPM III # Bkr, CTs and section bet. SBT & Vedasandur SS
1. Monthly maintenance work 2. Tree cutting work 3. CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
1. Monthly maintenance work 2. CT configuration work for implementation of 110KV bus bar protection.
376
73185 EE/O/SBT
377
73186 EE/O/SBT
378
73187 EE/O/SBT
379
72183 LINE MAINTENANCE WORKS
380
72211 EE/O/PSQ
381
71863
38271958 EE/O/TTN
38371797 EE/O/NNPT For monthly maintenance work
384
71798 EE/O/NNPT 110KV Alangulam #breaker with C.T For Monthly maintenance work
385
71799 EE/O/NNPT For monthly maintenance work
SEMBATTY 230 KV
110KV SBT - RNPM II # Bkr and CTs only
CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
110KV SBT - Mondipatti # Bkr and CTs only
CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
110KV SBT - Shriram # Bkr and CTs only
CT configuration work for implementation of 110KV bus bar protection.
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. R.S.MANGALAM AND THIRUVADANAI (INCLUDING ANANDUR SPUR LINE)
PASUMALAI 230 KV
1)110 KV Pasumalai - Arasaradi SC Feeder BKR & CT,LI 2)Line Entire
1)Monthly Maintenance Works of BKR & CT,LI 2)Tree cutting works in EHT and HT Line crossing areas
EE/O/KODIKURICHI
KODIKURICHY 230 KV
"1.230 KV Veeranam -II # Breaker with CT & Line Isolators & Entire line "
"1.For Monthly Maintenance Work. 2.Special Line Patrol "
TUTICORIN -AUTO 230 KV
110KV TTN - Sipcot- III Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
NALLAPPANAYAKANPATTY 230 KV
110KV Reddiapatti feeder breaker with C.T.
NALLAPPANAYAKANPATTY 230 KV
NALLAPPANAYAKANPATTY 230 KV
230/110 KV Auto TransformerII , 230KV HV Breaker II with CT, 110KV LV Breaker II with CT.
386
71800 EE/O/NNPT For monthly maintenance work
38772584
388
72635
389
72934 EE/O/APKM
390
72740 EE/O/SRP
391
73108 110KV SR Pudur feeder No.2
392
73119 110KV S.R.Pudur # 1
39372243 EE/O/VRNM Monthly maintenance work
394
71913
395
71915
NALLAPPANAYAKANPATTY 230 KV
110KV Rajapalayam feeder breaker with C.T
EE/O/Kayathar
KAYATHAR 230 KV
On 230/110 KV Auto transformer I, HV I and LV I, breaker with CT
a) For Monthly maintenance work
EE/O/Kayathar
KAYATHAR 230 KV
on 110 KV Kayathar - Gangaikondan feeder breaker CT and section between Thalayuthu , Gangaikondan
a) For Monthly maintanance b) for stringing low sag earth wire and defective disc replacement work
ANUPPANKULAM 230 KV
110 KV NNPT - Reddiapatty feeder section between 110 KV Reddiapatti SS and 110 Kv SIVAKASI ESI SS; 110 kv Reddiapatti SS and Rajapalayam SS.
Earth wire cut rectification work between Loc. No. 4 to 6 of 110 KV R.RPT LILO line.
SRPUDUR 230 KV
110 KV SRP-KDR I and II # line section Pechiparai to KDR PH
Monthly Maintenance work ,Tree clearance work
EE/PHS/KDR
KODAIYAR PH2
GRT breaker testing and Monthly maintenance of breaker, CT
EE/PHS/KDR
KODAIYAR PH2
GRT breaker testing and monthly maintenance of breaker, CT
VEERANAM 230 KV
230kv veeranam-kodikurichi-II feeder currenttransformer with lineswitch
EE/O/Pugalur
PUGALUR 230 KV
Auto transformer III, HV III and LV III Breaker,CT's and LAS only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
110KV Pugalur - Puliyur Feeder Breaker, CTs only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
396 71793 FOR periodical Maintenance
397
72850
398
72578 TRICHY
399
72593 TRICHY
AEE/OPERATION
KOVILKALAPAL
NT KUDI FEEDER NO 1 (VIA VADACHERY)
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
230KV Alundur - Thanjavur-I Feeder Breaker, CT's, CVT's, Line Isolators and 230 KV "B" Bus entire at Alundur end.
a)Monthly Preventive Maintenance work. b) 'B' (1529B) Bus switch Alignment work. c) Premonsoon Inspection and tree cutting work. d) Relay Testing Work.
TRICHY 230 KV
1. 110KV Trichy - Kovilur feeder breaker, CTs, line isolator and Line portion between 230KV SS Trichy and 110KV Kavalkaranpatti SS.
a) For monthly maintenance works. 2. Premonsoon inspection. 3. Relay Testing
TRICHY 230 KV
110KV Pettavaithalai SS LILO porsion.
For extension of 110 KV strung bus from LILO at Pettavaithalai 110 KV SS..
400
72927 EE/O/PDKT
401
72752
402
73029 230KV PPn-Thanjavur feeder
403
73051
PUDUKOTTAI 230 KV
1. 110KV T.Nallur feeder CT, Isolator 2.110 KV Athanakkottai feeder CT, Isolator 3. 110KV Alangudi feederCT, Isolator and line portion between 110 KV Pudukkottai - 110KV Alangudi SS 4. 110KV bus Couplor CT, Northen bus ,
1.110 kv Alangudy CT 3 Numbers Replacement work , 2.110 KV T.Nallur CT 3 Numbers , Replacement work 3.110 KV Athanakkottai CT 3 Numbers for CT Replacement work & Northen bus , 4. Monthly maintenance works and tree cutting and premansoon inspection, 5. 110KV Bus couplor 3 Nos CT Replacement work
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER BREAKER, CT's, AND LINE ISOLATOR. B) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER ENTIRE.
A) FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ N.T.KUDI. B) FOR PREMONSOON INSPECTION WORK BY AE/LINES/ PATTUKKOTTAI.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
EHT line premansoon inspection work
EE/O/Thanjavur
THANJAVUR 230 KV
230 KV Thanjavur - Alundur-1 feeder, Breaker, CT, CVT & LI
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur
404
73053
405
73056
406
73059 Monthly maintenance
40772791 EE/O/PBLR For monthly maintenance work
408
73121
40972156 230KV Bus coupler breaker Monthly maintenance work
410
72365 EE/O/CKNI
EE/O/Thanjavur
THANJAVUR 230 KV
100 MVA Auto Transformers-1 & 2, HV- 1 & 2, LV- 1 & 2 Breakers & CTs. (one by one)
Monthly maintenance works by the AEE/Mtce/Thanjavur
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur - NTKudi feeder (Line portion between Thanjavur 230 KV SS and Eachankottai 110 KV SS)
For premonsoon inspection works by the AEE/Lines/Thanjavur
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
100 MVA Auto Transformer-II HV-I I ,LVII ,CT'S and isolators.
PERAMBALUR 230 KV
110KV Kallakudy-II(Thuraiyur) feeder Breaker CT's only
EE/O&M/THANJAVUR
Thanjavur 110 KV
110KV TJR-Thiruvarur feeder Br and its line isolator
For monthly maintenance work .
EE/O/KADALANGUDY
KADALANGUDI 230 KVCHECKANURANI SW STATION 230 KV
110 KV Anupangulam T kallupatty radial feeder section between T kallupatty ss and Erichanatham ss
For Towerr to Tower inspection work
411
72492
412
72500 Monthly Mtc
413
72511
414
72517
41572074
416
72560
41772631 EE/O/KKDI 230KV KKDI-PGCIL-2 # Bkr & CTs
41872641 EE/O/KKDI 230KV VLTR – A.Koil # Entire Tower to Tower inspection
41973188 EE/O/SBT 230KV SBT - Karaikudi # Bkr and CTs Monthly maintenance work
420
73189 EE/O/SBT 110KV SBT - Theni I # Bkr and CTs only
421
73191 EE/O/SBT 110KV SBT - Theni II # Bkr and CTs only
EE/O/VALUTHUR
VALUTHUR 230 KV
230KV Valuthur - ALAGARKOIL FEEDER entire
"1. For attending breaker and it's CT's and isolators Monthly Maintenance work. 2. For attending tower to tower inspection work. "
EE/O/ THENI
then I 230 KV
110 KV Theni -Periyar # III Breaker with CT only
EE/O/ THENI
then I 230 KV
110 KV Theni -Periyar # III Line sec bet THENI & S.R.Puram SS
maintenance of 110 KV Bodi ss line tapping switch
EE/O/ THENI
then I 230 KV
230/110 KV Auto Transformer I (TELK make,100 MVA) ,HV & LV Breaker with CT only.
For replacement of wornout Gasket and oil circulation works
EE/O/Alagarkoil
ALAGARKOIL 230 KV
230KV ALKL-Valuthur # Bkr,CT,&Line entire
Monthly Mtce work & Tree clearance work,
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
1.230 kv renganathapuram - pugalur # breaker CT and relays
Monthly maintenance of breaker CT and grt testing work
KARAIKUDI 230 KV
1. Monthly maintenance of bay equipments
KARAIKUDI 230 KVSEMBATTY 230 KV
SEMBATTY 230 KV
CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
CT configuration work for implementation of 110KV bus bar protection.
422
73192 EE/O/SBT
423
73193 EE/O/SBT 110KV SBT - RNPM I # Bkr and CTs only
42472184 230KV/110KV AUTO TRANSFORMER -II
42572185 230KV/110KV AUTO TRANSFORMER -II
426
72213 EE/O/PSQ
427
71864
428
71865
429
71882 Monthly Maintenance works.
SEMBATTY 230 KV
110KV SBT - Udumalpet # Bkr and CTs only
CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
CT configuration work for implementation of 110KV bus bar protection.
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T
PASUMALAI 230 KV
1).110 KV Pasumalai - Thulukkapatty # Breaker & CT, LI only. 2) Line LC section between Pasumalai - Soolakarai SS.
1)Monthly Maintenance Works of BKR & CT,LI 2)Tree cutting works and T-T Inspection works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
On110KV Kannarpatty – Keelaveeranam feeder Section between (Keelaveeranam-Surandai)
For Defective disc replacement work at location No.10,17,24,31.
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Bus section I Breaker with CT & Isolators
For Monthly Maintenance Works.
EE/R /D/Tirunelveli
Uthumalai 110 KV
110 KV Veerasigamani Breaker with CTs
430
71946 For Monthly Maintenance Work
431
72409 EE/O/AMPM Monthly Maintenance Work
432
72003 For monthly maintenance work.
433
71717 For Monthly Maintenance Work
434
72586
43572592
43672102
43772747 EE/O/SRP 110 KV SRP - ARMI II # Br,CT. Monthly Maintenance work
43872246 EE/O/VRNM Monthly maintenance work
439
71834
440
71916
400KV KANARPATTI SS
kanarpatti 400 KV
400/230KV ICT 2 Main, tie Breaker with CT and Transformer(Bay no 405,406,207)
AMUTHAPURAM 230 KV
230/33KV Power transformer-4HV,LV Breakers with CT's and its 33KV feeder
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
110KV SIPCOT-EPVN # breaker with CTs only.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV ICT2
EE/O/Kayathar
KAYATHAR 230 KV
On 230/110 KV Autotransformer II, HV II an LV II breaker with CT and GRT Works
a) For Monthly maintenance work
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar- Talayuthu Express feeder breaker CT entire line
" For monthly maintenance work Line switch Maintenance work "
EE/O/SANKANERI
SANKANERI 230 KV
110kv SANKANERI- S.R.PUTHOOR # BREAKER CTs and Line siwcthes.
For monthly maintenance and GRT Relay test.
SRPUDUR 230 KV
VEERANAM 230 KV
PR TR-III,HVBR-III,LVBR-III & 33KV FEEDER OF MICON-1,2,& 6
EE/O/Mondipatty
Mondipatti 230KV
Mondipatty SS - 230KV BUS 'A' and 'B' one by one. (230 KV Bus 'B' - Between 9.00Hrs to 12.00 Hrs ; 230KV Bus 'A'- Between 12.00Hrs to 17.00 Hrs )
For precommissioning work at Bus 'A' and 'B' isolators of Auto Transformer II by SS Erection.
EE/O/Pugalur
PUGALUR 230 KV
230 KV Pugalur - Paramathy II feeder Breaker, CT & line switch & entire line only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
441
71917
442
71918
44372396
EE/O/Pugalur
PUGALUR 230 KV
230KV Pugalur - Renganathapuram feeder Breaker, CTs & line switch
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
Auto transformer I, HV I and LV I Breaker,CT's and LAS only.
For New C&R Panel commissioning work carried out by P&C wing,Erode and Monthly Maintenance work.
EE/O/EACHANGADU
EACHANGADU 230 KV
110 kv MCL-1 & II Feeder BREAKER , CT'S one by one
MONTHLY MAINTENANCE WORK
444
72567 TRICHY 1) 110KV Southern BUS ENTIRE
445
72574 TRICHY
446
72933 EE/O/PDKT
TRICHY 230 KV
1. 110KV bus isolator maintenance work, 2. 110KV bus PT maintenance work.
TRICHY 230 KV
110 KV Trichy – Punalkulam feeder Breaker, CTs & line isolator and line portion between 230KV SS Trichy and 110KV Mathur SS only.
a) For monthly maintenance works. 2. Premonsoon inspection. 3. Relay Testing
PUDUKOTTAI 230 KV
1. 110KV Sipcot feeder Breaker, CT, Isolator and line portion between 110 KV Pudukkottai - 110KV Sipcot SS
1.110 KV Sipcot CT 3 Numbers Replacement work , Monthly maintenance works and tree cutting & premansoon inspection,
447
72101 1.For EHT Line Inspection Work
448
72334 EE/O/CKNI
449 72523 Monthly Mtc
450
72619
45172655 EE/O/KKDI 1. Monthly maintenance works
452
73194 EE/O/SBT 230/110KV Auto III, HV III & LV III
453
73196 EE/O/SBT
45472186 110KV KAVANOOR-RRRE #
45571866 Auto Transformer - III Monthly maintenance work
45671960 EE/O/TTN
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110KV Samayapuram - Trichy Grid feeder line portion between 110KV Valady SS and 110KV Thiruvanaikoil SS.
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Kayathar feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
EE/O/ THENI
then I 230 KV
110 KV Theni-Periyar I & II # Breaker with CT (One by one)
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
1.110 kovilur renganathapuram feeder entire line section 2.110 KV kovilur - chettinad cement corporation limited feeder entire line
To arrange alternate supply to palayam and pudur palayam ss by providing 6 no of jumpers and earth wire
KARAIKUDI 230 KV
230/110KV, 50MVA AUTO TRANSFORMER-3 & its allied equipments.
SEMBATTY 230 KV
1. Monthly maintenance work 2. CT configuration work for implementation of 110KV bus bar protection.
SEMBATTY 230 KV
110KV Bus section III breaker, Bus section III entire with PT III
1. Erection of 1200-600-300/1 Amps ratio CT in bus section III breaker 2. Annual maintenance work 3. CT configuration work for implementation of 110KV bus bar protection.
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T&LINE MAINTENANCE WORK.
EE/O/KODIKURICHI
KODIKURICHY 230 KV
TUTICORIN -AUTO 230 KV
110KV TTN – ARNI- I feeder breaker with CT bus & Line side switches
For Monthly Maintenance Works
457
71718 For Monthly Maintenance Work.
45872581
459
72590
46072643
46172937 EE/O/APKM For monthly maintenance work.
46272940 EE/O/APKM 230KV KYTR- CNRI # Entire
463
72755 EE/O/SRP tree clearance work
464
73122 KDR PH-1 machine
465
71835
466
71919
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230 KV Anuppankulam Feeder, Breaker (201-52) & CT, CVT, LAS
EE/O/SANKANERI
UDAYATHUR 230 KV
POWER TRANSFORMER II ,HV & LV BREAKER, & Its FEEDERS
1.MTCE WORKS 2.ANNUAL RELAY TEST & CONTACT RESISTANCE TEST ON HV BREAKER BY GRT
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Checkanurani#, breaker with CT
a) For Monthly maintenance work B) GRT - Annual relay test.
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Melakkallur- Thalayuthu feeder section between melakkalur and palayapettai
For monthly maintenance and defective disc replacement work
ANUPPANKULAM 230 KV
230 KV Anuppankulam - Kayathar feeder Br., CT. and line swich only
ANUPPANKULAM 230 KV
For replacement of flash over disk at Loc. No : 197 & 229.
SRPUDUR 230 KV
110 KV SRP-KDR II feeder,section between SR Pudur and TKY.
EE/PHS/KDR
KODAIYAR PH1
GRT breaker testing, monthly maintenance of Gen.Tr 22.2MVA, SF6 breaker, 110KV LAS, 110KV CT&PT
EE/O/Mondipatty
Mondipatti 230KV
110KV Mondipatty - Sembatty feeder Breaker, CT's., Line isolator and line section between 110 KV Vaiyampatty SS and 230 KV Mondipatty SS
For monthly maintenance works, Line inspection and P&C testing.
EE/O/Pugalur
PUGALUR 230 KV
110KV Pugalur - Renganathapuram feeder Breaker, CTs only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
467
72854
468
72649
469
72939 EE/O/PDKT
470
72943 EE/O/PDKT
471
72103
472
73031
473
72795 EE/O/PBLR
47472157
475
72337 EE/O/CKNI
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
LC on 230KV Alundur - Pudukkottai Feeder breaker, CT'S, CVT's and Line Isolators.
a)Monthly preventive maintenance work. b)Premonsoon inspection and tree cutting work. c)Relay Testing Work.
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
1.110 KV kovilur trichy feeder section between kovilur and puthanatham
To provide alternate supply to palayam and pudur palayam ss by providing 6 no of jumpers and earth wire
PUDUKOTTAI 230 KV
1. 110KV EID Parry feeder Breaker, CT, Isolator and line portion between 110 KV Alangudi ss - 110KV Aliyanilai SS
1.110 KV EID Parry CT 3 Numbers Replacement work , Monthly maintenance works and tree cutting & premansoon inspection,
PUDUKOTTAI 230 KV
230 KV PUDUKKOTTAI-ALUNDHUR FEEDER BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE
FOR MONTHLY MAINTENANCE OF BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110 KV SMPM- Srirangam # Breaker and CT's only (Tied feeder)
1. For monthly maintenance works . 2.GRT relay Test.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Myladudurai feeder line portion Between Neelakudi SS and peralam SS
EHT line premansoon inspection work
PERAMBALUR 230 KV
1)230/110KV Auto-III,HV-III,LV-III Breakers CT'S & Isolaters only.
For monthly maintenance works
EE/O/KADALANGUDY
KADALANGUDI 230 KV
110KV Kadalangudy- LTPCL feeder entire
1)Line inspection work 2)Maintenance work
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Renganathapuram feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
476
72369 EE/O/CKNI 110 Kv Vadipatty Spur line For Line Maintenance Work
47772501
478
72534
47972663 EE/O/KKDI 110KV KKDI-PDKT# Bkr & CTs
480
72676
481
73198 EE/O/SBT Tree cutting work
48272187 230 KV KAVANOOR-KAMUTHI # 1
483
72215 EE/O/PSQ
CHECKANURANI SW STATION 230 KV
EE/O/VALUTHUR
VALUTHUR 230 KV
110KV Kavanoor-R.S.Madai-VGTPS FEEDER Section between VGTPS and R.S.Madai
For attending tower to tower Inspection and Tree cutting work
EE/O/ THENI
then I 230 KV
110 KV Theni –Rasingapuram # Breaker with CT & line
Mtc of entire Line For replacement of damaged jumpers at tapping loc of 110 KV Bodi SS( Rasinga puram side) works
KARAIKUDI 230 KV
1. Monthly maintenance of bay equipments and annual relay test by GRT
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
1.230 KV renganathapuram - chekanurani feeder breaker CT and relay 2.Auto transformer II breaker CT and relays
Monthly maintenance of breaker CT and relays
SEMBATTY 230 KV
110KV SBT - AKL II # section bet. Kosavapatti & V.K.Patti SS
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS OF BKR WITH C.T&LINE MAINTENANCE WORK.
PASUMALAI 230 KV
110 KV Pasumalai - Sembatty # Line LC section between Achampathu and Sithargalnatham SS
Tree cutting works and T-T Inspection works
484
71867 For monthly maintenance work.
485
71868
486
71888 Monthly Maintenance works.
48771948 For Monthly Maintenance Work
488
72420 TTPS
489
71695 SERVALAR 11/110 KV SWITCH YARD ENTIRE
490
71719 For Monthly Maintenance Work
49172594 230KV KAYATHAR FEEDER BREAKER
49272595
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Bus section II Breaker with CT & Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
1. on 110KV Kodikurichi-Veerasigamani-II # section between 110 Kv Naranapuram SS and Viswanathaperi SS
For replacement of defective insulator at location no 22,23,35,36 , 46,49,51
EE /D /R /Tirunelveli
Uthumalai 110 KV
1)110 KV Surandai Breaker with CTs 2) 110 KV Auro - Mira Breaker with CTs
400KV KANARPATTI SS
kanarpatti 400 KV
400/110KV ICT 3 Main, tie breaker with CT and Transformer Bay Nos 410,411 AND 101
EE/EM-I/TTPS
230KV TTPS KUDANKULAM FEEDER ENTIRE
Annual maintenance and testing of SF6 circuit breaker & testing og WBCT & LAs and Quarterly maintenance work
SERVALAR
SERVALAR POWER HOUSE 11/110 KV SWITCH YARD ENTIRE MONTHLY MAINTENANCE WORK
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3
EE/O/SANKANERI
UDAYATHUR 230 KV
1. MTCE 2.RELAY TEST CARRIED OUT BY GRT
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Udayathur #, breaker with CT
a) For monthly maintenance work
493
72598
49472653
495
72942 EE/O/APKM For Monthly Maintanance work.
496
72108 For monthly maintenance.
49772783 EE/O/SRP
49873096 eephsppm For monthly maintenance work
499
72399
500
72857
501
72585 TRICHY 1) 230KV BUS ENTIRE
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - Kodayar # breaker with CT and lines section between kayathar and veeravanallur
For Monthly maintenance work, Line switch maintenance work,
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Melakkallur - Sankanery feeder section between Melakkallur and Karisalpatti
For monthly maintenance and defective disc replacement work
ANUPPANKULAM 230 KV
100 MVA AUTO TR. I, HV-I and LV-I Breaker and C.T. only.
EE/O/SANKANERI
SANKANERI 230 KV
230/33KV PowerTransformer-I HV&LV Breakers,CTs only.
SRPUDUR 230 KV
110 KV SRP-SNRI #,Br,CT ,LS, Lines section between SR Pudur and Perungudy
Monthly Maintenance work ,Tree clearance work
PAPANASAM
110KV Papanasam - servalar feeder-1 breaker with CT .
