1 DIRECTORATE OF ESTATES AND FACILITIES PROCEDURE AND INFORMATION MANUAL EPM HS12 - Permit to Access & Permit to Work Document Originated: July 2012 By: Brent W ills Issue Number: 2 Number of pages: 44 Approved by EMG: B/A Status: Working document Last revised: October 2018 By: B Wills & M Blake Next revision: October 2019 By: TBC

EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

1

DIRECTORATE OF ESTATES AND FACILITIES

PROCEDURE AND INFORMATION MANUAL

EPM HS12 - Permit to Access & Permit to Work

Document Originated: July 2012 By: Brent W ills

Issue Number: 2 Number of pages: 44

Approved by EMG: B/A Status: Working document

Last revised: October 2018 By: B Wills & M Blake

Next revision: October 2019 By: TBC

Page 2: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

2

CONTENTS

Page No’s

1.0 Purpose of Document 4

2.0 Procedure 5

3.0 Access to Controlled Areas in an Emergency 6

4.0 Supporting documentation and guidance 7

5.0 Statutory Provisions 7

6.0 Management Responsibilities 7

7.0 Unit Managers 7

8.0 Permit Authorisers 7

9.0 Permit Requestors 8

10.0 Review 8

Appendices

Appendix 1 – Permit to Access Process Flow Chart

Appendix 2 – Permit to Work Process Flow Chart

Appendix 3 – Guidance for applying permits to work during construction work

Appendix 4 – Guidance for the evaluation of method statements for entry into confined

spaces

Appendix 5 – Guidance for the evaluation of method statements for cold works

Appendix 6 – Guidance for the evaluation of method statements for hot work.

Appendix 7 – Guidance for the evaluation of method statements for roof work.

Appendix 8 – Guidance for the evaluation of method statements for excavations.

Appendix 9 – Guidance for the evaluation of method statements for electrical isolations

(low voltage systems).

Appendix 10 – Guidance for accessing locked off areas in an emergency

Cont...

`

Page 3: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

3

Appendix 11 – Guidance for the evaluation of method statements for entry into

contaminated areas

Appendix 12 – Guidance for the evaluation of method statements for fire alarm work

Appendix 13 – Guidance for the evaluation of method statements for working on

pressure systems.

Appendix 14 – Guidance for the evaluation of method statements for entry into

vacant premises and unallocated space

Appendix 15 – Guidance for the evaluation of method statements for entry into plant

rooms

Appendix 16 – Permit to Access Exemptions

Page 4: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

4

1.0 Purpose of Document

1.1 The aim of this policy is to introduce a safe working procedure to control significant

risks by the implementation of a permit to work system. The University of Manchester

operates a permit to work and/or access system for work which is undertaken under

the following categories’;

Access into and work within confined spaces

Access onto and work on roofs

Access into vacant premises and unallocated space

Access into and work within plant rooms, switch rooms, boiler rooms, lift

motor rooms

Excavations

Work on fire alarm systems and detection

Electrical isolations (low voltage distribution systems)

Asbestos works and Asbestos contaminated areas

Hot work (use of naked flames, abrasive cutting, electric arc welding, hot

soldering)

Cold work (cryogenics and working with refrigerants)

Radioactive contamination

Work on High Pressure Systems (steam and compressed air)

1.2 This policy applies to all work undertaken in such spaces as described above by

University staff, contractors, and all other persons who are required to access such

areas or undertake work in these spaces.

1.3 There are separate arrangements for emergency situations where access is required.

The University will grant access to restricted spaces to a defined group of competent

staff and managers for the purposes of undertaking their job role by the issue of an

annual permit. This permit can only be issued by the Client Services Unit in the

Directorate of Estates and Facilities.

1.4 This policy does not apply to construction projects where a Principal Contractor has

exclusive possession of an internal or external space. This policy will apply where the

Principal Contractor takes over an internal or external space but interfaces with

building users in an adjacent building or area. Further guidance on the application of

permits for construction work can be found on the Professional Services Intranet and

Appendix 3 of this policy.

1.5 For the purposes of this policy two types of permit will be administered, permit to

work1 and permit to access.2

1 A permit to work will apply when work needs to be undertaken which exposes personnel to foreseeable

significant risks during prescribed activity.

2 A permit to access will apply when no work activity is required but access is needed to the space for purposes

of inspections, surveys and estimating.

Page 5: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

5

1.6 This policy is intended to ensure the University meets the requirements of the

Health and Safety at Work etc. Act 1974 and associated subordinate legislation.

1.7 It is the policy of the University of Manchester that all areas and activities under the

control of the Directorate of Estates and Facilities that are deemed to be of significant

risk will be controlled by a permit to work under the requirements of this policy.

2.0 Procedure

2.1 When access is required to an area that is considered to be a significant risk an

approval procedure will be required before access can be granted to such an area.

All such areas, deem as a significant risk, will be locked off to prevent unauthorised

access, assess to these areas will only be granted to authorised persons once the

Professional Services Unit are satisfied that minimum workplace precautions have

been agreed to deal with the health and safety risks associated with each activity

undertaken in such spaces.

2.2 Approval to access such areas will be the responsibility of the Client Services Unit.

Only nominated authorisers from the Client Services Unit will issue permits and

validate access cards.

2.3 University staff and contractors can apply to access controlled areas by the

application for a permit to work; the application for permits is undertake using an

online approval process administered by the Client Services Unit within the

Directorate of Estates and Facilities.

2.4 Access to spaces that are controlled by this Policy should not be gained without prior

authorisation. Unauthorised access is not permitted under any circumstances.

2.5 Before a permit can be issued the staff or contractor should discuss the scope of the

work and the arrangements needed to control any inherent risk associated with each

activity with one of the authorised Permit to Work Requestors. Further advice can

also be obtained from the Estates and Facilities Health and Safety Officer or the

Estates and Facilities Fire Officer.

2.6 Once the scope of work has been agreed a permit to access or a permit to work can

be applied for. The Requestor should add as much detail into the permit request

application as possible so that the person authorising the permit understands the

work which is proposed.

2.7 The permit requestor should attach a specific risk assessment to the permit request

for the work being proposed which identifies all of the residual risks associated with

the activity being undertaken. The risk assessment should identify what the risks

associated with the activity are, how they are likely to affect those working in the area

and the control measures which need to be implemented to control each risk. The

risk assessment should have an evaluation of the level of residual risk and should be

signed by a competent person3 employed by those who intend to undertake the work.

3 A competent person is someone who has sufficient training and experience to be able to identify and

evaluate health and safety risks which are inherent with the type of work being undertaken.

Page 6: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

6

Generic risk assessments will not be accepted for permit applications.

2.8 The permit requestor should attach a method statement or safe system of work to the

permit request which details how each of the residual risks associated with the

activity will be controlled during the time the proposed work is being undertaken. The

method statement should identify what the residual risk is, how the risk could affect

those working in the area and a detailed explanation of the safe methods

of undertaking the work. Generic method statements will not be accepted for

permit applications.

2.9 Once the permit request and the risk assessments and method statement have been

submitted they will be reviewed and a decision will be made by a permit authoriser

within 24 hours of the application being registered.

2.10 The permit authoriser will either authorise the permit in which case the work can be

undertaken or the permit will be declined and the work cannot take place until such

times the permit is authorised.

2.11 No work should be undertaken in areas designated as under the control of a permit

unless a permit to work has been duly authorised. There must be no exceptions to

this without the express permission from the Client Services Unit Manager.

2.12 Once a permit is authorised those staff undertaking the work should agree a suitable

date to undertake the work and should present the authorised permit, the risk

assessment and method statement to the relevant PSU key holder or approved local

designated representative. Access to these areas will not be granted if the required

documentation is not available.

2.13 Once the work has been completed the Permit Office should be notified so that

arrangements can be made to inspect the work area if necessary and for the permit

to be cancelled.

2.14 Upon the completion of the work those authorised to undertake the work should

return all keys, passes and other items issued as part of the permit to work.

2.15 Once the permit has been cancelled no further work can be undertaken in such areas

until a new permit has been raised.

2.16 A permit to work must not be in operation for any period longer than seven days,

work activity that is programmed for periods longer than seven days must be subject

to a series of permit applications.

3.0 Access to Controlled Areas in an Emergency

3.1 The University recognises that during an emergency, access to controlled area will

be required and the issue of a permit may delay or prevent expedient access. To

support staff that are required to access controlled areas a guidance note has been

developed identifying which situations are classed as an emergency.

Page 7: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

7

4.0 Supporting Documentation and Guidance

4.1 This policy document should be read in conjunction with a number of guidance

documents appended to the policy. These are there to support evaluation of risk

assessments and method statements for specific risk activities that fall under the

permit to work system.

5.0 Statutory Provisions

5.1 Section 2(i) of the Health and Safety at Work etc. Act 1974 requires that employers

ensure, so far as is reasonably practicable, the health, safety and welfare of their

employees.

5.2 Section 3 of the Health and Safety at Work etc. Act 1974 requires that employers

prevent, so far as is reasonably practicable, non-employees from being exposed to

risk.

5.3 The Management of Health and Safety Regulations 1999 identifies an absolute duty

to undertake a suitable and sufficient assessment of the risks for all work activities for

the purpose of deciding what measures are necessary for safety.

5.4 For work in high risk areas such as those covered by the University’s permit to work

procedure, this means identification of the hazards present, assessment of the risks

and determining what precautions to take.

6.0 Management Responsibilities

6.1 It is the overall responsibility of the Director of Estates and Facilities to ensure that

this policy is implemented and maintained. The Head of Professional Services will

have the responsibility for the day to day implementation and monitoring of this

policy.

7.0 Unit Managers

7.1 Management shall have the responsibility for the day-to-day operational

management ensuring safe working within areas under the control a permit.

