ENVIRONMENTAL STATEMENT
IN
FORM-V (Under Rule-14, Environmental protection Rules, 1986)
(2015-2016)
FOR
CLUSTER NO. – 8 (GROUP OF MINES)
Satgram Area and Sripur Area
Eastern Coalfields Limited
Prepared at
Regional Institute – I
Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)
G. T. Road (West End) Asansol - 713 304
CMPDI
ISO 9001:2008 Company
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
1
ENVIRONMENTAL STATEMENT FORM – V
Environmental statement for the financial year ending 31st March, 2016
Cluster No. – 8
FOR THE YEAR: 2015-16
CONTENTS
SL.NO. CHAPTER PARTICULARS PAGE NO.
1 CHAPTER-I INTRODUCTION 2-5
2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-13
LIST OF ANNEXURES
ANNEXURE NO. PARTICULARS PAGE NO.
I AMBIENT AIR QUALITY AND HEAVY METAL ANALYSIS 14-16
II NOISE LEVEL REPORT 17-18
III WATER QUALITY REPORT – MINE WATER QUALITY
AND GROUND WATER QUALITY
19-22
IV WELL WATER LEVEL REPORT 23
PLATES
I LOCATION PLAN
II PLAN SHOWING LOCATION OF MONITORING STATIONS
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
2
CHAPTER – I
INTRODUCTION 1.1 GENESIS:
The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the Environment Clearance granted by MoEF&CC, the work of Environmental Statement for Cluster No. 8 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.
1.2 DESCRIPTION OF THE MINES CLUSTER:
Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and Jharia did not have environmental clearance from the MoEF&CC and were operating on the basis of “Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the Raniganj Coalfield of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 8 is one of the clusters for which EC has been granted vide letter no. J-11015/107/2011-IA-II.(M) dated 19th March, 2015 for a combined peak capacity of 2.75 MTY and within a ML area of 8281 Ha. Cluster no. – 8 is located in the west-central portion of Raniganj Coalfields and are having lease boundaries adjacent to each other. They span over four geological blocks namely, Sripur, Satgram, Ningha, and Bhanora falling between latitudes 230 39’ N to 230 45’ N and longitudes 870 E to 870 6’ E. The area is well connected by roads and railways. Eastern Railway Topsi-Barabon Chord Railway Line passes through the lease hold area and the Andal-Baraboni branch line passes through the northern part of the block. It is also connected with the NH-2 through the all-weather metalled Asansol-Domohani Road at Asansol town which is about 5 kms to the south. The nearest railway station is Baraboni, which is 2 kms away from the block. The mines are administratively under Sripur and Satgram Areas of ECL. Location of cluster – 8 is shown in plate no. – 1.
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
3
The composition of the cluster is tabulated as under: Name of Mine
Production capacity
(MTPA) ML
(ha) Life of Mine
(years) Normative Peak
Bhanora UG Mine 0.2 0.3 1330 >20
Girmint/KDI UG Mine 0.04 0.65 1981 >50
Sirpur UG Mine 0.014 0.024 2338 >20
Sirpur Seam Incline UG Mine 0.105 0.136 279 >25
Ningah UG Mine 0.040 0.100 1072 >50
Mithapur West UG & OC Patch 0.28 0.342 527 >50
Satgram UG Mine 0.85 1.200 754 >30
Total 1.53 2.75 8281 -
1. Bhanora UG At present, there is no production from the mine. 2. Girmint/KDI UG At present, there is no production from the mine. 3. Sripur UG At present, there is no production from the mine. 4. Sripur Seam Incline UG At present, Rana (R-V) seam is being worked manually by driving three drifts from Sripur (R-VI) seam. Total production during 2015 – 16 was 0.037 MT. 5. Ningha UG Dishergarh (R-IV) seam is being worked by B & P method. Presently depillaring with part-caving is going to be resorted to along with sand-stowing. Two numbers of SDLs are presently being used with further augmentation being considered. Total production during 2015 – 16 was 0.03 MT. 6. Mithapur West UG & OC At present, there is no production from the mine. Shovel-dumper combination will be used for the proposed OC patch. 7. Satgram UG At present R-IV and R-III seams are being worked in the mine. Both the seams are being developed by Bord & Pillar method of mining. The main equipment deployed is LHDs and belt conveyors. Total production during 2015 – 16 was 0.067 MT.
1.3 ENVIRONMENTAL SCENARIO:
CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 3 all - weather stations, 3 pre-monsoon stations and 3 post-monsoon station (based on local meteorology) and compared with NAAQS, 2009 for quality. Samples of mine water are also collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
4
samples which includes heavy metals and salts is carried out once every year during December. Noise level is recorded at 4 locations. Groundwater level in the cluster area is monitored by taking measurements at 8 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500: 2012 standards for drinking water quality. For the year 2015 – 16, the monitoring could be started only from the second fortnight of May, 2015 owing to certain delays in fixation of monitoring stations subsequent to the grant of EC. Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 21 fortnights ending 31st March, 2016 are appended as Annexures – I, II, III & IV. The environmental monitoring results for the year 2015-16 are summarized below:
AMBIENT AIR QUALITY The PM10 concentration was found in the range of 59.7 to 192 µg/m3 and exceeded the NAAQS, 2009 on 22 occasions out of 126 samples while it is in limit as per GSR 742 (E) dated 25.09.2000. The PM2.5 concentration was found in the range of 16.2 to 86.3 µg/m3 and exceeded the NAAQS, 2009 on 9 occasions out of 126 samples. The SO2 concentration remained below 10.0 µg/m3 and NOX concentration was in the range of 8.2 to 27 µg/m3 and was thus quite well within NAAQS, 2009. ENVIRONMENTAL STANDARDS:
(I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette
Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from
dust generating point:
Station Category
Pollutant Concentration (µg/m3)
TSPM PM10 SO2 NOx
Industrial 700.0 300.0 120.0 120.0
Residential 200.0 100.0 80.0 80.0
Station
Category
Limits for noise (Leq) dB(A)
Day Time (6am-10pm)
Night Time (10pm-6am)
Industrial 75.0 70.0
Residential 55.0 45.0
(II) National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial
and rural areas for 24 hourly samples:
Pollutant PM10 PM2.5 SO2 NOX
Concentration (µg/m3) 100.0 60.0 80.0 80.0
Limits for noise
(Leq) dB(A)
Day Time (6am-9pm) Night Time (9pm-6am)
55.0 45.0
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
5
WATER UTILISATION, QUALITY & GROUNDWATER LEVEL Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption. The analysis results for the mine discharge water reveal that most of the parameters are within permissible limits prescribed by MoEF&CC as General Standards Schedule – VI for Class-‘A’ effluent (Effluent discharged into inland surface water) and IS 10500 for groundwater standards. In order to assess the impact of mining on the groundwater level, a network of 8 dugwells has been identified for monitoring of groundwater level in the months of January, May, August and November every year. Samples from these wells are collected and analysed during May every year and compared with IS 10500 standards for drinking water. Mine water and ground water analysis results are given in Annexure-III. Well water level results are given in Annexure – IV.
NOISE LEVEL The day time noise level was found in the range of 54 to 71.1 dB(A). The noise level recorded is within the permissible limits prescribed by MoEF&CC.
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
6
CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V
Environmental statement for the financial year ending March, 2016
PART – A SL. NO. HEADING PARTICULARS
(I) NAME AND ADDRESS OF THE
PROJECT
Cluster No. – 8 (Group of 7 mines of ECL)
i Bhanora UG Mine Bhanora Colliery, Sripur Area, Burdwan, West Bengal
ii Girmint/KDI UG Mine Girmint / KDI Colliery, Sripur Area, Burdwan, West Bengal
iii Sirpur UG Mine Sripur Colliery, Sripur Area, Burdwan, West Bengal
iv Sirpur Seam Incline UG Mine
v Ningha UG Mine Ningha Colliery, Sripur Area, Burdwan, West Bengal
vi Mithapur West UG & OC Patch Mithapur West Colliery, Satgram Area, Burdwan, West Bengal
vii Satgram UG Mine Satgram Colliery, Satgram Area, Burdwan, West Bengal
(II) INDUSTRY CATEGORY All mines in the cluster falls in red category
(III) PRODUCTION CAPACITY 2.75 MTY
(IV) YEAR OF ESTABLISHMENT All the UG mines in the cluster are taken over mines from
pre-nationalization period. OC patches are yet to start
production.
(V) DATE OF THE LAST
ENVIRONMENTAL STATEMENT SUBMITTED
The Environment Statement is being submitted for the first
time in the financial year 2015 – 16 after the grant of EC on 19th March, 2015.
PART – B WATER AND RAW MATERIAL CONSUMPTION
(I) WATER CONSUMPTION (Cu.m/day) 1. Bhanora UG
Sl.
No.
Particulars 2014-15 2015-16
A. MINING (Dust suppression, Firefighting, Others)
Nil Nil
B. COOLING
(in radiators of trucks/HEMM)
C. DOMESTIC
i Colony (Mine water)
TOTAL - -
2. Girmint/KDI UG
Sl.
