Case 2: EPS90 Testing
Q: How to Test EPS90 sub-rack.
A:
Step1:Install PMU and PSU, Connect AC input, disconnect battery, Disconnect
Load1 and Load2, Put off Power switch ofthe battery;
Measure the Voltage between BAT.(+) and BAT.(-), voltage between RTN(+)
and Load1(-), Voltage between RTN(+) and Load2(-). All of the voltage should
be about 53.5V.
Step2: Uninstall (take off, hot plug) PMU;Measure the Voltage between BAT.(+) and BAT.(-), it should be 0V;
Measure the Voltage between RTN(+) and Load1(-), it should be 53.5V.
Measure the Voltage between RTN(+) and Load2(-). it should be 53.5V.
7/28/2019 EPS90 Testing
2/2
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2
Step3:Install PMU, Put on Power switch ofthe battery;
Use one cable to short circuit BAT.(-) and LOAD2(-), the voice ofcontactor be put on should be heard.
Step4: Remove the short circuit cable;
Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.
Step5:Uninstall (take off, hot plug) PMU;Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.
If all results as same as the up-step, the EPS90 sub-rack is working
normally.