MRPL DHDT Project : DHDT Reactor

Equipment Erection_Srikanth

Embed Size (px)

Citation preview

  1. 1. MRPL DHDT Project : DHDT Reactor
  2. 2. DHDT Reactor 480 MT 5.198 m (OD) x 36.796 m (H) 0.3 m 21-Feb-2011 Linkbelt LS 918/ 1018 Ringer crane 680MT (L&T ) Demag CC2800 (600MT) (Hired from TWC) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  3. 3. IOCL RR Package, Paradip
  4. 4. Equilibrium Catalyst Hopper 818MT 9.5 m (ID) x 47.175 m (H) 10.3 m 21-Nov-2011 Demag CC8800-1 (1600MT) (Hired from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  5. 5. Lift in progress
  6. 6. Lift in progress
  7. 7. Main Fractionator Column (Bottom Section) 706 MT 11.8 m (ID) x 35.387 m (H) 0.3 m 28-Nov-2011 Demag CC8800-1 (1600MT) (Hired from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  8. 8. Lift in progress
  9. 9. Lift in progress
  10. 10. Main Fractionator Column (Top Section) 535 MT 11.8 m (ID) x 34.785 m (H) 35.687 m 10-Dec-2011 Demag CC8800-1 (1600MT) (Hired from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  11. 11. Lift in progress
  12. 12. Lift in progress
  13. 13. Regenerator (Bottom Section) 618 MT 12.5 m (D) x 19.5 m (H) 17.3 m 19-Jan-2012 Demag CC8800-1 (1600MT) (Hired from Mammoet) - Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  14. 14. Lift in progress
  15. 15. Regenerator (Top Section) 665 MT 16.05 m (ID) x 17.1 m (H) 37.264 m 8-Feb-2012 Demag CC8800-1 (1600MT) (Hired from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  16. 16. Lift in progress
  17. 17. Lift in progress
  18. 18. OMPL MARC Project, Mangalore
  19. 19. Adsorbent Chamber (17 FA01/02) 532 MT (2 Nos) 8 m (ID) x 30.9 m (H) 0.45 m 21/22-Nov-2012 PTC2 Ringer (1600MT) (Hired from Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  20. 20. Lift in Progress (17 FA-02)
  21. 21. Lift in Progress (17 FA-02)
  22. 22. Lift in Progress (17 FA-01)
  23. 23. Lift in Progress (17 FA-01)
  24. 24. Xylene Column (18 DA02) Bottom Section 700 MT 9.6 m (D) x 51.65 m (H) 0.5 m 15-Dec-2012 PTC2 Ringer (1600MT) (Hired from Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane
  25. 25. Lift in progress
  26. 26. Lift in progress
  27. 27. Lift in progress
  28. 28. Raffinate Column (17 DA01) 571 MT 8.5 m (D) x 66.7 m (H) 0.5 m 29-Dec-2011 PTC2 Ringer (1600MT) (Hired from Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions Installation Elevation Erection Date Main Crane Tailing Crane