EE/O/EACHANGADU
EACHANGADU 230 KV
230 KV Eachangadu- # poyyur BREAKER, CT's, &LINE CVT
FOR MONTHLY MAINTENANCE WORK
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
230KV Alundur - Thanjavur-II Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work. b)Premonsoon Inspection and tree cutting work. c)Relay Testing Work.
TRICHY 230 KV
1. All 230KV bus isolator maintenance work, 2) 230KV Bus PT & CVT maintenance work.
502
72948 EE/O/PDKT
503
73033 Auto Transformer III,HV &LV Breaker
504
73052 110KV Musiri feeder breaker Monthly maintenance
505
73058
506
73061
50772124
508
72373 EE/O/CKNI 110 KV Elumalai Spur line
PUDUKOTTAI 230 KV
1. 110KV Thirumayam feeder Breaker, CT, Isolator and line portion between 110 KV Thirumayam SS - 110KV Konnaiyur SS
1.110 KV Thirumayam CT 3 Numbers Replacement work , Monthly maintenance works and tree cutting & premansoon inspection,
EE/O/THIRUVARUR
THIRUVARUR 230 KV
Auto Transformer III, HV and LV breakers & CT's maintenance work
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
EE/O/Thanjavur
THANJAVUR 230 KV
230 KV Thanjavur - Alundur-2 feeder, Breaker, CT, CVT & LI
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur - NTKudi feeder, Breaker, CT & LI (Line portion between Thanjavur 230 KV SS and Thirukkanurpatti 110 KV SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur, 3) For annual relay testing works by the AEE/P&C/Thanjavur
EE / O / KMU
kumbakonam 230 KV
Auto Transformer II, HV , LV breakers and LAS.
To carry out monthly maintenance works.
CHECKANURANI SW STATION 230 KV
For Tower to Tower inspection work
509
72436
51072503
51172539
512
72675 EE/O/KKDI
51373199 EE/O/SBT Monthly maintenance work
514
72196 EE/O/PSQ
515
71870
516
71950 For Monthly Maintenance Work
51771963 EE/O/TTN
518
72603
51972622 230KV SANKANERI FEEDER BREAKER
EE/O/KNMLM
kinnimangalam 230 KV
110KV KNMLM THENI II # Section between 110KV Kanavilakku and 230KV KNMLM
Monthly maintenance works for breaker, CT and Line Isolator
EE/O/VALUTHUR
VALUTHUR 230 KV
110KV Perungulam - mandapam- ARKAY FEEDER Section between ARKAY and Mandapam.
For attending tower to tower Inspection and Tree cutting work
EE/O/ THENI
then I 230 KV
230 KV Theni – Moozhiyar # Breaker with CT.& Line
Line Monthly Mtc and premonsoon inspection
KARAIKUDI 230 KV
110KV KKDI-DVKT#Bkr & CTs and line entire
1. Monthly mtce of bay equipments, annual relay test by GRT 2. Tower to tower inspection and tree cutting works
SEMBATTY 230 KV
110KV SBT - Theni I # Bkr, CTs and Theni II # Bkr, CTs one by one
PASUMALAI 230 KV
230 KV Pasumalai - TTPS #, BKR & CT,LI only.
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Kanarpatti - Uthumalai # (section between Uthumalai -Surandai Idel Line)
For replacement of defective insulator at location no 15,24 & Tree clearance work
400KV KANARPATTI SS
kanarpatti 400 KV
110KV Keelaveeranam Feeder Breaker with CT Bay no 105
TUTICORIN -AUTO 230 KV
110KV TTN - ARNI - II Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kayathar - O.T.Patty # breaker with CT, Lines section between kayathar and seethaparpanallur
For monthly maintenance work, Line switch maintenance work defective disc replacement work
EE/O/SANKANERI
UDAYATHUR 230 KV
1. MTCE WORKS 2. BREAKER TEST TO BE CARRIED OUT BY GRT WING
520
72642
521
72887 TTPS 230KV TTPS-MADURAI FEEDER ENTIRE
522
72786 EE/O/SRP
52372117
524
72860
525
72607 TRICHY
526
72105
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Kanarpatti Keelaveeranam feeder Lines section between Kanarpatti and Keelaveeranam
For defective disc replacement work
EE/EM- III/ TTPS
1. Erection of CVT and maintenance work by EM- III 2. Annual MRT testing in LAS.
SRPUDUR 230 KV
110 KV SRP-KKY feeder Br,CT,LS,lines section SR Pudur and Kannanallur
Monthly Maintenance work ,Tree clearance work
EE/O/SANKANERI
SANKANERI 230 KV
230KV Sankaneri-Udayathoor feeder Breaker,CTs&Lineswitches.
For monthly maintenance and GRT BREAKER test.
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
230KV Alundur - Paramathy Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work. b) Premonsoon inspection and tree cutting work by AEE/Lines/Trichy. c) Relay Testing Work.
TRICHY 230 KV
230 KV TRICHY - ALUNDUR I Feeder breaker, CTs, Line Isolator.
a) For Line isoltor replacement work.
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110KV Samayapuram - Jambunathapuram tied feeder Breaker CT`s ,and line Isolator and line portion between 230KV Samayapuram ss and 110KV Vengaimandalam SS.
1. For monthly maintenance works . 2. EHT Lines inspection Work. 3. GRT relay test
527
72768
528
73037
529
73054 110Kv Vengaimandalam feeder Monthly maintenance
530
72352 EE/O/CKNI
53172438 AUTO TRANSFORMER III Monthly maintenance work
532
72076 AUTO TR I HV I & LVI Bkr,CT&LAS Monthly Mtce work
53372080 110KV ALKL-PASUMALAI II # Bkr&CT
534 72541 Monthly Mtc
53572542
536
72695
53772188 LINE MAINTENANCE WORK.
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A) 110KV PATTUKKOTTAI-MADUKKUR FEEDER (VIA: 110/11KV PATTUKKOTTAI URBAN SS), LINE PORTION BETWEEN 110KV PATTUKKOTTAI SS TO 110KV PATTUKKOTTAI URBAN SS. B) 110KV PATTUKKOTTAI- MADUKKUR FEEDER BREAKER & CT's AT 110KV PATTUKKOTTAI SS.
A) FOR PREMONSOON INSPECTION WORK BY AE/LINES/PATTUKKOTTAI. B) For Annual Relay Testing by P&C wing / Thanjavur
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Thanjavur feeder line portion between 230KV SS Thiruvarur and 110KV SS poondi and breaker
EHT line premonsoon inspection work , Breaker Mtc and annual relay test work
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Amuthapuram feeder entire
For Monthly Maintenance Work & Line Maintenance Work.
EE/O/KNMLM
kinnimangalam 230 KV
EE/O/Alagarkoil
ALAGARKOIL 230 KV
EE/O/Alagarkoil
ALAGARKOIL 230 KV
Monthly Mtce work & Annual relay testing
EE/O/ THENI
then I 230 KV
110 KV Theni- Kinnimangalam I &II # Breaker with CT only ( One by one )
EE/O/ THENI
then I 230 KV
110 KV Theni- Kinnimangalam I # line sec bet Theni & Valathur
Replacment of 2 Nos flashed over discs and jumper tightening work
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV renganathapuram sempatty III Feeder breaker CT GRT relay testing
Monthly maintenance of breaker CT GRT relay testing
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. THIRUVADANAI TO THONDI
53872189 LINE MAINTENANCE WORK.
539
72197 EE/O/PSQ
54071869 For monthly maintenance work.
541
71871
542
72412 EE/O/AMPM Monthly Maintenance Work
54371720 For Monthly Maintenance Work.
544
71754 EE/O/VRNM
54572606 For Monthly maintenance work
546
72734 EE/O/TTN
54772790 EE/O/SRP
548
71920
549
72806
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. THIRUVADANAI TO THONDI
PASUMALAI 230 KV
230 KV Pasumalai - Kayathar #, BKR & CT,LI only.
1) Maintenance Works of BKR & CT, LI 2) Tree cutting works
EE/O/KODIKURICHI
KODIKURICHY 230 KV
110 KV Kadayanallur # Breaker with CT & Line Isolators
EE/O/KODIKURICHI
KODIKURICHY 230 KV
230 KV Amuthapuram - Chekkanoorani # entire line
For rectification of jumper bolt at loc 384,389
AMUTHAPURAM 230 KV
Amuthapuran-Checkanoorani 230KV #,breakers,CT's and its isolators
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230 KV Madurai # Main Breaker (202-52), & CT,CVT
VEERANAM 230 KV
230KV Veeranam-Abisegapatti -II Feeder CT with line switch.
for Half-Yearly and Monthly Maintenance work
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Abishegapatty # breaker with CT
TUTICORIN -AUTO 230 KV
On 110KV Arumuganeri - SR Pudur - I Feeder (section between 110 KV Sathankulam SS and 110 KV Moolakaraipatti SS)
Tower to Tower Inspection and Rectification Work
SRPUDUR 230 KV
110 KV SRP-PZR feeder Br,CT,Line Switch and line entire.
Monthly Maintenance work ,Line maintanance work.
EE/O/Pugalur
PUGALUR 230 KV
110KV Pugalur-Link feeder Breaker,CTs,Line switch only.
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/NEMMELI THIPPIYAKUDI
THIRUVARUR 230 KV
110KV T(K)GTPS - THIRUVARUR FEEDER (VIA: 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS & 110KV MANNARGUDI SS), LINE PORTION BETWEEN T(K)GTPS TO 110KV ULLIKKOTTAI SS.
FOR PREMONSOON INSPECTION BY AE/LINES/ PATTUKKOTTAI.
550
73038
551
73040 110KV Bus II Bus II Maintenance work
552
73063
553
73064
554
72799 EE/O/PBLR
55572128
556
73183
557
72158
55872159 Monthly Maintenance work
559
72353 EE/O/CKNI 230 KV Checkanurani-TTPS #
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Karaikal feeder and breaker
EHT line premansoon inspection work,Breaker Mtc work and annual relay test work
EE/O/THIRUVARUR
THIRUVARUR 230 KV
EE/O/Thanjavur
THANJAVUR 230 KV
100 MVA Auto Transformers-1 & 2, HV- 1 & 2, LV- 1 & 2 Breakers & CTs. (one by one)
Monthly maintenance works by the AEE/Mtce/Thanjavur
EE/O/Thanjavur
THANJAVUR 230 KV
110 KV Thanjavur - Punalkulam feeder, breaker, CT & LI (Line portion between Thanjavur 230 KV SS and Punalkulam 110 KV Grid SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur
PERAMBALUR 230 KV
110KV Siruvachur Feeder breaker CT's only.2) 110KV Siruvachur feeder line section Perambalur 230KV SS and M/S MRF ltd -PBLR
1)For monthly maintenance work. 2) For commissioning of newly errection 110KV PT in the strung bus of 110KV Siruvachur SS
EE / O / KMU
kumbakonam 230 KV
110 KV Sakkottai feeder II breaker, C.T's CVT and Line isolator.
To carry out monthly maintenance works.
EE/El/T(K)GTPS
KOVILKALAPAL
110 KV Thiruvarur Feeder ( via Ullikkottai, Mannargudi)
Routine maintenance & Breaker, relay testing work
EE/O/KADALANGUDY
KADALANGUDI 230 KV
110 Kadalangudy- Mayiladuthurai feeder entire
1)Monthly Maintenance work 2)Line inspection work
EE/O/KADALANGUDY
KADALANGUDI 230 KV
230/110KV Auto transformer HV-I, LV-I breaker and Cts
CHECKANURANI SW STATION 230 KV
For Monthly Maintenance Work & Line Maintenance Work.
56072506 110KV VGTPS-PERUNGULAM# entire
561
73200 EE/O/SBT 110KV SBT - RNPM II # Bkr and CTs Monthly maintenance work
56271872
56371952 For Monthly Maintenance Work
564
72415 EE/O/AMPM Monthly Maintenance Work
56571964 EE/O/TTN 100 MVA Auto Transformer-- II
56671721 For Monthly Maintenance Work.
567
71801 EE/O/NNPT For monthly maintenance work.
56872610
56972648
570
72662
571
72930 TTPS
57272946 EE/O/APKM 230 KV TTPS - Chekkanoorani # Entire
57372745 EE/O/TTN
EE/O/VALUTHUR
VALUTHUR 230 KV
For attending tower to tower Inspection and Tree cutting work
SEMBATTY 230 KV
EE/O/KODIKURICHI
KODIKURICHY 230 KV
On 110KV O Thulukkapatti-Shasayee Paper Mill#
For Replacement of defective insulators at location No:15 & Tree clearence work
400KV KANARPATTI SS
kanarpatti 400 KV
400/110KV ICT 4 Main, tie breaker with CT and Transformer Bay Nos 410,411 AND 106
AMUTHAPURAM 230 KV
Amuthapuran-Nallamanayakkan patti 230KV #,breakers,CT's and its isolators
TUTICORIN -AUTO 230 KV
For Monthly Maintenance Works
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400KV Kanarpatti -2 feeder Main Breaker (401-52) & CT only
NALLAPPANAYAKANPATTY 230 KV
230 KV NNPT - AMUTHAPURAM feeder Breaker with CT
EE/O/Kayathar
KAYATHAR 230 KV
on 110 KV Kayathar - K.G.Patti feeder breaker with CT, section between Kayathar and kalugumalai
" For monthly maintenance work Line switch Maintenance work "
EE/O/Kayathar
KAYATHAR 230 KV
on 110 KVMelakkallur- - Kodayar feeder entire
Foir monthly maintenance work and tree clearance work at KMTR by lines wing kayathar
EE/O/Kayathar
KAYATHAR 230 KV
110 KV Main Bus entire before switch No 52 at 230/110 KV SS, kayathar
For the erection of 110 KV isolator at location 53 to preliminary work for blackstart operation
EE/EM-III/TTPS
230KV TTPS - CHCKANURANI FEEDER ENTIRE
Errection of CVT and maintenance work by EM-III
ANUPPANKULAM 230 KV
For replacement of flash over disk at Loc. No : 406,407,411,412,413,399,395,388
TUTICORIN -AUTO 230 KV
On 230 KV TTPS - Checkkanoorani Feeder Entire.
Tower to Tower Inspection and Rectification Work
574
72794 EE/O/SRP tree clearance work
57572118
57672247 EE/O/VRNM Monthly maintenance work
57771921
57871922
57972803 EE/O/PBLR 230KV Bus coupler Breaker only For monthly maintenance work
58072107
581
73041
582
72780
583
72354 EE/O/CKNI
58472083
58572543
586
72714
SRPUDUR 230 KV
110 KV SRP - KDR I # section between TKY & VNR
EE/O/SANKANERI
SANKANERI 230 KV
230/110KV AutoTransformer-II,HV&LV Breakers.
For monthly maintenance and GRT BREAKER test.
VEERANAM 230 KV
PR TR-I,HVBR-I,LVBR-I & 33KV FEEDERS OF Micon 4,Micon 5 and Micon 3
EE/O/Pugalur
PUGALUR 230 KV
230 KV Paruthiyur feeder breaker, CT & Line switch only
Monthly Maintenance work and Annual Relay testing work carried out by P&C wing,Erode.
EE/O/Pugalur
PUGALUR 230 KV
110 KV TNPL feeder breaker, CT & Line switch only
Monthly Maintenance Work and Annual Relay testing work carried out by P&C wing,Erode.
PERAMBALUR 230 KV
EE/O/Samayapuram
SAMAYAPURAM 230 KV
100 MVA Auto Transformer-I, HV-I, LV-I, Breakers , CT's, and isolators
1.For Maonthly mainrtenance work. 2. GRT Relay test
EE/O/THIRUVARUR
THIRUVARUR 230 KV
230KV Thiruvarur - NT Kudy feeder and breaker
Line premonsoon inspection work,230KV NT Kudy Breaker, CT's & Line side Isolator maintenance work and annual relay test work
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER BREAKER, CT's AND LINE ISOLATOR. B)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER ENTIRE
A)FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ NEMMELI THIPPIYAKUDI. B)FOR PREMONSOON RECTIFICATION WORK BY AE/LINES /PATTUKKOTTAI.
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Nallamanaikanpatty feeder ent
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
EE/O/Alagarkoil
ALAGARKOIL 230 KV
230 KV ALKL-Mondi[patty # Bkr,CT,&Line entire
Monthly Mtce work ,Auxiliary contact replacement work
EE/O/ THENI
then I 230 KV
110 KV Theni- Kinnimangalam II #(sec bet Theni &K.Vilakku
Mtc of Line,For line mtc works & Tree cutting works
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV renganathapuram udumalapetai feeder breaker CT and relays 2.section between renganathapuram and oddanchatram
Monthly maintenance of breaker CT and relays
58772190 LINE MAINTENANCE WORK.
588
71873 230KV Bus Section -I For Monthly Maintenance Work.
589
72004 For monthly maintenance work.
59071722 For Monthly Maintenance Work.
591
71803 EE/O/NNPT For monthly maintenance work
592
71804 EE/O/NNPT For monthly maintenance work
59371805 EE/O/NNPT 230 KV Main Bus Section - I
594
71806 EE/O/NNPT For monthly maintenance work.
59572608
596
72613
59772947 EE/O/APKM 230KV NNPTY - Ckekkanoorani # entire
59872769 EE/O/TTN
EE/O/KAVANOOR
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. VALUTHUR & R.S.MANGALAM (INCLUDING SALAIGRAMAM SPUR LINE)
EE/O/KODIKURICHI
KODIKURICHY 230 KV
EE/O/230KV Sipcot SS/MVTN/TTN
TUTICORIN -SIPCOT 230 KV
110KV SIPCOT-TTN # I breaker with CTs only.
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230KV Kayathar 1 # Main Breaker (204-52) & CT,CVT,LAS
NALLAPPANAYAKANPATTY 230 KV
230/110 KV Auto I, 230KV HV Breaker I with CT, 110KV LV Breaker I with CT
NALLAPPANAYAKANPATTY 230 KV
110KV Thottiapatti feeder breaker with C.T
NALLAPPANAYAKANPATTY 230 KV
For isolators 20389A and 20389A1 rectification work.
NALLAPPANAYAKANPATTY 230 KV
230 KV NNPT - CHEKKANURANI feeder Breaker with CT
EE/O/SANKANERI
UDAYATHUR 230 KV
POWER TRANSFORMER III ,HV ,LV BREAKERS & Its FEEDERS
1.MTCE 2.ANNUAL RELAY TEST & CONTACT RESISTANCE TEST BY GRT
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - 400 KV Kayathar I LINK #, breaker with CT and Lines inspection
a) For monthly maintenance work B) Lines - Jumper joint rectification work C) GRT - Annual relay test.
ANUPPANKULAM 230 KV
For replacement of flash over disk at Loc. No : 278, 228
TUTICORIN -AUTO 230 KV
On 110KV Arumuganeri - SR Pudur - II Feeder (section between 110 KV Arumuganeri SS and 110 KV Koodankulam SS)
Tower to Tower Inspection and Rectification Work
599
71836
600
72821
601
72953 EE/O/PDKT
602
73042
60372160 110KV bus coupler breaker Monthly Maintenance work
604
72355 EE/O/CKNI 230 KV Bus-B Entire For Monthly Maintenance Work.
60572508 110KV PENNA-VALUTHUR# entire.
606 72546 110 KV Capacitor bank Breaker with CT Monthly Mtc
607
72681 EE/O/KKDI Tower to tower inspection
608
72723
609
73201 EE/O/SBT Tree cutting work
61072191 230 KV KAVANOOR-SIPCOT #
61171955 For Monthly Maintenance Work
EE/O/Mondipatty
Mondipatti 230KV
230 KV Mondipatty - Alagarkoil feeder Breaker,CT's, Line isolator and entire line section.
For monthly maintenance works, Line inspection and P&C testing .
EE/O/NEMMELI THIPPIYAKUDI
THIRUVARUR 230 KV
110KV T(K)GTPS - THIRUVARUR FEEDER (VIA: 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS & 110KV MANNARGUDI SS), LINE PORTION BETWEEN 110KV ULLIKKOTTAI SS TO 110KV MANNARGUDI SS .
FOR PREMONSOON INSPECTION WORK BY AE/LINES/ PATTUKKOTTAI.
PUDUKOTTAI 230 KV
230KV PDKT - Karaikudi PG Breaker, CT, Isolator and 230KV PDKT - Karaikudi PG feeder EHT LINE
Monthly maintenance works, Breaker, CT, Isolator and EHT Line tree cutting & premansoon inspection
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Kovilvenni - Kumbakonam feeder
line premonsoon inspection work
EE/O/KADALANGUDY
KADALANGUDI 230 KVCHECKANURANI SW STATION 230 KV
EE/O/VALUTHUR
VALUTHUR 230 KV
For attending tower to tower Inspection and Tree cutting work
EE/O/ THENI
then I 230 KVKARAIKUDI 230 KV
110 KV KKDI-SVGA# S/B SVGA – M.Patty
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
110 KV renganathapuram sempatty II feeder breaker CT and relay
Monthly maintenance of breaker CT and relays relay testing
SEMBATTY 230 KV
110KV SBT - AKL II # section bet. V.K.Patti & Natham SS
EE/O/KAVANOOR
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
400KV KANARPATTI SS
kanarpatti 400 KV
400/110KV ICT 5 Main, tie breaker with CT and Transformer Bay Nos 413 AND 109
612
71723 For Monthly Maintenance Work.
613
72618 A) Monthly Maintenance work
61472620
61572637
616
72950 EE/O/APKM For monthly maintenance work.
61772777 EE/O/TTN
61873099 eephsppm For monthly maintenance work
619
73123 PH-1 Machine
620
72122
62172248 EE/O/VRNM 230kv Bus coupler breaker Monthly maintenance work
622
72864 230 KV Bus coupler breaker. a) Monthly Maintenance Work
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
400 KV Tie Breaker (402-52) for Kanarpatti-1 & Kanarpatti-2 Feeder
EE/O/Kayathar
KAYATHAR 230 KV
On 110 KV Kayathar - Vanchi Maniyatchi # breaker with CT
EE/O/Kayathar
KAYATHAR 230 KV
on 110 KV Kayathar GC Breaker with CT & 66Kv Kovilpatti breaker
" For monthly maintenance work Line switch Maintenance work "
EE/O/SANKANERI
UDAYATHUR 230 KV
230KV ABISHEKAPATTI FEEDER BREAKER
1.MTCE WORKS 2. BREAKER TEST TO BE CARRIED OUT BY GRT WING
ANUPPANKULAM 230 KV
110 KV APK - Thulukkapatti feeder BKR & CTs and line switch only.
TUTICORIN -AUTO 230 KV
On 230 KV Sipcot - Kavanoor Feeder Entire.
