EPS90 Testing

Embed Size (px)

Citation preview

  • 7/28/2019 EPS90 Testing

    1/2

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 1

    Case 2: EPS90 Testing

    Q: How to Test EPS90 sub-rack.

    A:

    Step1:Install PMU and PSU, Connect AC input, disconnect battery, Disconnect

    Load1 and Load2, Put off Power switch ofthe battery;

    Measure the Voltage between BAT.(+) and BAT.(-), voltage between RTN(+)

    and Load1(-), Voltage between RTN(+) and Load2(-). All of the voltage should

    be about 53.5V.

    Step2: Uninstall (take off, hot plug) PMU;Measure the Voltage between BAT.(+) and BAT.(-), it should be 0V;

    Measure the Voltage between RTN(+) and Load1(-), it should be 53.5V.

    Measure the Voltage between RTN(+) and Load2(-). it should be 53.5V.

  • 7/28/2019 EPS90 Testing

    2/2

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2

    Step3:Install PMU, Put on Power switch ofthe battery;

    Use one cable to short circuit BAT.(-) and LOAD2(-), the voice ofcontactor be put on should be heard.

    Step4: Remove the short circuit cable;

    Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.

    Step5:Uninstall (take off, hot plug) PMU;Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.

    If all results as same as the up-step, the EPS90 sub-rack is working

    normally.