Equipment Selection Program
Print Out! Then Follow it!!
1. Load New Project
2. Select the region
3. Mode Selection (C/O, H/P)
4. File name to save
1. Unit Selection
2. Input ValuesFloor, Room, Dimension, Loads/sq.m
1. “Building” is the highest position -> Floor -> Room2. Want to revise room data, dispose the cursor on the “Building” and click the right mouse button
2. Zoom Out
3. Zoom In 3. Full Screen
1. Geometric diagram
2. Text Input
3. Dummy
4. Y-joint
5. Drain joint 6. Distribution Kit
7. Drainage Hole
8. Up/Down Floor
9. Refrigerant Piping
10. Drainage Piping
12. Parts List
11. Orientation
13. Equipment List
14. Screen Save
1. At first, select the equipment then its background color turns yellow.
2. Click the left mouse button on the right side screen
1. Double-click on the symbol of Equipment
2. Add or Erase the options, capacity, mode
3. Modified options are recorded in DB file
and they keep the same information.
1. Drop all the equipments & Y-joint2. First, select a indoor unit (or outdoor unit) then drag the line to a edge of Y-joint symbol. Then pipe size and Y-joint size will appear.3. As for a beginner, make sure to enlarge the symbol which only senses the edge points. When the connection is done properly, the size will occur.
1. The symbols of Y-joint and drainage joint have the same
properties. (rotate, resize, object connection)
1. Drainage piping is the same as refrigerant piping.
2. When piping more than 2 indoor units, drainage joint
should be equipped.
1. Symbol to connect the pipe between the floors.2. The symbols are linked internally.3. When removing any of symbols at a certain floor, make sure that the symbol linked to the other floor becomes unidentified.
1. After finishing all connections, generate the list of equipment.
1. Equipment list can be saved in EXCEL mode.2. To change the screen, select the window
menu.