7.2 Managers must ensure that persons at all levels charged with a responsibility under

this policy shall be competent to undertake the task.

7.3 All personnel must be made fully aware of their safety responsibilities, as required

by statute, and they must be given the necessary information and training to

properly understand and carry them out. This also extends to contractors.

8.0 Permit Authorisers

8.1 Those staff who are appointed and trained as permit authorisers must ensure that the

requirements of this policy are adhered to at all times and that permits are only

issued when all the requirements of the permit policy have been met.

Page 8: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

8

8.2 Permit authorisers have the responsibility to ensure that permit operators and permit

requestors monitor the administration of the permit during the course of the work

being undertaken.

9.0 Permit Requestors

9.1 Permit requestors are required to liaise with maintenance staff, contractors,

consultants and other personnel accessing controlled areas to ensure that they have

a clear understanding of the requirements of each permit before requesting its issue.

Requestors should seek advice on the requirements of permits if there is any

uncertainty regarding the standards expected.

9.2 Permit requestors have the responsibility to ensure that once the method statement

and risk assessment are approved that the personnel undertaking the work comply

with the agreed safe working arrangements.

9.3 Permit requestors must ensure that the work has been undertaken to an acceptable

standard and the work area has been left in a suitable condition before cancelling the

permit to work.

10.0 Review

10.1 This Policy and it associated procedures will be subject to a review period of not less

than two years from its publication date. The policy may be reviewed before this date

if necessary by the introduction of new or revised legislation or if a significant failure

in the implementation of this policy results in injury or loss.

Page 9: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

9

No

Appendix 1

Permit to Access Process Flow Chart

Activity falls under the

requirements of Permit to

Access

Yes No

The scope of work, and

the requirements of the

permit should be reviewed

and agreed.

Confirmation must be

made that the activity

does not involve any work

in a controlled area

The area can be accesses

without a permit providing

no work is being

undertaken

Application for permit to be

made with at least 24

hours notice

Permit Yes

Approved

Scope of work agreed and

work scheduled to be

undertaken

On arrival contractor

attends Permit Office with

Permit

No Paperwork in order and checked

Task completed to the required

No standard and within the agreed

timescales

Contractor given

keys / access card

to area

Yes

Permit suspended Yes Keys /; access card

returned and access

documentation returned

Permit cancelled

Page 10: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

10

Appendix 2

Page 11: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

11

Appendix 3

Guidance for applying permits to work during construction work

The University operates a policy of restricted access to sections of its estate that are

considered to be a significant risk to staff that enter these areas. Such areas could include;

service risers, plant rooms, roofs, vacant buildings and unoccupied space, and electrical

switch rooms. Access to these areas usually requires a permit to be issued by the Client

Services Unit in the Directorate of Estates & Facilities.

The University recognises that during construction work the University may hand over parts

of estate to the control of a contractor during major construction work. Due to the

complicated nature of the University’s buildings it is imperative that there is clarity regarding

who has responsibility for isolations and access into restricted areas.

Project Managers from the Design Services Unit and the Capital Projects teams will be

responsible for ensuring the application of permits with contractors are applied within the

scope of the Universities permit to work arrangements. Project Managers will be considered

to be permit requestors in this context.

Where an area of the University’s estate is handed over to a contractor and the contractor

secures and takes responsibility for the area the contractor will be responsible for the

application of permits to work in their demise.

Where contractors work requires isolation of services outside of their demise, or isolation

within their demise impacts on building users the University will be responsible for the issue

of permits to work. Contractors should request permits in this instance to their project

manager.

Contractors and project managers should consider the notice periods for undertaking work

that requires the issue of a permit to ensure that the policy and procedures for permit to work

are followed at all times.

It is the responsibility of the project manager to ensure that permits are applied to

appropriate areas and to ensure that services are reinstated and energised following the

completion of the work.

Page 12: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

12

Appendix 4

Guidance for the Evaluation of Method Statements for Entry into Confined Spaces

What is a Confined Space?

Confined Spaces can be any space of an enclosed nature where there is a risk of death or

serious injury from hazardous substances or dangerous conditions (e.g. lack of oxygen). It

is important to recognise however that just because a space has a limited access or egress

it may not be a Confined Space if there is no significant risk of death or major injury from

hazardous substances or dangerous conditions. These areas are referred to as Restricted

Spaces.

Some confined spaces are fairly easy to identify, e.g. enclosures with limited openings:

Storage tanks;

Silos;

Reaction vessels;

Enclosed drains;

Sewers.

Others may be less obvious, but can be equally dangerous, for example:

Open topped chambers;

Combustion chambers in boilers;

Ductwork;

Unventilated or poorly ventilated rooms.

Some places may become confined spaces when work is carried out, or during their construction, fabrication or subsequent modification.

Confined and Restricted Spaces Register

The University of Manchester maintains a register all areas within its estate which are either

Confined Spaces or Restricted Spaces. This register should be referred to when evaluating

method statements for entry into these areas, as the register will identify what hazards are

present that have defined the area as confined or restricted.

Hazards in Confined Spaces

In order for an area to be considered as a confined space, a specified list of dangerous

occurrences must be reasonably foreseeable;

Asphyxiation of personnel due to lack of oxygen – this could be caused by working in a small

space for a period of time without sufficient air changes using up oxygen or by the oxygen in

the space being depleted by chemical processes such as corrosion.

Asphyxiation of personnel due to the presence of poisonous gas, fume or vapour – this could

be caused by residues of hazardous substances in storage tanks or vats, leaks from pipe

work in tunnels and ducts, or valves being accidently opened whilst personnel are working in

spaces where gas, fume or vapour is stored.

Asphyxiation of personnel due to free flowing solids – this could be caused by slippage of

soil into an excavation or duct, the flow of stored substances such as powder into work areas

or the flow of sewage into drains and intercepting chambers.

Page 13: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

13

Drowning of Personnel – this could be caused by the unexpected ingress of water into any

space that is being worked in such as; drains, service ducts with water distribution pipes in,

cellars and tunnels below the water table. Water from natural sources and from distribution

pipe work should be considered.

Loss of consciousness of personnel due to excessive heat – this could be caused by

naturally occurring geothermal conditions whilst working underground or the rise of

temperature in confined spaces due to the presence of heating pipes, steam pipes and

boilers. Heat rise in roof spaces due to solar gain should also be considered.

Fire or explosions – caused by the presence of flammable gas or fume in sufficient quantities

to be within the substances lower and upper explosion limit. Fire caused by the ignition of

flammable material from cutting, welding and other hot work may cause smoke generation

which could put personnel at risk. Oxygen enriched atmospheres due to chemical reactions

or use of oxy-gas equipment can create additional hazards.

Precautions for Confined Spaces

As a minimum the following precaution should be applied to all confined space work;

1. The entry into the confined space must be subject to the University’s Permit to Work

System; no other local arrangements or contractors systems should be accepted.

There permit must not be issued until a suitable and sufficient risk assessment and

safe system of work has been supplied by the company or individuals undertaking

the work.

2. The entry into the confined space should involve a minimum of two people, at least one of which should remain outside of the space for the entire duration of the task.

3. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in working in confined spaces.

4. All staff undertaking the work in the confined space must have been trained in the

requirements of the Confined Spaces Regulations 1997 and the hazards and controls

required when working in confined spaces

5. There should be a suitable rescue plan developed in writing and in place to recover

workers who become injured or unconscious during the work; this must not rely on

the fire service, University security or any other emergency services.

6. Before entry into the space measurements should be taken to confirm that the

oxygen in the area is sufficient to support personnel working in the space, this should

be undertaken using calibrated oxygen monitoring equipment and the results should

be recorded. Certificates confirming their calibration should be sought.

7. There must be a suitable method of communication between those working in the

space and those who may need to instigate a rescue from outside of the space. This

could be through unaided voice communication if the distance is small enough or by

radio and or mobile telephone where distances are greater. Where communication is

needed where a risk of fire or explosion exists communication devices must be

suitably constructed to prevent the generation of ignition sources; i.e. intrinsically

safe.

8. Safe access and egress to the confined space should be identified in the safe system

of work; this may need to provision of ladders and rope access systems. Clear and

Page 14: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

14

conspicuous safety signage must identify that entry into areas left open for access is

prohibited.

9. Suitable lighting should be available during the task either from existing lighting in the

area or supplementary lighting installed during the task. In either case emergency

lighting should be available to aid escape in the event of a power failure.

Other Precautions

Depending on the nature of the risk the following precautions will need to be included in the

method statement produced by those entering the confined space;

1. The testing of the atmosphere for the presence of known toxic substances in the form

of fumes, gas or vapour this should be undertaken using calibrated monitoring

equipment and the results should be recorded. Certificates confirming their

calibration should be sought.

2. The wearing of personal gas detectors by personnel if the presence of known toxic

substances in the form of fumes, gas or vapour could become present in the space

during the works. These should be calibrated and certificates confirming their

calibration should be sought.

3. Purging areas where a known toxic substance in the form of fumes, gas or vapour

will be present in the area. Purging can be undertaken using the forced flow of air or

other where flammable gasses and vapours are present by using inert gasses such

as nitrogen.

4. Forced ventilation to increase airflow and maintain oxygen levels for those working in

a confined space, or exhaust ventilation to remove the presence of known toxic

substances in the form of fumes, gas or vapour.

5. The cleaning and removal of residues of hazardous substances which may give of

toxic vapours or fume during the work in the confined space.

6. The isolation of gasses and liquids that could flow into the space. Isolation requires

the physical disconnection of services in such a way that they cannot be accidentally

reconnected. This will usually require using blanking plates, closing and locking off

valves or disconnecting and removing pipe work leading to the space. Any devices

used to lock off valves should only be removable by those working in and controlling

the space.