No.
Particulars 2014-15 2015-16
A. MINING (Dust suppression, Firefighting, Others) 95 95
B. COOLING
(in radiators of trucks/HEMM)
0 0
C. DOMESTIC
i Colony (Mine water) 221.20 221.20
ii Colony (PHED water) 177 177
iii Water supplied to local communities 930 930
TOTAL 1423.20 1423.20
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
7
3. Sripur UG Sl. No.
Particulars 2014-15 2015-16
A. MINING
Nil Nil
i Dust suppression
ii Fire fighting
iii Others (service building etc.)
B. COOLING (in radiators of trucks/HEMM)
C. DOMESTIC
TOTAL - -
4. Sripur Seam Incline UG
Sl. No.
Particulars 2014-15 2015-16
A. MINING (Dust suppression, Firefighting, Others) 120 120
B. COOLING
(in radiators of trucks/HEMM)
0 0
C. DOMESTIC
i Colony (Mine water) 280 280
ii Colony (PHED water) 224 224
iii Water supplied to local communities 535 535
TOTAL 1159 1159
5. Ningha UG
Sl. No.
Particulars 2014-15 2015-16
A. MINING (Dust suppression, Firefighting, Others) 226 226
B. COOLING (in radiators of trucks/HEMM)
0 0
C. DOMESTIC
i Colony (Mine water) 526.40 526.40
ii Colony (PHED water) 421 421
iii Water supplied to local communities 7516 7516
TOTAL 8689.40 8689.40
6. Mithapur West UG & OC
Sl.
No.
Particulars 2014-15 2015-16
A. MINING
Nil Nil
i Dust suppression
ii Fire fighting
iii Others (service building etc.)
B. COOLING
(in radiators of trucks/HEMM)
C. DOMESTIC
TOTAL - -
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
8
7. Satgram UG Sl. No.
Particulars 2014-15 2015-16
A. MINING (Dust suppression, Firefighting, Others) 758 758
B. COOLING (in radiators of trucks/HEMM)
0 0
C. DOMESTIC
i Colony (Mine water) 1060 1060
ii Water supplied to local communities 2548 2548
TOTAL 4366 4366
(II) RAW MATERIAL CONSUMPTION :
1. Bhanora UG Name of raw
material
Name of
products
Consumption of raw material
(per unit of product output)
During previous
financial year
(2014-15)
During current
financial year
(2015-16)
1. Explosive
Coal Nil Nil 2. Diesel
3. Lubricants
2. Girmint/KDI UG
Name of raw
material
Name of
products
Consumption of raw material
(per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal Nil Nil 2. Diesel
3. Lubricants
3. Sripur UG Name of raw material
Name of products
Consumption of raw material (per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal Nil Nil 2. Diesel
3. Lubricants
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
9
4. Sripur Seam Incline UG Name of raw material
Name of products
Consumption of raw material (per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal
0.718 kg/te 0.470 kg/te
2. Diesel - -
3. Lubricants - -
5. Ningha UG
Name of raw material
Name of products
Consumption of raw material (per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal
0.301 kg/te 0.217 kg/te
2. Diesel 0.048 l/te 0.043 l/te
3. Lubricants 0.157 l/te 0.149 l/te
6. Mithapur West UG & OC
Name of raw material
Name of products
Consumption of raw material (per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal Nil Nil 2. Diesel
3. Lubricants
7. Satgram UG
Name of raw material
Name of products
Consumption of raw material (per unit of product output)
During previous
financial year (2014-15)
During current
financial year (2015-16)
1. Explosive
Coal
0.552 kg/te 0.553 kg/te
2. Diesel - -
3. Lubricants - -
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
10
PART – C POLLUTION GENERATED
Pollutio
n
Quantity of pollution generated Percentage variation from prescribed standards with
reasons
WATER Mine water discharge Analysis results
are given in Annexure-II.
The analysis results reveal that most of the parameters are
below permissible limits prescribed by MOEF as General
Standards for class ‘A’ effluent (Effluent discharged into inland surface water.)
AIR The main air pollutant is suspended
PM10 and PM2.5. The air quality results are appended as Annexure-I.
Ambient air quality results show that the values of SO2 and
NOx are within the prescribed standards barring few times at few sampling stations. The concentration level of PM10 has
exceeded limits on 22 occasions and that of PM2.5 has exceeded limits on 9 occasions as per NAAQS, 2009.
PART – D HAZARDOUS WASTE
(As specified under Hazardous Waste (Management and Handling) Rules, 1989)
1. Bhanora UG Hazardous waste Total quantity
During Previous
financial year
(2014-15)
During current
financial year
(2015-16)
Disposal
method
A) From process
i)Used oil
ii)Lead-Acid Batteries a. Automobile batteries
b. Cap-lamp batteries iii) Used Cotton waste
iv) Metal Scrap
Nil Nil
2. Girmint / KDI UG
Hazardous waste Total quantity
During Previous financial year
(2014-15)
During current financial year
(2015-16)
Disposal method
A) From process i)Used oil
ii)Lead-Acid Batteries
a. Automobile batteries b. Cap-lamp batteries
iii) Used Cotton waste iv) Metal Scrap
Nil Nil
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
11
3. Sripur UG Hazardous waste Total quantity
During Previous financial year
(2014-15)
During current financial year
(2015-16)
Disposal method
A) From process
i)Used oil
ii)Lead-Acid Batteries a. Automobile batteries
b. Cap-lamp batteries iii) Used Cotton waste
iv) Metal Scrap
Nil Nil
4. Sripur Seam Incline UG
Hazardous waste Total quantity
During Previous
financial year (2014-15)
During current
financial year (2015-16)
Disposal
method
A) From process i)Used oil
ii)Lead-Acid Batteries
a. Automobile batteries b. Cap-lamp batteries
iii) Used Cotton waste iv) Metal Scrap
litres
Nos 255 Nos
Kg Kg
litres
Nil 100 Nos
Kg Kg
Dealt in
Part – F
5. Ningha UG
Hazardous waste Total quantity
During Previous
financial year
(2014-15)
During current
financial year
(2015-16)
Disposal
method
A) From process
i)Used oil ii)Lead-Acid Batteries
a. Automobile batteries
b. Cap-lamp batteries iii) Used Cotton waste
iv) Metal Scrap
litres
Nil Nos
75 Nos Kg
Kg
litres
Nil Nos
115 Nos Kg
Kg
Dealt in Part – F
6. Mithapur West UG & OC
Hazardous waste Total quantity
During Previous financial year
(2014-15)
During current financial year
(2015-16)
Disposal method
A) From process i)Used oil
ii)Lead-Acid Batteries a. Automobile batteries
b. Cap-lamp batteries
iii) Used Cotton waste iv) Metal Scrap
Nil Nil
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
12
7. Satgram UG Hazardous waste Total quantity
During Previous financial year
(2014-15)
During current financial year
(2015-16)
Disposal method
A) From process
i)Used oil
ii)Lead-Acid Batteries a. Automobile batteries
b. Cap-lamp batteries iii) Used Cotton waste
iv) Metal Scrap
Nil litres
Nos
Nos Kg
Kg
Nil litres
Nos
Nos Kg
Kg
Dealt in
Part – F
Approximate values may be given where actual values are not available. **It has been dealt in Part – F. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.
PART – E SOLID WASTE
Particulars Total quantity (In Million Cu.m)
During previous financial year
(2014-15)
During current financial year
(2015-16)
a) From process (Mining) - -
b) From pollution control facilities - -
c) Quantity recycled or reutilized back filled - -
PART – F
PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF
CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID
WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH
THESE CATEGORIES OF WASTE.
Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Batteries are stored in Area Store from where replacement is taken. Metal scraps are declared and report is sent to HQ. The scraps are then auctioned and sold through HQ. Used oil are re-used as lubricants in coal tubs and friction roller.
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
13
PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.
1.0 AIR POLLUTION CONTROL MEASURES:
Surfacing of all service roads/permanent roads by asphalt. The un-metalled roads is kept free of ruts, potholes, etc. Regular maintenance of HEMM engines to limit emission of harmful exhaust fumes. Physical removal of dust from the roads. Greenbelts around quarry, industrial sites, service building area besides avenue
plantation along roads.
2.0 WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water)
Filtered mine water is being supplied to inmates by installing slow sand filter in Satgram colliery.
3.0 NOISE POLLUTION CONTROL MEASURES:
Regular maintenance of machines and other equipment at Bunker and workshop including mine fan.
Providing green belt around core activity area, along road side in colony and in other vacant space.
All HEMM & light vehicles are provided with silencers.
Noise monitoring is being carried out regularly.
4.0 LAND RESOURCE MANAGEMENT:
5 Ha of subsided land have been planted upon in Sripur Seam Incline colliery.
PART – H
ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. The following are the additional investment proposals for environmental protection:
The Environmental monitoring of the project will be continued fortnightly as per the guidelines of Ministry of Environment and Forest (MOEF).
