COSMOTE Date: 14-02-2006 Version: 01 Ericsson RBS Commissioning Guide Ericsson RBS Commissioning Guide 1/16

Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

  • Upload
    dodien

  • View
    309

  • Download
    17

Embed Size (px)

Citation preview

Page 1: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

COSMOTE

Date: 14-02-2006 Version: 01

Ericsson RBS Commissioning Guide

Ericsson RBS Commissioning Guide

1/16

Page 2: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Ericsson RBS Commissioning Guide

1. Preparation for Commissioning

1.1 Tools Required

The commissioner before go to site for commissioning, he must have the following materials with him:

• Torques for plug-unplug units (if needed) • Screwdriver and krone-tool for installing PCM line (if needed). • Voltmeter to measure voltage. • Laptop more than 1000MHz, 512MB memory, WinXP or Win2000. • The latest version of OMT (currently it is R29_3). • Serial cable 9pin male - 9pin female for connection.

1.2 Last Check

Before begin the commissioning make some last checks.

• Cabinet is well fixed and grounded • DC voltage to cabinet is -48VDC (be careful of the polarity). • In case of 2106 power cables are connected correctly on power board.

Neutral and grounding are not connected on the same bar. • All internal cables of the cabinet are connected and there is no obvious

sign of damage.

Ericsson RBS Commissioning Guide

2/16

Page 3: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

2. Commissioning Procedure

2.1 Creating Database

Open OMT. Don’t connect to RBS but create first the IDB. Select ConfigurationàCreate IDB

Ericsson RBS Commissioning Guide

3/16

Page 4: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Let transmission line G.703 and create type of cabinet by clicking on New. If you have created already a new IDB and want to erase it click on Clear All. It will erase all old data.

Ericsson RBS Commissioning Guide

4/16

Page 5: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Select the type of the cabinet. 2206 Cabinet Type: 2206 Power System: -48VDC (Also +24VDC, 120-250VAC optional backup) Climate System: Fan+Filter 2106 Cabinet Type: 2106 Power System: 200-250 outdoor battery Air. Cond + heat exch. Click OK

Now it is time to create the cells for the cabinet. Here we will discuss the usual configuration with 3 cell of 900MHz without TMA. Create a new Antenna Sector by clicking on New

Ericsson RBS Commissioning Guide

5/16

Page 6: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

By clicking New a new window Antenna Systems for Sector 0 will be shown. Click on New to create the cells. Frequency: GSM 900 (other options GSM 800, GSM 1800, GSM 1900) CDU type: CDU G (other options CDU F) TMA: No (other options Yes) Tx combining: Uncombined (other options dTRU hybrid combiner, HCU, HCU_RX antenna sharing)

Ericsson RBS Commissioning Guide

6/16

Page 7: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

When finish with the cells click OK

Ericsson RBS Commissioning Guide

7/16

Page 8: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

One more window will be shown. From here select the configuration of the RBS. In our case it is SCC (Site Cell Configuration) 3x2 and No of Ant 3x2.

Save IDB in you computer before step forward.

Ericsson RBS Commissioning Guide

8/16

Page 9: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Select ConfigurationàDefineàAlarm Inlets… The dialog to define external alarms will be shown. You will define only external alarms. All the alarms are of type breaking. Also Id is different for every alarms. Follow the next table. It is the case where you have Ericsson 2206 with MPB and Sunlight.

ERICSSON+MPB+SUNLIGHT Position on Krone

Alarm Inlet

Declaration of the alarm in RBS Level

5 0/1 MPB DOOR OPEN 1 2 0/2 MPB TEMPERATURE TOO HIGH 2 0/3 FIRE SUSPECTED 2 3 0/4 MPB LOW TEMPERATURE 2 7 0/5 MPB FIRE DETECTED 2 6 0/6 MPB LOSS OF MAIN AC 2 10 0/7 MPBGENERAL ALARM 2 14 0/8 PSU SUNLIGHT BATTERY DISCHARGE 2 20 0/9 GENERATOR ON 2 8 0/10 MPB AIR CONDITION FAILURE 2 9 0/11 MPB AVIATION LIGHT BREAKDOWN 1 4 0/12 MPB OIL LEVEL TOO LOW 2 13 0/13 PSU SUNLIGHT MAINS FAILURE 2 11 0/14 PSU SUNLIGHT RECTIFIER URGENT 2 16 0/15 PSU SUNLIGHT RECTIFIER NON