Tower to Tower Inspection and Rectification Work
PAPANASAM
110KV Papanasam -Servalar feeder-2 breaker with CT .
EE/PHS/KDR
KODAIYAR PH1
Exciter cleaning, Back washing of UGB,LGB&TGB oil coolers, Governor oil circulation.
EE/O/SANKANERI
SANKANERI 230 KV
230/33KV PowerTransformer-II,HV&LV Breakers.
For monthly maintenance and GRT BREAKER test.
VEERANAM 230 KV
EE/Operation/230 KV SS/Alundur
ALUNDUR 230 KV
623
72109
624
73044
625
73055 110KV T.pet feeder breaker Monthly maintenance
626
72356 EE/O/CKNI 230 KV Bus coupler Breaker For Monthly Maintenance Work.
627
72377 EE/O/CKNI
62872439 230KV KNMLM-KAYATHAR # Entire
62972688 EE/O/KKDI 1. Monthly maintenance works
63072727 230 TBC Breaker
EE/O/Samayapuram
SAMAYAPURAM 230 KV
110 KV SMPM-Kallakudi -I # CT's , Breakers and entire line portion (tied feeder) .
1. For monthly maintenance works . 2. EHT Lines inspection Work. 3.Replacement of burst out coupling capacitor at 'B' Phase.
EE/O/THIRUVARUR
THIRUVARUR 230 KV
110KV Thiruvarur - Narimanam II feeder and breaker
EHT line premansoon inspection work,Breaker, CT's & Line side Isolator maintenance work and annual relay test work
EE/O/JAMUNATHAOURAM
Jambunathapuram 230KV
CHECKANURANI SW STATION 230 KVCHECKANURANI SW STATION 230 KV
230 KV Kinnimangalam - Kayathar feeder entire
For Tower to Tower inspection and Line maintenance Work
EE/O/KNMLM
kinnimangalam 230 KV
Maintenance works of Breaker ,CT and Line Isolator
KARAIKUDI 230 KV
110KV GC & 110/22KV Power Transformer and its allied Equipments.
EE/O/Renganathapuram
RENGANATHAPURAM 230 KV
Monthly maintenance of breaker
631
73202 EE/O/SBT
632
71874 230 KV Bus section II Monthly maintenance work
63371724 For Monthly Maintenance Work.
63472621 For monthly maintenance work
63572628
63672660
63772952 EE/O/APKM
638
72801 EE/O/SRP tree clearance work
639
73065
640
72793
SEMBATTY 230 KV
110KV SBT - Udumalpet # Bkr, CTs and section bet. SBT & Pappampatti SS
1. Monthly maintenance work 2. Tree cutting work
EE/O/KODIKURICHI
KODIKURICHY 230 KV
EE/O/400KV SS/KAYATHAR
Kayathar 400 KV
230KV Kayathar 2 # Main Breaker (205-52) & CT,CVT
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - 400 KV Kayathar II LINK #, breaker with CT and Lines inspection
EE/O/Kayathar
KAYATHAR 230 KV
On 230 KV Kayathar - Kinimangalam #, breaker with CT
a) For monthly maintenance work
EE/O/SANKANERI
UDAYATHUR 230 KV
110KV SAMUGARANGAPURAM FEEDER BREAKER
1.MTCE WORKS 2. BREAKER TEST TOBE CARRIED OUT BY GRT WING
ANUPPANKULAM 230 KV
230 KV Kayathar - Kinnemangalam # entire
For replacement of flash over disk at Loc. No : 199 & 230
SRPUDUR 230 KV
110 KV SRP - KDR I # section between VNR & PCI
EE/O/Thanjavur
THANJAVUR 230 KV
230 KV Thanjavur - Thiruvarur feeder, Breaker, CT, CVT & Line Isolator.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur, 2) For premonsoon inspection works by the AEE/Lines/Thanjavur
EE/O/NEMMELI THIPPIYAKUDI
NEMALITHIPIYAKUDI 230 KV
A)110 KV NEMMELI THIPPIYAKUDI-THANJAVUR FEEDER BREAKER,CT's & LINE ISOLATOR. B)110 KV NEMMELI THIPPIYAKUDI-THANJAVUR FEEDER (LP: 230KV NT KUDI SS TO 110 ORATHANADU SS).
A) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/NEMMELI THIPPIYAKUDI. B) PREMONSOON INSPECTION WORK BY AE/LINES/PATTUKKOTTAI.
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
Condition From date To date
6/1/2018 9:00 6/1/2018 17:00 1 POSSIBLE
6/1/2018 10:00 6/1/2018 17:00 1
6/1/2018 9:00 6/1/2018 14:00 1 POSSIBLE
6/1/2018 10:00 6/1/2018 17:00 1 occ approval
6/1/2018 9:00 6/1/2018 14:00 1 POSSIBLE
6/1/2018 9:00 6/1/2018 17:00 1 occ aproval
6/1/2018 9:00 6/1/2018 17:00 1
From time
To time
No. of
days
Recomendation
During the LC period 110 KV Periyakulam & Kodaikanal SS
under TSD
During the LC period, capacitor bank I & II will be in service one by
one.SE/O/MDU APPROVAL
1) The Feeder will be kept radial from Sembatty end upto Achampathu SS feeding
Sithargalnatham SS, 110KV Vadipatty SS and 110KV
Ramarajapuram SS loads. 2)110KV AB Switch towards
Pasumalai at Achampathu SS will be kept opened. 3)110/11KV
Achampathu SS will be under shutdown 4) No interruption to
any SS
400KV supply will be fed from 400KV Kayathar I & II Feeder.
During the LC Period 110KV UdayathoorSS Supply Radially upto NavalladySS.Hence NO ss will be
affected.
During the LC period there will be no supply in 400 KV Kanarpatti-1 feeder Main breaker (403-52). Hence no ss will be affected.During the LC period the capacitor Bank II in out of service
SE/O/TRY APPROVAL
6/1/2018 8:00 7/5/2018 17:00 35
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
1.AUTO TRANSFORMER HVI, LVI HAND TRIPPED AND ISOLATOR ALSO OPENED 2.AUTO II (100MVA) & AUTO III (160MVA) IN SERVICE. 3.THE ENTERE LOAD WILL BE MAINTAINED AUTO II & III 4.IF LOAD EXIDED AVAILABLE AUTO TRANSFORMER CAPACITY 6 + 6 HRS 3 PHASE SUPPLY AND REMAINING 12 HRS 2 PHASE SUPPLY WILL BE MAINTAINED. CONCURENCE OBTAINED FROM SE/PEDC/PDKT AND SE/O/TRICHY HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.REMARKS: It will take From 01.06.2018 to 05.07.2018, 35 days for erection of the new 160 MVA, 230/110 KV Auto Transformer by availing LC. Vide Lr.No:AEE/TE-I/TRY/ F PudukkottaiSS /D 81 /2018 Dt.22.05.2018.
"During the LC period (i)110kv Tenkasi SS, Kadayam, Shenkottai SS will be under monthly shudown (ii)110KV Keelapavoor wind farm SS will be fed from 110KVPapanasam-Kayathar # (iii)Papanasam PH will be tied with 110 KV Kayathar - Papanasam # by closing of AB switch at rastha SS end" (i)110 KV Tenkasi,110 KV Shencottai SS,110 KV Keelapavoor SS, will be Radiallay fed from 230KV Kodikurichi SS. ii) 110 KV Kadayam SS , 110 KV Rastha SS and Papanasam PH will be fed from 110KV Kayathar - Papanasam feeder by closing of Bus-coupler switch at 110 KV Rastha SS end. "
During LC Period There will be no supply in the entire feeder
"During the LC Period the station Load will be managed other two Auto Transformers"
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 15:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 15:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 15:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 14:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 12:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
During the LC period there will be no supply in the entire feeder.EE/O/CKNI has also programmed Line LC.
During the LC period Auto Transformer I& II will be in service. Hence there is 'no' interruption in power evacuation.
AUTO TR I will be in service .Industrial estate SS,UranganpattySS,Othakadai SS Melur SS under S/D.Feeder will be radial from other end. Industrial estate SS,OthakadaiSSunder S/D .If necessary Anupanadi SS loads will be transferred to 110KV PSQ-Sakthi sugar feeder.Feeder will be radial from other end. Industrial estate SS,OthakadaiSSunder S/D .If necessary Anupanadi SS loads will be transferred to 110KV PSQ-Sakthi sugar feeder.(Isolator at IT Park towards Othakadai wii be kept opened,B & L will be kept opened at Alkl end)During the LC period, 110KV KKDI-Kalanivasal SS is under TSD. Hence there will be no interruption of supply.
SE/O/MDU APPROVAL
During the LC period, other end will be in off condition.
FEEDER TO BE KEPT RADIAL FROM VGTPS UPTO R.S.MADAI SS R.S.MADAI SS WILL BE AVAILED TOTAL SHUTDOWN.EE / O / Kinnimangalam has also programmed
110KV Kanarpatty_Keelaveeranam feeder supply is to be extended up to this SS end by closing the 110 A. B switch at 110 KV Surandai SS.
110KV Uthumalai SS is availing monthly maintanence on the same date.Hence s no SS will be affected affectedDuring the LC period 110 KV Sattur SS will be availing total shut down. Hence No SS will be affected.
6/2/2018 9:00 6/2/2018 17:00 1
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 14:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 13:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 13:00 1 POSSIBLE
During the LC period other end also avails LC and there will be no supply in the entire line Hence no SS affected. Necessary LC Charges Rs 56440 /-collected vide 472T063918 dt.02.05.2018
During the LC Period both end availed Line clear
During the LC period 110 KV Veeranallur fed from Kayathar, MKLR fed from other end. Hence no SS will be affected.110KV Kayathar feeder radial from Kayathar to Kodayar
110KV melakaloor # radial from melakaloor to KDR
During the above work 1) The 80 MVA Auto Tr I & 50 MVA Auto Tr II are in parallel 2) Eachangadu 230 KV SS loads will be fed from the other Auto Transformer -II 3) 110 KV Vridhachalam SS loads will be transferred to 110 KV Neyveli -Deviakurichi feeder and 110 KV pennadam SS is also avail total shut down hence the Loads will be with in one transformer capacity.
DURING THE ABOVE SHUTDOWN PERIOD 110 KV PENNADAM SS IS ALSO AVAILING TOTAL SHUT DOWN and normaly the feeder is radial from Eachangadu 230 KV SS.
110 KV Sakkottai and 110 Kumbakonam urban ss availing total shut-down for monthly maintenance works.
110 KV Kovilvenni SS availing total shut-down for monthly maintenance works.
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 14:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1
110 KV Sakkottai SS and Kumbakonam Urban SS availing total shut-down.
1.110 KV trichy - kovilur feeder fed radially up to eriode ss from trichy end 2.hence no supply interruption to any other ss1. During the above LC Period, 110Kv Kallakudy II # Breaker is in H/T condition at 230KV Tahtchankurichy SS . 2.110Kv Thatchankurichy II# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV Thatchankurichy SS. 6.110 KV Kallakudi-I # will be in tied condition. 7.There will be no interruption to any other SS.
During the LC period, a) Intermediate 110KV K.Sathanoor SS load Relief 10.9 MW ,110 KV Ambigapuram SS load Relief 13.9 & 33 KV EB Road SS load Relief 8.2 MW also avail total shut down. b) 110 KV Alundur -Trichy-II Feeder Radial from other end. c) Bus Coupler Tripped condition switch No.09 & 10 opened. d) Switch No.15 opened. e) EHT and SE/TEDC/M/Trichy Concurrence obtained. f) All other 110 KV feeders will be in service. g)There will be no interruption of supply to any other feeder's and ss.
WHETHER IT IS A BUS LC? MESSAGE NOT CLEAR. WHY ALDR TRY II KEPT OPEN?
6/2/2018 10:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 9:00 6/2/2018 17:00 1 POSSIBLE
6/2/2018 10:00 6/2/2018 14:00 1 POSSIBLE
6/2/2018 12:00 6/2/2018 16:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
1) DURING THE LC PERIOD, 110KV PATTUKKOTTAI, PATTUKKOTTAI URBAN SS WILL AVAIL TOTAL SHUTDOWN. 2) 110KV PERAVURANI AND SETHUBAVACHATHIRAM WILL BE FED FROM 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-II FEEDER. 3) NO INTERRUPTION TO ANY OTHER SUBSTATIONS AND ALL OTHER 110KV FEEDERS ARE TIED CONDITION. 4) If necessary, 110KV Kovilkalappal-Madukkur-Pattukkottai tie will be created (by closing the 110KV Line Isolator (switch No.2) at 110KV Madukkur SS and 110KV Madukkur feeder Breaker hand tripped condition at 230KV N T Kudi SS.)
During the LC period 110KV Mannarkudi ss , 110KV O.Keelaiyur SS and 110KV Ullikottai ss will be fed from T(K)GTPS
During the LC period, 1) Thanjavur 110 KV Grid SS will avail shutdown in 33 KV #s on the same day (Load relief: 18 MW), 2) all other 110 KV feeders will be in tied condition, 3) no supply interruption to any SS.During the LC period there will be no interruption of supply to any SS, LC also applied by EE/O/TJR on the same day.During the above LC period there is no supply interruption to any SS.230KV Neyveli feeder breaker will be substituted by 230 KV bus coupler.230KV Kumbakonam feeder and Auto transformer HV-II,LV-II breaker will be kept in hand tripped condition.110KV Sakkotai ,110-33/11KV Kumbakonam SS proposed Shut down.230KV Kumbakonam SS supply fed from 230KV Thiruvarur sS.
During the above LC period there is no supply interruption to any SS. 110KV Sakkottai & Kumbakonam urban SS proposed total Shut downDuring the LC period 110 KV U.Palayam SS under TSD and no supply to Kamachi puram WFSS(Regen & GAMESA)
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
Other end is also availing L.C. 6/4/2018 9:00 6/4/2018 15:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 16:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 8:00 6/5/2018 18:00 2 POSTPONED
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 14:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
During the LC period Auto Transformer I& III will be in service. Hence there is 'no' interruption in power evacuation.
110 KV renganathapuram sempatty I # fed radially from sempatty end up to minukampatty as No supply interruption to any other ssAll other 230KV #rs will be tied with grid. Hence there will be no interruption of supply.
During the LC period (1) Alternate feeder at M/S.SAI REGENCY CPP, SAI #1 will be in service. Hence there will be no power evacuation problem. (2) Concurrence obtained from M/S. CORAMANDAL CPP to S/D generation during the LC period. (3) VGTPS Ph I & Ph II will be under Shut down for Combustion Chamber Inspection from 01.06.2018 to 08.06.2018.SINCE BOTH ENDS LC TO BE AVAILED .NO SUPPLY IN THE FEEDEREE / O / Alagarkoil has also programmed
DURING THE ABOVE PERIOD, ENTIRE LINE LC HAS BEEN PROPOSED BY EE/O/THENI
"During the LC period EE/O/Amuthapuram has also applied LC on 230KV Amuthapuram # I breaker on the same day 04.06.2018""During LC period, i)110 KV Tenkasi,110 KV Shencottai SS,110 KV Keelapavoor SS,and 110 KV Kadayam SS will be Radiallay fed from 230KV Kodikurichi SS. ii) 110 KV Rastha SS will be fed from 110KV Kayathar - Papanasam feeder by closingof Bus-coupler switch at 110 KV Rastha SS end. III)Hence no SS will be affected. "1) 230KV TTPS- AUTO SS- I FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.
No SS will be affected. 6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 13:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 RESCHEDULE
No SS will be affected 6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 14:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 16:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
1) During the LC period there will be NO supply in this feeder. 2)Other End also avail LC on same day. 3) Cocurrence obtained from SE/NCES/TIN.During the LC period,110 KV Valayapatti SS, Watrap SS, Erichnatham SS will be availing Total Shut down. 110 KV TTL SS & T. Kallupatti SS load will be transferred to 110KV Paraipatti feeder. Hence no ss will be affected.During the LC Period the feeder will be raidal from other end upto therkupatti SS by closing the 110 KV Line AB switch at keelaveeranam towards kayathar. Hence no ss affected.During the LC period Melappalayam will be radially fed from Sankanery and Karisalpatti Ss will be radially fed from Melakkallur Hence No Ss affected
During the LC period 110/11 KV Annanager SS will avail supply from MLKR end and 110/11 KV Vallioor SS will avail supply from SNRI end.
During the LC period, a) The 110KV feeders load will be managed through 110KV Alundur SS and 110 KV Sembatty SS. b) There will be no interruption of supply to any of the SS.During the LC period, a) The Intermediate 110 KV Ammapettai SS availing total shutdown for monthly maintenance works. b) other end also availing LC on the same feeder. c) All other 110 kv feeders will be in tied condition. d) There will be no interruption of supply to any of the SS.During the LC period, a) Intermediate 110KV Ammapettai SS also avail total shut down. b) Load Relief 110 KV Ammapettai SS - 7.3MW c) All other 110 KV feeders will be in service. d)There will be no interruption of supply to any other feeder's and ss.
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 9:00 6/4/2018 17:00 1 POSSIBLE
6/4/2018 11:00 6/6/2018 20:00 3 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 15:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 14:00 1 POSSIBLE
6/5/2018 9:00 6/9/2018 17:00 5
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
During the LC period, a)An Other 100 MVA Auto Transformer -I will be in service. c) All 110 KV feeders will be in service. d) There will be no interruption of supply to any other feeders.
During the LC Period there is no interruption to any other SS.All 230KV feeders are in service
During the above LC there is no supply interruption to any SS and all the feeders are in tied condition.
During the lc period the feeder will be charged radialy from other endFeeder will be radial from other end..
During the L.C Period, 110KV Kallal SS is under TSD. 110KV KKDI- SVGA # radial from SVGA end up to Madhagupatty. Hence there will be no interruption of supply.1.110 KV renganathapuram pugalur feeder radially fed from pugalur end up to 110 KV pallapatty ss
1)The Feeder will be kept radial from Kinnimangalam SS end upto Tirumangalam SS 2)The Feeder will be kept radial from 230KV Pasumalai SS end upto Kappalur SS 3)110KV isolator towards Pasumalai at Tirumangalam SS and towards Kinnimangalam at Kappalur SS will be kept opened. Hence No interruption of supply to any SS 4)The already applied LC from 30.05.2018 to 13.06.2018 vide ID No: 70563 may be treated as cancelled. 5)LC could be Entered only for 3 days whereas the actual LC required is from 05.06.2018 to 25.06.2018
AUTO TRANSFORMER -II WILL BE IN SERVICE
6/5/2018 9:00 6/5/2018 14:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 14:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 13:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 14:00 1 POSSIBLE
1)The feeder will be kept radial from 230KV Kinnimangalam SS upto Tirumangalam SS feeding Tirumangalam SS loads only. 2)At Kappalur SS the switch towards Tirumangalam SS will be kept opened 3)110KV Kappalur SS will be under shutdown. 4)Hence No interruption of Supply to any SS
"During the LC Period 1.110 KV V.K.Puram SS availed Monthly shutdown 2.110 KV Isolator towards Papanasam will be kept openen at V.K.Puram SS & Isolator towards V.K.Puram SS will be kept openen at Papanasam. 3.Hence No SS will be affceted."1) 230KV TTPS- STERLITE FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.During the LC period, the other end has also proposed LC on the same date and M/s. Sterlite-CPP generation (if available) will be exported to 230KV Anuppankulam end and no other SS will be affected please.During the LC period there willbe no supply in the Entire Feedere.Other End also LC applied.
During the LC period there will be no supply in 400 KV Karaikudi -1 feeder Main Breaker (407-52), Reactor Breaker (407-52R), Reactor .Hence no ss will be affected.
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
During the LC period, other end also avails LC and there will be no supply in the entire line, Hence no ss affected
During the LC period the feeder will be kept radial from Madurai end. Hence no SS will be affected.
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 14:00 1 POSSIBLE
No Generation in KDR PH-1 6/5/2018 9:00 6/5/2018 13:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 16:00 1 POSSIBLE
6/5/2018 10:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 10:00 6/5/2018 17:00 1 POSSIBLE
During the above LC Period, No SS will be affected 230KV Stelite SS Radially fed from 230KV Anuppankulam SS.During the LC period the 110 KV KDR PH I will be avail total shut down as approved by EE/PHS/KDR. Hence no ss will be affected.
During the LC period, a) other end also availing LC on the same feeder. b) All other 230KV feeders will be in tied condition. c) Hence there will be no interruption of supply to any of the feeder and SS.
During the above period of LC a)110KV Poovalur SS avail Total shutdown on the same day. b)110KV Court SS, 110KV Thennur SS,110KV T.V.Koil SS, 110KV Valady SS,M/s.Kothari EHT sc. will be fed radially from 110KV Trichy Grid SS. C). At 230KV Thatchankurichy SS line Isolator towards 110KV Poovalur ss will be Kept opened and earth switch closed. d)At 110KV Poovalur ss line Isolator towards 230KV Thatchankurichy SS will be Kept opened and earth switch closed. e)Necessary concurrence has been obtained from M/s.Kothari EHT Service for the interuptions during the switching operations. f)There will be no interuption to any other SS/EHT consumers.
During the LC period, a) Other end also avail shutdown. b) 110KV Poovalur SS load Relief 11.1 MW, 110KV Thennur SS load Relief 15.3 MW, 33 KV Varaganeri SS load Relief 5.9 MW also avail total shut down. c) All other 230 KV feeders will be in service. d) There will be no interruption of supply to any other feeders.NT KUDI 230 KV SS to Thirumakottai 110 KV SS Feed radially.1) DURING THE LC PERIOD, 110/33-11KV MADUKKUR SS AND 110KV THIRUMAKKOTTAI SS RADIALLY FED FROM 230KV N T KUDI SS. 2) No interruption to any Substation.
6/5/2018 9:00 6/5/2018 17:00 1 POSSIBLE
6/5/2018 9:00 6/5/2018 17:00 1
6/5/2018 9:00 6/5/2018 16:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 10:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/7/2018 17:00 2 RESCHEDULE
6/6/2018 9:00 6/6/2018 14:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
During the LC period all other feeders are in service and there is no interruption of supply to any other SS
NO supply interruption to any SS.Already PPN plant under shut down.
No supply interruption to any SS.Aduthurai SS proposed shut down.During the LC Period All the 230 KV Feeders fed through B-Bus
110KV VALUTHUR - PENNA feeder will be in service. Hence there will be no power evacution problem.During the LC , Sempaty end supply radially charged up to 110kv ayyampalyam vaigai and madurapuri ss under TSDAll other 2 Auto transformers will be in service and cater the load.