The Environmental Statement report will be submitted for each financial year ending 31st March.
Necessary Consent for discharge may be taken from Competent Authority.
PART – I
ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
14
Annexure – I AMBIENT AIR QUALITY
Station No
Station Name Month Fortnight Date of Sampling
PM10 PM2.5 SO2 NOx
8A1 Near Bhanora RS May Second 20-May-15 134.1 34.9 <10.0 16.7
8A1 Near Bhanora RS June First 03-Jun-15 120.3 29.3 <10.0 18.2
8A1 Near Bhanora RS June Second 18-Jun-15 112.5 27.2 <10.0 16.7
8A1 Near Bhanora RS July First 03-Jul-15 92.4 30.1 <10.0 18.1
8A1 Near Bhanora RS July Second 22-Jul-15 84.2 21.7 <10.0 18.5
8A1 Near Bhanora RS August First 12-Aug-15 86.8 22.7 <10.0 18.6
8A1 Near Bhanora RS August Second 21-Aug-15 88.1 22.0 <10.0 16.8
8A1 Near Bhanora RS September First 08-Sep-15 84.2 24.2 <10.0 16.8
8A1 Near Bhanora RS September Second 18-Sep-15 86.2 24.0 <10.0 14.9
8A1 Near Bhanora RS October First 08-Oct-15 90.1 26.8 <10.0 16.2
8A1 Near Bhanora RS October Second 29-Oct-15 89.3 28.8 <10.0 18.4
8A1 Near Bhanora RS November First 06-Nov-15 92.4 32.8 <10.0 16.2
8A1 Near Bhanora RS November Second 23-Nov-15 91.2 31.4 <10.0 17.2
8A1 Near Bhanora RS December First 08-Dec-15 90.4 30.3 <10.0 18.2
8A1 Near Bhanora RS December Second 21-Dec-15 89.2 32.7 <10.0 16.7
8A1 Near Bhanora RS January First 07-Jan-16 82.7 29.4 <10.0 14.8
8A1 Near Bhanora RS January Second 27-Jan-16 80.9 28.1 <10.0 15.7
8A1 Near Bhanora RS February First 02-Feb-16 118.3 37.4 <10.0 14.3
8A1 Near Bhanora RS February Second 16-Feb-16 119.4 38.2 <10.0 16.1
8A1 Near Bhanora RS March First 02-Mar-16 117.2 39.6 <10.0 14.8
8A1 Near Bhanora RS March Second 21-Mar-16 122.6 38.9 <10.0 15.8
8A2 In Shivdanga village May Second 20-May-15 82.5 22.1 <10.0 14.3
8A2 In Shivdanga village June First 03-Jun-15 80.2 26.8 <10.0 12.9
8A2 In Shivdanga village June Second 18-Jun-15 72.4 18.5 <10.0 14.0
8A2 In Shivdanga village July First 03-Jul-15 69.5 24.4 <10.0 14.9
8A2 In Shivdanga village July Second 28-Jul-15 66.8 19.3 <10.0 14.2
8A2 In Shivdanga village August First 11-Aug-15 62.1 21.0 <10.0 10.8
8A2 In Shivdanga village August Second 18-Aug-15 64.3 20.1 <10.0 12.8
8A2 In Shivdanga village September First 04-Sep-15 59.7 20.9 <10.0 12.5
8A2 In Shivdanga village September Second 25-Sep-15 62.1 21.4 <10.0 14.5
8A2 In Shivdanga village October First 13-Oct-15 69.4 22.7 <10.0 12.8
8A2 In Shivdanga village October Second 16-Oct-15 72.8 24.6 <10.0 14.6
8A2 In Shivdanga village November First 02-Nov-15 78.3 26.8 <10.0 16.5
8A2 In Shivdanga village November Second 16-Nov-15 79.3 28.1 <10.0 16.8
8A2 In Shivdanga village December First 03-Dec-15 84.7 28.4 <10.0 16.7
8A2 In Shivdanga village December Second 17-Dec-15 82.1 30.4 <10.0 14.9
8A2 In Shivdanga village January First 12-Jan-16 77.9 27.4 <10.0 12.4
8A2 In Shivdanga village January Second 28-Jan-16 78.1 26.4 <10.0 14.1
8A2 In Shivdanga village February First 05-Feb-16 88.6 38.9 <10.0 12.6
8A2 In Shivdanga village February Second 20-Feb-16 108.2 36.3 <10.0 14.2
8A2 In Shivdanga village March First 01-Mar-16 99.4 38.3 <10.0 16.2
8A2 In Shivdanga village March Second 16-Mar-16 104.2 40.7 <10.0 18.2
8A3 NEAR Jamuria RS May Second 19-May-15 84.3 24.5 <10.0 12.9
8A3 NEAR Jamuria RS June First 02-Jun-15 88.1 24.3 <10.0 10.7
8A3 NEAR Jamuria RS June Second 17-Jun-15 86.3 19.2 <10.0 12.7
8A3 NEAR Jamuria RS July First 02-Jul-15 88.2 31.4 <10.0 14.0
8A3 NEAR Jamuria RS July Second 22-Jul-15 76.2 20.6 <10.0 18.5
8A3 NEAR Jamuria RS August First 13-Aug-15 72.4 24.3 <10.0 14.2
8A3 NEAR Jamuria RS August Second 25-Aug-15 74.6 22.9 <10.0 16.5
8A3 NEAR Jamuria RS September First 09-Sep-15 74.3 26.8 <10.0 12.8
8A3 NEAR Jamuria RS September Second 16-Sep-15 78.4 24.9 <10.0 14.1
8A3 NEAR Jamuria RS October First 12-Oct-15 82.1 24.0 <10.0 13.5
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
15
Station
No
Station Name Month Fortnight Date of
Sampling
PM10 PM2.5 SO2 NOx
8A3 NEAR Jamuria RS October Second 27-Oct-15 84.7 25.2 <10.0 14.7
8A3 NEAR Jamuria RS November First 12-Nov-15 89.3 28.3 <10.0 12.5
8A3 NEAR Jamuria RS November Second 27-Nov-15 88.6 27.3 <10.0 14.7
8A3 NEAR Jamuria RS December First 01-Dec-15 86.1 30.1 <10.0 16.2
8A3 NEAR Jamuria RS December Second 28-Dec-15 87.6 29.7 <10.0 15.3
8A3 NEAR Jamuria RS January First 15-Jan-16 80.1 26.9 <10.0 14.3
8A3 NEAR Jamuria RS January Second 18-Jan-16 82.4 27.9 <10.0 16.4
8A3 NEAR Jamuria RS February First 03-Feb-16 181.4 86.3 <10.0 14.8
8A3 NEAR Jamuria RS February Second 17-Feb-16 182.6 77.8 <10.0 12.9
8A3 NEAR Jamuria RS March First 05-Mar-16 180.7 78.1 <10.0 14.9
8A3 NEAR Jamuria RS March Second 22-Mar-16 156.7 79.4 <10.0 16.9
8A4 In Kashinathpur village October First 07-Oct-15 88.3 25.9 <10.0 22.9
8A4 In Kashinathpur village October Second 31-Oct-15 89.6 26.8 <10.0 24.8
8A4 In Kashinathpur village November First 05-Nov-15 90.7 27.2 <10.0 22.8
8A4 In Kashinathpur village November Second 17-Nov-15 91.4 29.2 <10.0 20.9
8A4 In Kashinathpur village December First 09-Dec-15 90.2 31.2 <10.0 16.6
8A4 In Kashinathpur village December Second 22-Dec-15 89.2 30.6 <10.0 18.4
8A4 In Kashinathpur village January First 01-Jan-16 92.6 30.8 <10.0 18.7
8A4 In Kashinathpur village January Second 21-Jan-16 94.7 31.9 <10.0 19.7
8A4 In Kashinathpur village February First 01-Feb-16 192.1 80.7 <10.0 18.2
8A4 In Kashinathpur village February Second 23-Feb-16 190.7 79.4 <10.0 16.4
8A4 In Kashinathpur village March First 04-Mar-16 192.1 80.6 <10.0 14.8
8A4 In Kashinathpur village March Second 19-Mar-16 164.4 82.1 <10.0 16.2
8A5 In Ranisayer village October First 11-Oct-15 69.4 22.4 <10.0 20.6
8A5 In Ranisayer village October Second 29-Oct-15 72.7 24.7 <10.0 22.3
8A5 In Ranisayer village November First 03-Nov-15 78.4 26.5 <10.0 20.2
8A5 In Ranisayer village November Second 27-Nov-15 79.6 28.7 <10.0 20.8
8A5 In Ranisayer village December First 10-Dec-15 79.4 29.8 <10.0 17.2
8A5 In Ranisayer village December Second 29-Dec-15 81.9 30.4 <10.0 19.6
8A5 In Ranisayer village January First 14-Jan-16 76.3 24.2 <10.0 16.9
8A5 In Ranisayer village January Second 30-Jan-16 78.7 26.9 <10.0 17.1
8A5 In Ranisayer village February First 08-Feb-16 89.6 38.6 <10.0 18.7
8A5 In Ranisayer village February Second 18-Feb-16 84.1 29.7 <10.0 17.8
8A5 In Ranisayer village March First 07-Mar-16 80.4 28.1 <10.0 18.5
8A5 In Ranisayer village March Second 26-Mar-16 78.6 36.9 <10.0 17.2
8A6 In Ikra village October First 05-Oct-15 68.2 22.3 <10.0 12.3
8A6 In Ikra village October Second 31-Oct-15 70.4 24.0 <10.0 14.1
8A6 In Ikra village November First 11-Nov-15 74.3 26.1 <10.0 16.4
8A6 In Ikra village November Second 20-Nov-15 78.8 27.4 <10.0 18.2
8A6 In Ikra village December First 04-Dec-15 78.9 28.1 <10.0 18.4
8A6 In Ikra village December Second 18-Dec-15 76.3 29.1 <10.0 19.4
8A6 In Ikra village January First 13-Jan-16 88.4 36.7 <10.0 19.3