7. Isolation of mechanical and electrical equipment. Isolation requires the physical

disconnection of the flow of power to the equipment in such a way that they cannot

be accidentally reenergised. This will usually require isolation and locking off of the

plant at the distribution board or at the local isolation switch. Any devices used to

lock off equipment should only be removable by those working in and controlling the

space.

8. The use of intrinsically safe and spark proof electrical equipment in areas where

known flammable substance in the form of dust, fumes, gas or vapour could be

present. The use of spark proof tools such as copper and aluminium tools. Tools

powered by internal combustion engines should not ne permitted in any confined

space.

Page 15: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

15

9. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, and dust masks. Consideration should be given the specification of

PPE where a flammable atmosphere may exist as clothing could generate static

electricity which could ignite flammable dust, gasses, fumes or vapours.

10. The wearing of Respiratory Protective Equipment (RPE) such as dust masks,

respirators, air fed respirators and self contained breathing apparatus. All RPE

should be face fit tested to the worker and be subject to pre-use inspections. Self

contained breathing apparatus should only be used by trained and competent

workers and be subject to a formal inspection. Certificates confirming their inspection

should be sought.

11. Where flammable atmospheres exist or where known flammable substance in the

form of dust, fumes, gas or vapour could be present the earthing and cross bonding

of metal items to prevent static discharges. Consideration should also be given to

materials that can generate static such as plastics and other man made materials.

12. The prevention of smoking within a reasonable proximity of the entrance to confined

spaces where flammable atmospheres exist or where known flammable substance in

the form of dust, fumes, gas or vapour could be present.

13. Limiting the time each person works in the confined space particularly where heat

accumulations has been assessed as an issue or where comfort issues caused by

wearing PPE and RPE are likely to cause individual health issues.

Further Guidance

Further Guidance on safe working in confined spaces is available from the HSE’s guidance

note L101 – Safe work in confined spaces. Confined Spaces Regulations 1997 which can be

downloaded from the HSE web site http://www.hse.gov.uk/pubns/priced/l101.pdf

Page 16: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

16

Appendix 5

Guidance for the Evaluation of Method Statements for Cold Work

What is a Cold work?

Cold work is any work that involving the maintenance, installation or inspection of plant

which contains liquefied gasses at sub-zero temperatures, in this guidance cryogenic

temperatures are defined as those below 120 K (-153◦C).

Hazards in Cold Work

Cold contact burns - Liquid or low-temperature gas from any of the specified cryogenic

substances will produce effects on the skin similar to a burn.

Asphyxiation - Degrees of asphyxia will occur when the oxygen content of the working

environment is less than 20.9% by volume. Effects from oxygen deficiency become

noticeable at levels below ~18% and sudden death may occur at ~6% oxygen content by

volume. This decrease in oxygen content can be caused by a failure/leak of the cryogenic

vessel or transfer line and subsequent vaporization of the cryogen.

Explosion – Pressure - Heat flux into the cryogen from the environment will vaporize the

liquid and potentially cause pressure build-up in cryogenic containment vessels and transfer

lines. Adequate pressure relief must be provided to all parts of a system to permit this

routine outgassing and prevent explosion.

Explosion – Chemical - Cryogenic fluids with a boiling point below that of liquid oxygen are

able to condense oxygen from the atmosphere. Repeated replenishment of the system can

thereby cause oxygen to accumulate as an unwanted contaminant. Similar oxygen

enrichment may occur where condensed air accumulates on the exterior of cryogenic piping.

Violent reactions, e.g. rapid combustion or explosion, may occur if the materials which make

contact with the oxygen are combustible.

Precautions for Cold Work

As a minimum the following precaution should be applied to all cold work;

10. All Cold work must be subject to the University’s Permit to Work System; no other

local arrangements or contractors systems should be accepted. There permit must

not be issued until a suitable and sufficient risk assessment and safe system of work

has been supplied by the company or individuals undertaking the work. This should

be reviewed by the Estates and Facilities Health and Safety Officer

11. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in cold work precautions.

12. During the work personal oxygen monitors should be used to ensure that the oxygen

in the area is sufficient to support personnel working in the space, this should be

undertaken using calibrated oxygen monitoring equipment and the results should be

recorded. Certificates confirming their calibration should be sought.

13. The isolation of cryogenic gasses and liquids that could flow into the space. Isolation

requires the physical disconnection of services in such a way that they cannot be

accidentally reconnected. This will usually require using blanking plates, closing and

locking off valves or disconnecting and removing pipe work leading to the space.

Page 17: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

17

Any devices used to lock off valves should only be removable by those working in

and controlling the space.

14. Isolation of mechanical and electrical equipment. Isolation requires the physical

disconnection of the flow of power to the equipment in such a way that they cannot

be accidentally reenergised. This will usually require isolation and locking off of the

plant at the distribution board or at the local isolation switch. Any devices used to

lock off equipment should only be removable by those working in and controlling the

space.

15. All smoke and heat detectors within the vicinity of the work should be protected with

proprietary covers to prevent accidental fire alarm activation. Before covering

detectors the Estates and Facilities Fire Officer must be notified and covers for fire

detectors must be removed at the end of each day.

16. Suitable lighting should be available during the task where work is undertaken during

night times. This can be either from existing lighting in the area or supplementary

lighting installed during the task. In either case emergency lighting should be

available to aid escape in the event of a power failure.

17. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, safety helmets and dust masks. Consideration should be given the

specification of PPE to be temperature resistant during cold work activity.

PPE - Whenever handling or transfer of cryogenic fluids which could result in

exposure to the cold liquid, boil-off gas, or surface, protective clothing shall be worn.

This will include:

face shield or safety goggles, safety gloves long-sleeved shirts, work coats, aprons.

Eye protection is required at all times when working with cryogenic fluids. When

pouring a cryogen, working with a wide mouth dewar or around the exhaust of cold boil-off gas, use of a full face shield is recommended.

Hand protection is required to guard against the hazard of touching cold surfaces.

Loose insulating gloves can be used.

Further Guidance

Further Guidance on safe working with Cryogenic material can be sought from The

Estates and Facilities Health and Safety Advisor.

Page 18: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

18

Appendix 6

Guidance for the Evaluation of Method Statements for Hot Work

What is a hot work?

Hot work is any work that could generate sufficient heat to ignite building materials and

cause a fire to establish within the infrastructure of the building. Examples of hot work

include; roof work with LPG torches, bitumen or tar burners fused for roof work, soldering

pipe work to plant and other items, brazing, welding, cutting with power tools, grinding of

metal products and some chemical treatments which result in an exothermic reaction.

Hazards in Hot Work

Ignition of Building Materials – if sufficient heat in generated during hot work building

materials such as wood, materials treated with weather proofing products, paint and

insulating materials could easily ignite. Often these materials will burn slowly and fire may

spread within the building structure and remain undetected until it grows significantly and

takes hold. Work on roofs, ceiling voids, service risers etc are of a particular risk.

Burns to personnel – from contact with hot surfaces following hot work activity, heat

transferred through conductive materials may pass to other parts of the building adjacent to

the area of works.

Smoke and fumes – during some hot work fumes and toxic smoke can be generated as by

products to the hot work. If these are inhaled in sufficient quantities by personnel

undertaking the work or adjacent to the work area these products may cause ill health

effects.

Sparks and hot partials ejected during hot work – during cutting, grinding and welding activity

sparks and other partials of hot debris can be ejected to other areas of the work place which

may ignite flammable materials or gasses and vapours.

Precautions for Hot Work

As a minimum the following precaution should be applied to all hot work;

1. All hot work must be subject to the University’s Permit to Work System; no other local

arrangements or contractors systems should be accepted. There permit must not be

issued until a suitable and sufficient risk assessment and safe system of work has

been supplied by the company or individuals undertaking the work. This should be

reviewed by the University’s Fire Officer

2. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in hot work precautions.

3. All work undertaken where a risk of ignition exists should be the subject of fire

inspections during the work and after the work has been completed. Fire watch

should be undertaken between half an hour and up to one hour after the work has

been completed to ensure that materials have not been ignited by the work

undertaken.

Page 19: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

19

4. Where possible and practicable materials adjacent to the area to be heated will be

dampened to prevent ignition, where this is not possible areas should be protected

with flame resistant materials to prevent ignition.

5. Suitable fire extinguishers should be available during hot work to be used in the

event of ignition of materials. Care should be taken when selecting appropriate

extinguishers, that their deployment does not create damage to the building

infrastructure or increase the risk of harm to those personnel undertaking the work.

6. All smoke and heat detectors within the vicinity of the hot work should be protected

with proprietary covers to prevent accidental fire alarm activation. Before covering

detectors the Estates Fire Officer must be notified and covers for fire detectors must

be removed at the end of each day.

7. All areas that have been heated should be provided clear and conspicuous safety

signage to identify that the area could be hot. This should include areas adjacent to

or above or below the area of work where heat transfer could occur through

conduction.

8. Any process that creates toxic or hazardous fume should be undertaken in well

ventilated areas, where this is not possible forced ventilation or local extraction

should be used to remove toxic fumes from the atmosphere.

9. All flammable substances and flammable atmospheres should be removed before

any hot work commences. This includes the isolation of extracts onto roofs, removal

of flammable liquids and gasses and removal of combustible materials stored in the

work area.

10. Suitable lighting should be available during the task where work is undertaken during

nighttimes. This can be either from existing lighting in the area or supplementary

lighting installed during the task. In either case emergency lighting should be

available to aid escape in the event of a power failure.

11. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, safety helmets and dust masks. Consideration should be given the

specification of PPE to be flame resistant during hot work activity.

Further Guidance

Further Guidance on safe working in confined spaces is available from the HSE’s

guidance note HSG139 – The safe use of compressed gases in welding, flame cutting

and allied processes which can be downloaded from the HSE web site

http://www.hse.gov.uk/pubns/priced/hsg139.pdf.

