24
Perfection is our business

EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

  • Upload
    phamnga

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

EPROM

Company Profile

Perfection is our business

Page 2: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

1

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Contents

1- Revamping Public Address Systems For PII, PIIQ, & PIIC Platforms ................................. 2

2- Technical Support to ERC Project .............................................................................................. 3

3- Manpower Supply For "ETHYDCO / TOYO / ENPPI" ......................................................... 5

4- Construction Of Fire Fighting 4th Stage Project – APRC. ....................................................... 7

5- Construction of Naphtha Pipeline 12” Project– APRC. .......................................................... 9

6- Maintenance Services For Planned, & Breakdown Repairs For CHEVRON Egypt. ........ 11

7- Complete Replacement of Bottom Plates for Fixed Roof Tank CHEVRON Egypt ........... 12

8- Enterprise Assets Management Services Contract - KHALDA ........................................... 13

9- MIDOR Expansion Project ........................................................................................................ 14

10- Pre-flash Tower Project - MIDOR ............................................................................................. 15

11- Technical Support to ASORC - "AHC Project" ........................................................................ 17

12- ESTYRENICS Maintenance CSA ............................................................................................... 19

13- Alexandria Petroleum Company Continuous Service Agreement CSA. ............................ 21

14- Cairo Refining Company Continuous Service Agreement CSA. ......................................... 22

Page 3: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 2

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

1- Revamping Public Address Systems For PII, PIIQ, & PIIC Platforms

Project : "Revamping Public Address Systems For PII, PIIQ, & PIIC Platforms"

Client : ( ABU QIR PETROLEUM Company)

Location : Alexandria – Egypt

Signature date : 23/5/2016

Duration : One Year

Project

Objective:

: Construct the appropriate infrastructure to support the critical

operation of Abo Qir Petroleum, and to prepare for future trends to

meet operational and safety compliance needs.

Scope:

: - The EPC Project main scope is to replace the two separate

systems by one modem standalone public address and general

alarm system.

- Revamp the existing systems loud speakers, beacons, remote

access units and microphone stations.

- Revamp the existing cables, accessories, trays and junction boxes

- Tie-in the proposed new PA and GA system with the existing

Fire & Gas and ESD systems for the overall P-II Complex.

- Commissioning, testing and handover of the completed works to

Abu Qir Petroleum Company.

Page 4: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

3

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

2- Technical Support to ERC Project

Project : Provision of Technical Support to ERC Project

Client : Egyptian Refining Company

Location : Cairo - Egypt

Project

Objective:

: Supporting the ERC Project by Multidiscipline Experts during the

EPC Phase.

Represent the ERC in all engineering issues and review processes.

Scope:

: ERC Representatives in Korea

- HAZOP Study for Whole Refinery.

- SIL Selection.

- Review 3D Plant Design.

- Carry out FAT Activities for Control Systems.

Providing Technical Support to ERC

- Manpower Supply for Mechanical, Projects, Process, Scheduling,

Lab and Safety disciplines.

- Review Special Tools and two year spare parts.

- Carry out SAT Activities for Control Systems.

- Review Pre-Commissioning & Commissioning Activities

Procedures.

- Services Agreements preparation for:

- Maintenance Support Services

- HVAC Maintenance.

- Tanks Calibration.

- Calibration of lifting Equipment.

Page 5: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 4

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 6: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

5

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

3- Manpower Supply For "ETHYDCO / TOYO / ENPPI"

Project : " MANPOWER SUPPLY FOR "ETHYDCO / TOYO / ENPPI"

Client : ENPPI/TOYO JV

Location : Alexandria – Egypt

Signature date : 12/10/2015

Project

Objective:

: Undertake the pre-commissioning and commissioning activities for

the ETHYDECO Petrochemical Plant.

Scope: : Pre-commissioning, Commissioning & Start-up Activities for

(ETHYDCO) Project during 2015- 2016 for:

- Utilities Project.

- Ethylene Project.

- Polyethylene Project.

Page 7: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 6

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 8: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

7

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

4- Construction of Fire Fighting 4th Stage Project – APRC.

Project : " CONSTRUCTION OF FIRE FIGHTING 4TH STAGE PROJECT "

Client : Amrya Petroleum Refining Company APRC

Location : Alexandria - Egypt

Signature date : 16/1/2016

Project

Objective:

: Upgrading the firefighting network that serves APRC process units

and facilities.

Scope: :

- Fabricate and construct 4 km length, 18 inch carbon steel pipe

line.

- Apply all workshop and site welding activities.

- Perform all required NDT.

