2. DHDT Reactor 480 MT 5.198 m (OD) x 36.796 m (H) 0.3 m
21-Feb-2011 Linkbelt LS 918/ 1018 Ringer crane 680MT (L&T )
Demag CC2800 (600MT) (Hired from TWC) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane
3. IOCL RR Package, Paradip
4. Equilibrium Catalyst Hopper 818MT 9.5 m (ID) x 47.175 m (H)
10.3 m 21-Nov-2011 Demag CC8800-1 (1600MT) (Hired from Mammoet)
Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane
5. Lift in progress
6. Lift in progress
7. Main Fractionator Column (Bottom Section) 706 MT 11.8 m (ID)
x 35.387 m (H) 0.3 m 28-Nov-2011 Demag CC8800-1 (1600MT) (Hired
from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight
Dimensions Installation Elevation Erection Date Main Crane Tailing
Crane
8. Lift in progress
9. Lift in progress
10. Main Fractionator Column (Top Section) 535 MT 11.8 m (ID) x
34.785 m (H) 35.687 m 10-Dec-2011 Demag CC8800-1 (1600MT) (Hired
from Mammoet) Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight
Dimensions Installation Elevation Erection Date Main Crane Tailing
Crane
11. Lift in progress
12. Lift in progress
13. Regenerator (Bottom Section) 618 MT 12.5 m (D) x 19.5 m (H)
17.3 m 19-Jan-2012 Demag CC8800-1 (1600MT) (Hired from Mammoet) -
Weight Dimensions Installation Elevation Erection Date Main Crane
Tailing Crane
14. Lift in progress
15. Regenerator (Top Section) 665 MT 16.05 m (ID) x 17.1 m (H)
37.264 m 8-Feb-2012 Demag CC8800-1 (1600MT) (Hired from Mammoet)
Liebherr LR 1750 (750MT) (Hired from Allcargo) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane
16. Lift in progress
17. Lift in progress
18. OMPL MARC Project, Mangalore
19. Adsorbent Chamber (17 FA01/02) 532 MT (2 Nos) 8 m (ID) x
30.9 m (H) 0.45 m 21/22-Nov-2012 PTC2 Ringer (1600MT) (Hired from
Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane
20. Lift in Progress (17 FA-02)
21. Lift in Progress (17 FA-02)
22. Lift in Progress (17 FA-01)
23. Lift in Progress (17 FA-01)
24. Xylene Column (18 DA02) Bottom Section 700 MT 9.6 m (D) x
51.65 m (H) 0.5 m 15-Dec-2012 PTC2 Ringer (1600MT) (Hired from
Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane
25. Lift in progress
26. Lift in progress
27. Lift in progress
28. Raffinate Column (17 DA01) 571 MT 8.5 m (D) x 66.7 m (H)
0.5 m 29-Dec-2011 PTC2 Ringer (1600MT) (Hired from Mammoet) Demag
CC2600 (500MT) (L&T Crane) Weight Dimensions Installation
Elevation Erection Date Main Crane Tailing Crane
29. Lift in progress
30. Lift in progress
31. Xylene Column (18 DA02) Top Section 382 MT 8.7 m (D) x
30.95 m (H) 52.15 m 21-Jan-2012 PTC2 Ringer (1600MT) (Hired from
Mammoet) Demag CC2600 (500MT) (L&T Crane) Weight Dimensions
Installation Elevation Erection Date Main Crane Tailing Crane