Page 20: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

20

Appendix 7

Guidance for the Evaluation of Method Statements for Roof Work

What is roof work?

Roofs can be hazardous work areas particularly when working on pitched roofs or when

working on roofs with no edge protection. Some roofs also carry plant and have flues and

outlets from chemical processes terminating on them. All roof access is controlled by key

access and permit to access and permit to work systems.

Permit to access roofs are issues to staff and contractors who need at access roofs for the

purpose of inspections and surveys. This type of permit does not allow physical work to be

undertaken.

Register of Roof Access Statements

The University of Manchester maintains a register of all roofs and a detailed access

statement relating the roof of each building. This register should be referred to when

evaluating method statements for entry onto these areas, as the register will identify what

hazards are present and the precautions to be taken.

Hazards in roof work

Persons Falling – this could include persons tripping over plant and other services on the

roof surface causing a fall on the level or a fall from height, in the most serious case this

could result in a fall from the roof to the ground below.

Loss of consciousness of personnel due to the presence of poisonous gas, fume or vapour –

this could be from pipe work and ducts in buildings that are used to extract toxic and other

hazardous substances.

Fire or explosions – caused by the presence of flammable gas or fume in sufficient quantities

to be within the substances lower and upper explosion limit. Fire caused by the ignition of

flammable material from cutting, welding and other hot work may cause smoke generation

which could put personnel at risk.

Falling Tools, Equipment and Debris – building materials, loose masonry, tools and

equipment could fall from roofs creating a hazard for any pedestrians and vehicles below.

Exceeding the roofs safe working load – The design of the roof may include materials that

are either fragile surfaces or are of a construction that is not intended to have any significant

load placed upon it.

Extreme Weather Conditions – high winds, heavy rain and ice and snow can increase the

likelihood of a fall on or from a roof.

Page 21: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

21

Precautions for Roof Work

As a minimum the following precaution should be applied to all roof work;

18. The entry onto the roof must be subject to the University’s Permit to Work System; no

other local arrangements or contractors systems should be accepted. There permit

must not be issued until a suitable and sufficient risk assessment and safe system of

work has been supplied by the company or individuals undertaking the work.

19. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in working on roofs.

20. Where no edge protection is available on a roof temporary edge protection should be

considered before resorting to fall prevention and fall arrest equipment.

21. If fall protection equipment is used a full body harness should be worn by all staff

working on the roof with a fixed length lanyard attached to a tested and certified anchor point. The fixed length lanyard should be sufficiently short that the worker

cannot reach within one metre of any point of fall i.e. the roof edge.

22. If fall arrest equipment is used a full body harness should be worn by all staff working

on the roof with a deceleration / shock absorbing lanyard attached to a tested and

certified anchor point. Fall arrest equipment should only be used as a last resort

when all other methods of fall prevention have been exhausted. The use of fall arrest

equipment will require a minimum of two people to be working on the roof at all times

so that a rescue can be initiated should a fall and unintended suspension occur.

23. Where fall arrest equipment is used there should be a suitable rescue plan

developed in writing and in place to recover workers who fall and become suspended

during the work; this must not rely on the fire service, University security or any other

emergency services. The rescue plan must be able to be initiated and the suspended worker rescued within 30 minutes of the fall occurring.

24. There must be a suitable method of communication between those working on the

roof and the project manager overseeing the work. This could be by radio and or

mobile telephone where network coverage permit.

25. Suitable lighting should be available during the task where work is undertaken during

nighttimes. This can be either from existing lighting in the area or supplementary

lighting installed during the task. In either case emergency lighting should be

available to aid escape in the event of a power failure.

26. All tools used with one meter of the point of fall should be tethered on tool lanyards to

help prevent falling objects.

27. All method statements relating to roof work should include a statement relating to the

controls for working on fragile surfaces and any weight restrictions on the roof. This

information should be taken from the roof access statement.

28. A statement regarding the adverse weather conditions and above set wind speeds or

in the presence of ice and snow that the work would be suspended until the weather

conditions improve.

Page 22: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

22

Other Precautions

Depending on the nature of the risk the following precautions will need to be included in the

method statement produced by those working on the roof;

14. The wearing of personal gas detectors by personnel if the presence of known toxic

substances in the form of fumes, gas or vapour could become present on the roof

during the works. These should be calibrated and certificates confirming their

calibration should be sought.

15. The isolation of gasses, fumes or vapours that could flow onto the roof. Isolation

requires the physical disconnection of services in such a way that they cannot be

accidentally reconnected. This will usually require using blanking plates, closing and

locking off valves or disconnecting and removing pipe work leading to the roof. Any

devices used to lock off valves should only be removable by those working in and

controlling the work area.

16. Isolation of mechanical and electrical equipment. Isolation requires the physical

disconnection of the flow of power to the equipment in such a way that they cannot

be accidentally reenergised. This will usually require isolation and locking off of the

plant at the distribution board or at the local isolation switch. Any devices used to

lock off equipment should only be removable by those working in and controlling the

work area.

17. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, safety helmets and dust masks. Consideration should be given the

specification of PPE where a flammable atmosphere may exist as clothing could

generate static electricity which could ignite flammable dust, gasses, fumes or

vapours.

18. The wearing of Respiratory Protective Equipment (RPE) such as dust masks,

respirators, air fed respirators and self contained breathing apparatus. All RPE

should be face fit tested to the worker and be subject to pre-use inspections. Self

contained breathing apparatus should only be used by trained and competent

workers and be subject to a formal inspection. Certificates confirming their inspection

should be sought.

19. Detailed controls for undertaking hot works on roofs will be required if any cutting,

welding, brazing, soldering, grinding or work with open flame torches or bitumen / tar

burners. These are detailed in the guidance for hot work.

Further Guidance

Further guidance on the safety in roof work can be gained from the Estates and Facilities

Health and Safety Officer, Roof permit authorisers in the Client Services Unit in the

Directorate of Estates and Facilities.

Additional guidance is available in HSE publication HSG33 – Safety in Roof Work which can

be accessed at http://www.hse.gov.uk/pubns/priced/hsg33.pdf

Page 23: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

23

Appendix 8

Guidance for the Evaluation of Method Statements for Excavations

What is an excavation?

Excavation is the breaking, digging or removal of ground with the purpose to expose

underground services or plant, install or maintain underground services or plant or to install

foundations and other building structures.

Hazards in Excavations

Unstable Ground Conditions – depending on the topography and geology of the ground to

be excavated, soil and rock, once disturbed can become unstable and slip. This can lead to

the collapse of trenched and excavations, the subsidence of building structures and the

breach of services.

Underground structures or water courses – natural water courses such as underground

rivers and streams exist under much of the UK. Once disturbed they can alter their flow and

cause flooding and land slippage. Many other structures can be found underground ranging

from oil and gas distribution pipes, disused service tunnels, residual voids from previous

mining activity and natural caves and caverns.

Interference with plant and underground services – most of our highways and footpaths

cover a wide range of underground plant and utilities; these include gas pipes and

distribution valves, high and low voltage electric cables, water distribution pipes and valve

boxes, telecommunications cables, fibre optic cables and both foul and storm drain

networks. Each of these carries their own hazards and risks when damaged or broken.

Asphyxiation of personnel due to the presence on toxic gasses, fumes and vapours in the

excavation - this could be caused by residues of hazardous substances in subsoil, leaks

from pipe work, or valves being accidently opened whilst personnel are working in

excavations.

Drowning of Personnel – this could be caused by the unexpected ingress of water into the

excavation, water from natural sources and from distribution pipe work should be

considered.

Collapse of excavations – caused by a range of factors such as unstable bedrock or subsoil,

unsupported sides of an excavation, water ingress, explosion and vehicle movement close to

the edges of excavations.

Falling or dislodging material – the surface edges of an excavation are usually unstable and

the topsoil and subsoil are usually easily dislodged by pedestrian or vehicle movement

around the edge of the exaction. Falling or dislodged material can fall into the excavation

causing a risk for those working in the excavation. Spoil piles placed too close to the edge

can also be easily dislodged and fall into the excavation.

Falling into excavations – personnel and vehicles may fall into an excavation if they work in

proximity of the edge and no edge protection in provided around the perimeter of the

excavation.

Fire or explosion - caused by the presence of flammable gas or fume in sufficient quantities

to be within the substances lower and upper explosion limit. Fire caused by the ignition of

flammable material from cutting, welding and other hot work may cause smoke generation

which could put personnel at risk. Oxygen enriched atmospheres due to chemical reactions

or use of oxy-gas equipment can create additional hazards.

Page 24: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

24

Biological hazards – a range of bacteria, fungi, viruses, hazardous substances and animal

bi-products could be present in soil and water within an excavation. The most prevalent

risks are; leptospirosis (Weils disease), anthrax, radon gas, asbestos and bacterial infections

such e-coli from sewerage pipes.

Precautions for excavations

As a minimum the following precaution should be applied to all Excavation work;

1. All excavation work must be subject to the University’s Permit to Work System; no

other local arrangements or contractors systems should be accepted. There permit

must not be issued until a suitable and sufficient risk assessment and safe system of

work has been supplied by the company or individuals undertaking the work.

2. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in safe working precautions during excavations.

3. All excavation work should be supported by up to date utility plans, relevant ground

surveys (mining, previous land use etc.) and the results of local cable locations

surveys. The method statement provided by the company undertaking the work

should reflect the likely services to be found in the area to be excavated. It would not

be acceptable to state that they will dig with caution or undertake CAT scanning on

the day of the work.

4. Where underground services exist it would be expected that the excavation would

use hand digging methods using non conductive tools as well as using mechanical

digging methods when at a sufficient distance from plant and services.