- Execute all painting and sandblasting activities

- Hydrotest, pre-commissioning and commissioning activities.

- Executing all necessary civil.

S.N. Work Specifications Unit QTY

1 Above ground piping installation m 4,000

2 Steel for Piping Support Ton 7

3 Fittings welding Dia. Inch 12,000

4 Sandblasting & Painting m2 6,000

5 RT "Film 40×10cm Each 1,400

Page 9: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 8

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 10: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

9

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

5- Construction of Naphtha Pipeline 12” Project– APRC.

Project : " CONSTRUCTION OF NAPHTHA PIPELINE 12” PROJECT "

Client : Amrya Petroleum Refining Company APRC

Location : Alexandria - Egypt

Signature date : 16/1/2016

Project

Objective:

: Transfer Naphtha Product by 9 Km, 12 inch Pipeline From the APRC

to the marketing companies "Exxon Mobil, Misr Petroleum, and Co-

operation Petroleum companies".

Scope: :

- Fabricate and construct 9 km length, 12 inch carbon steel pipe

line.

- Apply all workshop and site welding activities.

- Perform all required NDT.

- Execute all painting and sandblasting activities

- Hydrotest, pre-commissioning and commissioning activities.

S.N. Work Specifications Unit QTY

1 Above ground piping installation m 9,000

2 Steel for Piping Support Ton 85

3 Fittings welding Dia. Inch 1,500

4 Sandblasting & Painting m2 9,000

5 RT "Film 24×10cm Each 2,700

Page 11: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 10

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 12: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

11

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

6- Maintenance Services For Planned, & Breakdown Repairs For CHEVRON Egypt.

Project : "Provision of Maintenance Services for Planned, and Breakdown

repairs For CHEVRON Egypt"

Client : CHEVRON Egypt Lubricants S.A.E

Location : Cairo - Egypt

Signature date : 1/3/2016

Duration : One Year

Project

Objective:

: Applying successful maintenance and repair schemes including all

supporting logistics, guarantee liaison and procurement activities

within CHEVRON.

Scope: :

- Apply Maintenance and Inspection Works for tanks.

- Applying Preventive Maintenance for :

Firefighting alarm system.

Boilers.

Elevators, forklifts and Scissors Man lift.

Pumps.

Instruments.

Electrical Equipment.

Air conditioning

Subcontracting

Page 13: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 12

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

7- Complete Replacement of Bottom Plates for Fixed Roof Tank CHEVRON Egypt

Project : Tanks Inspection And Repair.

Client : CHEVRON Egypt Lubricants S.A.E

Location : Cairo - Egypt

Signature date : 14/2/2016

Duration : 6 months

Project

Objective:

: Applying the necessary inspection, repair and civil works required to

improve the tank condition.

Scope: :

- Apply Inspection activities required to define the repair scope.

- Perform civil works and Compact the soil layers under the

bottom plates.

- Replace the entire tank Bottom Plates.

- Apply hydro tests and painting activities.

Page 14: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

13

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

8- Enterprise Assets Management Services Contract - KHALDA

Project : " Enterprise Assets Management Services Contract "

Client : Khalda Petroleum Company KPC

Location : : KPC Fields Western Desert - Egypt

Signature date : 6/3/2016

Duration : 1 Year

Project

Objective:

: Migrate maintenance database from MAXIMO to ORACLE and to

carry out site assets and maintenance data entry into ORACLE

Scope: :

- Provision of CMMS & eAM Technical Support Services "Data

Gathering, Data Entry, Data cleanness, Material Management,

Go-Live support …. etc."

Page 15: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 14

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

9- MIDOR Expansion Project

Project : Provision of Technical Support to MIDOR Expansion Project

Client : Middle East Oil Refinery - MIDOR

Location : Alexandria - Egypt

Signature date : 15/7/2015

Project

Objective:

: Supporting MIDOR Project by Multidiscipline Experts during the

EPC Phase.

Represent MIDOR in all engineering issues and review processes.

Scope:

: - Early work activities.

- Open Book estimate.

- Basic engineering review and approval.

- Plot plan review and P&ID approval.

- Project specification review and approval.

- Technical & Commercial offer evaluation for the project lump

sum.

Page 16: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

15

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

10- Pre-flash Tower Project - MIDOR

Project : Provision of Technical Support to MIDOR "AHC Project"

Client : Middle East Oil Refinery - MIDOR

Location : Alexandria - Egypt

Signature date : 15/7/2015

Project

Objective:

: Supporting MIDOR Project by Multidiscipline Experts during the

EPC Phase.

Represent MIDOR in all engineering issues and review processes.