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.110KV KAVANOOR-VALUTHUR # WILL BE IN SERVICE
1)Auto Transformer -2 will be in Service 2)110/11KV Avaniyapuram and Anupanadi SS will be under Shutdown on 06.06.2018. 3)110/33-11KV Villapuram SS will be under Shutdown on 07.06.2018. 4) 110KV Pasumalai - Sembatty feeder will be kept radial from Other end 5) If necessary 110KV Pasumalai - Anupankulam feeder will be kept radial from Other end
1)The Feeder will be kept radial from Alagarkoil SS upto Vandiyur SS feeding Othkadai, IT Park SS, Industrial Estate SS and Vandiyur SS 2)110/33-11KV Anuppanadi SS and 110/11KV Avaniyapuram SS will be under Shut down."During the LC period EE/O/Amuthapuram has also applied LC on 230KV Amuthapuram- # II breaker on the same day 06.06.2018"
6/6/2018 10:00 6/6/2018 17:00 1 POSSIBLE
No SS will be affected. 6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1
6/6/2018 9:00 6/6/2018 15:00 1 POSSIBLE
No SS will be affected 6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
400kv will fed from Abisekapatti Main breaker & 400kv kayathar I II Feeder.
1) 230KV TTPS- AUTO SS-II FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Cocurrence obtained from SE/NCES/TIN.During the LC period there will be no supply in 230 KV Sangaraperi 2 # Main Breaker (212-52) & CT, CVT,LAS. Hence No SS affected.During the LC period, other end also avails LC and there will be no supply in the entire line, Hence no ss affected
During the LC period a)110 KV Kayathar-Papanasam # radial from 110 KV kodikurichi - papanasam tie # by clsoing the bus coupler switch no 7A at rastha SS B)110 KV kodikurichi # radial from other end by closing the 110 KV Line AB Switch at keelaveeranam SS towards kytr, 110 KV K.G.Patty # tied with kodikuruchi SS Hence no ss affected. C) Concurrunce will be obtained from SE/EDC/Tuticorin, EE/PH/PPM, SE /TEDC /Tirunelveli
Durin the LC period the Auto Tr. III will cater the load of Auto Tr. II. Hence No SS affected.
6/6/2018 9:00 6/6/2018 18:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 14:00 1 POSSIBLE
6/6/2018 10:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 16:00 1 POSSIBLE
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
During the LC period ,110 KV Thengamputhur SS ,Kanyakumari SS and 110 KV Meenakshipuram SS will avail total shut down as approved by KKEDC/NGL upto 14:00 Hrs .From 14:00 Hrs to 18:00 Hrs 110 SRP-KKY # supply will be extended to 110/11 KV Kanyakumari SS,110 /11 KV Thengamputhur SS and 110/11 KV Meenakshipuram SS.110 KV NGL SS will avail supply from 110 KV SRP-KDR I Feeder.Hence no SS will be affected.
During the LC period ,entire 110/11KV Tamilpadi SS & 110/33-11KV Aruppukottai loads will be fed from 230/110KV kavanoor SS
During the lc period there will be no supply in the entire feeder concurrence obtained from SE/NCES/TIN.
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy I feeder. This LC approved in 143th OCC meeting.
During the LC period, there will be no supply in 230 KV Pugalur - Pudansanthai feeder since other end also availing L.C on the same period.
During the LC period, a) other end also availing LC on the same feeder. b) All other 230KV feeders will be in tied condition. c) Hence there will be no interruption of supply to any of the feeder and SS.
110 KV Thirupurambiyam SS availing total Shut-down, for monthly maintenance works.
6/6/2018 9:00 6/6/2018 17:00 1 POSSIBLE
6/6/2018 10:00 6/6/2018 16:00 1 RESCHEDULE
6/6/2018 10:00 6/6/2018 17:00 1 RESCHEDULE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 13:00 1 POSSIBLE
Feeder will be radial from SBTY 6/7/2018 9:00 6/7/2018 15:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 14:00 1 POSSIBLE
During the LC period, a) Other end also avail shutdown. b) All other 230 KV feeders will be in service. c) There will be no interruption of supply to any other feeders.
During the above period of shut down 1)230KV Perambalur SS will be radially fed from 230KV TAQA end1)230Kv perambalur feeder Breaker H/T at Jamunathapuram SS 2)Bus and line switch open at Jamunathapuram SS.3)Jamunathapuram feeder breaker H/T at 230KV Perambalur SS to avail LC.4)No supply interruption to any other SS.During LC Period There will be no supply in the entire feeder
"During the LC Period the station Load will be managed other two Auto Transformers"
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO KEELAKARAI & FROM KAVANOOR UPTO VALINOKKAM KILAKARAI SS WILL BE AVAILED TOTAL S/D.FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO KEELAKARAI & FROM KAVANOOR UPTO VALINOKKAM KILAKARAI SS WILL BE AVAILED TOTAL S/D.EE / O / Checkanoorani has also programmed
6/7/2018 9:00 6/7/2018 14:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
No SS will be affected 6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 12:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 15:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 14:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
1) The sakthisugars feeder is kept fed from Alkl end through 110KV Alagarkoil - Karaikudi Feeder feeding Nattarmanaglam and Arasanoor SS upto Sakthisugars. 2) At Uranganpatty SS the switch towards Pasumalai SS is already kept opened 3)110KV Sakthisugar -Sivaganga Feeder will be in grid . 4)110KV Alagarkoil - Karaikudi Feeder is also radial from Alagarkoil upto Tirupathur SS Line links feeding Narasingampatti , Melur SS and Thaniyamangalam SS. 5) At Tirupathur SS the switch towards Alagarkoil is kept open. 6) 110/33-11KV Villapuram SS will be under Shutdown.
"During the LC period 110 KV Kodikurichi WF SS will be fed from 110 KV Tenkasi - Papanasam # by closing of AB Switch towards Tenkasi at Kodikurichi WF SS. ""i)110 KV Echantha SS will be fed from 110 KV Veerasigamani SS by closing the AB switch at Echantha SS end ii)110 KV isolator towards Echantha SS will be kept opened in Kodikuruchi SS and AB switch towards kodikuruchi will be kept opened in Echantha SS . "
During the LC period 110KV Kadayanallur SS & 110KV Achanpudur SS will be radial from 110KV Kadayanallur feeder of 230KV Kodikuruchi SS. Hence no SS affected.THERE WILL BE NO SUPPLY ON 33KV FEEDERS
since there is no intermediate SS, there will be no interruption and no other SS will be affected please.other endhas also obtained LC on the same date & timeDuring the LC Period 110KV Melakallur Supply Radialy upto 110KV VadakkanKulamSS. Hence no SS will be affaected.During the LC period ther will no supply in 406-52,409-52, 412-52,406-89A, 406-89AE,412-89A, 412-89AE, 409-89A, 403-52, 403-89A, 403-89B &4B1E, 403-52,403-89A,403-89B, 403-89L, 402-52, 402-89A, 402-89B. Hence no SS affected.
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 11:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 0:00 6/7/2018 0:00 1
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 15:00 1 POSSIBLE
6/7/2018 9:00 6/7/2018 14:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 15:00 1 POSSIBLE
During the LC period there will be no supply in 400 KV Karaikudi-2 feeder Main Breaker (409-52), Reactor Breaker (409-52R), Reactor and line. Hence no ss will be affected.During LC period 1)There is NO wind generation in 110 KV RAMNAGAR SSand concurrence received from the in charge of RAMNAGAR SS the party has remitted Rs.1,19,091/- vide PR No.PC/MDU/RA-1/D.1411/ dt11-01-2018 for annual relay test work 2)Concurrence obtained from SE/NCES/TINDuring the LC period 110KV Kadayanallur SS & 110KV Achanpudur SS will be radial from 110KV Kadayanallur feeder of 230KV Kodikuruchi SS. Hence no SS affected.During the LC period Palayamkottai SS will be fed from 110 KV Arumuganeri SS. Hence no ss affected
During the LC period Kadaiyanallore SS will be radially fed from 230/110 KV Kodikuruchi SS. B) 110 KV NNPTY SS will be radially fed from 230/110 KV NNPTY SS & Visvanathaperi SS and Naranapuram SS load will be radially fed from Kodikuruchi SS. Hence No SS will be affected.During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from KDR PH II upto Thuckalay SS (incl).The 110/11 KV Chemponvilai, Cheramangalam and Karungal SS will avail total Shutdown as approved by SE/KKEDC/NGL and SE/O/TIN. Concurreance to be obtained from Railway authoritise.Hence no SS will be affected.
6/7/2018 9:00 6/7/2018 16:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 13:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 17:00 1 RESCHEDULE
6/7/2018 9:00 6/7/2018 17:00 1 POSSIBLE
6/7/2018 10:00 6/7/2018 16:00 1
6/7/2018 9:00 6/7/2018 17:00 16/8/2018 9:00 6/8/2018 17:00 1 RESCHEDULE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
During the LC period, a) other end also availing LC on the same feeder. b) all other 230KV feeders will be in tied condition. c) there will be no interruption of supply to Since 230 KV Kadalangudy-kumbakonam- Thiruvarur feeder tie opened at thiruvarur end. Breaker maintenance only without interruption of the supply, Bus coupler will be substituted for 230KV kadalangudy feeder.1. During the LC period 230 KV SMPM SS will be radially fed from 230 KV SS Poyyur. 2.The other end 230 KV SS Trichy also availing LC on the same date & time. 3.No interruption to any other 110 KV SS.
1) DURING THE LC PERIOD, 110KV PERAVURANI (LR: 20MW) AND 110KV SETHUBAVACHATHITRAM SS(LR: 8 MW) WILL AVAIL TOTAL SHUTDOWN. 2) AUTO-II IN SERVICE. 2) NO INTERRUPTION TO ANY OTHER SS.The above feeder is in idly charged condition and hence there is no interruption of supply to any other SS
During the LC period, the other end also availing LC on the same date.
During LC period there will be no supply in the entire feeder
During the LC period the feeder will be radial from THENI SS upto 110 KV Chekkanurani SS.
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 15:00 1
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 14:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 17:00 1 POSSIBLE
No SS will be affected. 6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 15:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
During the LC period 230KV Valuthur Karaikudi and Alagarkovil feeders will be in service hence there will be no problem in power evacuation. LC Proposed at kavanoor end alsoKottampatty, Singampunari, A.Thekkur, S.PudurThuvarangurichy loads will be fed from 110KV ALKL-Karaikudi # feeding radial from kkdi.(Nspty,Melur,Thaniyamangalam SS loads of 110 kv ALKL-KKDI feeder will be fed from Alkl )
SE/O/MDU APPROVAL
During the LC period, the 110KV Manamadurai SS is under TSD. Hence there will be no interruption of supply.
110kv Uranganpatti ss,Arasanoor ss will be avail Total shut down and 110kv Nelmudikarai and Sakthi sugars To be Lc then the above feeder to be kept radial from karaikudi.SINCE BOTH ENDS LC TO BE AVAILED .NO SUPPLY IN THE FEEDEREE / O / Anuppankulam has also programmed
110 KV Veerasigamani WF SS, PuliyangudiSS,Naranapuram SS, Viswanathaperi SS will be radially fed from 110 KV Nallamanayaganpatti SS."During the LC Period 1.110 KV Isolator towards veerasigamani already kept opened at Uthumalai SS. 2.110 KV Isolator towards Uthumalai will be kept opened in veerasigamani SS 3.Hence no SS will be affected."The feeder will be Radially fed from 230KV Kodikurichi SS,No SS affected.
There will be no supply on corresponding 33KV feeders
During the LC period there will be no supply in 230 KV Bus Coupler. Hence No SS affected.
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 13:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 14:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 12:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 16:00 1 RESCHEDULE
6/8/2018 10:00 6/8/2018 13:00 1 POSSIBLE
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
During the LC period the feeder will be radial from other end upto vijayapuri SS. Hence no ss affected.During the LC period the 110 KV Vembakkottai SS load will be fed from 230/110 KV Nallamanaickenpatti SS. (AB switch at 110 KV Vembakottai SS towards APKM SS WILL BE KEPT OPEN ) Hence no SS will be affected.During the LC period Auto Tr II & III will be in servicePresent PWD Demand is 50 cusecs.During the LC Period the feeder will be radial from other end. No SS Will be affected.
During the LC period there will be no supply in the entire PR TR-IV & 33KV feeders. Concurrence obtained from SE/NCES/TIN.During the LC period, a) Other end also avail LC on the same feeder. b) 230KV Mondipatty - Alagarkoil feeder will be in service. c) There will be no interruption of supply to any of the feeder and SS.230 KV Bus Coupler in stand by equipment since load flow does not affected.During the L.C period, 1) other end also availing L.C on the same Feeder. 2) All other 230KV feeders will be in tied condition. 3) There will be no interruption of supply to any of the feeder and SS.
Entire load feed from Auto Transformer II
6/8/2018 10:00 6/8/2018 17:00 1
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1 POSSIBLE
6/8/2018 9:00 6/8/2018 17:00 1
6/8/2018 10:00 6/8/2018 16:00 1 POSSIBLE
6/8/2018 10:00 6/8/2018 17:00 1 RESCHEDULE
6/9/2018 9:00 6/9/2018 17:00 1 POSSIBLE
6/9/2018 9:00 6/9/2018 17:00 1 POSSIBLE
DURING LC PERIOD 110 kv Siruganur SS (radial) also availing total shut down on that same date. (1) 110Kv Samayapuram-Kallaudy I # tie opened at 230KV Samayapuram SS. (2) 110KV Samayapuram-Siruganur # Breaker is in H/T condition at 230KV Samayapuram SS and line Isolator towards 230KV Thatchankurichy SS at 110KV Siruganur SS and Line Isolator at 230KV Samayapuram SS towards 110KV Siruganur SS is kept in open condition and earth switch closed at both end. . (3) AUTO TR II(100 MVA) , HV-II & LV-II BREAKER'S kept H/T Condition . 4) 110KV Kallakudy Grid SS fed through 110KV Samayapuram- Kallakudy II feeder. (5) 110 KV BUS SWITCH NO. 29 BS will be in opened condition . (6) AUTO TR.I (100 MVA) WILL BE IN SERVICE AND CATER THE ENTIRE SS LOAD. (7)There will be no intruption to any other 110KV SS, EHT Consumers.
SE/O/TRY APPROVAL
During the LC period, a) 230KV Alundur - Mondipatty feeder both end availing Total Shut down. b) All other 230 KV feeder's will be in service. c) There will be no interruption of supply to any other feeders & ss.
The 230KV Bus II is in stand By condition and hence there is no interruption to any other SS
During the LC period 110KV SS nagapattinam SS will be fed from 110KV Narimanam - MRL- Nagapattinam Feeder . Hence there is no interruption of supply to any other SS
SE/O/TRY APPROVAL
During the above period of shut down 1)230KV Perambalur SS will be radially fed from 230KV Jambunathapuram SS1)230Kv Trichy feeder Breaker H/T at Jamunathapuram SS 2)Bus and line switch opened at Jamunathapuram SS 3)Jamunathapuram feeder breaker H/T at 230 KV Trichy SS to avail LC.4)No supply interruption to other SS.During the LC- K,G.Patty SS will be radial from Kayathar end.DURING THE ABOVE PERIOD, ENTIRE LINE LC HAS BEEN PROPOSED BY EE/O/THENI
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 15:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 15:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
During LC Period There will be no supply in the entire feeder
EE/O/CKNI has also programmed Line LC During the LC period there will be no supply in the entire feederKEELAKARAI SS will be radialy fed from Kavanoor end.
Feeder will be radial from kkdiend.uptoNarasingampatti SS. Feeder will be radial from Sakthi sugars end.uptourptyss..A.Thekkur,S.Pudur SS Duvaragurichy SS loads will be transferred to Kottampatty feeder.
Feeder will be radial from kkdiend.uptoNarasingampatti SS. Feeder will be radial from Sakthi sugars end.uptourptyss..A.Thekkur,S.Pudur SS Duvaragurichy SS loads will be transferred to Kottampatty feeder.All other 230KV #rs will be tied with grid. Hence there will be no interruption of supply.
SINCE BOTH ENDS LC TO BE AVAILED .NO SUPPLY IN THE FEEDERSINCE BOTH ENDS LC TO BE AVAILED .NO SUPPLY IN THE FEEDERii) 110 KV isolator towards OT Patty SS will be kept opened in Seethaparpanallur SS and 110 KV isolator towards Seethaparpanallur will be kept opened in OTPatty SS .Hence no SS will be affected.1) During the LC period there will be NO supply in P.Tr-1 and its 33KV feeders. 2) If there is wind generation its 33KV feeders will be paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.No SS will be affected. During this above LC period all 110KV feeders will be fed from 100MVA AUTO Transformer-II
6/11/2018 9:00 6/11/2018 13:00 1 POSSIBLE
6/11/2018 13:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 14:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 18:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 13:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
No SS will be affected. 6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 14:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 16:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
During the LC period the 230kv Ind-Barath feeder II will be in service for their homeload of power and no interruption in evacuation and necessary consent obtained from M/s IBPGL and no other SS will be affected
During the LC period the 230kv Ind-Barath feeder I will be in service for their homeload of power and no interruption in evacuation and necessary consent obtained from M/s IBPGL and no other SS will be affected
During the LC Period there willbe no supply in the Entire Feeder. Other End also LC applied.
1)Both end Breakers to be Tripped 2)Both end Bus and Line Isolators to be opened 3)Both End earth switches should be closed During the LC period, the feeder will be radial upto dhuraisamypuram SS. Hence no ss affected
During the LC period 110 KV ESI SS load will be fed from 230/110 KV NNPTY SS. Hence no SS will be affected.During the LC period, both ends availing Lc.
During the LC period,230 KV SR Pudur Koodankulam feeder will be in service.
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.There is no interruption of supply to any other SS since it was tie feeder.
6/11/2018 9:00 6/11/2018 17:00 1 POSSIBLE
6/11/2018 9:00 6/13/2018 17:00 3 POSSIBLE
6/11/2018 10:00 6/11/2018 14:00 1 POSSIBLE
6/11/2018 9:00 6/11/2018 16:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 17:00 1 POSSIBLE
During the LC period 110KV SS Kudavasal will be fed from 230KV SS Thiruvarur and 110KV SS Kovilvenni ,110KV SS Vaduvoor will be fed from 230KV SS , Kumbakonam , hence there is no interruption of supply to any other SSOnly 230KV Bus bar protection will be in Cut out condition since there is no interruption of supply
During the above period of shut down 1)110KVAriyalur SS and 110KV Perali SS fed from 230KV Poyyur SS. 2) 110KV Koothur SS Avaling total shutdown 3)There will be no interruption to any other SS/EHT ConsumerNo supply interruption to any SS.110KV Sakkottai and Urban SS supply fed from 230KV Kumbakonam SS.During LC period there will be no supply in the entire feeder
During the LC period other two Auto transformers will be in service and scatter the loadTotal shut down to be proposed in the following 110 KV subststions for load relief of 82 MW (110/22 kv , ,CUMBUM ss, Ayyampalayam, Batla gundu SS, V.pandi SS, M.G.Kottai SS, theni ss,aundipatti
During the L.C Period the 110KV A.Pudur & Poosalakudi SS are under TSD and TVNI load will be tied with 110KV KKDI-DVKT #. Hence there will be no interruption of Supply.
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
6/12/2018 9:00 6/13/2018 17:00 2 RESCHEDULE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 13:00 1 POSSIBLE
6/12/2018 13:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 12:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 15:00 1 POSSIBLE
1)Auto Transformer - 1 will be in Service. 2)110/11KV Pasumalai SS will be under Shutdown on 12.06.2018 3)110/33-11KV Ellis Nagar SS and 110/11KV Anaiyur SS will be under Shutdown on 13.06.2018 4)110KV Pasumalai - Sembatty feeder will be kept radial from other end if necessary to contain Auto Tr -1 loads within limits. 5)If necessary 110KV Pasumalai - Anupankulam feeder will be kept radial from Other end
"During the LC period EE/O /Veeranam has also applied LC on 230kv veeranam -I breaker on the same day(12.06.2018) "No SS will be affected. During this above LC period 110KV Vagaikulam SS will be fed from 230KV Sipcot SSDuring the LC period No supply at consumer end. consent requested to M/s Swamynatham.
During the LC period, the other end has also proposed LC on the same date and no other SS will be affected please.
During the LC period there will be no supply in 400 KV Tie Breaker (408-52) for Karaikudi and Kamudhi Feeder. Hence no ss will be affected.During the LC period 110KV NALLAMANAICKENPATTI SS, 110KV VISWANATHAPERI SS,110KV NARANAPURAM SS,110KV Veerasigamani SS & 110KV PULIANGUDI SS will be radial from 110KV VEERASIGAMANI-II FEEDER OF 230KV Kodikuruchi SS. Hence no SS affected.During the LC period, gangaikondan SS will be fed from thalaiyuthu SS, Hence no ss affectedDurin the LC period the Auto Tr. II will cater the load of Auto Tr. III. Hence No SS affected.
6/12/2018 9:00 6/12/2018 15:00 1 POSSIBLE
No SS will be affected. 6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 18:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 14:00 1 POSSIBLE
No generation in KDR PH-2 6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 13:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 16:00 1 POSSIBLE
During the LC period Kadaiyanallore SS will be radially fed from 230/110 KV Kodikuruchi SS. B) 110 KV NNPTY SS will be radially fed from 230/110 KV NNPTY SS & Visvanathaperi SS and Naranapuram SS load will be radially fed from Kodikuruchi SS. Hence No SS will be affected.
During the LC period,230 KV SR Pudur-SNRI feeder will be in service.
During the LC period ,other end also availing LC . 230/110KV SVPM SS load will be fed through 230KV Checkanurani Feeder from 230/110KV Checkanurai SS.
During the LC Period 110 NSPM - KVPT Traction I feeder breaker, bus and line side switches will be kept in open condition at NSPM SS end. 110kv Kovilpatti Traction ss will be fed from 110 KV N. Subbhaipuram- Kovilpatti Railway Traction II feeder, Hence No ss will be affected.During the lc period there will be no supply in the entire feeder concurrence obtained from SE/NCES/TIN.During the LC Period, 1) 110KV Karur SS availing total shutdown.The remaining 110KV Manmangalam SS,110KV Veppampalayam SS load will be fed through 110KV Pugalur -Renganathapuram feeder via 110KV Malaikovilur SS. 2) 110KV Renganathapuram # tie opened at 230KV Renganathapuram SS. Hence there is no supply interruption to any SS.
During the L.C Period HVII and LV II are tripped condition. 110KV Karur SS availing total shutdown. Load contain with in two auto transformer (I & III).There is no interruption to any SS.During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
6/12/2018 9:00 6/12/2018 17:00 1
No Interruption 6/12/2018 10:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 9:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 17:00 1 POSSIBLE
6/12/2018 8:00 6/12/2018 12:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 16:00 1 POSSIBLE
6/12/2018 10:00 6/12/2018 17:00 1 RESCHEDULE
6/12/2018 9:00 6/12/2018 16:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
During the LC period, a) All other 110 KV feeders will be in service b)There will be no interruption of supply to any other feeder's and ss.