5. Sides of excavations should be supported where there is a risk of collapse of the

trench. There is not set depth at which trenches and excavations should be

supported, but a risk assessment of the topsoil, subsoil and bedrock should identify if

this is necessary. Support using close boarding, sheet piling, trench boxes, battering

or boarding should be identified in the method statement.

6. Once the excavation has been dug, and before personnel enter the excavation the

air should be tested to ensure that a suitable atmosphere exits to support life. All

excavations where personnel are expected to enter should be regarded as confined

spaces.

7. The barriering off of the perimeter of the excavation, pedestrian barriers should be

placed one meter from the edge of the excavation. Where vehicles are expected to

reverse to excavations for backfilling, stop blocks should be used to prevent vehicles

falling into the excavation.

8. Safe access and egress must be maintained from any excavation, which is usually

implemented by the use of ladders and hoists.

9. If the excavation is likely to be open during the night times then the perimeter should

lit and warning lamps fitted to warn pedestrians of the risks.

10. The excavation must be inspected before each shift, by a competent person. This

inspection must be recorded and made available for inspection by a University

officer.

11. Staff should receive training in hygiene practices and wear protective clothing where

known contaminants and infectious material may be present in the excavation. The

Page 25: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

25

organisation undertaking the work may also need to provide welfare facilities such as

showers and decontamination units.

12. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, safety helmets and dust masks. Consideration should be given the

specification of PPE to be flame resistant during hot work activity.

Further Guidance

Further Guidance on safe working in excavations is available from the HSE’s guidance

note HSG 47 – Avoiding danger from underground services. Which can be downloaded

from the HSE web site http://www.hse.gov.uk/pubns/priced/hsg47.pdf.

Page 26: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

26

Appendix 9

Guidance for the Evaluation of Method Statements for Electrical Isolations (Low

Voltage Systems)

What is an electrical isolation?

Regulation 14 of The Electricity at Work Regulations 1989 requires that no work is

undertaken on or near to a live conductor unless it is unreasonable in all the circumstances

for it to be dead.

The University of Manchester is committed to this duty and it is a requirement that all

electrical conductors on systems before and beyond local distribution boards are made and

proven dead before being worked on. This duty is dispensed by isolation procedures and a

permit to work system.

The Health and Safety Executive define the term isolated as:

“Equipment (or part of an electrical system) which is disconnected and separated by a safe

distance (the isolating gap) from all sources of electrical energy in such a way that the

disconnection is secure, i.e. it cannot be re-energised accidentally or inadvertently.”

Hazards in Electrical Work

Contact with Live Conductors – contact with live conductors can result in electric shock

which can be fatal. Electric shock can cause muscle convulsions, Ventricular Fibrillation (no

heart beat) and Tachycardic Fibrillation (irregular heart beat). Those personnel who receive

an electric shock should seek medical attention to confirm that such effects do not pose a

risk to their health.

Fire - Sparks from electrical arcing can be of sufficient temperature to ignite materials and flammable substances. If this is not detected it could propagate into a significant fire.

Burns to those working in proximity to live conductors - As electrical energy passes through

conductors, the conductor will experience a heating effect due to the natural resistance of

the conductor. If the conductor is human tissue this too will experience a heating effect and

this will result in internal and external burns. Severe internal burns can lead to fatalities

some days after the event.

Secondary injuries from contact with live electrical conductors – those personnel who are

working at height or who are working near to a point of fall, may be caused to lose the

footing as a result of an electric shock.

Page 27: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

27

Precautions for Electrical Isolation Work

As a minimum the following precaution should be applied to all electrical work;

1. All work on electrical systems, prior to local electrical distribution boards, must be

subject to the University’s Permit to Work System; no other local arrangements or

contractors systems should be accepted. The permit must not be issued until a

suitable and sufficient risk assessment and safe system of work has been supplied

by the company or individuals undertaking the work. This should be reviewed by the

University’s Electrical Engineer.

2. The University does not permit contractors to undertake their own isolations of

electrical systems, other than local circuits fed from local distribution boards.

3. All electrical work undertaken on the University’s electrical system must be

undertaken and proven to be dead. Exceptions to this requirement can only be

authorised by the University’s electrical engineer.

4. Isolations of electrical systems supplying local distribution boards can only be made

by the Universities Electrical Engineering Team, in the Directorate of Estates and

Facilities.

5. Isolations to circuits fed by local electrical distribution boards can be made by contractors without the need for permits to work providing they are undertaken following safe systems of work that meets the requirements of HSE Guidance HSG

85 and the 17th Edition of IEE Wiring Regulations.

6. Before an isolation is made the appropriate voltage indicator should be proven and

tested on a known source to confirm correct operation.

7. An isolation of the circuit should be made that prevents accidental re-energisation of

the circuit. The isolation should be locked off and be suitably labelled to identify the

isolation.

8. Once an isolation has been made it is essential that the circuit is tested and proved

dead using an appropriate voltage indicator, which conforms with HSE guidance

GS38. It is also required that the appropriate voltage indicator is then proven using

the known source (in 5. above) to confirm operation.

9. Once the work has been complete the electrical system should be made safe and

commissioned prior to the reconnection of the supply.

10. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in relevant work precautions.

Further Guidance

11. Further guidance on the safety in Electrical Isolations can be gained from the Estates

and Facilities Electrical Engineering Team. 12. Additional guidance is available in HSE publication HSG85 – Electrical Work, Safe

Working Practices which can be accessed at

http://www.hse.gov.uk/pubns/priced/hsg85.pdf

Page 28: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

28

Appendix 10

Guidance for accessing locked off areas in an emergency

The University operates a policy of restricted access to sections of its estate that are

considered to be a significant risk to staff that enter these areas. Such areas could include;

service risers, plant rooms, roofs, vacant buildings and unoccupied space, and electrical

switch rooms. Access to these areas usually requires a permit to be issued by the Client

Services Unit in the Directorate of Estates

The university also recognises that under certain circumstances entry may need to be made

into these areas to deal with emergency situations in order to isolate and terminate utilities.

This work can be undertaken without a permit at the discretion of the Duty Manager in

Maintenance Services.

The following situations are considered to be an emergency.

The uncontrolled leak or escape of water, oil or other liquid which is sufficient to

cause damage to the building infrastructure,

The accidental release of a gas or vapour which poses a risk to the health and or

safety of building users,

The collapse of any significant part of a building infrastructure such as ceilings and

internal walls,

The critical failure of IT infrastructure,

Loss of electrical supply to an essential part of a building,

A fire in any part of a building that requires isolations of services to be made,

A significant leak of rainwater into any building as a result of a breach in the buildings

waterproofing,

The following examples would not be considered to be an emergency.

An insignificant leak of water, oil or other liquid which is insufficient to cause damage

to the building infrastructure and can be contained by collection,

Loss of power or services that are not considered to be critical to the operation of the

University,

Minor vandalism or damage to a building that can be secured and isolated at source.

In order to access any locked off area in the University in an emergency situation the

University Security Office should be notified in the first instance who will contact the Duty

Manager in Maintenance Services to authorise access.

Information regarding the hazards in each area will be available at the point of entry so that a

dynamic risk assessment can be made prior to entry into the space.

Page 29: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

29

Appendix 11

Guidance for the Evaluation of Method Statements for Entry into Contaminated Areas

What is a Contaminated Area?

Contaminated Areas can be any space of inside a room, a whole room or plant area that

have Hazardous substances that can cause harm to human health, present in the air or the

fabric of the building.

Hazardous substances present will be categorised into one of the following groups;

Chemical Substances;

Biological Agents;

Ionising Radiation Sources;

Non Ionising Radiation Sources;

Silicate Minerals (asbestos).

Hazards in Contaminated Areas

A wide range of hazards that may be present in areas such as workshops, laboratories, plant

rooms and extract systems can cause harm to human health by entering the body through

four routes;

Inhalation;

Ingestion;

Absorption through skin and membranes;

Injection by skin punctures.

These hazardous substances once entered into the body can cause a range of serious and

fatal health conditions if the correct procedures are not followed.

Hazard Identification - if hazards exist in the area signage will indicate the nature of the

hazard and the source, guidance should be sought before entering or working in an areas

displaying these symbols.

Danger Flammable Oxidiser Explosive Corrosive

Compresse

d or

liquefied

Gas

Aquatic

Toxicity Warning

Sensitiser,

carcinogen,

mutagen

or

teratogen

Page 30: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

30

Biological

Hazard

Asbestos

Containing

Material

Asbestos

Hazard

Radioactive

Substance

Laser

Hazard

Fume Cupboards and Microbiological Cabinets – Laboratories and workshops may have

local extraction of hazardous substances using cabinets, these extract to atmosphere and

guidance should be sought before working on the extract or in proximity to the extract outlet.

Secured Facilities – Some of the University’ facilities where high risk or research work is

being undertaken are secured to prevent unauthorised access to meet the requirements of

legislation. Entry into these areas may not be granted without the appropriate notice and

permission.

Page 31: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

31

Precautions for Contaminated Areas

As a minimum the following precaution should be applied to all work in contaminated areas;

12. The entry into the confined space must be subject to the University’s Permit to Work

System; no other local arrangements or contractors systems should be accepted.

There permit must not be issued until a suitable and sufficient risk assessment and

safe system of work has been supplied by the company or individuals undertaking

the work.

13. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in the control measures required in each area.

14. Before entry into the space permission needs to be gained from the competent

person who is employed by the School controlling the area. Permission to enter the

area can be facilitated by the Client Services Unit or Maintenance Services Unit

with the Directorate of Estates and Facilities.

15. Prior to any work being undertaken in the area a clearance certificate must be

gained from the competent person who is employed by the School controlling the

area. Issuing of a clearance certificate can be facilitated by the Client Services Unit or

Maintenance Services Unit with the Directorate of Estates and Facilities.