Scope:

: - Providing technical support and managing the installation of a

Crude Distillation Pre-flash tower to increase refinery

throughput by 15% from 100,000 BBL to 115,000BBL at the

same unit capacity

- Review and Approve Basic and Detail Engineering .

- Perform the technical evaluation and approval for material

requisition purchased by MIDOR.

- Follow up and Inspect main equipment fabrication.

- Supervise Construction activities.

- Perform Commissioning and start up activities.

Page 17: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 16

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 18: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

17

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

11- Technical Support to ASORC - "AHC Project"

Project : Provision of Technical Support to ASORC "AHC Project"

Client : ASORC - Assiut Hydrocracking Complex (AHC).

Location : Assuit - Egypt

Signature date : 1/9/2015

Project

Objective:

: Supporting ASORC Project by Multidiscipline Experts during the

EPC Phase.

Represent ASORC in all engineering issues and review processes.

Scope:

: PRE-FEED ACTIVITIES

- Review project Basic engineering Design data (BEDD).

- Review overall plant configuration and (BFD)

- Develop Project Design criteria with TECHNIP.

- Participate in preparing project philosophies.

- Review all process and utility units Design Basis.

- Licensor Selection process.

- Participate and attending all licensor agreement meetings.

Attending P&ID Review Meetings with licensor/general

contractor inside & outside Egypt

FEED ACTIVITIES

- P & ID Review.

- Equipment and instrument datasheets Review.

- Safety review (HAZID, HAZOP and SIL….etc.).

- Flare system study.

- Procurement & Subcontracting Activities.

- Piping Design and material selection.

- Final Basic Design Package Review

Engineering. Procurement Construction follow up

Mechanical completion, Pre-commissioning and commissioning

activities

Page 19: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 18

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

PROJECT PHASES

PRE-FEASIBILITY STUDY

PRE-FEASIBILITY STUDY BUDGET

PRICE

PREFEED

+/- 30% Estimate

Licensor Selection

FEED

+/- 10% Estimate

EPC

LSTK START-UP

Page 20: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

19

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

12- ESTYRENICS Maintenance CSA

Project : Provision of Maintenance Services to ESTYRENICS

Client : Egyptian Styrene & Polystyrene Production Co. ESTYRENICS

Location : : Alexandria - Egypt

Project

Objective:

: Applying successful maintenance and repair schemes including all

supporting logistics, guarantee liaison and procurement activities

within ESTYRENICS.

Scope: :

- Piping fabrication and welding activities.

- Workshop activities.

- Valves rehabilitation and testing.

- Heat exchangers re-tubing and fabrication.

- Overhauling pumps, compressors ...etc.

- Electrical and Instrument Maintenance activities.

Page 21: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 20

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Page 22: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

21

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

13- Alexandria Petroleum Company Continuous Service Agreement CSA.

Project : Alexandria Petroleum Company Continuous Service Agreement CSA

Client : Alexandria Petroleum Company

Location : Alexandria - Egypt

Signature date : 25/8/2015

Project

Objective:

: Providing Technical support and consultation for Revamps, Water

management system and energy saving

Scope:

: - Provision of technical support / study for the existing Waste

Water system (API).

- Provision of Energy Saving study for fired Heater, Boilers and

steam system.

Page 23: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

PAST 22

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

14- Cairo Refining Company Continuous Service Agreement CSA.

Project : Cairo Refining Company Continuous Service Agreement CSA

Client : Cairo Refining Company

Location : MOSTORD - CAIRO - Egypt

Signature date : 09/06/2015

Project

Objective:

: Improving the company efficiency levels from one side and saving

on energy costs from the other side by finding and applying proper

solutions.

Scope:

: - Surveying the site to scan fired heaters, Boilers and steam systems.

- Performing flue gas analysis by using portable analyzers. - Scanning all heaters and boilers with a thermal camera to

identify the locations of hot spots which indicate failure of internal liner. (Refractory)

- Giving the recommendations and solutions for the main problems.

- Giving training courses to improve the operation and maintenance staff skills.

Page 24: EPROM · -Hydrotest, pre-commissioning and commissioning activities. S.N. Work Specifications Unit QTY 1 Above ground piping installation m 9,000 2

23

Perfection is our business

MISCELLANEOUS PROJECTS (HIGHLIGHTS)

Address:

Alexandria (Headquarters):

19.5 Km Alexandria Cairo Desert Road, Petroleum Complex.

Tel: +2 03 2020 258

Fax: +2 03 2020 259

Cairo Office:

Nasr City, EL Nasr St, Markato Building.

Tel & Fax: +2 02 2414 0033

Perfection is our business