8A6 In Ikra village January Second 28-Jan-16 90.1 34.2 <10.0 18.1
8A6 In Ikra village February First 04-Feb-16 88.4 36.7 <10.0 19.3
8A6 In Ikra village February Second 24-Feb-16 189.3 80.2 <10.0 18.6
8A6 In Ikra village March First 08-Mar-16 90.1 29.7 <10.0 16.4
8A6 In Ikra village March Second 25-Mar-16 92.7 30.1 <10.0 18.4
8A7 In Baraboni village May Second 19-May-15 132.1 36.3 <10.0 24.9
8A7 In Baraboni village June First 02-Jun-15 134.5 34.5 <10.0 22.4
8A7 In Baraboni village June Second 17-Jun-15 122.4 24.1 <10.0 23.4
8A7 In Baraboni village July First 02-Jul-15 118.6 36.5 <10.0 26.8
8A7 In Baraboni village July Second 29-Jul-15 80.1 20.1 <10.0 19.2
8A7 In Baraboni village August First 04-Aug-15 84.7 24.8 <10.0 20.8
8A7 In Baraboni village August Second 24-Aug-15 82.1 22.6 <10.0 18.6
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
16
Station
No
Station Name Month Fortnight Date of
Sampling
PM10 PM2.5 SO2 NOx
8A7 In Baraboni village September First 14-Sep-15 87.7 25.1 <10.0 22.9
8A7 In Baraboni village September Second 28-Sep-15 86.1 26.2 <10.0 20.8
8A8 In Gopalbad village May Second 19-May-15 82.7 20.5 <10.0 16.4
8A8 In Gopalbad village June First 02-Jun-15 78.6 18.3 <10.0 18.1
8A8 In Gopalbad village June Second 17-Jun-15 70.4 18.9 <10.0 16.7
8A8 In Gopalbad village July First 02-Jul-15 72.1 24.3 <10.0 18.1
8A8 In Gopalbad village July Second 24-Jul-15 64.3 18.4 <10.0 18.4
8A8 In Gopalbad village August First 10-Aug-15 64.3 16.2 <10.0 18.3
8A8 In Gopalbad village August Second 26-Aug-15 66.4 17.2 <10.0 17.3
8A8 In Gopalbad village September First 08-Sep-15 60.4 18.4 <10.0 17.4
8A8 In Gopalbad village September Second 17-Sep-15 64.6 20.9 <10.0 19.2
8A9 In Prembazar village May Second 19-May-15 76.3 19.2 <10.0 8.2
8A9 In Prembazar village June First 02-Jun-15 74.3 19.5 <10.0 9.6
8A9 In Prembazar village June Second 17-Jun-15 70.1 17.8 <10.0 10.2
8A9 In Prembazar village July First 02-Jul-15 68.3 22.9 <10.0 9.3
8A9 In Prembazar village July Second 20-Jul-15 64.0 17.8 <10.0 10.8
8A9 In Prembazar village August First 06-Aug-15 60.9 17.3 <10.0 10.2
8A9 In Prembazar village August Second 18-Aug-15 62.1 18.1 <10.0 12.3
8A9 In Prembazar village September First 02-Sep-15 62.1 19.2 <10.0 8.7
8A9 In Prembazar village September Second 28-Sep-15 66.7 21.5 <10.0 9.5
HEAVY METAL ANALYSIS IN AIR Station
No Station Name Month Fortnight Date of
Sampling Arsenic Cadmium Chromium Mercury Nickel Lead
8A1 Near Bhanora RS September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06
8A1 Near Bhanora RS March First 02-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A2 In Shivdanga village September First 04-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04
8A2 In Shivdanga village March First 01-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A3 NEAR Jamuria RS September First 09-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06
8A3 NEAR Jamuria RS March First 05-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A4 In Kashinathpur village March First 04-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A5 In Ranisayer village March First 07-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A6 In Ikra village March First 08-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005
8A7 In Baraboni village September First 14-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04
8A8 In Gopalbad village September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.05
8A9 In Prembazar village September First 02-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06
Environmental standards: National Ambient Air Quality Standards (NAAQS) for residential, industrial and rural areas for 24 hourly/yearly samples:
Heavy Metal Arsenic (As) Cadmium (Cd)
Chromium (Cr)
Mercury Hg)
Nickel (Ni)
Lead (Pb)
Limit (µg/m3) 0.006 Not specified Not specified Not specified 0.02 0.5
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
17
Annexure – II
NOISE LEVEL
Station No
Station Name Month Fortnight Date of Sampling
Noise Level dB(A)
8N1 Pit-top Girmint /K D I UG June Second 17-Jun-15 61.4
8N1 Pit-top Girmint /K D I UG June First 02-Jun-15 58.7
8N1 Pit-top Girmint /K D I UG July First 03-Jul-15 60.2
8N1 Pit-top Girmint /K D I UG September Second 22-Sep-15 70.1
8N1 Pit-top Girmint /K D I UG August First 11-Aug-15 68.8
8N1 Pit-top Girmint /K D I UG August Second 18-Aug-15 67.1
8N1 Pit-top Girmint /K D I UG September First 04-Sep-15 69.5
8N1 Pit-top Girmint /K D I UG October First 12-Oct-15 69.6
8N1 Pit-top Girmint /K D I UG October Second 16-Oct-15 70.6
8N1 Pit-top Girmint /K D I UG November First 06-Nov-15 71.0
8N1 Pit-top Girmint /K D I UG November Second 16-Nov-15 69.2
8N1 Pit-top Girmint /K D I UG December First 04-Dec-15 60
8N1 Pit-top Girmint /K D I UG December Second 29-Dec-15 69
8N1 Pit-top Girmint /K D I UG January First 02-Jan-16 64
8N1 Pit-top Girmint /K D I UG January Second 29-Jan-16 67
8N1 Pit-top Girmint /K D I UG February First 02-Feb-16 69
8N1 Pit-top Girmint /K D I UG February Second 16-Feb-16 64
8N1 Pit-top Girmint /K D I UG March First 01-Mar-16 69
8N1 Pit-top Girmint /K D I UG March Second 16-Mar-16 63
8N2 Pit-top Sripur Seam Incline UG June Second 18-Jun-15 66.1
8N2 Pit-top Sripur Seam Incline UG June First 02-Jun-15 62.9
8N2 Pit-top Sripur Seam Incline UG July First 03-Jul-15 64.7
8N2 Pit-top Sripur Seam Incline UG September Second 24-Sep-15 64.3
8N2 Pit-top Sripur Seam Incline UG August First 11-Aug-15 71.1
8N2 Pit-top Sripur Seam Incline UG August Second 18-Aug-15 69.8
8N2 Pit-top Sripur Seam Incline UG September First 04-Sep-15 63.4
8N2 Pit-top Sripur Seam Incline UG October First 07-Oct-15 66.4
8N2 Pit-top Sripur Seam Incline UG October Second 16-Oct-15 67.8
8N2 Pit-top Sripur Seam Incline UG November First 06-Nov-15 69.4
8N2 Pit-top Sripur Seam Incline UG November Second 17-Nov-15 65.6
8N2 Pit-top Sripur Seam Incline UG December First 04-Dec-15 63
8N2 Pit-top Sripur Seam Incline UG December Second 29-Dec-15 70
8N2 Pit-top Sripur Seam Incline UG January First 02-Jan-16 60
8N2 Pit-top Sripur Seam Incline UG January Second 29-Jan-16 62
8N2 Pit-top Sripur Seam Incline UG February First 05-Feb-16 57
8N2 Pit-top Sripur Seam Incline UG February Second 16-Feb-16 67
8N2 Pit-top Sripur Seam Incline UG March First 01-Mar-16 59
8N2 Pit-top Sripur Seam Incline UG March Second 16-Mar-16 69
8N3 Pit-top Ningah UG June Second 17-Jun-15 58.2
8N3 Pit-top Ningah UG June First 03-Jun-15 59.8
8N3 Pit-top Ningah UG July First 02-Jul-15 60.7
8N3 Pit-top Ningah UG September Second 16-Sep-15 60.2
8N3 Pit-top Ningah UG August First 11-Aug-15 67.2
8N3 Pit-top Ningah UG August Second 24-Aug-15 67.9
8N3 Pit-top Ningah UG September First 04-Sep-15 59.5
8N3 Pit-top Ningah UG October First 07-Oct-15 62.9
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
18
Station
No
Station Name Month Fortnight Date of
Sampling
Noise Level
dB(A)
8N3 Pit-top Ningah UG October Second 27-Oct-15 64.1