16. No work, other than that which has been agreed in the permit, should be undertaken

as the clearance certificate will only cover the agreed scope of work. Work

undertaken in other aspects of the space could expose those working in the area to

hazardous substances which could cause permanent damage to their health.

17. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, and dust masks. Consideration should be given the specification of

PPE where hazardous substances may exist. Guidance on the correct grade of PPE

should be sought from the competent person who is employed by the School

controlling the area. Contact with the competent person can be facilitated by the

Client Services Unit or Maintenance Services Unit with the Directorate of Estates

and Facilities.

18. Upon completion of the work notification should be made to the competent person

who is employed by the School controlling the area that the space is ready to hand

back. Notification for handing back the area can be facilitated by the Client

Services Unit or Maintenance Services Unit with the Directorate of Estates and

Facilities.

Page 32: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

32

Other Precautions

Depending on the nature of the risk the following precautions will need to be included in the

method statement produced by those entering the confined space;

20. The testing of the atmosphere for the presence of known toxic substances in the form

of fumes, gas or vapour this should be undertaken using calibrated monitoring

equipment and the results should be recorded. Certificates confirming their

calibration should be sought.

21. The wearing of personal gas detectors by personnel if the presence of known toxic

substances in the form of fumes, gas or vapour could become present in the space

during the works. These should be calibrated and certificates confirming their

calibration should be sought.

22. The wearing of Respiratory Protective Equipment (RPE) such as dust masks,

respirators, air fed respirators and self-contained breathing apparatus. All RPE

should be face fit tested to the worker and be subject to pre-use inspections. Self-

contained breathing apparatus should only be used by trained and competent

workers and be subject to a formal inspection. Certificates confirming their inspection

should be sought.

Further Guidance

Further Guidance on working in contaminated areas is available from the Estates and

Facilities Health and Safety Officer, the University’s Biological Safety Officer or the

University’s Radiation Protection Officer.

Page 33: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

33

Appendix 12

Guidance for the Evaluation of Method Statements for Fire Alarm Work

What is a Fire Alarm work?

Fire Alarm work is any activity which may compromise the integrity of a fire alarm system.

This will include any isolation of devices either electronically or physically which includes

‘capping off’ detectors, and any works associated with connection / disconnection of Fire

Alarm systems or part of Fire Alarm systems.

Hazards in Fire Alarm Work

The University’s fire strategy deals with the risks associated with fire in buildings through

both passive and active fire precautions. One key part of these precautions is the fire

detection and fire warning systems that are installed in each building which protect the life of

building occupants and the integrity of the buildings in the event of a fire occurring.

Work on these systems, if not managed correctly can result in malfunction of these systems

resulting in a failure to detect a fire that has propagated, failure to warn building users of an

activation or can result in false activations which can cause widespread disruption.

Precautions for Fire Alarm Work

As a minimum the following precaution should be applied to all hot work;

1. All Fire Alarm work must be subject to the University’s Permit to Work System; no

other local arrangements or contractors systems should be accepted. The permit

must not be issued until a suitable and sufficient risk assessment and safe system of

work has been supplied by the company or individuals undertaking the work. This

should be reviewed by the University’s Fire Officer

2. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in relevant work precautions.

3. All work on fire alarm systems should be notified to the security control room prior to

the work taking place so that appropriate responses can be delivered to the event.

4. Where fire alarm systems are taken off watch manual systems of detecting and

alerting building occupants in the event of a fire must be planned and instigated.

Before these arrangements are implemented they must be agreed by the University’s

Fire Officer.

5. Before carrying out any fire alarm work a tag should be fixed to the control panel ‘Fire

Alarm Off Watch’. Whilst the work is in progress - the requirements printed on the tag

must be strictly complied with. The Competent Person carrying out the works shall

ensure that the system is fully operational each evening prior to leaving site.

6. On completion of the works the ‘Fire Alarm Off Watch’ Tag must be removed and it

reveals ‘Fire Alarm on watch’ tag. It is imperative that the competent person advise

building users / managers that the work on the fire alarm system is complete.

7. Suitable fire extinguishers should be available during fire alarm work where

automatic fire suppression systems have been disabled. Care should be taken when

Page 34: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

34

selecting appropriate extinguishers, that their deployment does not create damage to

the building infrastructure or increase the risk of harm to those personnel undertaking

the work.

8. All smoke and heat detectors that are likely to be affected by local works should be

protected with proprietary covers to prevent accidental fire alarm activation. Before

covering detectors the Estates Fire Officer must be notified and covers for fire detectors must be removed at the end of each day.

This document should be read in conjunction with Directorate of Estates Local Policy,

Procedure and Guidance Document EH&S 37 -The Management of Fire Alarm Systems

Page 35: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

35

Appendix 13

Guidance for the Evaluation of Method Statements for working on Pressure Systems

What is a Pressure System?

The Pressure Systems Safety Regulations 2000 defines a pressure system as

-

“A system comprising one or more pressure vessels of rigid construction, any associated

pipework and protective devices, with steam at any pressure, gases which exert a pressure

in excess of 0.5 bar above atmospheric pressure and fluids which may be mixtures of

liquids, gases and vapours where the gas or vapour phase may exert a pressure in excess

of 0.5 bar above atmospheric pressure.”

A pressure vessel may be regarded as a vessel used, or intended to be used, to contain a

relevant fluid.

The aim of this guidance is to prevent serious injury from the hazard of stored energy as a

result of the failure of a pressure system or one of its component parts.

Hazards in Pressure Systems

Failure of pipework and connections – pipework and it associated connections can fail as a

result of poor maintenance, corrosion or incorrect installation. Failure of such components

will result in an accidental release of the stored liquid or gas.

Fire or explosion from release of flammable gasses or liquids - as such pressure systems

may be used to store and distribute flammable liquids and gasses, accidental release of

such substances can generate and explosive atmosphere and a resulting fire or explosion

can result.

Accidental release of gas or liquid under pressure – Accidental release of gasses and liquids

can cause injury for example from steam or hot water being released in the vicinity of

personnel working on pressure systems.

Failure of protective devices – protective devices such a release valves and bursting discs

are installed on to pressure systems to prevent the pressure exceeding the safe operating

limit for each system. If these devices fail to release excessive pressure then the system will

become over pressurised and will be at risk of critical failure.

Over pressurisation of a pressure system – if a pressure system is pressurised beyond it

safe operating limit the system will breach at its weakest design point causing a catastrophic

failure of the vessel and or associated pipework. Critical failures of systems can cause

severe injury from the blast and debris can be projected over great distances causing impact

injuries.

Page 36: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

36

Precautions for working on Pressure Systems

As a minimum the following precaution should be applied to all work on pressure systems;

1. All work on pressure systems above pressures identified above must be subject to

the University’s Permit to Work System; no other local arrangements or contractors

systems should be accepted. There permit must not be issued until a suitable and

sufficient risk assessment and safe system of work has been supplied by the

company or individuals undertaking the work.

2. The whole activity should be supervised by an individual who has the responsibility to

ensure that all of the necessary precautions are implemented and must have

received training in safe working precautions during work on pressure systems.

3. Prior to the commencement of works on pressure systems the Schedule of

Inspection should be reviewed to aid the planning of the scheduled works. A copy of

the Schedule of Inspection is available from the Client Services Unit.

4. Before working on pressure systems the system should be isolated and where

necessary depressurised to prevent accidental release of the relevant fluid, isolations

on pressure systems must be undertaken with the Maintenance Services Team to

minimise the impact on other systems. All isolations should be secured to prevent an

accidental re-energisation by a physical lock off and signage to indicate work in being

undertaken on the system.

5. Emergency procedures should be established to deal with an unexpected release of

the relevant fluid, including evacuation and rescue plans where the work is being

undertaken in a restricted space or the relevant fluid has hazardous properties.

6. Where substantial modifications or repairs (including extensions or additions) are to

be carried out which might increase the risk of system failure, the contractor should

consult the competent person in the Maintenance Services Unit to advise before

work begins.

7. All pressure systems have a regular inspection according to the schedule of

inspection drawn up for each system. On completion of work on pressure systems

reference should be made to the schedule to identify if a re-inspection is required

before the system can be re-commissioned and put back into service.

8. When re-commissioning the pressure system it should not be pressurised beyond it

safe operating limit which will be identified on the system and the schedule of

inspection. Working pressures in the system should be verified by the use of

appropriate gauges or measuring equipment prior to handover of the equipment.

9. Records should be made of all work undertaken on pressure systems, including

design drawings and this should be made available to the Maintenance Services Unit

upon completion of the work.

10. Staff should receive training in hygiene practices and wear protective clothing where

known contaminants and infectious material may be present in the system. The

organisation undertaking the work may also need to provide welfare facilities such as

showers and decontamination units.

11. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, safety helmets and dust masks. Consideration should be given the

specification of PPE to be flame resistant during work activity.

Page 37: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

37

Further Guidance

Further Guidance on safe working on pressure systems is available from the HSE’s

approved code of practice L122 – Safety of Pressure Systems. Which can be

downloaded from the HSE web site http://www.hse.gov.uk/pubns/priced/l122.pdf.

Page 38: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

38

Appendix 14

Guidance for the Evaluation of Method Statements for Entry into Vacant Premises and

Unallocated Space

What is a Vacant Premise?

Vacant Premises are building s which are no longer used for core activity and have been

closed off to prevent unauthorised access and intruders. These spaces cannot be accessed

without a Permit to Access which is issued by the Client Services Unit.

What is an allocated space?

Unallocated spaces are singular or multiple rooms that have not been allocated to Faculties,

Schools, Departments, or Support Services. To prevent unauthorised use these spaces

have been secured with locks which are controlled by the Estates Directorate.