SE/O/TRY APPROVAL
1) DURING THE LC PERIOD, 110/11KV URANIPURAM SS WILL AVAIL TOTAL SHUTDOWN. 2) NO INTERRUPTION TO ANY SS AND ALL OTHER FEEDERS ARE TIED CONDITION.
During the LC period all other feeders are in service and there is no interruption of supply to any other SS
during the above LC Period 1) 110kv thuraiyur feederH/T at 230KV jambunathapuram ss 89A,89Lopen condition 89LE closed condition 2)Back feeding supply to 110KV thuraiyur ss will be arranged from 230kv ss perambalur . 3) at koppampatty ss GC H/T and availed shutdown 4) There will be No During the LC period, 1) this feeder will be radial from 230 KV Trichy SS upto 110 KV Vaalavanthankottai SS and from 110 KV Punalkulam Grid SS to 110 KV Veeramarasanpettai SS, 2) 110 KV EHT Service M/s.SICGILSOL Gases/Pudukudi (formerly Seva Gases) will avail total shutdown, 3) concurrence has been obtained from HAPP / Trichy for supply interruption during blink operations, 4) no supply interruption to any SS,230KV Thiruvarur SS and lines/ thiruvarur availing L.C.
No supply interruption to any SS.PPN under shut down.
No supply interruption to any SS.110KV Palaiyur SS proposed shut downDuring LC period there will be no supply in the entire feeder
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 10:00 6/13/2018 17:00 1
6/13/2018 9:00 6/13/2018 14:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 10:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 13:00 1 POSSIBLE
EE/O/CKNI has also programmed Line LC. During the LC period there will be no supply in the entire feederRemaining 110KV feeders at ARKAY will be in service. Hence there will be no power evacuation problem.Other 2 Auto transformers will be in service and cater the load.
During the LC period, Dindigul SS and railway traction SS will be transferred to 110KV AKL II #, hence no interruption to any SS.
SE/O/MDU APPROVAL
1)110KV Anaiyur SS and Ellis Nagar SS will be under Shutdown. 2)Switch No 1 will be kept open at Pasumalai 110KV SS 3)At Arasaradi SS, the Ellis Nagar breaker will be kept hand tripped and Incoming and out going isolators will be kept in open condition 4)110 KV Arasaradi SS loads will be fed from 110KV Pasumalai -Arasaradi radial feeder of 110KV Pasumalai Grid SS by closing the newly erected 110KV isolator at Arasaradi SS 5)The feeder will be kept radial from Alagarkoil SS upto Anaiyur SS line links feeding Tirupalai SS 6)The 110KV isolator towards Pasumalai at Anaiyur SS and the 110KV Line isolator at 230KV Pasumalai SS will be under open condition. 7)Hence there is no interruption of Supply to any SS"During the LC period (i)Auto-I will be out of service, (ii) Auto-II & III will Cater the SS load "
ICT 2 in service,Load will be transferred to ICT 2,No feeder or SS will be affected.
1) During the LC period there will be NO supply in P.Tr-2 and its 33KV feeders. 2) If there is wind generation its 33KV feeders will beparalleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.During the L.C period, the other end ha snot proposed LC date and no SS will be affected please.
6/13/2018 13:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 14:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 18:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 13:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 18:00 1 POSSIBLE
6/13/2018 10:00 6/13/2018 12:00 1 POSSIBLE
During the LC period, the other end has not proposed LC
During the LC Period 110KV Vijayapathy SS supply Radially fed from SRPuthoor-Arumuganeri feeder-II, By Closing Buscoupler-II at 110KV Koodankulam SS.Hence no SS will be affected.During the LC period there will be no supply in 110 KV Bus Coupler. Hence No SS affected.
1)Both end Breakers to be Tripped 2)Both end Bus and Line Isolators to be opened 3)Both end Earth switches should be closed condition
During the LC period, the loads of Auto III will be shared by Auto I and II. Hence no ss affected.
During the LC period the feeder will be radial from other end upto sankarankovil SS. Hence no ss affected
During the LC Period the Palayapettai ss will be radially fed from Melakkallur
During the LC period the 110 KV Thulukkapatti I feeder will cater the load of 110 KV Thulukkapatti II feeder. Hence no SS will be affected.
1. Both end breakers to be tripped 2. Both end Bus and Line isolators to be opened 3.Both end Earth swithches Should be Closed condition
Present PWD Demand is 50 cusecs.During the LC Period the feeder will be radial from other end. No SS Will be affected
6/13/2018 9:00 6/13/2018 17:00 1
6/13/2018 9:00 6/13/2018 16:00 1 POSSIBLE
6/13/2018 10:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 9:00 6/13/2018 17:00 1 POSSIBLE
6/13/2018 10:00 6/13/2018 16:00 1
6/14/2018 9:00 6/14/2018 17:00 1
"1.IF ONE Auto Will be Out of Service OTHER TWO AutoWill Cater the Present SS Load. 2.230kvAmuthapuram I & II,230KV Veeranam # I,II Will be radial fed from Other End."
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.1) 110KV LINE ISOLATOR (NO.2) TOWARDS PATTUKKOTTAI ALREADY OPENED AT 110 KV MADUKKUR SS. 2) NO INTERRUPTION TO ANY SUBSTATION.
During the LC period the 110KV Kudavasal ss ,110KV Kovilvenni ss and 110KV Vaduvoor ss supply will be fed from 230KV SS Kumbakonam Hence there is no interruption of supply to any other ss
During the LC period, 1) this feeder will be radial from Alundur 230 KV SS upto Thuvakudi 110 KV SS, 2) Thuvakudi 110 KV SS will avail shutdown on the same day (Relief : 13.1 MW), 3) all other 110 KV feeders will be in service, 4) no supply interruption to any SS.
During the above period of shut down i) 110KV Krishnapuram SS, 110KV Esanai SS and 110KV Managalamedu SS is also availing total shutdown. ii) 110KV A.Mettur SS and Dhanalakshmi sugars will be radially fed from 230KV Deviyakurichy SS
"During the LC period EE/O /Veeranam has also applied LC on 230kv veeranam - Abisegapatti -# on the same day (12.06.2018) "
RESCHEDULE TO 14.06.18 AS PER SRPC OCC INSTEAD OF 12.06.18
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 14:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 13:00 1 POSSIBLE
During LC period there will be no supply in the entire feeder
During the LC Period Solavanthan SS Availing Total Shutdown and 110 KV Ammiyanaickanur SS Fed Radial From 230 KV Sembatty SS and 110 KV SS Samaynallur SS Fed radial From 230 KV Alakarkoil SSDuring the LC period there will be no supply in the entire feeder. EE/O/PSQ has also programmed on Breaker."During the LC period entire Line No supply condition"
During the LC period a) 110 KV line switch towards 110KV Thuvarankurichy SS side will be ket opend at 110KV S.Puthur ss. C) 110 KV Thuvarankurichy SS will be avail total shut down for montghly maintenance work. d) Concurrence obtained from the Superintending engineer/TEDC/Metro/Trichy.During the LC Period, A.Thekkur, S.Pudur and Thuvarankurichy are Under TSD. 110 KV KKDI – ALKVL # will be radial from KKDI upto TPTR, Singampunari. Hence there will be No interruption of Supply.During the LC period, other end is also availing LC.
EE / O / Kinnimangalam has also programmed
"During the LC period (i)Auto-II will be out of service, (ii) Auto-I & III will Cater the SS load "
1) 230KV TTPS- Kayathar- I FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.During the LC period, (Auto-I)HV-1 Brkr, LV-I Brkr, Will be in tripped condition at 230KV Sipcot SS end and Auto-Transformer II will be in service and no other SS will be affected please.
6/14/2018 13:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 14:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 15:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 13:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 14:00 1
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 14:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
No generation in KDR PH-2 6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
During the LC period, (Auto-II)HV-II Brkr, LV-II Brkr will be in tripped condition and Auto-Transformer I will be in service and there will be in no interruption please. .
During the LC Period there willbe no supply in the Entire feeder.
During the LC period there will be no supply in 400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV Breaker 101-52, 110 KV Ayyanaroothu Line 1,& 400/110KV ICT1. 110KV Backfeeding supply arranged from 110KV Kanarpatti - Uthumalai Feeder of Kanarpatti 400KV SS to Ayyanaroothu 110 KV SS (WF),Sundankuruchi 110KV SS (WF) & Vannikonendal 110KV SS (Distribution) SS.
During the LC Period there will be no supply in the entire 230KV Veeranam-Abisegapatti -I Feeder.Concurrence obtained from SE/NCES/TIRUNELVELI.110KV FEEDERS WIIL BE FEED FROM 230/110KV AUTO TRFR at 230KV SANKANERI SS
During the LC period, Other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
During the LC Period the 110 KV Anuppankulam SS will be availing total shut down. Hence no SS will be affected.During the LC period the 110 KV Capacitor Bank - II will be Hand Tripped condition.
SE/O/TIN APPROVAL
No SS will be affected,During the above LC period , 110KV Navalladi SS will be fed from 110KV Sanganeri SS.During the LC period Auto Tr I & III will be in service.
During the LC Period 230/110KV SVPM SS will be fed through 230 KV Meelavittan feeder through 230/110 KV Meelavittan SS
No generation in KDR PH-2 6/14/2018 9:00 6/14/2018 17:00 1
No generation in KDR PH-2 6/14/2018 9:00 6/14/2018 17:00 1
6/14/2018 10:00 6/14/2018 13:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 0:00 6/14/2018 0:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 16:00 1 POSSIBLE
During the LC Period 110 NSPM - KVPT Traction II feeder breaker, bus and line side switches will be kept in open condition at NSPM SS end. 110 KV Kovilpatti Traction SS will be fed from 110 KV N.Subbiahpuram - Kovilpatti Railway Traction I feeder, Hence no ss will be affected.During the LC period, a) 110KV Manapparai SS avail total shutdown. b) LC availed at both end. c) All other 110 KV feeders will be in tied condition. d) There will be no interruption of supply to any of the SS and feeders.During the L.C Period, 1)110KV Sivagiri SS and 110KV Elumathur SS are proposed total shutdown and the remaining 110KV Kodumudi SS 110KV New nadupalayam SS, load fed from 110KV Erode SS.
During the LC period 1) 110KV P.Velur SS and 110KV Valavanthi SS are proposed total shutdown and the remaining 110KV Kabilarmalai SS and 110KV Villipalayam SS load fed from 230KV Valayapatti SS. Hence there is no interruption to any SS. Concurrence obtained from EE/O/Valayapatti.During the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230KV Poyyur ss.
During the LC period, a) 110KV Trichy-Srirangam feeder will be radially fed from 230kv samayapuram SS upto 110KV Kambarasampettai SS. b) All other 110KV feeders are in tied condition. c) there will be no interruption of supply to any other feeder and SS. d) Necessary concurrence obtained from other 230KV Samayapuram SS end.
6/14/2018 9:00 6/14/2018 16:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 17:00 1 RESCHEDULE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 17:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 16:00 1 POSSIBLE
6/14/2018 9:00 6/14/2018 17:00 1 POSSIBLE
During the LC period, a) Intermediate 110 KV Manikandam SS also availing Total shutdown b) All other 110 KV feeders will be in service c) There will be no interruption of supply to any other feeders & SS.During the LC period, a)Other end also availing shut down. and Intermediate 110KV Manikandam SS Also avail total shut down.. b) All other 110 KV feeders will be in service c)There will be no interruption of supply to any other feeder's and ss.During the LC period, a) Other end also avail shutdown. b) 110 KV Manapparai SS Total shut down Load relief in 22.6MW. d)All other 110 KV feeder's will be in service. e)There will be no interruption of supply to any other feeder's and ss.1.During the above LC Period 230KV SMPM SS will be radial from 230KV TRICHY SS . 2.Other end Poyyur SS also availing LC on that day. 3.Concurrence obtained from Trichy Auto SS and SE/Operation/ Trichy 4. No interruption to any other 110 KV SS.During the LC period all other feeders are in service and there is no interruption of supply to any other SS
During the LC period, 1) Mariammankoil 110 KV SS will avail shutdown on the same day (Load relief: 9 MW), 2) all other 110 KV feeders will be in tied condition, 3) no supply interruption to any SS.During the above LC Period ,1) LV I Breaker of Auto I is H/T Condition. 2) HV I Breaker of Auto I is H/T Condition.3)Auto transformer II will be in service. 4) There will be No interruption to any other SS and EHT SC.During above period of shut down 1)The remaining loads will be fed Through Auto Transfermer III(100MVA) of Perambalur Auto SS and if necessary 110KV Kallakudy -I ( Siruvachur) feeder tie will be opened at Perambalur SS. .During the LC period there will be no interruption of supply to any SS, LC also applied by EE/O/TJR on the same day.110kv M KOVIL SS S/D programmed on the same day
6/14/2018 10:00 6/14/2018 16:00 1 POSSIBLE
6/14/2018 10:00 6/14/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 16:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 14:00 1
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 13:00 1 POSSIBLE
There will be no interruption of supply.
No supply interruption to any SS.PPN under shut down
The Feeder will be Radial from 230KV PSQ SS upto TMGLM SS.
The Feeder will be Radial from 230KV PSQ SS upto TMGLM SS.
During the LC period 230KV Valuthur - Kavanur and Alagarkovil feeders will be in service. Hence, there is "NO" interruption in power evacuation.
1.110 KV angunagar ss avail total shutdown L/R 33.7 mw 2.110 KV vadamadurai ss load will transfer to sempatty Mondipatty feeder 3.110 KV renganathapuram sempatty II feeder fed radially up to gandhigramam ss from sempatty end 4.hence no supply interruption to any other ssAll other 230KV # rs will be tied with grid. Hence there will be no interruption of supply.
During the LC period ,other end also availing total S/D.
During the LC period other end is also availing LC.
During the LC period, 1. Mondipatti # will be radial from other end upto Sengurichi SS. 2. RNPM II # will be radial from SBT end upto Gandhigramam SS. Vadamadurai SS will be changed over to 110KV Mondipatti # and 110KV Angunagar SS is availing total shutdown, hence no interruption to any SS.FEEDER TO BE KEPT RADIAL FROM KAMUTHI 400 KV SS TO KAMUTHI 110 KV SS INCLUDING KAMUTHI, TAMILPADI. KADALADI TO BE UNDER TOTAL SHUTDOWN1) 110/33-11KV Virudhunagar SS and 110/33-11KV Aviyur SS will be under total shutdown 2) 110KV Railway traction loads will be transferred to 110KV Pasumalai - Thulukkapatti Feeder. 3) Hence No interruption of Supply to any SS
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 10:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 13:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 14:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 10:00 6/16/2018 14:00 1 POSSIBLE
6/16/2018 14:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
"During the LC period 110 KV Veerasigamani I (Echantha) SS will be fed from 110 KV Kodikurichi- Veerasigamani II# by closing of AB Switch towards Veerasigamani at Echantha SS. ""During the LC period 1.110 KV Isolator towards Servalar will be kept opened at PapanasamP.H 2.110 KV Isolator towards PapanasamP.H will be kept opened at Servalar"110KV Manur supply will be fed from 110KV Kayathar SS.
1) 230KV TTPS- Kayathar- II FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.No SS will be affected. 110KV Arumuganeri-I & II feeder, 110KV Sipcot-I,II & III feeders line side switches opened condition. Auto Tr-I HV, LV breaker tripped and switch No.92 & 65 opened condition. All 110KV radial feeders feed from Auto Tr-II. All 22KV feeders monthly shut down may be approved by SE/TEDC/TTN. 110KV Manjalneerkayal Ss will be fed from 110KV Arumuganeri SS. 110KV Town SS and 110KV Vagaikulam SS will be fed from 230Kv Sipcot SS.
During the L.C period 110 KV TOWN SS will be in shut down condition and no other SS will be affected please.
Power transformer -III will not be in service.PowerTransformer-I&II will be carriedout the Entire Load.
During the LC period there will be no supply in 230 KV Vellappaneri # Main Breaker (21052), CT &,CVT. Hence no SS will be affected.LC WORK WILL BE AVAILED AT 110KV RADHAPURAM WF SS
110KV NAVALADI SS WILL BE FED FROM 230KV SANKANERI SS
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 13:00 1 POSSIBLE
6/16/2018 13:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 13:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 14:00 1 POSSIBLE
6/16/2018 10:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 10:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 10:00 6/16/2018 17:00 1 POSSIBLE
During the LC period, Backfeeding from Kokikurichi Thenkasi papanasam supply at rastha SS towards kayathar AB switch already opened condition, Sannathu puthukudi SS availed Total shutdown. Hence no ss affectedDuring the LC period 110 KV Virudhunagar SS will be availing total shut down. 110 KV Railway Traction SS load will be transferred to 110 KV PSQ - Thulukkapatti feeder. Hence no ss affected.During the LC period the 110 KV Paraipatty SS will be availing total shut down. Hence no SS will be affected.During the LC period the 110 KV Kovilpatti SS under total shut down and 110 KV Duraisamipuram SS will be radially fed from Kayathar SS end. Hence no SS will be affected.During the LC period the 110/11 KV Marthandam, Kuzhithurai,Munchirai and Nadaikavu SS will avail total shut down to be approved by SE/O/TIN and SE/KKEDC/Ngl. Parasalai SS will avail Back feeding from KSEB. OCC approved.Hence no SS will be affected.During the lc period there will be no supply in the entire PR TR-II & 33KV feeders concurrence obtained from SE/NCES/TIN.DURING THE ABOVE SHUTDOWN PERIOD Supply to M/S SASL CO- GENARATION WILL BE Fed BY CLOSING THE BUSCOUPLER SWITCH NO 44 AT 110 KV PENNADAM SS AND THERE WILL BE NO INTERRUPTION TO EHT CONSUMER. Vridhachalam 110KV SS is aiso avialing shutdown on the same day.During the above work,1) The 80 MVA Auto Tr I & 50 MVA Auto Tr II are in parallel. 2) Eachangadu 230 KV SS loads will be fed from the other Auto Transformer -I and 110 KV pennadam SS is also avail total shut down hence the Loads will be with in one transformer capacity.
6/16/2018 9:00 6/16/2018 16:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 16:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 8:00 6/16/2018 17:00 1 RESCHEDULE
During the LC period a) Trichy 110 KV Grid SS availing total shut down for monthly maintenance works. b) 110 KV Iyyarmalai SS and 110 KV Pettavaithalai SS loads will be managed through 110KV Pugalur - Puliyur - Trichy feeder and M/s Welspun Solar power. c) All other 110 KV feeders will be in service. d) there will be no interruption of supply to any of the SS.
a) During the LC period a) 100MVA Auto Transformer – I, LV breaker will be in Hand tripped condition. b) 110KV Srirangam feeder radialy fed from 110KV Srirangam SS up to 110KV Kambarasampettai SS. c)110KV Trichy Link I & II feeder breaker and 110KV Kovilur feeder breaker will be in hand tripped condition and kept radial from respective other end. d) 100MVA auto Transformers II & III will be in service. e) 230 KV Trichy SS station load will be managed by Auto Transformer-2 & 3. f) All other 110 KV feeders will be in tied which will fed by 110KV southern bus. g) There will be no interruption of supply to any other feeder and SS. h) Concurrence obtained from SE/O/Try and the respective other 230 KV SS and 110 KV Grid SS/Trichy.
a) 110KV Vadugapatty is radial feeder. b) 110KV Vadugapatty,Pakkudy and Ammachatram SS avail Total shutdown. c) Load relief 110 KV Vadugappatty SS 18.50 MW, 110KV Pakkudy SS 1.70MW , 110 KV Ammachatram SS 2.20 MW. d) All other 110KV feeders will be in service. e) There will be no interruption of supply to any other feeders and SS.
During the LC period, a)An Other 100 MVA Auto Transformer -II will be in service. b)All 110 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 17:00 1 POSSIBLE
6/16/2018 9:00 6/16/2018 16:00 1 RESCHEDULE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
During the LC Period other 2 Auto Transformer are in service and load with in the limit. since total shut down will be availed by 110KV ss Thiruvarur,110KV SS/Thiruthraipoondi ,110KV SS / Thirkuvalai and 110KV SS /Voimedu.During the LC period 110KV ss Thirukuvalai,110KV SS thiruthuraipoondi and 110kv SS Voimedu will be availed total Shut down during the day.Hence there is no interruption of supply to any other SS
SE/O/TRY APPROVAL
During the LC period, 1) all 110 & 230 KV feeders will be in tied condition, 2) 230 KV Bus-Coupler breaker is already kept in standby condition, 3) no supply interruption to any SS.
110 KV Thirupanandal SS availing total shut-down for monthly maintenance works.
No supply interruption to any SS.110KV Jayankondam,Thirupurambium SS fed from Kumbakonam SS.
During the LC period there will be no supply in the entire feeder. EE/O/PSQ has also programmed on Breaker.
During the LC period 110 KV C.O. puram ss under TSD.KMPM ss radial from Theni & Thevaram ss radial from Periyar PH
During the LC period Auto Transformer II & III will be in service. Hence there is 'no' interruption in power evacuation.
During the L.C Period, the 110KV TPTR SS is under TSD & 110 KV Singampunari, A.Thekkur, S. pudur & Thuvarankurichy SS will be fed from ALKVL end. Hence there will be no interruption of power supply
6/18/2018 10:00 6/18/2018 17:00 1
6/18/2018 10:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 14:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 16:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 14:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 14:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 14:00 1 POSSIBLE
6/18/2018 10:00 6/18/2018 17:00 1 POSSIBLE
During the LC period, capacitor bank I & II will be in off condition and 110KV Bus switch towards capacitor bank at 110/22KV Sembatti SS will be kept opened. No interruption to 110KV Sembatti SS.
SE/O/MDU APPROVAL
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO VALINOKKAM
EE / O / Kinnimangalam has also programmed
"During the LC period 110kv Keelapavoor SS, Alangulam SS, & Keelaveeranam ss will be Radially fed from 400 KV Kanarpatti SS Hence, No SS will be affected."
1) During the LC period there will be NO supply in P.Tr-3 and its 33KV feeders. 2) If there is wind generation its 33KV feeders will beparalleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.During the LC period, the other end has also proposed LC on the same date and M/s. Sterlite-CPP generation (if available) will be exported to 230KV TTPS end and no other SS will be affected please. .During the LC period, the other end also availing LC on the same date.
During the LC Period AutoTransformer-I Willnot be inservice.AutoTransformer-II will carriedout the Entire Load.No SS will be affected, During this above LC period 230KV Sterlite SS will be radially fed from TTPS.During the LC period Auto Tr I & II will be in service
During the shutdown period, there will be No interruption to the EHT Consumer . Concurence also obtained from the concerned.