8N3 Pit-top Ningah UG November First 06-Nov-15 65.6
8N3 Pit-top Ningah UG November Second 27-Nov-15 67.8
8N3 Pit-top Ningah UG December First 04-Dec-15 65
8N3 Pit-top Ningah UG December Second 29-Dec-15 62
8N3 Pit-top Ningah UG January First 02-Jan-16 70
8N3 Pit-top Ningah UG January Second 29-Jan-16 65
8N3 Pit-top Ningah UG February First 08-Feb-16 62
8N3 Pit-top Ningah UG February Second 23-Feb-16 54
8N3 Pit-top Ningah UG March First 07-Mar-16 57
8N3 Pit-top Ningah UG March Second 21-Mar-16 67
8N4 Pit-top Satgram UG June Second 18-Jun-15 60.7
8N4 Pit-top Satgram UG June First 03-Jun-15 62.8
8N4 Pit-top Satgram UG July First 02-Jul-15 64.0
8N4 Pit-top Satgram UG September Second 17-Sep-15 68.4
8N4 Pit-top Satgram UG August First 12-Aug-15 70.3
8N4 Pit-top Satgram UG August Second 24-Aug-15 68.5
8N4 Pit-top Satgram UG September First 04-Sep-15 66.8
8N4 Pit-top Satgram UG October First 05-Oct-15 67.2
8N4 Pit-top Satgram UG October Second 27-Oct-15 67.5
8N4 Pit-top Satgram UG November First 06-Nov-15 69.1
8N4 Pit-top Satgram UG November Second 27-Nov-15 68.3
8N4 Pit-top Satgram UG December First 04-Dec-15 67
8N4 Pit-top Satgram UG December Second 29-Dec-15 66
8N4 Pit-top Satgram UG January First 02-Jan-16 71
8N4 Pit-top Satgram UG January Second 29-Jan-16 62
8N4 Pit-top Satgram UG February First 03-Feb-16 64
8N4 Pit-top Satgram UG February Second 23-Feb-16 67
8N4 Pit-top Satgram UG March First 07-Mar-16 62
8N4 Pit-top Satgram UG March Second 21-Mar-16 59
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
19
Annexure – III
Effluent Water Quality for 5 parameters
Station No
Station Name Month Fortnight Date of Sampling
pH TSS TDS O&G COD
8MW1 Girmint /K D I UG May Second 20-May-15 7.61 32 394 <2.0 16
8MW1 Girmint /K D I UG June Second 20-Jun-15 7.42 26 380 <2.0 16
8MW1 Girmint /K D I UG July First 02-Jul-15 7.74 26 386 <2.0 16
8MW1 Girmint /K D I UG August First 12-Aug-15 7.86 32 410 <2.0 14
8MW1 Girmint /K D I UG July Second 22-Jul-15 7.74 <25.0 388 <2.0 16
8MW1 Girmint /K D I UG August Second 21-Aug-15 7.74 <25.0 442 <2.0 16
8MW1 Girmint /K D I UG September First 04-Sep-15 7.86 26 453 <2.0 16
8MW1 Girmint /K D I UG June First 03-Jun-15 7.61 32 394 <2.0 16
8MW1 Girmint /K D I UG September Second 18-Sep-15 7.92 6 428 <2.0 16
8MW1 Girmint /K D I UG October First 08-Oct-15 8.36 5 452 <2.0 12
8MW1 Girmint /K D I UG October Second 23-Oct-15 7.94 9 482 <2.0 24
8MW1 Girmint /K D I UG November First 02-Nov-15 8.28 5 476 <2.0 16
8MW1 Girmint /K D I UG November Second 16-Nov-15 8.32 12 504 <2.0 24
8MW1 Girmint /K D I UG December Second 17-Dec-15 8.25 8 459 <2.0 24
8MW1 Girmint /K D I UG January First 15-Jan-16 8.21 15 468 <2.0 24
8MW1 Girmint /K D I UG January Second 27-Jan-16 8.21 12 475 <2.0 24
8MW1 Girmint /K D I UG February First 02-Feb-16 8.29 8 521 <2.0 16
8MW1 Girmint /K D I UG February Second 20-Feb-16 8.39 <5 468 <2.0 08
8MW1 Girmint /K D I UG March First 02-Mar-16 8.05 <5 521 <2.0 12
8MW1 Girmint /K D I UG March Second 21-Mar-16 8.19 8 541 <2.0 16
8MW2 Sripur Seam Incline UG May Second 20-May-15 7.65 30 342 <2.0 24
8MW2 Sripur Seam Incline UG June Second 17-Jun-15 7.52 <25.0 339 <2.0 24
8MW2 Sripur Seam Incline UG July First 02-Jul-15 7.62 26 342 <2.0 20
8MW2 Sripur Seam Incline UG August First 12-Aug-15 7.58 26 355 <2.0 22
8MW2 Sripur Seam Incline UG July Second 22-Jul-15 7.70 <25.0 345 <2.0 32
8MW2 Sripur Seam Incline UG August Second 24-Aug-15 7.64 <25.0 371 <2.0 20
8MW2 Sripur Seam Incline UG September First 04-Sep-15 7.60 <25.0 370 <2.0 20
8MW2 Sripur Seam Incline UG June First 05-Jun-15 7.65 30 342 <2.0 24
8MW2 Sripur Seam Incline UG September Second 18-Sep-15 7.94 10 422 <2.0 24
8MW2 Sripur Seam Incline UG October First 08-Oct-15 8.42 9 454 <2.0 20
8MW2 Sripur Seam Incline UG October Second 23-Oct-15 7.78 7 480 <2.0 16
8MW2 Sripur Seam Incline UG November First 06-Nov-15 8.08 5 488 <2.0 20
8MW2 Sripur Seam Incline UG November Second 16-Nov-15 8.28 8 516 <2.0 16
8MW2 Sripur Seam Incline UG December Second 17-Dec-15 7.69 7 444 <2.0 32
8MW2 Sripur Seam Incline UG January First 15-Jan-16 7.72 7 436 <2.0 16
8MW2 Sripur Seam Incline UG January Second 27-Jan-16 7.72 8 438 <2.0 16
8MW2 Sripur Seam Incline UG February First 04-Feb-16 8.28 7 468 <2.0 24
8MW2 Sripur Seam Incline UG February Second 20-Feb-16 8.27 6 436 <2.0 28
8MW2 Sripur Seam Incline UG March First 02-Mar-16 8.43 8 486 <2.0 24
8MW2 Sripur Seam Incline UG March Second 21-Mar-16 8.40 9 470 <2.0 16
8MW3 Ningah UG May Second 20-May-15 7.59 <25.0 634 <2.0 8
8MW3 Ningah UG June Second 16-Jun-15 7.41 <25.0 630 <2.0 8
8MW3 Ningah UG July First 02-Jul-15 7.79 <25.0 622 <2.0 24
8MW3 Ningah UG August First 12-Aug-15 9.27 <25.0 657 <2.0 12
8MW3 Ningah UG July Second 22-Jul-15 8.92 26 646 <2.0 16
8MW3 Ningah UG August Second 25-Aug-15 8.86 <25.0 672 <2.0 12
8MW3 Ningah UG September First 04-Sep-15 8.90 28 682 <2.0 10
8MW3 Ningah UG June First 05-Jun-15 7.59 <25.0 634 <2.0 8
8MW3 Ningah UG September Second 18-Sep-15 8.52 12 524 <2.0 20
8MW3 Ningah UG October First 08-Oct-15 8.62 8 438 <2.0 24
8MW3 Ningah UG October Second 27-Oct-15 7.86 6 520 <2.0 16
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
20
Station
No
Station Name Month Fortnight Date of
Sampling
pH TSS TDS O&G COD
8MW3 Ningah UG November First 02-Nov-15 7.92 6 490 <2.0 28
8MW3 Ningah UG November Second 17-Nov-15 8.02 10 492 <2.0 24
8MW3 Ningah UG December Second 17-Dec-15 7.60 6 536 <2.0 24
8MW3 Ningah UG January First 15-Jan-16 7.56 6 549 <2.0 16
8MW3 Ningah UG January Second 27-Jan-16 7.62 7 563 <2.0 16
8MW3 Ningah UG February First 04-Feb-16 8.68 6 601 <2.0 24
8MW3 Ningah UG February Second 20-Feb-16 8.53 8 549 <2.0 20
8MW3 Ningah UG March First 02-Mar-16 8.52 10 603 <2.0 24
8MW3 Ningah UG March Second 21-Mar-16 8.50 7 637 <2.0 24
8MW4 Satgram UG May Second 20-May-15 7.62 28 472 <2.0 16
8MW4 Satgram UG July First 02-Jul-15 8.02 26 448 <2.0 24
8MW4 Satgram UG August First 12-Aug-15 7.56 26 449 <2.0 34
8MW4 Satgram UG July Second 29-Jul-15 7.48 <25.0 436 <2.0 24
8MW4 Satgram UG August Second 24-Aug-15 7.66 <25.0 410 <2.0 34
8MW4 Satgram UG June Second 16-Jun-15 8.41 <25.0 441 <2.0 28
8MW4 Satgram UG September First 04-Sep-15 7.74 30 401 <2.0 36
8MW4 Satgram UG June First 06-Jun-15 7.62 28 472 <2.0 16
8MW4 Satgram UG September Second 16-Sep-15 7.78 11 472 <2.0 24
8MW4 Satgram UG October First 08-Oct-15 8.54 7 492 <2.0 28
8MW4 Satgram UG October Second 27-Oct-15 7.74 8 524 <2.0 20
8MW4 Satgram UG November First 02-Nov-15 7.95 8 518 <2.0 24
8MW4 Satgram UG November Second 17-Nov-15 7.92 10 458 <2.0 20
8MW4 Satgram UG December Second 17-Dec-15 7.95 10 493 <2.0 16
8MW4 Satgram UG January First 15-Jan-16 8.06 17 513 <2.0 32
8MW4 Satgram UG January Second 27-Jan-16 8.09 15 517 <2.0 40
8MW4 Satgram UG February First 04-Feb-16 8.70 10 533 <2.0 32
8MW4 Satgram UG February Second 20-Feb-16 8.60 7 513 <2.0 36
8MW4 Satgram UG March First 08-Mar-16 8.71 12 535 <2.0 36