Building Register

The University of Manchester maintains a register all areas within its estate including vacant

premises and unallocated space. Information on each space in available from the building

database Archibus which is accessible from the professional services intranet pages

Hazards in Vacant Premises and Unallocated Spaces

Contamination by Hazardous Materials or Substances – dependant on the previous use of

the building or space certain parts may have residual chemical or biological contamination

that may be a risk to health. The building or space may also have contamination of asbestos

in building materials or risers which if disturbed may be a risk to health.

Low Levels of Lighting - spaces that have not been occupied for some time may have

lighting that is below the standard for occupied space due to damage from de-occupation or

damaged from theft and vandalism. Whilst emergency lighting is installed where necessary,

faults may have developed since the last formal inspection and may not be operational.

Damaged Services and Electrical Systems – services in the building such a water pipes,

electrical cables and heating systems may have been damaged during de-occupation or

damaged from theft and vandalism. It is possible for such services to be live or dangerous.

Compromised Emergency Escape Routes – in order to secure buildings and spaces

additional locks and security devices may have been installed to prevent unauthorised

access. Such security measures may impede exits from the building in the event of an

emergency. Fire alarm systems where fitted will be maintained and operational.

Uneven and Irregular Floor Surfaces – when spaces are vacated by the building users floor

surfaces can be damages or left uneven as a result of the relocation of furniture and

equipment. This may result in trip hazards being present in the building which could be the

cause of falls. The risk of falls is increased in low lighting situations.

Page 39: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

39

Precautions for Vacant Premises and Unallocated Spaces

As a minimum the following precaution should be applied to all access into Vacant

Premises and Unallocated Spaces;

1. The entry into the space must be subject to the University’s Permit to Access

System; no other local arrangements or contractors systems should be accepted.

There permit must not be issued until a suitable and sufficient risk assessment and

safe system of work has been supplied by the company or individuals undertaking

the work.

2. Those entering the space should be aware of any residual hazards that remain once

the space has been vacated.

3. The entry into the space should involve an effective communication system which

enables lone working procedures to be followed.

4. Safe access and egress to the space should be identified in the safe system of work;

this may need to provision of temporary escape routes. Clear and conspicuous

safety signage must identify that entry into areas left open for access is prohibited.

5. Suitable lighting should be available during the task either from existing lighting in the

area or supplementary lighting such as battery powered lighting. In either case

emergency lighting should be available to aid escape in the event of a power failure.

6. Where necessary Isolation of mechanical and electrical equipment. Isolation requires

the physical disconnection of the flow of power to the equipment in such a way that

they cannot be accidentally reenergised. This will usually require isolation and

locking off of the plant at the distribution board or at the local isolation switch. Any

devices used to lock off equipment should only be removable by those working in

and controlling the space.

7. The wearing of Personal Protective Equipment (PPE) such as overalls, safety

footwear, gloves, and dust masks. Consideration should be given the specification of

PPE where a contaminated atmosphere may exist.

Further Guidance

Further Guidance on safe working in vacant premises and unallocated spaces is available

from the Estates and Facilities Health and Safety Officer and the Space Planning Team in

the Client Services Unit.

Page 40: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

40

Appendix 15

Guidance for the Evaluation of Method Statements for Entry into Plant Rooms

What is a Plant Room?

Plant rooms are spaces which are used to house electrical and mechanical services and

systems. These can include; boiler rooms, electrical switch rooms, compressor houses, lift

motor rooms, telephone switch rooms, server rooms and service ducts or risers. These

spaces cannot be accessed without a Permit to Access which is issued by the Client

Services Unit.

Building Register

The University of Manchester maintains a register all areas within its estate including plant

rooms. Information on each space in available from the building database Archibus which is

accessible from the professional services intranet pages

Hazards in Plant Rooms

Contamination by Hazardous Materials or Substances – dependant on the type of plant

there could be a risk of exposure to hazardous substances which may pose a risk to health.

The space may also have contamination of asbestos in building materials or risers which if

disturbed may be a risk to health.

Contact with moving machinery – some plant rooms, such as lift motor rooms can have

moving parts which could cause injury from trapping and drawing in of body parts.

Presence of High Pressure Systems – plant rooms can house high pressure plant such as

air receivers, steam pipes and hydraulic systems which could breach as a result of over

pressurisation.

Hot and Cold Surfaces and Pipework – plant rooms can be heavily populated with pipework

which can carry hot water, steam or cryogenic gasses. Such pipes and equipment can

cause burns when contacted by exposed body parts.

Damaged Services and Electrical Systems – services in the building such a water pipes,

electrical cables and heating systems may have been damaged from theft and vandalism. It

is possible for such services to be live or dangerous.

Uneven and Irregular Floor Surfaces – as plant rooms are infrequently accessed by the staff

the floor surfaces can be uneven or congested as a result of the storage of spares and

equipment. This may result in trip hazards being present in the building which could be the

cause of falls. The risk of falls is increased in low lighting situations.

Low headroom – some plant rooms may have pipes or ductwork that is below head height

on access routes, this can lead to head injuries if a collision occurs whilst in the plant room.

Some service ducts may be small enough that may require crawling to access plant and

equipment.

High Noise Levels – Some plant located in rooms can generate noise levels as sufficient

intensity to cause hearing damage, often plant will generate high noise levels spasmodically

and without warning.

Page 41: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

41

Precautions for access to Plant Rooms

As a minimum the following precaution should be applied to all access into Plant Rooms

1. The entry into the space must be subject to the University’s Permit to Access

System; no other local arrangements or contractors systems should be accepted.

There permit must not be issued until a suitable and sufficient risk assessment and

safe system of work has been supplied by the company or individuals undertaking

the work.

2. The permit to access does not cover working and a separate permit must be applied

for to undertake work in plant areas.

3. Those entering the space should be aware of any residual hazards that exist in the

space; this information can be gained from the hazards register for each plant room.

4. Those entering the space should not touch or interfere with any plant in the area

unless they have a permit to work and are considered to be competent in working on

the specific plant.

5. The entry into the space should involve an effective communication system which

enables lone working procedures to be followed.

6. Safe access and egress to the space should be identified in the safe system of work;

this may need to provision of temporary escape routes. Clear and conspicuous

safety signage must identify that entry into areas left open for access is prohibited.

7. Suitable lighting should be available during the task either from existing lighting in the

area or supplementary lighting such as battery powered lighting. In either case

emergency lighting should be available to aid escape in the event of a power failure.

8. Where necessary Isolation of mechanical and electrical equipment. Isolation requires

the physical disconnection of the flow of power to the equipment in such a way that

they cannot be accidentally re-energised. This will usually require isolation and

locking off of the plant at the distribution board or at the local isolation switch. Any

devices used to lock off equipment should only be removable by those working in

and controlling the space.

9. The wearing of Personal Protective Equipment (PPE) such as overalls, saf ety

footwear, gloves, safety helmet and dust masks. Consideration should be given the

specification of PPE where a contaminated atmosphere may exist. In high noise

areas the wearing of suitable hearing protection must be considered as a mandatory

item of PPE.

Further Guidance

Further Guidance on safe working in vacant premises and unallocated spaces is available

from the Estates and Facilities Health and Safety Officer and the Space Planning Team in

the Client Services Unit.

Page 42: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

42

Appendix 16

Permit to Access exemptions

Exemption status from the Permit to work system is only considered for access permits and

where use of the Permit system would be cumbersome, and unmanageable.

Access in to Estate areas is controlled by the options below:

1. Permit to Work - Where neither option 2 or 3 is granted a PTW will be required for

persons requiring access and working within Estates areas.

2. Permit to Work Exempt – Where granted this means the named individual is able to

access and work in agreed Estates Areas (as attached list) without a Permit. This is

based on the person working for / or regularly at the University and the person being

aware of the danger associated with such areas. By their training, qualification and

experience they are deemed competent to enter those areas, this being identified,

agreed and continually assessed by their respective Unit Manager. When access is

required keys etc. will be issued from PSU using the formal booking system. The

exemptions being granted as it is part of their normal working day to enter and work

within such areas.

3. Free Access – Where granted this means the named individual is able to access and

work in agreed Estates Areas (as attached list) without a Permit and also be issued

with keys / cards enabling them to have free access to the said area. This is based

on the person working for / or regularly at the University and the person being aware

of the danger associated with such areas. By their training, qualification and

experience they are deemed competent to enter those areas freely in completing

their normal duties at work, this being identified and agreed and continually assessed

by their respective Unit Manager.

Generally ‘Free access’ is granted to MSU trade staff and MSU contractors for lower

risk locations.

Generally ‘Free access’ for the higher risk locations is granted to Supervisory level

and above only.

In all cases it is the responsibility of the Unit Manager to assess the competency of staff /

contractors to enter and work within Estates locations. This should be reviewed on a

continual basis via audits, toolbox talks, and 1 to 1 meetings – all of which should be

formally recorded.

The current list of Exemptions is detailed below and is a live document that remains in the

ownership of PSU. Requests to be added or removed are to be made by Unit Managers

who have satisfied themselves regarding individuals’ competency and have in place a

suitable and sufficient risk assessment and method statement covering the role/ work

activities of their staff and contractors.