6/18/2018 8:00 6/18/2018 17:00 1
6/18/2018 10:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/18/2018 9:00 6/18/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 13:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 17:00 1
1.110 KV Bus bar protection (out) From 14.06.2018 to 25.06.2018 CONCURRENCE OBTAINED FROM EE/P&C/TRY 2.AUTO I & III IN SERVICE. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.
During the above Shutdown Period 100 MVA Auto Transformer I will be in service. No interruption to any other SSDuring the LC period 110KV Thiruvarur - Narimanam II feeder is in service and hence there is no interruption of supply to any other SS
During the LC period, 1) other end also (i.e. Thiruvarur Lines) will avail LC on the same day, 2) all other 230 KV feeders will be in tied condition, 3) no supply interruption to any SS.
During LC period there will be no supply in the entire feeder
"During the LC Period the station Load will be managed other two Auto Transformers"During the LC period, the other end is also availing LC.
During the LC period, Thadicombu and V.N.Patti SS area availing total shutdown and Vedasandur SS will be fed by RNPM end. hence no interruption to any SS.
During the LC period, Auto III will be in service. Auto I will be under LC for augmentation work.
6/19/2018 11:00 6/19/2018 12:00 1 POSSIBLE
6/19/2018 12:00 6/19/2018 13:00 1 POSSIBLE
6/19/2018 13:00 6/19/2018 15:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 14:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 12:00 1 POSSIBLE
6/19/2018 11:00 6/19/2018 13:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 17:00 1 POSSIBLE
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
During the LC period, M/s. Shriram will curtail their generation. Concurrence obtained from Shriram generation ltd.
FEEDER TO BE KEPT RADIAL FROM VALUTHUR UPTO R.S.MANGALAM AND TO KEPT RADIAL FROM KARAIKUDI UPTO THIRUVADANAI. ANANDUR SS TO BE UNDER SHUTDOWN1)110/33-11KV Arasaradi SS will be under shutdown 2) Switch No 1 is kept open at 110KV Pasumalai SS 3) At Arasaradi SS, the Ellis Nagar breaker will be kept hand tripped and Incoming and out going isolators will be kept open 4) The newly erected 110KV isolator near Arasaradi SS will also be kept open 5)Hence there is no interruption of Supply to any SS"During the LC period EE/O /Veeranam has also applied LC on 230kv veeranam -II # breaker on the same day(19.06.2018) "
No SS will be affected. During this above LC period 110KV Town SS will be fed from 230KV Sipcot SSDuring the LC period 110 KV Reddiyapatti SS will be availing total monthly shutdown on that day. Hence no SS affected.During the LC period 110KV Alangulam SS will be availing total monthly shutdown on that day. 110KV Vembakottai SS will be radial from 110KV Rajapalayam I feeder of 230KV Anupankulam SS. Hence no SS affected.
During the LC period 110 KV Reddiyapatti SS, 110KV Rajapalayam SS and 110KV Alangulam Substation will be availing total monthly shutdown on that day. Hence no SS affected.
6/19/2018 10:00 6/19/2018 12:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 14:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 13:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 13:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
During the LC period 110KV Rajapalayam Substation will be availing total monthly shutdown on that day. Hence no SS affected.During the LC period Loads of Auto I will be shared by Auto II and III. Hence, no ss affected.During the LC Period Gangaikondan Ss will radially fed from Kayathar Hence No ss affected
During the LC period the 110 KV Reddiapatti, Alangulam SS under total shut down . 110KV NNPT-RJPM # of NNPT SS also availing LC at that time.Hence no SS will be affected.During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto PCI SS (incl) and KDR II feeder will be radial from SRP upto PCI series switch.Hence no ss will be affected.110KV SR Pudur 2# radial from SR Pudur to Kodayar
110KV S.R Pudur 1 # radial from SR Pudur to KDR
During the lc period there will be no supply in the entire feeder concurrence obtained from SE/NCES/TIN.During the L.C Period, HV III Breaker and LV III Breaker are tripped condition. 110KV Thanthonimalai SS and 110KV Kaniyalampatty SS are proposed total shutdown.There is no interruption to any SS.Load contain with in two auto transformer(I & II).During the LC period, 1)110KV Thanthonimalai SS &110KV Kaniyalampatty SS availing total shut down and remaining 110KV Velliyanai SS,110KV Puliyur SS,110KV Mayanur SS, 110KV Panjapatty SS and 110KV Chinthamanipatty SS load will be fed from 110KV Ayyermalai SS. Hence there is no interruption to any SS. 2) Solar generation 50 MW in 110KV Panjapatty SS and 50 MW in 110 KV Ayyermalai SS are avilable. 3) Concurrence obtained from EE/O/Trichy.
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 16:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 16:00 1
NT KUDI 230 KV SS feed upto Vadachery 110 KV SS RadiallyDuring the LC period, a) 100 MVA Auto-II, HV-II, 230KV Trichy II , Mondipatty,Pudukkottai,Thanjavur -II and ICT-III Will be transferred from 'B' bus to 'A' Bus. b) 230 KV Bus Coupler Breaker Tripped condition. c) All 230 KV Feeder will be in 'A' Bus . d) Load Relief to 110 KV Thanjavur Urban SS - 17 MW, 110 KV Ayyempettai SS- 11 MW, 110 KV Maniamandapam SS - 9 MW, 110 KV Poondi SS - 8 MW ans 110 KV Eachankottai SS - 11 MW. e) Other end also avail shutdown. f)All other 230 KV feeders will be in service. g)There will be no interruption of supply to any other feeders.
During LC period, 1) 110KV Kovilur feeder Line switch towards Trichy 230KV SS will be kept opened at 110KV Kavalkaranpatti SS. 2) 110KV Kovilur feeder Line switch towards Kavalkaranpatti SS will be kept opened at Trichy 230KV SS. 3) 110KV Trichy - Kovilur feeder will be radial from 110KV Kovilur SS up to 110KV SS Kavalkaranpatti SS. 4) All other 110KV feeders will be in tied condition. 5) There will be no interruption of supply to any of the intermediate SS. 6) Necessary concurrence obtained from 230 KV Renganathapuram SS.
During the LC period a) 110 KV Ayyermalai Pettavaithalai # will be radially fed from 110 KV Ayyermalai ss upto 110 KV Perttavaithali SS Line switch no 2 and Switch No.1 & 2 kept opend. b) 110 KV EHT consumer M/s Eid Parry, Pettavaithali will avail Sht downn and concurrence obtained from M/S EID Parry, Pettavaithalai.C) 110 KV Pettavaithali SS will avail total shut down for montghly maintenance work. d) Concurrence obtained from the Superintending engineer/TEDC/Metro/Trichy.
6/19/2018 8:00 6/19/2018 17:00 1
6/19/2018 10:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 17:00 1 RESCHEDULE
6/19/2018 8:00 6/19/2018 17:00 1 POSSIBLE
1. 110KV T.NALLUR SS UNDER SHUTDOWN. 2. 110 KV ATHANAKKOTTAI SS, 110KV GANDHARVAKKOTTAI SS, 110KV KARAMBAKUDI SS UNDER SHUTDOWN. 3. 110KV ALANGUDI SS, 110KV MALAIYUR SS, 110KV VADAKADU SS UNDER SHUTDOWN. CONCURRENCE OBTAINED FROM SE/PEDC/PUDUKKOTTAI. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.
1) DURING THE LC PERIOD 110/33-11KV VADASERI SS WILL AVAIL TOTAL SHUTDOWN. 2) NO INTERRUPTION TO ANY SUBSTATIONS AND ALL OTHER 110KV FEEDERS ARE TIED CONDITION.During the LC period all other feeders are in service and there is no interruption of supply to any other SS since it was tie feeder
During the LC period, 1) other end also will avail LC on the same day, 2) Thanjavur 110 KV Urban SS, Orathanadu 110 KV SS (33 KV #s) and Thirukkanurpatti 110 KV SS will avail shutdown on the same day (Total Relief : 44 MW), 3) AEE/O/Thanjavur 110 KV Grid SS has applied LC in the 110 KV Thanjavur - Thiruvarur feeder breaker at Thanjavur 110 KV Grid SS and this feeder will be radial from Thiruvarur 230 KV SS upto Thanjavur 110 KV Urban SS. Hence additional load relief around 37 MW (i.e. from Manimandapam 110 KV SS, Mariammankoil 110 KV SS, Ayyempettai 110 KV SS, Poondi 110 KV SS) will be got for Auto Transformers and 230 KV Thanjavur - Alundur-1 feeder at Thanjavur 230 KV SS, 4) all other 230 KV feeders will be in tied condition, 5) no supply interruption to any SS.
6/19/2018 8:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 8:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 17:00 1 POSSIBLE
6/19/2018 10:00 6/19/2018 16:00 1 POSSIBLE
6/19/2018 9:00 6/19/2018 13:00 1 POSSIBLE
No supply interruption to any SS 6/19/2018 10:00 6/19/2018 14:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
During the LC period, 1) Thanjavur Urban 110 KV SS will avail shutdown on the same day (Load relief : 17 MW), 2) AEE/O/Thanjavur 110 KV Grid SS has applied LC in the 110 KV Thanjavur - Thiruvarur feeder breaker at Thanjavur 110 KV Grid SS and this feeder will be radial from Thiruvarur 230 KV SS upto Thanjavur 110 KV Urban SS. Hence additional load relief around 37 MW (i.e. from Manimandapam 110 KV SS, Mariammankoil 110 KV SS, Ayyempettai 110 KV SS, Poondi 110 KV SS) will be got for Auto Transformers at Thanjavur 230 KV SS, 3) all 230 KV feeders will be in tied condition, 4) no supply interruption to any SS.
During the LC period, 1) this feeder will be radial from NTKudi 230 KV SS upto Eachankottai 110 KV SS, 2) Thirukkanurpatti 110 KV SS will avail shutdown on the same day (Load relief: 9 MW), 3) all other 110 KV feeders will be in tied condition, 4) no supply interruption to any SS.During the above LC Period , 1) LVII Breaker of AutoII is H/T Condition. 2) HV II breaker of Auto -II is in H/T Condition .3)Auto transformer I will be in service. 4) There will be No interruption to any other SS and EHT SC.
During the above LC period 1)110KV Mangoon SS also avaling total shut down.During the LC period there will be no interruption of supply to any SS,110kv TJR URBAN SS S/D PROGRAMMED ON THE SAME DAY,110KV TJR-Thiruvarur feeder will be radially fed from 230KV SS THIRUVARUR UPTO URBAN SS THANJAVUR
During LC period feeder will be radialupto erichanatham ss and T Kallupatti SS availing total shutdown
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 13:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 7/14/2018 17:00 25
Other end is also availing LC. 6/20/2018 9:00 6/20/2018 15:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 16:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 10:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 10:00 6/20/2018 11:00 1 POSSIBLE
6/20/2018 11:00 6/20/2018 12:00 1 POSSIBLE
During the LC period 230KV Valuthur - Kavanur and KARAIKUDI feeders will be in service. Hence, there is "NO" interruption in power evacuation.
During the LC supply Radial From Periyar end.
During the LC period 110 KV Bodi ss under TSD
"During the long LC Period the station Load will be managed other two Auto Transformers & Import wind power"
1.230 KV pugalur end also programmed to avail lc 2.110 KV renganathapuram and vagarai SS avail total shut down (l/r : 18 + 7.7 mw) 3.110 KV renganathapuram udumalapetai feeder fed radially from udpt end 4.110 KV renganathapuram sempatty I # fed radially from sempatty end 5.hence no supply interruption to any other ssAll other 230KV # rs will be tied with grid. Hence there will be no interruption of supply.230 KV VLTR – ALKVL # LC Programmed by other end also.
The feeder is is radial from Sembatti condition.
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
6/20/2018 12:00 6/20/2018 13:00 1 POSSIBLE
6/20/2018 13:00 6/20/2018 15:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1
6/20/2018 9:00 6/20/2018 14:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 10:00 6/20/2018 12:00 1 POSSIBLE
During the LC period, the feeder will be radial from other end and Pappampatti SS will be availing total shutdown. Hence no interruption to any SS.
During the LC period, the feeder will be radial from other end and Minukkampatti SS will be availing total shutdown. Hence no interruption to any SS.
AUTO TRANSFORMER -I WILL BE IN SERVICE
AUTO TRANSFORMER -I WILL BE IN SERVICE
1)The feeder will be kept radial from Thulukapatty SS upto Soolakarai feeding 110KV Soolakarai SS loads. 2)Hence there will be No interruption of Supply to any SS. 3)110KV Aviyur SS loads will be transferred to 110KV Pasumalai - Anupankulam Feeder."i)110 KV surandai will be fed from Uthumalai SS by closing the isolator towards uthumalai at Surandai SS end ii) 110 KV isolator towards Keelaveeranam will be kept opened in Surandai and 110 KV isolator towards Surandai will be kept opened in Keelaveeranam.Hence no SS will be affected .. ""During the LC period 1.110 KV Kadayanallur SS and 110 KV Achanpudhur SS will be radially fed from 230KV Nalamanaickampatti SS. 2.110 KV Kodikurichi- Kayathar will be radially fed from 230/110 KV KANARAPATTI SS. The load of 110 KV Kodikurichi- Tenkasi- Papanasam # Will be transferred to 110 KV Kayathar - Papansam by closing bus coupler switch at rastha and radially up to line switch of tenkasi#. 3.The load of 110 KV Kodikurichi windfarm # will be transferred to 110 KV Kayathar - Papanasam by closing 110 KV AB switch towards tenkasi at Kodikurichi windfarm SS Auto I will be out of service, Auto III & II will carter the SS Load 4.110 KV bus coupler switch 5089 BC will be kept in open condition. 5.Concurrence obtained from SE/WF/Tin for Wind block. 6.Hence No SS will affected."No SS affected. This Breaker is under Idle condition at this SS end.
6/20/2018 10:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
There is no supply in entire feeder 6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 14:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 14:00 1 POSSIBLE
6/20/2018 10:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
ICT 1in service,Load will be transferred to ICT 1,No feeder or SS will be affected.
1) During the LC period there will be NO supply in P.Tr-4 and its 33KV feeders. 2) If there is wind generation its 33KV feeders will beparalleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
110KV AYPM SS will be in shut down condition & 110KV OPTM SS will be radially fed from other end(EPVN) and no other SS will be affected please.
During the LC period there will be no supply in 400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV ICT2. Hence No SS affected.During the LC period Loads of Auto II will be shared by Auto I and III, Hence no ss affected
During the LC Period the 110KV SR puthoor-Sankaneri# Supply will be radialy up to 110KV Irrukanthurai ss.Hence no SS will be affected.110 KV SRP-ARMI II # radial from ARMI upto SR Pudur(excl).Hence no SS will be affected.
During the lc period there will be no supply in the entire PR TR-III & 33KV feeders concurrence obtained from SE/NCES/TIN.During the LC period, a) All feeders will be in Bus - A while working in bus 'B' isolator. b) All feeders will be in Bus - B while working in bus 'A' isolator. c) Bus coupler will be in tripped condition. d) There will be no interruption of supply to any of the SS and feeders.During the LC period, there will be no supply in 230 KV Pugalur - Paramathy II feeder. Hence There is no interruption to any SS.This LC approved in 143th OCC meeting.
6/20/2018 9:00 6/20/2018 17:00 1 POSSIBLE
6/20/2018 9:00 6/21/2018 17:00 2 POSSIBLE
6/20/2018 10:00 6/20/2018 17:00 1 POSSIBLE
During the LC period there will be no supply in 230 KV Pugalur - Renganathapuram feeder. Other end also availing LC for monthly maintenance work.During the L.C Period HV I and LV I are tripped condition. 1)110KV Pugalur-Puliyur # radially upto 110KV Puliyur SS and the remaining 110KV Mayanur SS,110KV Kaniyalampatty SS,110KV Panjapatty SS and 110KV Chinthamanipatty SS load fed from 230KV Trichy SS.Concurrence obtained from EE/O/Trichy. 2)110KV Pugalur-Ranganathapuram feeder tie opened at Pugalur 230KV SS and the remaining 110KV AC Palayam SS,110KV Thalapatty SS,110KV Malaikovilur SS and 110KV Pallapatty SS load from 230KV Ranganathapuram SS.Concurrence obtained from EE/O/Ranganathapuram. 3)110KV Pugalur-Elumathur feeder radially upto Line switch of 110KV Elumathur SS and the remaining 110KV Elumathur SS load fed from 110KV Erode SS.Concurrence obtained from SLDC/Erode. 4)110KV Pugalur-Kabilarmalai feeder radially upto Line switch of 110KV Valavanthi SS and the 110KV valavanthi SS load fed from 230KV Valayapatty SS.Concurrence obtained from EE/O/Valayapatty. There is no interruption to any SS. Load contain with in two auto transformer (II & III)
At present there is no import/export from MCL
6/20/2018 9:00 6/20/2018 16:00 1 POSSIBLE
6/20/2018 9:00 6/20/2018 16:00 1 POSSIBLE
6/20/2018 8:00 6/20/2018 17:00 1 POSSIBLE
1. 230KV HV 2, LV 2 & 3 breakers will be in tripped condition. 2. Auto Transformers 2 & 3 will not be in service. 3. 110KV Trichy - Alundur I & II feeder breakers will be in tripped condition at Trichy 230KV SS and kept radial from 230KV Alundur SS and 110KV Punalkulam feeder readialy feed from 110KV Punalkulam SS Upto 110KV MAthur SS. 4. 110KV Trichy link I & II, 110KV Trichy - Srirangam and 110KV Trichy - Kovilur feeder will be in service and this load will be managed through 110KV Northern bus, 5. If necessary the load will be managed through the supply extended to 110KV Trichy grid SS from 230KV Alundur SS through the bypass arrangement switches between 110KV Alundur I feeder and 110KV Trichy Link I feeder (switch no.48 & 49). 6. No interruption of supply to any other SS. 7. Necessary concurrence obtained from SE/O/Trichy and the respective other 230 KV SS and 110 KV Grid SS/Trichy. 8. All 230KV Feeders will be in tied condition.
During the LC period , a) 110KV Trichy - Punalkulam feeder will be radially fed from Punalkulam 110 KV Grid SS upto 110KV Mathur SS and line switch towards 230KV Trichy SS side will be kept opened at 110KV Mathur SS. b) 110KV Mathur SS also availing total shutdown. C) Necessary concurrence obtained from other end 230KV Tanjore SS. e)All other 110KV feeders will be In tied condition. f) No interruption of supply to any of the SS.
1. 110KV SIPCOT SS UNDER SHUTDOWN. CONCURRENCE OBTAINED FROM SE/PEDC/PUDUKKOTTAI. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.
6/20/2018 10:00 6/20/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 15:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 13:00 1
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
No SS will be affected. 6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
During the above period of shut down a) 110KV T.V.Kovil SS avail toal shutdown on the same day. b) 110KV Poovalur SS, 110KV Kothai EHT Sc, 110KV Valady SS will be fed radially from 230KV Samayapuram SS. b) 110KV court SS,110KV Thennur SS will be fed radially from 110KV Trichy Grid SS. c). The line Isolator towards 110KV Valady SS at 110KV Thirvanaikoil ss will be Kept opend and earth switch closed. d)The line Isolator towards 110KV T.V.Koil SS at 110KV Valady SS will be Kept opend and earth switch closed. e) Necessary concurrence has been obtained from M/s.Kothari EHT Service for switching operation. f)There will be no interuption to any other SS/EHT consumers.
During LC Period There will be no supply in the entire feeder
During the LC supply Radial From Periyar end.1.110 kovilur, vallipatti , chatrapatti SS avail total shut down l/r : 12+4+4mw 2.concorrunce obtained from Chettinad cement limitedOther two Auto tranformers will be in service and cater the load
During the LC period, Auto II will be in service and Auto I will be under LC for augmentation work.
During the LC period, 1. 110KV Bus I & II will be in service. 2. 110KV PSQ, AKL I and AKL II feeders will be radial from other end. 3. Dindigul, Natham, AMNR and Sembatti SS are availing total shutdown. Hence no interruption to any SS.SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
"During the LC period (i)Auto-III will be out of service, (ii) Auto-I & II will Cater the SS load "
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 15:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 14:00 1 POSSIBLE
No generation in PH-1 m/c 6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
During the LC period there will be no supply in 230 KV Anuppankulam Feeder, Breaker (201-52) & CT, CVT, LAS. Hence no ss will be affected.THERE WILL BE NO SUPPLY ON 33KV FEEDERS
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
During the LC period Palayapettai Ss will be radially fed from Thalayuthu Hence No Ss affected
During the LC period, the other end also availing LC on the same date.
During the LC period, both ends availing Lc.
"During the LC period ,110 KV SR Pudur-KDR II feeder will be radial from KDR PH upto TKY SS (INCL).Hence no SS will be affected. "
During the above LC period, a) Vaiyampatty SS avail total shutdown. b)110KV Sembatty- Mondipatty feeder radially fed from 230KV Sembatty SS upto 110KV Vaiyampatty SS. c) 110 KV line isolator at 110 KV Vaiyampatty SS towards 230 KV Mondipatty SS will be kept open condition. d) All other 110 KV feeders will be in tied condition. e)There will be no interruption of supply to any of the SS.
During the LC period 1) 110KV AC Palayam SS and 110KV Thalapatty SS are proposed total shutdown,The remaining 110KV Malaikovilur SS and 110KV Pallapatty SS load fed from 230KV Rengnathapuram SS. Hence there will be no supply interruption in any 110KV SS. 2) Concurrance obtained from EE/O/Renganathapuram
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 16:00 1 POSSIBLE
6/21/2018 8:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 17:00 1 POSSIBLE
6/21/2018 10:00 6/21/2018 16:00 1 POSSIBLE
6/21/2018 9:00 6/21/2018 16:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
During the LC period, a) Other end also avail shutdown. b) Load Relief to 110 KV Thirumayam SS ,110 KV Konnaiyur SS and 110 KV old Pudukkottai SS total = 54 MW. c) All other 230 KV feeders will be in service. d) There will be no interruption of supply to any other feeders.1.110 KV eriode and palayam ss avail total shut down L/R 11.290 + 8.156 2.concurrence obtained from EE/O and M /north dindigul for supply of to pudur palayam wind mill ss 3.hence no supply interruption to any other ss1. 110KV EID Parry(Co-Gen), 110KV Aliyanilai SS, 110KV Nagudy SS, 110KV Kodikulam SS, 110KV Keeramangalam SS UNDER SHUTDOWN. CONCURRENCE OBTAINED FROM SE/PEDC/PUDUKKOTTAI. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.PUDUKKOTTAI 230 KV SS LOAD WILL BE MAINTAINED FROM 230 KV KARAIKKUDY PG FEEDER. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.