8MW4 Satgram UG March Second 16-Mar-16 8.56 6 548 <2.0 32
Effluent Water Quality Standards (MoEF Schedule – VI Standards)
Parameters pH TSS TDS Oil & Grease COD
Limit 5.5-9.0 100 Not Specified 10 250
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
21
Annexure – III
Effluent Water Quality for full parameters (29 parameters)
Cluster 8 8 8 8 Effluent Water (MOEF Schedule-VI Standard)
Station No 8MW1 8MW2 8MW3 8MW4
Station Name Girmint /K D I UG
Sripur Seam Incline UG
Ningah UG Satgram UG
Month December December December December
Fortnight First First First First
Date of Sampling
08-Dec-15 09-Dec-15 09-Dec-15 08-Dec-15
Colour 4 4 3 3 Unobjectionable
Odour Unobjectionable
Unobjectionable Unobjectionable Unobjectionable Unobjectionable
TSS 10 16 12 14 100.0
pH 8.08 8.11 8.13 8.0 5.5-9.0
Temperature(
Deg C)
22.0 21.92 21.80 21.7 Shall not exceed 50C
above the receiving water temp
Oil & Grease <2.0 <2.0 <2.0 <2.0 10.0
Total Residual Chlorine
0.03 0.03 0.04 <0.02 1.0
Ammonical Nitrogen
0.42 0.52 0.62 0.35 50.0
Total Kjeldahi Nitrogen
1.37 1.48 1.62 1.48 100.0
Free Amonia <0.4 <0.4 <0.4 <0.4 5.0
BOD 3 5 3 4 30.0
COD 32 32 16 24 250.0
Arsenic <0.005 <0.005 <0.005 <0.005 0.2
Lead <0.005 <0.005 <0.005 <0.005 0.1
Hexavalent Chromium
0.02 0.04 0.03 0.02 0.1
Total Chromium
0.03 0.06 0.04 0.04 2.0
Copper 0.03 0.04 0.03 0.03 3.0
Zinc 0.03 0.04 0.05 0.03 5.0
Selenium <0.005 <0.005 <0.005 <0.005 0.05
Nickel <0.10 <0.10 <0.10 <0.10 3.0
Fluoride 0.32 0.65 0.36 0.47 2.0
Dissolved Phosphate
1.72 1.76 1.82 1.84 5.0
Sulphide 0.009 0.005 0.006 0.007 2.0
Phenolics <0.001 <0.001 <0.001 <0.001 1.0
Manganese 0.20 0.22 0.24 0.20 2.0
Iron 0.11 0.10 0.14 0.16 3.0
Nitrate Nitrogen
2.6 3.4 3.9 3.8 10.0
Cadmium <0.001 <0.001 <0.001 <0.001 0.003
Total Dissolved
Solids
454 445 506 480 Not Specified
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
22
Annexure – III
GROUNDWATER QUALITY Cluster No 8 8 8 8 8 8 8 8
Indian Drinking Water Standard (IS-10500)
Station No 8GW1 8GW2 8GW3 8GW4 8GW5 8GW6 8GW7 8GW8
Station Name Dugwell at
Paharbera primary
school
Dugwell at
Baraboni RPF camp
Dugwell near
Gopalbad village primary school
Dugwell at
Prembazer village
near Maszid
Dugwell at
backside of
Jamuria Municipali
ty Coorporat
ion
Dugwell at Ikra Basanti
Bijoy high school
Dugwell at
Ranisayer more near Netai
Mahato house
Dugwell at
Kashinathpur more
near Ratibati
workshop
Month May'15 May'15 May'15 May'15 May'15 May'15 May'15 May'15
Fortnight Second Second Second Second Second Second Second Second
Date of sampling
11-May-15
11-May-15
11-May-15
12-May-15
12-May-15
12-May-15
11-May-15
11-May-15
Colour,Hazen unit Max
4 4 3 4 5 3 4 4 5
Odour Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Unobjectionable
Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable
Turbidity,NTU Max
3.2 4.0 3.1 2.8 3.9 4.0 4.1 2.9 5
pH 7.59 7.19 7.39 7.87 7.56 7.34 7.37 7.30 6.5-8.5
Total Hardness
176 428 248 240 228 376 404 352 300.0
Iron <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 0.30
Chlorides 59 54 04 109 78 06 80 110 250.0
Res Free chlorine
<0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.20
Dissolved Solids
313 587 334 461 385 454 572 625 500.0
Calcium 52.8 99.2 57.6 68.8 57.6 81.6 84.8 81.6 75.0
Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05
Manganese <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.10
Sulphate 49 64 58 64 53 69 48 51 200.0
Nitrate 3.99 10.19 4.43 3.54 2.66 7.08 4.87 8.86 45.0
Fluoride 0.42 0.76 0.48 0.34 0.64 0.62 0.58 0.64 1.0
Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05
Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05
Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05
Zinc <0.01 <0.01 <0.01 0.03 <0.01 0.08 <0.01 <0.01 5.00
Hex Chromium
<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05
Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 1.00
Coliforms (MPN)
Nil Nil Nil Nil Nil Nil Nil Nil Nil
Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001
Alkalinity 80 112 240 160 216 248 156 168 200.0
Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16
23
Annexure – IV
Groundwater Level
Station No
Station Name Month Fortnight Date of Sampling
Ground Water Level BGL (mtr)
8GWL1 Dugwell at Paharbera primary school May Second 18-May-15 6.45
8GWL1 Dugwell at Paharbera primary school November Second 26-Nov-15 2.25
8GWL1 Dugwell at Paharbera primary school January First 11-Jan-16 4.10
8GWL1 Dugwell at Paharbera primary school August Second 31-Aug-15 0.40
8GWL2 Dugwell at Baraboni RPF camp May Second 19-May-15 6.40
8GWL2 Dugwell at Baraboni RPF camp November Second 26-Nov-15 5.80
8GWL2 Dugwell at Baraboni RPF camp January First 11-Jan-16 7.30
8GWL2 Dugwell at Baraboni RPF camp August Second 31-Aug-15 2.30
8GWL3 Dugwell near Gopalbad village primary school May Second 19-May-15 8.25
8GWL3 Dugwell near Gopalbad village primary school November Second 26-Nov-15 2.75
8GWL3 Dugwell near Gopalbad village primary school January First 11-Jan-16 3.90
8GWL3 Dugwell near Gopalbad village primary school August First 04-Aug-15 2.30
8GWL4 Dugwell at Prembazer village near Maszid May Second 19-May-15 9.90
8GWL4 Dugwell at Prembazer village near Maszid November Second 26-Nov-15 1.05
8GWL4 Dugwell at Prembazer village near Maszid January First 11-Jan-16 1.60
8GWL4 Dugwell at Prembazer village near Maszid August First 04-Aug-15 0.65
8GWL5 Dugwell at backside of Jamuria Municipality Coorporation
May Second 22-May-15 6.95
8GWL5 Dugwell at backside of Jamuria Municipality Coorporation
November Second 26-Nov-15 5.90
8GWL5 Dugwell at backside of Jamuria Municipality Coorporation
January First 13-Jan-16 6.90
8GWL5 Dugwell at backside of Jamuria Municipality Coorporation
August First 04-Aug-15 1.30
8GWL6 Dugwell at Ikra Basanti Bijoy high school May Second 22-May-15 10.20
8GWL6 Dugwell at Ikra Basanti Bijoy high school November Second 18-Nov-15 4.85
8GWL6 Dugwell at Ikra Basanti Bijoy high school January Second 30-Jan-16 7.50
8GWL6 Dugwell at Ikra Basanti Bijoy high school August Second 31-Aug-15 2.50
8GWL7 Dugwell at Ranisayer more near Netai Mahato house
May Second 22-May-15 8.30
8GWL7 Dugwell at Ranisayer more near Netai Mahato house
November Second 18-Nov-15 3.15
8GWL7 Dugwell at Ranisayer more near Netai Mahato house
January First 13-Jan-16 3.90
8GWL7 Dugwell at Ranisayer more near Netai Mahato house
August Second 31-Aug-15 3.05
8GWL8 Dugwell at Kashinathpur more near Ratibati workshop
May Second 21-May-15 3.45
8GWL8 Dugwell at Kashinathpur more near Ratibati workshop
November Second 24-Nov-15 3.10
8GWL8 Dugwell at Kashinathpur more near Ratibati workshop
January Second 20-Jan-16 3.40
8GWL8 Dugwell at Kashinathpur more near Ratibati workshop
August Second 31-Aug-15 0.65
ENIVORMENTAL STATEMENT FOR CLUSTER-8
CMPDIISO 9001 Company
H Q XX X XXX X XX
0
LOCATION PLAN
CUSTOMER: EASTERN COALFIELDS LIMITED JOB NO 111438
SUBJECT:
CLUSTER-8 ECL
PLATE NO. 1
E
.