Page 43: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

43

PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access

PSU Mike Bailey Electrical Engineer Yes Yes Yes Yes Yes Yes No No No No No No

PSU Steve Smyth Asst Electrical Engineer Yes Yes Yes Yes Yes Yes No No No No No No

PSU Andy Belcher Asst Electrical Engineer Yes Yes Yes Yes Yes Yes No No No No No No

PSU Steve Pace Electrical Inspector Yes Yes Yes Yes Yes Yes No No No No No No

PSU Tony Nield Electrical Inspector Yes Yes Yes Yes Yes Yes No No No No No No

PSU Paul Brittan Building Surveyor Yes No Yes No No No Yes Yes No No Yes Yes

PSU Andy Burrows Asst Building Surveor Yes No Yes No No No Yes Yes No No Yes Yes

PSU Jerome Muir Asst Building Surveor Yes No Yes No No No Yes Yes No No Yes Yes

PSU Chris Cunningham Asst Mechanical Engineer Yes Yes Yes Yes Yes No No No No No No No

PSU Brad Murphy Project Mechanical Engineer Yes Yes Yes Yes No No No No No No No No

PSU Chris Wilson Asst Mechanical Engineer Yes Yes Yes Yes No No No No No No No No

PSU Lynton Prescot Asst Mechanical Engineer Yes Yes Yes Yes No No No No No No No No

PSU Tony Meadowcroft Mechanical Inspector Yes Yes Yes Yes No No No No No No No No

DLO Andrew Hirst North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Alan Gregson North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO John Hazelhurst North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Ken Drury North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Stephen Clowes North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Stephen Flynn North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Les Taylor North Area technician Yes Yes Yes Yes Yes No No No No No No No

DLO Tony Lawless North Area technician (Locksmith) Yes Yes Yes Yes Yes No No No No No No No

DLO Eugene Struminski East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Curtis Helme East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Roy Winkley East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Pat Lilley East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Ron Davies East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Ian Seal East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Rob Hope East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Foley East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Phil Forbes East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Paul Humphreys East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Mark Walton East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Jack Thornley East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Allan Williams East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Mike Flynn East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO David Ainsworth East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO G McDonagh East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Paul Davies East Area Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Ken Beswick East Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Rob Kennedy East Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Ross East Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Dave Hutton West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Dave Johnson West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Mike O'Donoghue West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Carl Stait West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Nick Robinson West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Ged Witherington West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Adrian Cowing West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Darren Kay West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Steve Brown West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Gavin Susca West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Brian Heap West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Lomax West Area Locksmith Yes Yes Yes Yes Yes No No No No No No No

DLO Sean Fairclough West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO David Morgan Yes Yes Yes Yes Yes No No No No No No No

DLO Thomas Higgins West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Steven Salt West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Richard Felton West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Bryan Warburton West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Daniel Buckley West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Ian Hackett West Area technicians Yes Yes Yes Yes Yes No No No No No No No

DLO Alan Greenlees West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Brian Jackson West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Derek Hutton West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Abdul Tahir West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Andy Belfield West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Benji Phillips West Area Shift PO Yes Yes Yes Yes Yes No No No No No No No

DLO Ian Jackson Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Dave Barton Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Alex Dean Jones Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Pete Watson Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Dean Lockwood Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Richard Johnson Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Jason Byrne Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Tony Riley Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO David Dumican Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO James Edwards Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Rob Casey Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Lawrence Johnson Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Colin Read Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Graham Clarke Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Duddy Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO John Tiplady Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Eamon Clarke Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Martin Kuracka Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Alan Wilkinson Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Mark Farrington Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO David Brown Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Walker Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Phil Ashworth Residence Technician (DSE) Yes Yes Yes Yes Yes No No No No No No No

DLO Mike Dennison Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Ben Birch Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Paul Harvey Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Gary King Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Lee Casey Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Lee Jackson Controls Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Greg Eccles Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Martin Sloan Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Dennis Betts Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Dave Rose Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Peter Marsden Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Paul Fitt Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO David Riley Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

DLO Jeff Reed Fire Alarm Technician Yes Yes Yes Yes Yes No No No No No No No

Main Swichrooms Confined Spaces Vacant SpacesRoofsCompany Name Role Plant Room Risers

Page 44: EPM HS12 - Permit to Work and Controlled Access Procedure · 2.10 The permit authoriser will either authorise the permit in which case the work can be undertaken or the permit will

44

PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access PTW Exempt Free Access

MSU Area Manager Paul Sharples Assistant Maintenance Manager (North) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Area Manager John Giblin Assistant Maintenance Manager (DSE) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Area Manager Peter Roberts Assistant Maintenance Manager (West) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Area Manager Tim Bamford Assistant Maintenance Manager (East) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Area Manager Gary Rowlinson Specialist Services Manager Yes Yes Yes Yes Yes Yes No No No No No No

MSU Supervisor John Waterhouse North Area Supervisor (mechanical) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Garry Naylor North Area Supervisor (electrical) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Supervisor Tony Varley North Area Supervisor (building) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Alan England West Area Supervisor (electrical) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Supervisor Martin Moore West Area Supervisor (Building) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Keith Rushton West Area Supervisor (mechanical) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor East Area Supervisor (mechanical) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Paul Davis East Area Supervisor (electrical) Yes Yes Yes Yes Yes Yes No No No No No No

MSU Supervisor Tony Wilson East Area Supervisor (building) Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Lee Walton DSE Fallowfield Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Barry Hollinshead DSE City Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Paul Clews DSE Victoria Park Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Dave Whelan Fire Alarm Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Dave Egan Electrical Test and Inspection Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor James Towey Specialist Contracts Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Terence Hilton Electrical Test and Inspection Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Jimmy Collins Controls Supervisor Yes Yes Yes Yes Yes No No No No No No No

MSU Supervisor Charlie Fletcher WMIC Building Supervisor Yes Yes Yes Yes Yes Yes No No No No No No

MSU Supervisor Paul Glowinkowski Data Installations Supervisor Yes Yes Yes Yes Yes No No No No No No No

Coopers Mark Jones Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Coopers Greg Owen Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Coopers Mark Fisher Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Coopers Andy Ball Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Coopers Peter Morton Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Coopers Phil Griffin Fire Alarm Maintenance Yes No Yes No No No No No No No No No

Cheshire Refrigeration Phil Hardiker Refrigeration contractor Yes No Yes No No No No No No No No No

Cheshire Refrigeration Bob Aris Refrigeration contractor Yes No Yes No No No No No No No No No

Cheshire Refrigeration Gary Hewitt Refrigeration contractor Yes No Yes No No No No No No No No No

Cheshire Refrigeration John Connor Refrigeration contractor Yes No Yes No No No No No No No No No

Cheshire Refrigeration Shaun Regan Refrigeration contractor Yes No Yes No No No No No No No No No

Kone Steve Fisher Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Carl Malinowski Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Paul Muse Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Paul Heap Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Sam Bythell Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Dominic Bythell Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

Kone Jason Pollit Lift Engineer Yes* Yes* No No No No Yes* Yes* No No No No

T. Jollys Lee Bowers Boiler Servicing Yes Yes No No No No No No No No No No

T. Jollys Stephen Pearson Boiler Servicing Yes Yes No No No No No No No No No No

T. Jollys Adrian Marsden Boiler Servicing Yes Yes No No No No No No No No No No

T. Jollys No 4 Boiler Servicing Yes Yes No No No No No No No No No No

Scotshield Mike Earwalker CCTV Maintenance Yes No Yes No No No Yes* No No No No No

Scotshield John Binns CCTV Maintenance Yes No Yes No No No Yes* No No No No No

Scotshield Chris Uttley CCTV Maintenance Yes No Yes No No No Yes* No No No No No

Scotshield Alex McKay CCTV Maintenance Yes No Yes No No No Yes* No No No No No

Scotshield Paul Baines CCTV Maintenance Yes No Yes No No No Yes* No No No No No

Fire Queen John Brookes Fire Extinguisher Maintenance Yes Yes Yes No No No No No No No No No

Fire Queen Tom Dowsett Fire Extinguisher Maintenance Yes Yes Yes No No No No No No No No No

Fire Queen Paul Percival Fire Extinguisher Maintenance Yes Yes Yes No No No No No No No No No

Schneider Damien Birne Access Control Yes Yes Yes No Yes No No No No No No No

Schneider Lee Trengrove Access Control Yes Yes Yes No Yes No No No No No No No

Schneider Neil Connor Access Control Yes Yes Yes No Yes No No No No No No No

Schneider Kevin Riordan Access Control Yes Yes Yes No Yes No No No No No No No

Schneider Dave Torevell BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Schneider Gary Halford BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Schneider Steve Fielding BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Schneider Steve Drake BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Schneider Paul Butler BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Schneider Pete McGowan BMS Maintenance Yes Yes Yes Yes Yes No No No No No No No

Seddons tbc

Johnsons Marke Williams Chiller Maintenance Yes No Yes No No No No No No No No No

Johnsons Steve Williams Chiller Maintenance Yes No Yes No No No No No No No No No

Johnsons Jason Mooney Chiller Maintenance Yes No Yes No No No No No No No No No

Airvane Tom Nealon Air Compressor Maintenance Yes Yes Yes No No No No No No No No No

Sudlows Paul Jackson Data Installation Yes No Yes No No No No No No No No No

T.I.S. Kevin Lyles Data Installation Yes Yes Yes No No No No No No No No No

T.I.S. Paul Robinson Data Installation Yes Yes Yes No No No No No No No No No

Crowther & Shaw Darren Carr access required to roof areas, plant rooms and risersYes Yes Yes Yes No No Yes No No No No No

Andy Rood Lightning Andy Rood Roof access and some plant area's for lightning protectionYes Yes Yes Yes No No Yes* No No No No No

Alianz Insurance Steve Hett Inspector - Pressure Systems Yes Yes No No No No No No No No No No

Alianz Insurance Andy Joel Inspector - Lifts / Lifting tackle Yes* Yes* No No No No Yes* No No No No No

Hydraclean Vinny Wynn Tank maintenance / inspection Yes Yes No No No No No Yes* No No No No

WMB Ryan Beardwood Metering Project Yes Yes Yes Yes Yes No No No No No No No

Schneider (Electric) Peter Walster Door Access Yes Yes Yes Yes No No No No No No No No

Schneider (Electric) Chris Sumner Door Access Yes Yes Yes Yes No No No No No No No No

Feedwater Water Risk Assessors access required to Plant Rooms Yes Yes Yes Yes No No No No No No No No

Main Swichrooms Confined Spaces Vacant SpacesRoofsCompany Name Role Plant Room Risers