(A)During the LC period 110KV SMPM-Srirangam feeder will be radially fed from 230 KV Auto SS-Trichy. (B) 110KV Samayapuram SS is also availing shutdown on that day. (C) Concurrence obtained from 230KV Auto SS, Trichy. (D) No interuption to any other 110 KV SSDuring the LC period 110KV SS Neelakudi fed from 230KV ss Thiruvarur and 110KV SS Peralam and perambur will be fed from Myladudurai ss.There is no interruption of supply to any other SSDuring above period of shut down 1)The remaining loads will be fed Through Auto Transfermer I(100MVA) of Perambalur Auto SS and if necessary 110KV Krishnapuram feeder tie will be opened at Perambalur SS.No supply interruption to any SS.110KV Manalmedu SS and Nidur SS proposed shut down.
During LC period there will be no supply in the entire feeder
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 16:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 14:00 1 POSSIBLE
During LC period Vadipatty SS Availing Total Shutdown
R.S.Madai SS will be radialy fed from Kavanoor end. Hence there will be no interruption.During the LC 110 KV Rasinga puram SS under shut down
During the L.C Period, 110KV Kanadukathan SS is under TSD. Hence there will be no interruption of supply.1.110 KV kallimandayam ss and lakshmananpatty ss avail total shut down load relief 12.1 + 13 me 2.230 KV chekanurani end also programmed for avail lc 3.110 KV renganathapuram udumalapetai # fed radially from udpt end 4.110 KV renganathapuram sempatty I feeder fed radially from SBT end 5.no supply interruption to any other ss
During the LC period, the feeder will be radial from other end upto V.K.Patti SS and radial from SBT end upto Kosavapatti SS. Hence no interruption to any SS.SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
1) The Feeder will be kept radial from Sembatty end upto Sithargalnatham SS 2)The Feeder will be kept radial from Pasumalai SS end upto Achampathu SS 3)110KV AB Switch towards Pasumalai at Sithargalnatham SS and towards Sembatty at Achampathu SS will be kept opened 4)110/11KV Vadipatti SS and 110/11KV Ramarajapuram SS will be under shutdown 5)Hence No interruption of supply to any SS
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 14:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 15:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
"During the LC period 1)110 KV Echantha SS load will be transferred through 110 KV veerasigamani II to Nalamanaickanpatty # by closing AB Switch towards veerasigamani at Echantha SS. 2)110 KV Kodikurichi- Veerasigamani II # will Be tied with 110kv Nalamanaickanpatty # by closiing of AB Switch at Nalamanaickanpatty SS towards 230 kvNalamanaickanpatty SS 3.110 KV bus coupler switch 5089 BC will be in open condition.Hence No SS will affected.""During LC period, i) 110KV Veerasigamani SS,110 KV Puliangudi SS,110 KV Naranapuram SS will be radially fed from Kodikuruchi SS ii) 110 KV Viswanathaperi SS will be fed from Nallamanaickenpatty SS iii) Hence, no SS will be affected."No SS affected during the LC period since 1) It is radial up to Surandai SS. 2) 110 KV Auro - Mira power plant is under DC.
ICT 4 & 5 will be in service,Load will be shared by the two Transformers,no feeder or SS will be affected.1) 230KV TTPS- KUDANKULAM FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS, 2) 29A & 29B ISOLATORS KEPT OPENED CONDITION, 3) EARTH SWITCH SHOULD BE KEPT CLOSED CONDITION AT BOTH ENDS.SERVALAR POWER HOUSE 11/110 KV SWITCH YARD ENTIRE MONTHLY MAINTENANCE WORK PRESENT PWD DEMAND IS 50 C/S DURING THE LC PERIOD THE MACHINE WILLBE IN STAND BY CONDITION, HENCE THERE WILLBE NO LOSS OF GENERATION EARTH SWITCHES HAVE TO BE CLOSED AT BOTH ENDDuring the LC period there will be no supply in 400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3.Hence no SS will be affected.THERE WILL BE NO SUPPLY THROUGHOUT THE FEEDER BY KEPT OPEN THE LINE SWITCHES AT BOTH ENDSDuring the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 14:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 14:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 12:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 16:00 1 RESCHEDULE
During the LC period, the feeder will be radial from other end upto veeravanallur SS. Hence, no ss affected
During the LC period Karisalpatti Ss will be radially fed from Sankanery Hence No Ss affected
During the LC period the Auto Tr. II & III will cater the load of Auto Tr. I. by closing 110 KV Bus section Isolator 2-29 B. Hence No SS affected.During the LC Period PowerTransformer-I will not beinservice.PowerTransformer-II&III willbe Carriedout the EntireLoad.During the LC period,110 KV SR pudur-SNRI feeder will be radial from SNRI end upto Perungudi SS (Incl).Hence no SS will be affected.Present PWD Demand is 50 cusecs.During the LC Period the feeder will be radial from other end. No SS Will be affectedDuring the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230 kv Eachangadu- Neyveli TSI #. 230 KV POYYUR SS end is also availing LC On that Day.During the LC period, a)Other end also avail shutdown. b) Load Relief to 110 KV Oranthanadu 110 KV SS (33 KV Feeders) 15 MW, 110 KV Mariammankoil SS - 9 MW, 110 KV Thanjavur Grid SS - 18 MW and 110 KV Thirukkanurpatti SS - 9 MW. c)All other 230 KV feeders will be in service. d)There will be no interruption of supply to any other feeders.
During the LC period a) all the 230 KV feeders will be kept radial from respective other end. b)110KV side loads can be managed through the 110 KV Bus and solar power. c)Auto Transformer I,II & III will be kept out of service. d)If necessary 110 KV Trichy - Srirangam feeder, 110kv Trichy - Punalkulam feeder & 110KV Trichy – Kovilur feeder will be kept radial from other end. e)There will be no interruption of supply to any of the SS. f) Necessary concurrence obtained from SE/O/TRY.
6/22/2018 8:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 9:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 8:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 8:00 6/22/2018 17:00 1 POSSIBLE
6/22/2018 10:00 6/22/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
1. 110KV PUDUKKOTTAI (OLD)SS, 110KV THIRUMAYAM SS, 110KV KONNAIYUR SS UNDER SHUTDOWN. CONCURRENCE OBTAINED FROM SE/PEDC/PUDUKKOTTAI. 2. 110KV URBAN SS BACK FED THROUGH 230KV KARAIKUDI SS. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.During the LC period other two auto are in service and load with in the limit.Hence there is no interruption of supply to any other SSDuring the above LC Period, 1)1101KV Musiri feeder H/T at Jamunathapuram 230 KV SS ,line switch opened and at 110KV Musiri SS breaker H/T and line switch opened.2)110KV AB switch No 2&3 closed Breaker chraged at 110KV T.pet SS to avail supply to 110kv ss Musiri 4)110kv ss thotiam availed shutdown5) There will be No interruption to any other SS and EHT SC.
During the LC period, 1) other end also will avail LC on the same day, 2) Eachankottai 110 KV SS and Poondi 110 KV SS will avail shutdown on the same day (Total Relief: 19 MW), 3) all other 230 KV feeders will be in tied condition, 4) no supply interruption to any SS.During the LC period, 1) this feeder will be radial from NTKudi 230 KV SS upto Thirukkanurpatti 110 KV SS, 2) Eachankottai 110 KV SS will avail shutdown on the same day (Load relief: 11 MW), 3) all other 110 KV feeders will be in tied condition, 4) no supply interruption to any SS.
Auto Transformer I will be in service, feeds the entire load.
During LC period 110 KV Chinnakattalai SS and elumalai SS availing total shutdown
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 10:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 14:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 10:00 6/25/2018 17:00 1 RESCHEDULE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 10:00 6/25/2018 15:00 1 POSSIBLE
Andipatty SS will change over to Theni I feeder,110KV Chinnakatalai, Elumalai SS availing Total shutdown. During the LC period the feeder will be radial from Theni upto Kanavilakku SS.EE/O/CKNI has also programmed Line LC at 110KV Elumalai Spur line only.
Mandapam SS will be radialy fed from Perungulam end. Hence there will be no interruption.OCC has already approved for both end LC
During the L.C Period, 110KV Sakkavayal & Devakottai SS are under TSD. Hence there will be no interruption of supply.
During the LC period, the feeder will be radial from other end one by one. Hence no interruption to any SS.EE / EM - III / TTPS has also programmed
"During the LC Period 1.110 KV Isolator towards surandai will be kept opened at Uthumalai SS 2.110 KV Isolator towards Uthumalai already kept opened in Surandai SS 3.Hence no SS will be affected."
110KV Keelaveeranam SS and 110KV Surandai SS will be fed through 110KV Uthumalai feeder via Surandai feeder at 110KV Uthumalai SS ,no SS will be affected.No SS will be affected. 110KV Manjalneerkayal SS will be fed from 110 KV Arni SSDuring the LC Period, The feeder will be radial from other end upto seethaparpanallur SS. Hence no ss affected
THERE WILL BE NO SUPPLY THROUGH OUT THE FEEDER BY KEPT 230KV LINESWITCHES OPENED AT BOTH ENDS
6/25/2018 9:00 6/25/2018 17:00 1 RESCHEDULE
6/25/2018 9:00 6/25/2018 18:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 14:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 14:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/27/2018 17:00 3 RESCHEDULE
6/25/2018 10:00 6/25/2018 17:00 1 POSSIBLE
During the LC Period, The feeder will be radial from other end upto Keelaveeranam SS. Hence no ss affected. Maintenance also applied at KanarpattiSS1. Both end breakers to be tripped 2. Both end Bus and line isolators to be opened 3. Both end Earth switches should be closed condition.During the LC period 110/11 KV Karungulam SS will avail back feeding supply from 110 KV Palavoor # and Kannanallur SS will avail back feeding supply from 110 KV Muppandal #. Hence no SS will be affected.During the LC Period There willbe no supply inthe Entire feeder, Other end also LC applied.
During the LC period, a) 230KV Paramathy feeder Breaker Both end tripped condition. b)All other 230 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
During the LC period, a) 230KV TRICHY-Alundur I feeder Line switch towerds Trichy side opend at 230KV Alundur SS, b) All other 230KV feeders will be in tied condition. c) There will be no interruption of supply to any of the feeder and SS.
During the above LC Period, 110KV Vengaimandalam SS is also availing total shutdown on that same day. 1) 110 KVJambunathapuram tied # Breaker at 230 KV SMPM SS will be in H/T condition Bus and line isolator towards 110KV Vengaimandalam SS is Kept opened and earth switch closed . 2) At 110KV Vengaimandalam SS Line Isolator towards 230KV Samayapuram SS will be kept in open condition and Earth switch closed condition. 3)There will be no interupation to any other SS.
6/25/2018 10:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 9:00 6/25/2018 17:00 1 POSSIBLE
6/25/2018 10:00 6/25/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 15:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 15:00 1 POSSIBLE
6/26/2018 0:00 6/26/2018 0:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 14:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
1) DURING THE LC PERIOD, 110KV PATTUKKOTTAI URBAN SS SUPPLY WILL BE FED FROM 110KV MADUKKUR SS BY CLOSING THE 110KV LINE ISOLATOR (NO.2) TOWARDS PATTUKKOTTAI AT 110KV MADUKKUR SS. 2) NO INTERRUPTION TO ANY SUBSTATION. 3) 110KV PATTUKKOTTAI- MADUKKUR FEEDER BREAKER HAND TRIPPED AT 110KV PATTUKKOTTAI SS.
During the LC period 110KV SS Poondi load will be transfer to 110KV Thanjavur grid SS.Since there is no interruption of supply to any other SS
1)110Kv Gc H/T at vengaimandalam SS to avail shut down 2)110Kv vengaimandalam feeder H/T at 230Kv Jamunathapuram SS and also 230 kv ssThatchankurichi ss availing lc. 4) No supply interruption to other SS.During LC period there will be no supply in the entire feeder
During the LC period other two Auto transformers will be in service and scatter the loadAUTO TR II .will be in service. Thiruppalai SS , VandiyurSS,,Narasingampatty SS ,Samayanallur SS under S/D. If necessary 110kv Alkl-Sembatty 1 & 2 feeder tie will be kept opened at ALKL end.Feeder will be radial from other end..Thiruppalai SS S/D
the feeder will radialy charged from other endDuring the LC supply Radial From Kinnimangalam end. Up to Valanthur.110 KV Gandamanur SS under TSD1.110 KV vedasandur as avail total shut down l/r 28 mw 2.110 KV renganathapuram - sempatty III Feeder radially fed up to 110 KV chinakampatty ss from SBT end 3.hence no supply interruption to any other ssMAIN LINE WILL BE KEPT IN TIED CONDITION. THONDI TO BE AVAILED SHUTDOWN
6/26/2018 9:00 6/26/2018 17:00 1
6/26/2018 9:00 6/26/2018 14:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 10:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 14:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 10:00 6/26/2018 17:00 1 POSSIBLE
MAIN LINE WILL BE KEPT IN TIED CONDITION. THONDI TO BE AVAILED SHUTDOWNEE / O/ 400KV Kayathar has also programmed
"During the LC period 110 KV Achanpudur SS,Kadayanllur SS will be radially fed from 230KV Nalamanaickampatti SS.""During the LC period EE/O /Amuthapuram has also applied LC on 230kv Amuthapuram - Chekkanoorani # entire line on the same day (26.06.2018) "1) During the LC period there will be NO supply in this feeder. 2)Other End also avail LC on same day. 3) Cocurrence obtained from SE/NCES/TIN.During the LC period there will be no supply in 230 KV Madurai # Main Breaker (202-52), & CT,CVT. Hence no SS will be affected.During the LC Period there will be no supply in the entire 230KV Veeranam-Abisegapatti -II Feeder.Concurrence obtained from SE/NCES/TIRUNELVELI.During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected.No SS will be affected, During this above LC period 110KV Sathankulam SS will be radially fed from 110KV Arumuganeri SS and 110KV Moolakaraipatti SS will be radially fed from 230KV SR Pudur SS."During the LC period Pazhavoor SS will avail backfeeding from 110 KV SR Puthur-KKY feeder.Hence no SS will be affected. "During the L.C period, 110 KV Pugalur SS is proposed total shut down and concurrence obtained from EHT consumer M/s. EID Parry/Pugalur.1) DURING THE LC PERIOD, 110KV ULLIKKOTTAI SS WILL AVAIL TOTAL SHUTDOWN. 2) 110KV OKKANADU KEELAIYUR SS AND 110KV MANNARGUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 2) NO INTERRUPTION TO ANY SUBSTATIONS.
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 10:00 6/26/2018 16:00 1
6/26/2018 10:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 17:00 1 POSSIBLE
6/26/2018 9:00 6/26/2018 16:00 1 POSSIBLE
6/26/2018 10:00 6/26/2018 14:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
During the LC Period the 110KV SS Karaikal will be shut down will be programed and Concurrence will be obtained from EE / electrical/ Karaikal
During the LC period 1)Total shut down will be programed in 110KV Karaikal SS 2) 110KV T.R.Pattinam feeder idly charged condition and hence no interruption of supply.3)110KV Narimanam SS will be fed from 110KV Thiruvarur -narimanam II feeder only.During the LC period, 1) Thanjavur 110 KV Grid SS, Ayyempettai 110 KV SS and Punalkulam 110 KV Grid SS will avail shutdown on the same day (Load relief : 42 MW), 2) all 230 KV feeders will be in tied condition, 3) no supply interruption to any SS.During the LC period, 1) 110 KV Punalkulam - Trichy feeder will be radial from Trichy 230 KV SS upto Punalkulam 110 KV Grid SS, 2) Punalkulam 110 KV Grid SS will avail shutdown on the same day (Load relief: 13 MW), 3) all other 110 KV feeders will be in tied condition, 4) no supply interruption to any SS.During the above period of shut down 1)110KV Siruvachur SS also availing total shutdown 2) 110KV Pudukurichy SS and MRF load will be fed from 110KV Kalakudy Grid SS and there will be no interruption to any others SS /Eht consumer
SE/O/TRY APPROVAL
110 KV Sakkottai II feeder was in ideally charged condition, No interruption of supply.During the above LC period there will be no interruption to any substation. 110 KV Ullikkottai SS will be radially fed from Thiruvarur 230 KV SS.No supply interruption to any SS.110KV Mayiladuthurai SS proposed shut down.
No supply interruption to any SS.Auto-I load can be managed by Auto-II.110KV Mayiladuthurai SS proposed total shut down.During LC period there will be no supply in the entire feeder
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 13:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 16:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 18:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
No SS will be affected, 6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
Perunguam SS will be fed from VLTR & ARKAY. Hence there will be no interruption.During the LC period, the feeder will be radial from other end and Gandhigramam SS is availing total shutdown. Hence no interruption to any SS.No SS will be affected. The EHT Sree Shasayee Paper Mill Will be Under shutdown for maintenance work on the same dayICT 3 & 5 will be in service,Load will be shared by the two Transformers,no feeder or SS will be affected.1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Cocurrence obtained from SE/NCES/TIN.No SS will be affected. During this above LC period all 110KV feeders will be fed from 80 MVA Auto Tr-IDuring the LC period there will be no supply in 400 KV Kanarpatti-2 feeder Main breaker (401-52). Hence no ss will be affected.During the LC period there will be no supply in the entire feeder and other end also will be applying LC on the same day. Hence no SS affected.During the LC period, the feeder will be radial from other end upto kalugumalai SS. Hence no ss affected.During the LC Period thereis no supply on the feeder
During the LC period switch No 52 will be kept opened and all the 110 KV Feeders will be kept radial from other end. Concurrence to be obtained from railway for Vanchi Maniyachi feeder
1. Both end breakers to be tripped. 2. Both end Bus and line isolators. 3. Both end Earth switches shoulod be closed condition
During the LC period, both ends availing Lc.
6/27/2018 9:00 6/27/2018 14:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 14:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 16:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 9:00 6/27/2018 17:00 1 POSSIBLE
6/27/2018 10:00 6/27/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
Other end is also availing LC 6/28/2018 9:00 6/28/2018 15:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 14:00 1 POSSIBLE
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto TKY SS (incl) and radial from KDR upto VNR (Incl).Hence no ss will be affected.During the LC Period Auto Transformer-II willnot be inservice. AutoTransformer-I will be carriedout the EntireLoad.During the LC period there will be no supply in the entire PR TR-I & 33KV feeders concurrence obtained from SE/NCES/TIN.During the LC period, there will be no supply on the above feeder. Concurrence obtained from M/s Regen power Tech.Paruthiyur.During the LC period, there will be no supply on the above feeder. Concurrence obtained from EHT consumer M/s TNPL Ltd.Idle Breaker.There will be no interruption to the Consumer
During the above Shutdown Period 100 MVA Auto Transformer II will be in service. No interruption to any other SSDuring the LC period all other feeders are in tied condition and there is no interruption of supply to any other SS
1)DURING THE LC PERIOD 230/110KV NEMMELI THIPPIYAKUDI SS RADIALLY FED FROM 230KV KARAIKUDI SS. 2) NO INTERRUPTION TO ANY SS AND ALL OTHER FEEDERS ARE TIED CONDITION.During LC period there will be no supply in the entire feeder
During the LC supply Radial From Kinnimangalam end. Up to K.vilakku SS1.110 KV renganathapuram udumalapetai # radially fed from udpt end up to oddanchatram as 2.oddanchatram SS avail total shut down load relief 22 mw 3.no supply interruption to any other ss
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 10:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 11:00 6/28/2018 13:00 1 POSSIBLE
6/28/2018 10:00 6/28/2018 16:00 1 POSSIBLE
6/28/2018 10:00 6/28/2018 16:00 1 POSSIBLE
6/28/2018 10:00 6/28/2018 15:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
FEEDER TO BE KEPT RADIAL FROM KARAIKUDI UPTO R.S.MANGALAM. SALAIGRAMAM TO BE AVAILED SHUTDOWN"During the LC period (i) Auto I Will be Out of Service AutoII & III Will Cater the Present SS Load, 389 MA will be kept open condition. (ii)230kv Veeranam # load will be transferred through Tie breaker."During the L.C period 110 KV Sipcot SS will be in shut down condition and 110 KV Vagaikulam SS and 110KV Kombukaranatham SS will be radially fed from other end.During the LC period there will be no supply in 230 KV Kayathar 1 # Main Breaker (204-52) & CT, CVT,LAS. Hence No SS affected.During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS and 110KV Nallamanaickenpatti SS will be availing total Monthly shutdown on that day. Hence no SS affected.During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS will be availing total Monthly shutdown on that day.110KV Srivilliputhur SS will be fed by 110KV T.Kallupatti feeder of 230KV Anuppankulam SS. Hence no SS affected.During the LC Period 230/110KV Auto I and 230KV Chekkanurani feeder are under L.C . Hence there will be no supply interruption.During the LC Period there will be no supply in the entire feeder and other end also will be applying LC on the same day. Hence no SS affected.THERE WILL BE NO SUPPLY ON 33KV FEEDERS
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
During the LC period, both ends availing Lc.
No SS will be affected, During this above LC period 110KV Koodankulam SS will be radially fed from 230KV SR Pudur SS.
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 10:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
6/28/2018 9:00 6/28/2018 17:00 1 POSSIBLE
No supply interruption to any SS 6/28/2018 10:00 6/28/2018 12:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 13:00 1
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 14:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 10:00 6/29/2018 17:00 1 POSSIBLE
During the LC period, a) Other end will also avail LC on the same feeder. b) 230KV Mondipatty - Alundur feeder will be in service. c) There will be no interruption of supply to any of the feeder and SS.
1) DURING THE LC PERIOD, 110KV OKKANADU KEELAIYUR SS AVAILED TOTAL SHUTDOWN. 2) 110KV MANNARGUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 3) 110KV ULLIKKOTTAI SS RADIALLY FED FROM T(K)GTPS . 4) NO INTERRUPTION TO ANY SUBSTATIONS.PUDUKKOTTAI 230 KV SS LOADS WILL BE MAINTAINED FROM 230 KV ALUNDHUR FEEDER. HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.
During the LC period 110KV SS Kovilvenni and Vaduvoor ss loads will be transfered to 230KV SS Thiruvarur in addition to 110KV SS Kudavasal
During the LC Period All the 230 KV Feeders fed through A-Bus
110KV Penna-KAVANOOR feeder will be in service. Hence there will be no power evacuation problem.lc to be availed depending upon the grid voltage
SE/O/MDU APPROVAL
During the L.C Period, 110KV Kalayarkoil SS will be under TSD & KKDI-SVGA # will be radial upto M.Patty SS from KKDI end. Hence there will be no interruption of supply.1.110 KV vadamadurai ss avail total shut down load relief 13.1 mw
During the LC period, the feeder will be radial from other end upto Natham SS and radial from SBT upto V.K.Patti SS. Hence no interruption to any SS.SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER110KV Load will be Shared by ICT 3 and 4..Hence no feeder or SS will be affected.
