    3115181_2.DOC Asset Standards Authority State of NSW through Transport for NSW Page 1 of 1

    For queries regarding this document [email protected]

    www.asa.transport.nsw.gov.au

    Technical Note TN 002 : 2014

    Issued date 24 January 2014 Effective from 01 March 2014

    Subject: Replacement of RailCorp Waiver Processes

    This technical note is issued by the Asset Standards Authority as a notification to removal from

    use for the RailCorp Waiver Processes and associated files listed in Table 1 as of 1 March

    2014. The documents listed Table 1 are legacy RailCorp documents and should be used for

    reference purposes only. The TS 10765 : 2014 Concessions to ASA Requirements supersedes these documents.

    Table 1 - Superseded files

    Reference number

    Title Version Issue Date

    EPA 243 Engineering Standards Waivers 1.0 June 2011 TMG J049 Signal Engineering Waivers 2.0 May 2010 EP 00 00 00 17 TP

    Electrical Engineering Waiver Management 1.2 March 2013

    TMM P227 Telecommunications Engineering Waiver Management

    1.0 August 2010

    EPA 243 FM01 Engineering standards waivers request form 1.0 26/07/2011

    Authorisation

    Technical content prepared by

    Checked and approved by

    Inter disciplinary coordination checked by

    Authorised for release

    Signature

    Name K Kwan J Peiris David Spiteri Graham Bradshaw

    Position Manager Program Management Office

    Manager Network Standards

    Chief Engineer Rail Principal Manager Network Standards & Services

    mailto:[email protected]://www.asa.transport.nsw.gov.au/

  • Engineering Procedure Common

    Engi

    neer

    ing

    Proc

    edur

    e

    EPA 243

    ENGINEERING STANDARDS WAIVERS

    Version 1.0

    Issued June 2011

    Owner: Manager, Engineering Standards and Configuration

    Approved Jagath Peiris by: Manager

    Engineering Standards and Configuration

    Authorised Jim Modrouvanos by: General Manager

    Chief Engineers Division

    Disclaimer This document was prepared for use on the RailCorp Network only. RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It is the document users sole responsibility to ensure that the copy of the document it is viewing is the current version of the document as in use by RailCorp. RailCorp accepts no liability whatsoever in relation to the use of this document by any party, and RailCorp excludes any liability which arises in any manner by the use of this document. Copyright The information in this document is protected by Copyright and no part of this document may be reproduced, altered, stored or transmitted by any person without the prior consent of RailCorp.

    UNCONTROLLED WHEN PRINTED Page 1 of 11 Sup

    erse

    ded

    by T

    N00

    2:20

    14 fr

    om 0

    1 M

    arch

    201

    4

  • RailCorp Engineering Procedure Common Engineering Standards Waivers EPA 243

    RailCorp Page 2 of 11 Issued June 2011 UNCONTROLLED WHEN PRINTED Version 1.0

    Document control

    Version Date Summary of change 1.0 June 2011 First issue

    Summary of changes from previous version

    Summary of change Section

    Sup

    erse

    ded

    by T

    N00

    2:20

    14 fr

    om 0

    1 M

    arch

    201

    4

  • RailCorp Engineering Procedure Common Engineering Standards Waivers EPA 243

    RailCorp Page 3 of 11 Issued June 2011 UNCONTROLLED WHEN PRINTED Version 1.0

    Contents

    1 Introduction .............................................................................................................................4 2 Scope........................................................................................................................................4 3 Purpose....................................................................................................................................4 4 Referenced documents ..........................................................................................................4 5 Terms and definitions.............................................................................................................4 6 Requirements ..........................................................................................................................5 6.1 General......................................................................................................................................5 6.2 Waiver request ..........................................................................................................................5 6.3 RailCorp response ....................................................................................................................6 7 Forms .......................................................................................................................................6 8 Review of waivers ...................................................................................................................6 9 Responsibilities.......................................................................................................................6 9.1 Requestor..................................................................................................................................6 9.2 Assessor....................................................................................................................................7 9.3 Authorising or approving officer ................................................................................................7 Appendix A Sample engineering standards waiver request form...........................................8 Appendix B Sample engineering standards waiver approval notice ....................................11

    Sup

    erse

    ded

    by T

    N00

    2:20

    14 fr

    om 0

    1 M

    arch

    201

    4

  • RailCorp Engineering Procedure Common Engineering Standards Waivers EPA 243

    RailCorp Page 4 of 11 Issued June 2011 UNCONTROLLED WHEN PRINTED Version 1.0

    1 Introduction RailCorp engineering standards include mandatory requirements. A deviation from a standard requirement is only permitted with the written waiver authorisation from the relevant standards authority.

    In the first instance every effort should be made to comply with the engineering standards. A waiver is a last resort when compliance to the standards is not possible or unrealistic to achieve.

    2 Scope This procedure sets out the requirements for the requisition, assessment and authorisation of engineering standards waivers to RailCorp engineering standards. It applies to all engineering disciplines.

    This procedure applies to designers, constructors and maintainers of RailCorp assets, operators of rolling stock that request access to RailCorp tracks and to RailCorp staff involved in assessing waiver requests.

    3 Purpose The purpose of this procedure is to specify:

    minimum information to be supplied in a requisition for a waiver factors to be taken into account when assessing the waiver request the form of advice returned to the requestor the requirements for record keeping.

    4 Referenced documents EPD 0001 Design management process

    SMS-12-PR-0371 Managing Engineering Design Control

    SMS-12-SR-1363 Engineering standards

    5 Terms and definitions ALARP as low as reasonably practical

    authorising officer the RailCorp discipline head or delegate authorising or rejecting a waiver request

    assessor a RailCorp person with engineering authority who is responsible for evaluating and making recommendations on the waiver request

    discipline head person recognised as having responsibility for assuring technical integrity of a particular class of assets (e.g. Chief Engineer Track being responsible for assuring technical integrity of track infrastructure) (from SMS-12-PR-0371)

    engineering authority the authority to make and approve engineering decisions

    engineering standards the types of engineering technical documents listed in SMS-12-SR-1363

    Sup

    erse

    ded

    by T

    N00

    2:20

    14 fr

    om 0

    1 M

    arch

    201

    4

    http://engintranet.railcorp.nsw.gov.au/Disciplines/AllStandards/Design_Management_Process.pdf

  • RailCorp Engineering Procedure Common Engineering Standards Waivers EPA 243

    engineering standards waiver a written authority issued by a discipline head or an authorised representative that allows a particular design to deviate from a RailCorp engineering standard subject to given conditions

    may indicates the existence of an option

    requestor a person who identifies an existing or proposed item that does not or will not comply with RailCorps engineering standards or standard designs

    shall indicates that a statement is mandatory

    should indicates a recommendation

    waiver see engineering standards waiver

    6 Requirements

    6.1 General The process for a waiver request generally follows the path in Figure 1.

    Figure 1 Typical Path of Waiver Request

    6.2 Waiver request A waiver request shall be submitted to the appropriate discipline head or delegate.

    The information required is set out in the sample waiver request form in Appendix A