URGENT 2

12 0/16 PSU SUNLIGHT DC VOLTAGE<47V 2 In case that we have 2106 declare the alarms as next

Alarm Inlet Declaration of the alarm in RBS Level 2/16 Fire Alarm 2 3/16 Smoke Alarm 2

Ericsson RBS Commissioning Guide

9/16

Page 10: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Next define the delays for the feeders ConfigurationàDefineàDelay… Here you must define the delay for each feeder. Don’t touch ESB (External Synchronization Bus)

To calculate the electrical delay you open the corresponding excel file (900MHz or 1800MHz). At OMT you must fill the sum of the electrical delay of feeder and jumper (column H) Repeat for all feeders.

Next select configurationàDefineàHardware Info… Here you can set the hardware information of every unit. Select IDM 0 and fill the HW information of the cabinet.

Ericsson RBS Commissioning Guide

10/16

Page 11: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Then define the loss of feeders. ConfigurationàDefineàLoss…. At the new window that will appear we will fill only the losses for the feeders. From the Excel file you opened before add the attenuation of feeders and jumper (Column F)

Next you sill define PCM line. ConfigurationàDefineàPCM…. Transmission Interface: G.703 (E1) Network Topology: Stand Alone (Other options is cascade, if another site is activated from the same line after this cabinet). Sync source: PCMA. Leave the next parameters as they are.

Ericsson RBS Commissioning Guide

11/16

Page 12: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

At the next step you will define the present RUs and remove those RUs that do not exist. Select ConfigurationàDefineàPresent RUs. Usually you must remove PSU-3 and some TRU that don’t exist.

Select ConfigurationàDefineàTEI… and set the TEI number of DXU. This TEI number is given from OMC. Cabinets on the same line must have different TEI values.

Ericsson RBS Commissioning Guide

12/16

Page 13: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Save IDB. Connect to RBS and then select ConfigurationàInstall IDB. Speak with OMC to unlock the site. Be careful that units are at remote mode.

2.2 Checking the external alarms

Check the external alarms of RBS. Refer to manual of each equipment on how to simulate them. Make sure that you don’t leave active alarm when leaving from site.

2.3 Checking Climate Unit of 2106

On CCU of 2106 there is a button that tests the operation of climate unit. Push it and see if a fault will occur.

Ericsson RBS Commissioning Guide

13/16

Page 14: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Puch test button to test climate unit

Ericsson RBS Commissioning Guide

14/16

Page 15: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

2.4 Checking Battery Backup

Close the AC main breaker of the site. In case of 2106, cabinet must continue working from the batteries. In case of 2206 Power System will provide the necessary power from its own batteries.

2.5 Integration

Integration is very important procedure because we can test the performance of RBS. If done correctly it is possible to detect many errors during installation or commissioning.

• Check with a compass the direction of the antennae. Directions must be the

same with those at Work Order. • Make sure that feeders are connected to the correct antenna and start from the

correct filter. Also cable connections between units inside cabinet must be correct.

• Make calls from every channel of every TRU. Speak with the center to lock some TRU if necessary.

• Check that the cells look at the correct direction. • Make handover between the cells • Make handover to a nearby site and write down the cell id.

Ericsson RBS Commissioning Guide

15/16

Page 16: Ericsson RBS Commissioning Guidedocshare01.docshare.tips/files/14611/146111530.pdf · • Screwdriver and krone-tool for installing ... case where you have Ericsson 2206 with MPB

Contents

Ericsson RBS Commissioning Guide .........................................................................2 1. Preparation for Commissioning ......................................................................2

1.1 Tools Required .......................................................................................2 1.2 Last Check..............................................................................................2

2. Commissioning Procedure ..............................................................................3 2.1 Creating Database...................................................................................3 2.2 Checking the external alarms ................................................................13 2.3 Checking Climate Unit of 2106.............................................................13 2.4 Checking Battery Backup .....................................................................15 2.5 Integration ............................................................................................15