R
.
A
n
d
a
l
L
o
o
p
0500M 1500M
VE11
RRN
CMPDI
EASTERN COALFIELDS LTD.
RS
Kalipahari
RS
Raniganj
RS
RS
Jamuria
RS
Ikra
RS
Toposi
RS
Sonachora
N
u
n
i
a
K
h
a
l
P
u
n
t
a
K
h
a
l
Napur Bil
Mejia Bil
Raja Bandh
G
.
T
.
R
o
a
d
B
y
e
-
P
a
s
s
D
i
v
e
r
s
i
o
n
o
f
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Nunia Jore
E
.
R
ly
.
K
a
s
t
a
B
r
a
n
c
h
E
.
R
l
y
.
A
n
d
a
l
L
o
o
p
R.S.
A
J
A
Y
R
I
V
E
R
N
a
n
i
d
J
o
r
s
W
s
D
M
a
i
n
L
i
n
e
E
.
R
a
i
l
w
a
y
S
.
E
.
R
a
i
l
w
a
y
M
a
i
n
L
i
n
e
S
.
E
.
R
a
i
l
w
a
y
M
a
i
n
L
i
n
e
E
.
R
.
I
k
r
a
B
r
a
n
c
h
N
unia Jore
Chinchuria
RS
E
.
R
l
y
.
I
k
r
a
b
r
a
n
c
h
E.Rly.Toposi-Baraboni Chord
N
u
n
i
a
K
h
a
l
P
u
n
t
a
K
h
a
l
D
a
m
o
d
a
r
N
a
l
a
Damoda
R A N I G A N J
Prembazar
Lalbazar
Patharchur
Sankhari
Kumardiha
Parui
Tarapur
Mejia
Rangamatia
Kalidaspur
Parbatipur
Jemua
Lakhsmanband
Tegharia
Jorsa
Mohana
Kastara
Kendana
Jugibag
Ghusra
Barduari
ArdhagramBhului
Kalikapur
Perubad
Lalbazar
Durlavpur
Gopalnagar
Bharra
Sahebdanga
Jordanga
Harakbad
Salma
Bakulia
Majit
Siaghir
Fatakduar
Searsol
Mahabir
Narainkuri
Egara
Kankardanga
Amkula
Damalia
Amritnagar
East Nimcha
Harabhanga
Tirat
Babladanga
Chelad
Belebathan
Jamari
Chalbalpur
Jaykaynagar
Bogra
Chapui
Saora
Ratibati
Kashinathpur
Kumardiha
Ghusick
Ashtadanga
Damra
Jamdov
Mallackpara
Kalipahari
Katagoria
Ranisayer
Bijpur
Mithapur
Satgram
Berala
Balanpur
Mondalpur
Banali
Joba
Kendulia
Joba
Chanda
Shivdanga
Kurtidanga
Ushagram
Ningha
Keshabganj
Murgachori
Nischantapur
Kankhaya
Bonbishnupur
Satpukhuria
Khalrui
Gomaria
Bagrasola
Majiara
Bhanora
Charanpur
Pariharpur
Kaithi
Sripur
Baijantipur
Akhalpur
Damodarpur
Sekpur
Ikra
Sarthakpur
Hormadanga
Nandi
Jambad
Sattore
Taltore
Layekdanga
Shibpur
Jhiladanga
Shyamsunderpur
Faridpur
Taradanga
DomohaniBaraboni
Samuldihi
Jamalpur
Darbardanga
NabasanBrajdihi
Bheleni
Tamra
Sira
Konda
Chora
Haripur
Khaskenda
North Jambad
Dahuka
Chichuria
Chichuria
Dobrana
Haripur
Chora
Nutan Madanpur
Baktarnagar
Palasban
Babuisol
Ballavpur
Kumarbazar
Gajadar Kajora
Pure Kajora
Kajora
Bahula
Parashkol
Jambad
Harishpur
Beniadidanga
Dhandardihi
Mangalpur
Sonachora
Kuldanga
New Konda
Shaldanga
Belbaid
Kunustoria
Toposi
Banshra
Amrasota
Jot Janki
Bijaynagar
Dhasal
Dhasal
Krishnanagar
Bahadurpur
Chakdola
Kumar Jamsol
Jamsol
Hijalgora Chak Tulsi
Jawdanga
Shymla
Bhuri
Bagdiha
Kharimati
Rakhakura
Sindrichak
Natundih
Khosnagar
Jhapradhura
Shitadhura
Katanidangal
Kelejora
Rampur
Puchra
Domohani
Beldanga
Gopalbad
Moldanga
Khyerkunda
Kashidanga
Sanyasi
Khayerbad
Kapistha
Narayanpur
Jamgram
Kalipathar
Khayerban
Madanpur
Sarsathali
Amulia
Shirishdanga
Rashunpur
Barhra
Pahargora
Paharpur
Madantanr
Nayakpur
Madhudanga
Jaynagar
Dishermohan
Beldanga
Barakunri
Madhabpur
Diguli
Churulia
Baguli
Lado
Kasta
Gobindpur
Andhaira
Sultanpur
Taldanga
Chinchurbil
Beldanga
Karrabad
Santaldih
Binul
Birkulti
Bhendi
Afzalpur
Lachmanpur
Barkola
Parsundih
Tulsipara
Mohidnagar
Husumnagar
Arjunsali
Bindudih
Hosenpur
Belpahari
Gourbazar
Pariharpur
Chhotalia
Chhota Rampur
Nandal
Baradanga
Mahanpur
Shrirampur
Mahishmura
Muktarchandi
Phulberia
Balaram Chak
Patol
Alkusha
JanardansayerThekedanga
Balkunda
Madhai Chak
Sadhna
Radhaballabpur
LahatShyamdih
Lalganj
Pahargora
Parbatpur
Maniddanga
Karrabdih
Paniphala
Palasban
Sidabari
Baradanga
Ashanboni
Rebatijubati
Taldanga
Baradanga
Itapara
Raghunath Chak
Baliapur
Amdiha
Bila
Raniganja
Amtala
Kanskuli
Hansipahari
Achhra
Manhara
Keshurdih
Kirtanmela
Chayanpur
Kansanko
Dabar
Manhara
Dharaspur
Paharpur
Khayerbandh
Kalya
Ketoban
Kadwa
Kalikamali
Kantapahari
Mirzapur
Aliganja
Kijo
Batadang
Gourangdih
Digalpahari
Pachurlo
Chhotkara
Satta
Rangdabhit
Kasbidanga
Alipur
Panuria
Gobindpur
Apisgram
Narsingbandh
Burnpur
Dihika
Shyamdihi
Madandihi
Kiradih
Saldanga
Suryanagar
Mithani
Baradhemo
Bidyanandapur
karanbera
Pathmohona
Ranisar
Bangram
Rangapara
Bandangal
Kuilapur
Jorpara
Damodar
Purushottampur
Dharampur
Nakrasota
Hirapur
Barachak
Gopalpur
Bartoria
Shanrmara
Bara Dighari
Jagatdih
Phatepur
Narsamuda
Santa
Burungdanga
Santalgaon
Kalajhoria
Dhanua
Danga Mohosila
Talkunri
Dipopara
Mohisila Colony
ASANSOL
Ismail
Gurgurpara
Nabaghanti
Baradanga
Barathol
Shyambandh
Rahamatnagar
Nathundih
Mahujuri
Shitala
Dhadka
Petuasalani
Jamdob
Mohisila
Kalla
Naktikanyapur
Kalikapur
Sitarampur
Lachipur
Ramjibanpur
Sudi
Raghunathbati
Ethora
Sarakdih
Ganrui
Marichkota
Angaria
Sitakanyapur
Napara
Madanpur
Bansarakdih
Monoharbahal
Panchgachia
Palashdiha
Nuni
Jayramdanga
Baropukuria
Saragdih
Haripur
Mucchadanga
Sitadanga
Chinchuria
Dhadka
Churulia
Colony
I
.
O
.
C
.
P
I
P
E
L
I
N
E
UnitChakbagakhas
JOREKURI
BELDANGA KHASTEWARI'S -
PALASHTHALIKASTA
PARIHARPUR
KASTA BENGALCOLLIERY
EAST PARSUNDICOLLIERY
AURANG COLLIERY
BARMONDIA
KALIDASPUR
ARDHAGRAM
GOURANGDIH-BEGUNIA(BARREN)
GOURANGDIH
MOHANPURSANGRAMGARH
B H A N O R A
A N D D A M R A
K A L I P A H A R I
G H U S I C K
S R I P U R
D H E MO M A I N
P A T M O H A N A
BELBAID
KRISHNANAGAR
DHANDADIH
BANSRA
EAST SEARSOLECOLLIERY
PARASEA
KENDA AREA
POTTERY COLLIERY
POTTERYMAHABIR
REALRANIGANJCOLLIERY
TOPOSI
KUNUSTORIA
SATGRAM
MITHAPUR
MAHABIR
JEMEHARI
J.K.NAGAR
AMRITNAGAR
NORTH SEARSOLERATIBATI
NIMCHA
KUARDIHI
HARIPUR
KRISHNANAGAR
BAHULA
JAMBAD
LOWER KENDA
NABAKAJORA
NEW KENDA
MADHABPUR
LACHHIPUR
GHANASHYAM
HARIPUR UGP
No.29
Debu Qry.
No.30
Running
No.28
Inc.13
Inc.14
No.27
Gourangdih O.C.P.
No.31
Khoirabad Fire Project Filled-up
Inc.6
Inc.4&5
No.26
Filled-up Filled-upNo.21
No.22 Filled-up
No.23Mohonpur O.C.P.RunningNo.32 No.24
Filled-up
No.19
Inc.(Spl. Seam)
Filled-up
No.20
Inc.
No.17
No.18Inc.
Inc.Inc.
No.15
No.16
No.14
Ranga
No.25
Inc.8
Pit-10
PitPit
Pit-11
Pit-5 Pit-6
Pit-5Pit-6
PitPit-1
Pit-2
Pit-2Pit-1
Pit
Pit
Pit-3
Pit-1Pit-2
Pit
Pit-2Pit-1
Pit-5
Pit
Pit-1
Pit-2
Pit-APit-BPit-C
Pit
Pit-6
Pit-4Pit-5
Pit-6Pit-7
Pit-2
Pit-1
Pit-2 Pit-1
Pit
Pit-1Pit-2
Pit-1Pit-3
Pit-1Pit-2
Pit-3
Pit-2
Pit-2Inc-2
Inc-6Inc-7
Pit-1
Pit-9
Pit-2
Pit-5
Pit-6Pit-3
Inc-2
Inc-6Inc-7
Inc-5
Pit-2
Inc-4
Pit-BPit-A
Inc-6Inc-5Inc-1
Inc-3Inc-4
Inc-7Inc-8
A.S.
Pit-44
Pit-1
Pit-45
Pit-2Pit-3
Pit-1Pit-2
Pit-30
Pit-37Pit-35
Pit-34
Pit-33
Pit-39
Pit-29
Pit-6Pit-1
Pit-3Pit-4
Pit-5
Pit-1Pit-2
Pit-5Pit-15A
Pit-4
Pit-7
Pit-17Pit-16
Pit-5Pit-14Pit-13
Pit-3
Pit-2
Pit-10Inc-2
Pit-1
Pit-11
Inc.-2
Pit-4Pit-5
Pit-1
Pit-4Pit-3
Pit-3
Pit-1Pit-2
Pits
inc.-1
Pit-2
Pit-3
Pit-3
Pit-12Pit-11
Pit-18
Pit-1
Pit-14
Pit-13 Pit-2
Pit-2
Pit-14
Pit-1
Pit-2
Pit-11Pit-12
Pit-1Pit-4
Pit-1pit-2
ASInc.-1
Pit-4
Inc.-2
Pit-1Pit-10
Pit-2
ASAS
ASPit-4
Pit-3Pit-6
Pit-2
Pit-6Pit-4Pit-3 Pit-5
Pit-3
Pit-1Pit-7
Pit-4Pit-2
Pit-7
Pit-7
Pit-4Pit-5
Pit-6
Pit-6
Pit-2
Pit-3Pit-3Pit-2
Pit-1
Pit-7
Pit-8
Pit-3
Pit-4
Pit-6
Pit-7Pit-5Pit-4
Pit-8
Pit-8
Pit-1
Pit-3Pit-4
Pit-8
Pit-5
Pit-3Pit-4
Pit-5
Pit-2
Pit-17Pit-6
pit-3pit-4
pit-1Pit-2Pit-1
Pit-4
Pit-4
Pit-4Pit-5
Pit-1Pit-2
pit-6pit-3
Pit-1Pit-2
Pit-3Pit-1
Pit-10
Pit-11
Pit-7
Pit-2Pit-3
Pit-9
pit-2
Pit-1Pit-2
pit-6
pit-12Pit-11
Pit-1
Pit-8
Pit-7
Pit-4Pit-3Pit-2
Pit-1
Pit-4
Pit-5
Pit-APit-B
Pit-3
Pit-2Pit-1
Pit-5
PIT-1
Running
PITPITPIT
PITINC.
PIT
PIT-2
PITPIT INC. INC.
INC.
PIT
PIT-3PIT-4
PITINC.
PITINC.INC.
PITINC.INC.
PIT
INC.-2PIT-1AS
PIT-2ASINC.
INC.PIT
PIT PIT
PLATE NO.- 2
8
ENVIRONMENTAL STATEMENT OF CLUSTER - 8
Behari
Hirenban
Hambazar
Pagarbari
Dighit
Bagjata
Kukbrakuri
Anandapur
Kesharkund
Bhitargarh
Chandbad
LOCATION OF
MONITORING STATIONS
N I N G H A
G I R M I N T
Kachcha Road
Protected Forest
Reserved Forest
SAND
Built Up
Road (ECL/NH)
Water Bodies
(River, Nala, Dam)
River/Nalah
Permanent Air Station
Pre - monsoon
Post - monsoon
Predominant Wind Direction
during October - March (Post - Monsoon)
Predominant Wind Direction
during April - September
(Pre - Monsoon & Monsoon Period)
8A4
8A5
8A6
8A7
8A8
8A9
8A2
8A1
8A3
Station Code Type of Station Name of StationAIR QUALITY MONITORING STATIONS
8A1 Permanent Air Station Near Bhanora RS8A2
Post monsoon Air Station
In Shivdanga Village8A3 Near Jamuria RS8A4 In Kashinathpur Village8A5 In Ranishayar Village8A6 In Ikra Village8A7 In Baraboni Village
Post monsoon Air StationPost monsoon Air StationPre monsoon Air Station
Station Code Name of Station (Workplace)NOISE SAMPLING STATIONS
8N1 Girmint / K D I UG8N2 Sripur seam Incline UG8N3 Ningha UG
Station Code Mine/Effluent Water StationMINE/ EFFLUENT WATER STATIONS
8MW1 Girmint / K D I UG8MW2 Sripur seam Inline UG
Station Code Location of Dug WellGROUND WATER LEVEL
8GWL1 Dugwell at Paharbera Primary school8GWL2 Dugwell at Baraboni RPF camp8GWL38GWL48GWL5 Dugwell at backside of Jamuria Municipality
Dugwell near Gopalbad village Primary schoolDugwell at Prembazar Village near maszid
8A8 In Gopalbad VillagePre monsoon Air Station8A9 In Prembazar VillagePre monsoon Air Station
Permanent Air StationPermanent Air Station
8N4 Satgram UG
8N18N2
8N4
8N3
8MW38MW4
Ningha UGSatgram UG
8MW18MW2
8MW3
8MW4
8GWL6 Dugwell at Ikra Basanti Bijay High school8GWL7 Dugwell at Ranishayar more near Netai Mahato house8GWL8 Dugwell at Kashinathpur more near Ratibati workshop
8GWL2
8GWL3
8GWL4
8GWL5
8GWL6
8GWL7
8GWL8
8GWL1