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1
6/29/2018 10:00 6/29/2018 15:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 14:00 1 POSSIBLE
No SS will be affected, 6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 10:00 6/29/2018 12:00 1 POSSIBLE
No generation in PH-1 m/c 6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 14:00 1 POSSIBLE
6/29/2018 10:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
During the LC period there will be no supply in 400 KV Tie Breaker (402-52) for Kanarpatti-1 and Kanarpatti-2 Feeder. Hence no ss will be affected.During the LC period, other end also avails LC, and there will be no supply in the entire line. Hence no ss affected. Concurrence will be obtained from Southern RailwayDuring the LC period station supply will be availed from sannadhupudhukudi SS Via 11KV TWAD #
SE/O/TIN APPROVAL
THERE WILL BE O SUPPLY THROUGHOUT THE FEEDER BY KEPT OPEN LINE SWITCHES AT BOTH ENDS.During the LC Period, 110KV MRPM-SS, 110KV Velayuthapuram-SS, 110KV TKPT SS and EHT M/S.Ramalinga Mills will be under Total shutdown. 110 KV Aruppukottai SS loads will be fed from 230/110 KV Savvasapuram SS along with solar generation . Hence no SS affected.
Present PWD Demand is 50 cusecs.During the LC Period the feeder will be radial from other end. No SS Will be affected.
During the LC Period PowerTransformer-II willnot beinservice. PowerTransformer-I&III will be carriedout the EntireLoad.During the lc period there will be no interruption of supply in 230kv & 33kv feeders concurrence obtained from SE/NCES/TIN.During the LC period, a) All 110 KV feeders will be in service in main Bus. b) 230 KV Bus Coupler Isolator switch No.(1229) 'A' and (1229) 'B' Opend. c) There will be no interruption of supply to any other feeders.
6/29/2018 10:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 9:00 6/29/2018 17:00 1 POSSIBLE
6/29/2018 10:00 6/29/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1
TBC is in stand by condition 6/30/2018 9:00 6/30/2018 14:00 1 POSSIBLE
1. During the above LC Period, 110Kv Kallakudy I # Breaker is in H/T condition at 230KV Thatchankurichy SS . 2.110Kv Thatchankurichy I# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV Thatchankurichy SS. 6.110 KV Kallakudi-II # will be in tied condition. 7.There will be no interruption to any other SS.
During the LC period the 110KV SS narimanam will be fed from 110KV Thiruvarur - Narimanam I Feeder only and hence there is no interruption of supply to any other SS
During the above LC Period , 1)110KV Gc H/T at T.Pet SS to avail shut down . 2)110kv T.pet feeder breaker H/T at jamunathapuram SS and line switch opened.3)Welspun solar generation will be tranfered from T.pet to Musiri feeder 4) There will be No interruption to any other SS and EHT SC..
Already in stand by Condition There no supply interruption
During LC period there will be no supply in the entire feeder
EE/O/CKNI has also programmed Line LC During the LC period there will be no supply in the entire feederDuring the LC period local 110/22kv SS will be under TSD
SE/O/MDU APPROVAL
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 10:00 6/30/2018 15:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 14:00 1 POSSIBLE
6/30/2018 9:00 6/30/2018 17:00 1 POSSIBLE
6/30/2018 10:00 6/30/2018 17:00 1 POSSIBLE
During the LC period, the feeder will be radial from other end upto Pappampatti SS. 110KV Palani and S.V.Patti SS are availing total shutdown. Hence no interruption to any SS"During the LC period (i)Auto III Will be Out of Service Auto I Will Cater the Present SS Load, 389 MA, 389 MB will be kept at open condition. (ii)230kvAmuthapuram I & II # Will be radial fed from Other End.Auto II load Transfered to the tie breaker."During the LC period there will be no supply in 230 KV Kayathar 2 # Main Breaker (205-52) & CT, CVT,LAS. Hence No SS affected.During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affectedDuring the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affectedTHERE WILL BE NO SUPPLY THROUGHOUT THE FEEDER BY KEPT OPENED LINE SWITCHES AT BOTH ENDSDuring the LC period, both ends availing Lc.
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto VNR SS (incl) and radial from KDR upto PPI (Incl).Hence no ss will be affected.During the LC period, 1) other end also will avail LC on the same day, 2) all other 230 KV feeders will be in tied condition, 3) no supply interruption to any SS.
1)DURING THE LC PERIOD,110KV ORATHANADU SS (11KV only availed shutdown) and 110KV THIRUKKANURPATTY SS, 110KV ECHANKOTTAI SS AND 110KV ORATHANADU SS RADIALLY FED FROM 230KV THANJAVUR SS. 2) ALL OTHER FEEDERS ARE TIED CONDITION AND NO INTERRUPTION TO ANY SS.
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2018 at 17th TNSOCC Meeting
Transmission Lines / Elements Details
Remarks GCC/P&C LONG LC INTER LD REMARKS
Approved MDU
MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
TRY
SE Approval
(*Subject to Remarks)
OPERATION CIRCLE
SUB TO WIND GEN AND LOAD
CONDITION
Approved by SE/O/MDU
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO.
140
SUB. TO LOAD CONDNS. WM
GEN. & NO BLOCKING OF
WM GEN.SRPC OCC APPROVAL NO.139
Approved by SE/O/TRY
TRY GCC LONG LC
Approved TIN
Approved MDU
Approved MDU
LONG LC NOTE TO BE PUT UP
Note to be put up
SUB TO WIND GEN AND PPM PWD DEMAND
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION, WM GEN. & NO BLOCKING OF WM GEN.
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO LOAD CONDITION AND TOTAL S/D
Approved by SE/O/MDU
SUB. TO LOAD CONDNS. & ERODE SLDC CONCURRENCESUB TO TOTAL S/D
SUBJECT TO LOAD CONDNS.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO TOTAL S/D
TIN GCC
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY ERODE
Approved TRY
Approved TRY
Approved TRY
SUB. TO FURNISHING OF NEW LINE DETAILS, SANCTION COPY DRAWING & PR COPY
Note to be put up
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB. TO LOAD & GRID CONDNS.
SUB. TO LOAD & GRID CONDNS.
SUB. TO LOAD & GRID CONDNS.
SUB TO LOAD TRANSFERING AND TOTAL S/D ERODE SLDC CONCURRENCE
SUB TO TOTAL S/D
SUB TO TOTAL S/D
SUB TO TOTAL S/D
Approved TRY
Approved TRY
Approved TRY
TRY
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
Subject to EE/SLDC/MDU Concurrence
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN & CONCERNED WF SS & SE/NCES/UDPT CONCURRENCE
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU GCC
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO FURNISHING OF SANCTION COPY, DRAWING
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO PPM PWD DWMAND, WM GEN. & NO BLOCKING OF WM GEN.
SUB. TO TTPS 3 M/C CONDNS.
Approved TIN
Approved TIN
Approved TIN
Approved TIN
TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
Approved TRY
SUB. TO TTPS 3 M/C CONDNS.
SUB TO WIND GEN
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SRPUDUR ALSO LC APPLIED
Subject to EE/SLDC/MDU Concurrence
SUB. TO TTPS 3 M/C CONDNS.
SUB. TO WM GEN. & NO BLOCKING OF WM GEN. RAILWAY CLEARANCESUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO TOTAL S/D
Approved TRY
Approved TRY
Approved TRY P&C
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU GCC
Approved MDU
SUB TO LOAD CONDITION
BUS BAR PROTECTION SCHEME WILL BE OUT OF SERVICE FOR 3 DAYS BET. 04/06/18 TO 06/06/18
SUB TO LOAD CONDITIONSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
LONG LC NOTE TO BE PUT UP
Note to be put up
SUBJECT TO LOAD CONDNS.
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO PPM PWD DEMAND, WM GEN. & NO BLOCKING OF WM GEN.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSRPC OCC APPROVAL NO.155
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO GRID CONDITION
SUB TO GRID CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved TRY
TRY GCC
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU P&C
Approved MDU
Approved TIN
DETAILS OF SANCTION COPY, DRAWING TO BE FURNISHED
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
DUE TO SBT AUTO LC
Subject to EE/SLDC/MDU Concurrence
SUB TO TOTAL S/D
SUB TO WIND GEN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
TIN
Approved TIN
Approved TIN
SRPC OCC APPROVAL NO.162SUB. TO TTPS 3 M/C CONDNS.
SUB TO LOAD CONDITION
SUB TO WIND GEN
SUB TO WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
OTHER #'S KODAYAR, MLKLR, ANPKM, N.S.PM, CONDITION NOT MENTIONED; CONCURRENCE FROM SE/NCES/TIN FOR WIND BLOCKING IF ANY TO BE OBTAINED
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB. TO TTPS 3 M/C CONDNS.
Approved TIN P&C
Approved TIN
Approved TIN
Approved TRY ERODE
Approved TRY ERODE
Approved TRY
Approved TRY
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SRPC OCC APPROVAL NO. & ERODE SLDC CONCURRENCE
SRPC OCC APPROVAL NO.128 & ERODE SLDC CONCURRENCE
SUB TO LOAD CONDITION & AVAILABILITY OF TAQA M/C
SUB TO TOTAL S/D
Approved TRY
TRY
TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
SUB TO LOAD CONDITION & AVAILABILITY OF TAQA M/C
SINCE 230 KV ALDR-TRY # 2 LC REQ.
Subject to EE/SLDC/MDU Concurrence
SINCE 230 KV ALDR-TRY # 2 LC REQ.
Subject to EE/SLDC/MDU Concurrence
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSRPC OCC APPROVAL NO. 173
Approved TIN
Approved TIN
REPEATED Cancelled TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SRPC OCC APPROVAL NO. 172
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS. WM GEN. & NO BLOCKING OF WM GEN.
SUB TO LOAD CONDNS, TOTAL S/D & RAILWAY CLEARANCE
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TRY
Approved TRY
Approved TRY
TRY
Approved TRY
Approved TIN
Approved MDU
Approved MDU
SUB TO LOAD CONDITION & TAQA M/C AVAILABILITY
SUB TO 230KDGDI-NEY # AND 230KKDI-NTKDI# LOADS
SUB TO LOAD CONDITION & TAQA M/C AVAILABILITY
TOTAL S/D NOT ENOUGH TO CONTAIN AUTO TR. LOADING
Subject to EE/SLDC/MDU Concurrence
PSQ LC APPLIED ON 08.06.18
SUB. TO WIND GEN.
Approved MDU
MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
Approved by SE/O/MDU
SUB. TO LOAD CONDNS. OF AUTO TR. AT KKDI & ALKL
SUB. TO LOAD CONDNS. OF AUTO TR. AT KKDI & ALKL
SUBJECT TO LOAD CONDNS.
SUB. TO WIND GEN.
SUB. TO WIND GEN.
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO TTPS 3 M/C CONDNS.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
TRY
Approved TRY
SUB. TO TTPS 3 M/C CONDNS.
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB. TO WIND GEN.SUB. TO PWD DEMAND & WIND GEN.
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SINCE 230 KV PBLR-TAQA # LC APPLIED
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
TRY
Approved TRY
Approved TRY
TRY
Approved TRY CHENNAI
TRY
Approved MDU
Approved MDU
Approved by SE/O/TRY
SUB. TO LOAD CONDNS.
Approved by SE/O/TRY
SUB. TO CHENNAI SLDC CONCURRENCE
SINCE 230 KV PBLR-TAQA # LC APPLIED
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITIONSUB TO LOAD CONDITION
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO PWD DMD. & WIND GEN.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
Approved TIN P&C
Approved TIN P&C
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
Approved TRY
Approved TRY P&C
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
SUB. TO LOAD CONDNS.
BUS BAR PROTECTION SYSTEM WILL BE CUT OUT FOR 3 DAYS
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
MDU P&C
Approved TIN
Approved TIN
Approved TIN P&C
Approved TIN P&C
Approved TIN
Approved TIN
Approved TIN
Approved TIN
DUE TO SBT AUTO LC
Subject to EE/SLDC/MDU Concurrence
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SRPC OCC APPROVAL NO. 190
SUB. TO LOAD CONDNS. WM GEN. & NO BLOCKING OF WM GEN.
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
Approved TRY
SUBJECT TO WIND GEN.
SUB. TO LOAD CONDNS.
SUB. TO WIND GEN.
SUB. TO LOAD CONDNS.
SUB TO GRID CONDITION & FREE FLOWSUB TO RAILWAY CONCURRENCE
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
TRY
Approved TRY
Approved MDU
Approved by SE/O/TRY
SUB TO TOTAL S/D
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB TO CONCURRENCE FROM SEVA GAS
SUB. TO LOAD CONDNS.
230KBKNM-TVRR # LC APPLIED
Subject to EE/SLDC/MDU ConcurrenceSUB TO LOAD
CONDITION
SUB TO LOAD CONDITION
Approved MDU
Approved MDU
Approved MDU
MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN P&C
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved by SE/O/MDU
SUB TO TOTAL S/D
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUBJECT TO WIND GEN. SRPC OCC APPROVAL NO. 194SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
BUS BAR PROTECTION SCHEME WILL BE OUT OF SERVICE FROM 12.06.18 TO 15.06.18
Approved TIN P&C
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
BUS BAR PROTECTION SCHEME WILL BE OUT OF SERVICE FROM 12.06.18 TO 15.06.18
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION & TIME MAY BE LIMITED BET. 9-13 HRS. ALONG WITH SIPCOT SS LCSUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB. TO LOAD CONDNS.
ALREADY BR. UNDER OUTAGE AT APKM
SUB TO LOAD CONDITION & TIME MAY BE LIMITED BET. 9-13 HRS. ALONG WITH SIPCOT SS LCSUB. TO PWD DEMAND AND WIND GEN.
TIN P&C
Approved TRY
Approved TRY
Approved TRY
Approved TRY
TRY GCC ERODE
Approved TIN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN. BUS BAR PROTECTION SCHEME OUT OF SERVICE FOR 10 TO 15 DAYS
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO TOTAL S/D; DRAWING TO BE GIVEN; ERODE SLDC CONCURRENCE
Subject to EE/SLDC/MDU Concurrence
SUBJECT TO WIND GEN. & SRPC OCC APPROVAL NO.154
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO TTPS 3 M/C CONDNS.
SUB TO LOAD CONDITION
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB. TO WIND GEN. SRPC OCC APPROVAL NO. 151SUB. TO WIND GEN. SRPC OCC APPROVAL NO.202
SUB. TO WIND GEN. SRPC OCC APPROVAL NO.154
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO TTPS 3 M/C CONDNS.
SUB. TO TOTAL S/D
Approved by SE/O/TIN
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO LOAD CONDNS.
SUB TO GRID CONDITION
REPEATED Cancelled TIN
REPEATED Cancelled TIN
Approved TIN
Approved TRY
Postponed TRY ERODE
Approved TRY ERODE
Approved TRY CHENNAI
Approved TRY
SUB TO CONCURRENCE FROM RAILWAY
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS. ERODE SLDC CONCURRENCE
SUB. TO LOAD CONDNS. ERODE SLDC CONCURRENCE
SUB. TO LOAD CONDNS. & CHENNAI SLDC CONCURRENCESUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
DUE TO ECH-NEY # LC REQ.
Subject to EE/SLDC/MDU Concurrence
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU
MDU ERODE
Approved MDU
Approved MDU
Approved MDU
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
LOAD TR. NOT CLEARLY MENTIONED
Subject to EE/SLDC/MDU ConcurrenceSUB. TO LOAD
CONDNS. & ERODE SLDC CONCURRENCE
Combine with 2nd June 2018
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO TOTAL S/D
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO PWD DEMAND
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO TTPS 3 M/C CONDNS.
SUB TO LOAD CONDITION & NORMALISATION OF ARMI 110 KV BUS COUPLER SWITCH
SUB. TO LOAD CONDNS.
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO TTPS 3 M/C CONDNS.
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB. TO PWD DMD. & WIND GEN.
SUB TO TOTAL S/D
SUB TO TOTAL S/D
SUB TO TOTAL S/D
SUBJECT TO PARASALA CONCURRENCE
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
TRY
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
110NORTHERN BUS LC @ 230TRY
Subject to EE/SLDC/MDU Concurrence
Approved TRY
TRY
Approved TRY
Approved TRY
TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
SUB TO LOAD CONDITION
Approved by SE/O/TRY
SUB TO TOTAL S/D
110TPNL-TRPBM # LC
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS. WM GEN. & NO BLOCKING OF WM GEN.SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved by SE/O/MDU
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
TRY P&C
Approved TRY
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU
BB PROTECTION OUT DURATION NOT CLEARLY MENTIONED.
Subject to EE/SLDC/MDU Concurrence
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
AUTO 1 LC FOR AUGMENTATION
Subject to EE/SLDC/MDU Concurrence
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO CONCURRENCE FROM SRIRAM
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB. TO LOAD CONDNS.
SUB TO TOTAL S/D
SUB TO TOTAL S/D
SUB TO TOTAL S/D
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION, RLY CLEARANCE
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
TRY
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
DOCUMENTS SUCH AS SLD, SANCTION COPY TO BE FURNISHED
Subject to EE/SLDC/MDU Concurrence
TRY
Approved TRY
TRY
Approved TRY
SANCTION COPY; WHETHER 3 NOS. FEEDERS AND 1 NO. BUS COUPLER C.T. REPLACEMENT COULD BE COMPLETED IN A SINGLE DAY AND COMMISSIONED?
Subject to EE/SLDC/MDU Concurrence
LC MAY BE COMBINED WITH OTHER END SINCE LC IN 230 KV ALDR-TJR # 1
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
Approved MDU
Approved MDU
Approved MDU
Postponed MDU LONG LC
Approved MDU
Approved MDU
MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION, WM GEN. & NO BLOCKING OF WM GEN.SUB TO LOAD CONDITION, WM GEN. & NO BLOCKING OF WM GEN.LONG LC - TO BE TAKEN AFTER COMPLETION OF AUTO TR. WORKS AT SBT
SUB TO LOAD CONDITION
SUB TO 230PGLR-PARAMATHY # 1 LOAD
MID OCC APPROVAL TO BE OBTAINED
Addressed to SRLDC approval
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved MDU
Approved MDU
Approved MDU
REPEATED Cancelled MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY ERODE
SRPC OCC APPROVAL NO. 217
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO.216
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO LOAD CONDNS.
SRPC OCC APPROVAL NO. 170 ERODE SLDC CONCURRENCE
Approved TRY
Postponed TRY
Approved TRY
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS. ERODE SLDC CONCURRENCE; RNPM AUTO TR. LOADING
Approved TRY
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
Approved TRY
Approved MDU
Approved MDU
MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITIONSANCTION COPY, DRAWING TO BE FURNISHED
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO CONCURRENCE FROM COY.
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO LOAD CONDNS.
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO GRID CONDITION
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION OF 230 KV PGLR-PARAMTHI # 1,2
Approved MDU
Approved MDU
Approved MDU
Approved MDU
MDU ERODE
Approved MDU
Approved MDU
Approved MDU
SUB TO TOTAL S/D
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION & ERODE SLDC CONCURRENCE
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB. TO ICT LOADING AT KAMUTHI
SUB TO TOTAL S/D
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB. TO LOAD, WM GEN. & NO BLOCKING OF WM GEN.
SRPC OCC APPROVAL NO.235
SUBJECT TO LOAD CONDNS.
SUB. TO PWD DEMAND
SRPC OCC APPROVAL NO. 234
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
TRY
SUB. TO LOAD CONDNS.
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB. TO PWD DEMAND
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
DUE TO LOADING OF 230 KV ECH-NEY, TAQA-PBLR THIS LC MAY BE COMBINED WITH TOTAL S/D
Subject to EE/SLDC/MDU Concurrence
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
SUB TO SOLAR GEN
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D AND TRANSFERING OF ANDIPTY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO. 22 ON DELETED PROPOSALSUB TO TOTAL S/D
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB. TO WM GEN. & NO BLOCKING OF WM GEN.
Subject to EE/SLDC/MDU Concurrence
SUB. TO LOAD CONDNS.
SUB. TO PWD DEMAND, WM GEN. & NO BLOCKING OF WM GEN.SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Not feasible TRY
Approved TRY
Subject to EE/SLDC/MDU Concurrence
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSRPC OCC APPROVAL NO. 189
DUE TO LOADING CONDNS.
SUB TO TOTAL S/D
Approved TRY
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITIONSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
REPEATED Cancelled MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO. 197
SRPC OCC APPROVAL NO. 194
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO TOTAL S/D AND CONCURRENCE FROM EID
SUB TO LOAD CONDITION
Approved TRY
Approved TRY
Approved TRY
Approved TRY
TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
SUB TO CONCURRENCE FROM EE/KKL
SUB TO KKL TOTAL S/D & LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved by SE/O/TRY
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB TO CONCURRENCE FROM SHRI SESHAYEESRPC OCC APPROVAL NO.249
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO. 248
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
Approved MDU ERODE
SUB TO LOAD CONDITION, RAILWAY CLEARANCE
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO CONCURRENCE FROM TNPL
SUB. TO LOAD CONDNS.
SUB TO 230KDGDI-NEY # LOAD
SUB TO 230KDGDI-NEY # LOAD
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION & ERODE SLDC CONCURRENCE
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
SUB TO LOAD CONDITION
SUB.TO WM GEN. & NO BLOCKING OF WM GEN.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved TRY
Approved MDU
Approved MDU
MDU
Approved MDU
Approved MDU
Approved MDU
Approved MDU
Approved TIN
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO.204
SUB TO LOAD CONDITION
SUB. TO LOAD CONDNS.
SUB TO LOAD CONDITION
Approved by SE/O/MDU
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SRPC OCC APPROVAL NO. 257
Approved TIN
Approved TIN
TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
SRPC OCC APPROVAL NO. 256
SUB TO CONCURRENCE FROM SOUTHERN RAILWAY
Approved by SE/O/TIN
SRPC OCC APPROVAL NO. 207
SUB TO TOTAL S/D
SUB. TO LOAD CONDNS.
SUB. TO PWD DEMAND
SUB TO GRID CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved TRY
Approved TRY
Approved TRY
Approved MDU
Approved MDU
Approved MDU
MDU
Approved MDU
SUB. TO LOAD CONDNS.
SUB. TO LOAD CONDNS.
SUB TO SOLAR GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Approved by SE/O/MDU
Approved MDU
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TIN
Approved TRY
Approved TRY
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GENSUB TO LOAD CONDITION
SUB TO LOAD CONDITION, RAILWAY CLEARANCE
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION