1 Environmental Report Gazania Investments 9 EPL3540-March 2014 P.O.Box 98530 1552 Tauben Strasse Hochland Park Windhoek Namibia Phone/fax: 061-248149 ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540 Period- January 2012 December 2013 Prepared by: C. Mutizwa Consulting Geologist P.O Box 5 Kombat Tel: + 264 (0) 67 231011 Namibia Prepared for: Gazania Investment 9 (Pty) Ltd P.O Box 98530 Hochland Park Windhoek Namibia The Permanent Secretary Ministry of Environment and Tourism Private Bag 13306 Windhoek Namibia

ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

1 Environmental Report Gazania Investments 9 EPL3540-March 2014

P.O.Box 98530

1552 Tauben Strasse

Hochland Park

Windhoek

Namibia

Phone/fax: 061-248149

ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540 Period- January 2012 – December 2013 Prepared by: C. Mutizwa Consulting Geologist P.O Box 5 Kombat Tel: + 264 (0) 67 231011 Namibia Prepared for: Gazania Investment 9 (Pty) Ltd P.O Box 98530 Hochland Park Windhoek Namibia The Permanent Secretary Ministry of Environment and Tourism Private Bag 13306 Windhoek Namibia

Page 2: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

2 Environmental Report Gazania Investments 9 EPL3540-March 2014

CONTENTS

1 INTRODUCTION:

2 PREVIOUS ENVIRONMENTAL DAMAGE

3 EXPLORATION AND REHABILITATION

4 DRILLING

5 VEHICLES AND EQUIPMENT

6 POLLUTION AND WASTE

7 HEALTH AND SAFETY

8 ROADS AND TRACKS

9 INFRASTRUCTURAL DEVELOPMENT

10 TRENCHING

11 PROTECTION OF FAUNA AND FLORA

12 FUTURE EXPLORATION, RECOMMENDATIONS

LIST OF FIGURES

Figure 1 – Location of EPL3540, showing the Kombat mining lease excisions as hatched shapes.

Figure 2. An RC drillhole after rehabilitation, Schlangenthal prospect EPL 3540

Figure 3- An RC drillhole 3months after rehabilitation, Schlangenthal prospect EPL 3540

Figure 4-A skid mounted drill rig at Guchab Prospect .EPL 3540

Figure5-An Atlas Copco diamond drill rig at Guchab Prospect, EPL3540

Figure 6-A truck mounted RC drill rig, Schlangenthal Prospect, EPL 3540

Figure 7-Location of EPL 3540 showing main prospects

LIST OF TABLES

Table 1.License Holder Details

Table 2.Farms covered by EPL 3540

Table 3.Current Coordinates of EPL 3540 (Degrees Decimal)

Table 4.Geochemical exploration Programmes [2012- 2012]

Table 5. Exploration Drilling (2012-2013)

Table 6.Vehicles, Equipment type and Quantities

Table 7.Environmental Audit, Schlangenthal

Table 8. Environmental Audi, Guchab

Page 3: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

3 Environmental Report Gazania Investments 9 EPL3540-March 2014

1 INTRODUCTION:

This environmental report covers exploration and rehabilitation work completed by the Company during

the period 2011 to 2013. An Environmental scoping study and an EMP (Environmental Management

Plan) is currently being conducted by an environmental consultant, SLR Environmental Consulting

(Namibia) (Pty) Ltd within the licenses area.

Exclusive Prospecting License (EPL) 3540 was renewed to Gazania Investments Nine (Pty) Ltd on the

30th of October 2013 until the 29

th of October 2015. The EPL was originally issued for the exploration of

base and rare metals industrial minerals and precious stones. The License area is located about 20

kilometres east of Otavi (Figure.1 & 7).

EPL 3540 covers 220 km2 and incorporates the Kombat Copper Trend which follows a major east west

structure associated with high copper anomalies in soils and outcrop.

Figure 1 – Location of EPL3540, showing the Kombat mining lease excisions as hatched shapes.

Page 4: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

4 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 1. License Holder Details Company Name Gazania Investments 9 ( Pty) Ltd

License holder

Gazania Investments 9 ( Pty) Ltd

Address of Company:

1552 Tauben Street Hochland Park Windhoek

Postal Address

P.O B ox 98530 Hochland Park Windhoek

Tel/Fax

067 231002 / 061-248149

Licence Number/Type

EPL 3540

Location

Otavi

Region/Province

Otjozondjupa Region / Grootfontein District

Minerals to be explored

Industrial minerals Base, rare metals and Precious metals

Size

22,220.0 Hectares

Page 5: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

5 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 2 Farms covered by EPL 3540

Farm Name Farm Name

1 Asis Ost 526 19 Farm 517

2 Askevold 316 20 Farm 520

3 Baltika 515 21 Farm 521

4 Block V 656 22 Farm 527

5 Clubhead 747 23 Farm 528

6 Dammbeck 511 24 Farm 530

7 Driehoek 768 25 Farm 651

8 Eggert 806 26 Farm 815

9 Farm 31 27 Frieden 763

10 Farm 332 28 Gaub Pad 759

11 Farm 364 29 Gross Otavi 805

12 Farm 367 30 Johannestal 652

13 Farm 37 31 Kaiserfelden 758

14 Farm 38 32 Otjirukaku 42

15 Farm 380 33 Rietfontein 344

16 Farm 513 34 Sommerau 757

17 Farm 514 35 Sumas West 752

18 Farm 516 36 Uitkomst 41

Page 6: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

6 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 3

Current Coordinates of EPL 3540 (Degrees Decimal)

Latitude

Longitude

Pint

Latitude

Longitude

1

-19.62672369 17.52873575 13 -19.69081473 17.97162495

2 -19.64110474 17.58440515 14 -19.69425035 17.96646541

3 -19,66584811 17.58502166 15 -19.72080143 17.84877507

4 -19.65815316 17.61620617 16 -19.72605814 17.73095311

5 -19.67319720 17.69657137 17 -19.74050874 17.73137767

6 -19.63591091 17.78028497 18 -19.74130017 17.69864979

7 -19.61775549 17.79971508 19 -19.73250413 17.69743108

8 -19.63400894 17.80273505 20 -19.71917667 17.66519881

9 -19.65815271 17.77736728 21 -19.70370367 17.66519922

10 -19.69209991 17.84269088 22 -19.66795286 17.56764195

11 -19.66932517 17.89082547 23 -19.64386174 17.54880588

12 -19.66649194 17.95882796 24 -19.63687083 17.52889456

2 PREVIOUS ENVIRONMENTAL DAMAGE The license area surrounds the Kombat mining area, the Gross Otavi mine and the historic Baltika Mine,

which have seen sustained mining over the last 100 years. The area has also been farmed for around a

century, with much of the landscape cleared of vegetation on the flats. Many of these cleared flats have

since been over-run with weed species of thorn bush. There is no significant damage to the environment

from current and previous exploration or mining activities outside these historic mining centres.

Page 7: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

7 Environmental Report Gazania Investments 9 EPL3540-March 2014

3 EXPLORATION AND REHABILITATION

3.1 Regional and detailed Geochemistry Mapping and sampling programmes were completed on specified grid patterns ranging from 200X50m

grid spacing (reconnaissance sampling) to grids of 100m by 50m and in some instances on a 50m by

20m grid spacing. Soil sampling excavations, which were around 30x30x30cm (hand-held shovel width

and depth), were immediately back filled after sampling.

Table 4.

Geochemical exploration Programmes [2012- 2013]

Description Period/Farms Details Remarks/Geologist

Soil sampling

/geological mapping

Eggert 200X50 pattern,1478

samples on 45 lines

Jan-Feb 2012

R. Kushokosha

Soil sampling

/geological mapping

Breccia Koppie

200X50m pattern,

100X50m,413

sample points on 13

lines

April-May ,2013

T. Weyulu

Soil sampling

/geological mapping

Rendezvous

100X50 pattern,1818

sample from 44 line

February- April2013

R Kushokosha

Soil sampling

/geological mapping

Sommerau 200X50 pattern,371

samples on 28 lines

April-June 2013

H. Nampala

Rock chip assay Guchab/Schlangenthal HXRF In house HXRF assaying

Rock chip assay Guchab/Schlangenthal IP spectroscopy Bureau Veritas Laboratory

Channel sampling Guchab 180 samples

collected in historic

workings

April 2012

Kushokosha

Page 8: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

8 Environmental Report Gazania Investments 9 EPL3540-March 2014

Geophysics

A low level geophysical survey was conducted by contractor Greg Symons Geophysics (Pty) Ltd within

the Guchab area of the License. The survey was a Fixed Loop Transient Electromagnetic (TEM)

geophysical survey completed during the period December 2012 to January 2013.

A gravity survey was undertaken at the end of 2013 over the Guchab, Rodgerberg and Schlangenthal

areas. The survey covered an area of 4km by 2km and contain 2485 points on about 50m stations in an

attempt define the full extent of mineralisation in the area. The survey was non-penetrative and non-

destructive to the environment.

Geophysical surveys are non-destructive and non-pervasive methods which have minimal environmental

impact apart from limited noise pollution during airborne surveys.

4 DRILLING

Reverse Circulation (RC) Drilling

A total of 22 reverse circulation (RC) drill holes were drilled in the Schlangenthal Prospect to follow up on

mineralised intersections identified during the percussion drilling programme (refer to table 10 for hole

location details).

A total of 396 metres of RC drilling was achieved during the July-December period in 2013.

Notification of intention to drill was lodged and approved with the Ministry of Mines and Energy and

drilling was conducted during the second half of 2013. The drilling equipment mobilised for the project is

indicated in Table 7.

Two water boreholes were drilled in 2012 to supply water to the diamond drilling contractor at the Guchab

project and the local farmer. Prior to that water for drilling purposes was transported to the drill site using

a truck mounted water tank. All drillholes were rehabilitated immediately after completion. (Tables 8-9,

Figure1-2)

Page 9: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

9 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 5.

Exploration Drilling- [2012 –July 2013]

Description Area/Farm Details Remarks/Geologist

Diamond drilling Guchab 34 NQ size

drill holes.

Contractor – Metzger Drilling.

Geologist: R. Kushokosha

RC Drilling Schlangenthal 22, drillhole Contractor – Metzger Drilling.

Geologist: T. Weyulu

Percussion ( Water

Boreholes

Schlangenthal/ Guchab 2 drillhole Contractor – Metzger Drilling.

Figure 2. An RC drillhole after rehabilitation, Schlangenthal prospect EPL 3540

Page 10: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

10 Environmental Report Gazania Investments 9 EPL3540-March 2014

Figure 3- An RC drillhole 3months after rehabilitation, Schlangenthal prospect EPL 3540 5 VEHICLES AND EQUIPMENT

A summary of vehicles, exploration equipment used is summarised in table 7 below. Drilling equipment is

shown in figures 4-6.

Table 6.

Vehicles, Equipment type and Quantities

Project

Period

Vehicle Type

Description

Number

Schlangenthal RC drilling

201

Lorries 4x4- 5-10 Ton 2

Drill Rig Skid Mounted 1

Guchab diamond drilling

2012

Pick-up 4x4 2

Portable Diamond Rig

Skid mounted rig 1

Ground Geophysical survey-Border

2011 Pick up 4x4 1

Airborne Geophysical survey

2011 Fixed wing Cessna 1

Page 11: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

11 Environmental Report Gazania Investments 9 EPL3540-March 2014

Figure 4-A skid mounted drill rig at Guchab Prospect EPL 3540

Page 12: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

12 Environmental Report Gazania Investments 9 EPL3540-March 2014

Figure5-An Atlas Copco diamond drill rig at Guchab Prospect, EPL 3540

Figure 6-A truck mounted RC drill rig, Schlangenthal Prospect, EPL 3540

Page 13: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

13 Environmental Report Gazania Investments 9 EPL3540-March 2014

6 POLLUTION AND WASTE

All refuse such as, bottles, tins, paper, and plastic, was collected at drill sites, sealed, and removed from

the prospecting area on a weekly basis and deposited within the Kombat Mine Municipal dump. The

exploration staff and drilling contractors were housed at a camp established 4 km south of Kombat Mine.

Very little domestic refuse was therefore generated near the drilling sites. The license area was left clean

after the drilling exploration programme during the period under review.

7 HEALTH AND SAFETY

All company and contract personnel were equipped with necessary protective wear against dust, noise

and air pollution within.

8 ROADS AND TRACKS

Six kilometres of tracks were constructed within the license area during the drilling programme. Five

kilometres of the tracks used were rehabilitated by raking over. The remaining tracks have not been

rehabilitated and will used during follow-up drilling programmes planned for the second half of 2014.

9 INFRASTRUCTURAL DEVELOPMENT No major infrastructural developments were built within the license area. All drilling contract and

permanent staff were housed in a camp near Kombat Mine.

10 TRENCHING Trenching was not conducted during the period under review. Excavations done during previous

exploration programmes were rehabilitated and back filled.

11 PROTECTION OF FAUNA AND FLORA All Gazania personnel and drilling contractors were given an in house induction course in environmental

protocols and protection of wildlife.

Page 14: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

14 Environmental Report Gazania Investments 9 EPL3540-March 2014

12 FUTURE EXPLORATION, RECOMMENDATIONS

A full EIA (Environmental Impact Assessment) is recommended for the Guchab prospect where a

sufficient resource is likely to be identified. Exploration will be intensified during the upcoming exploration

period in and around the Guchab area to define a JORC compliant mineral resource.

The company has a strict environmental management policy and environmental audits are conducted

during and after completion of any major exploration or drilling programme. (Tables 7-8).

Recommendations from the environmental consultant will be considered during all exploration phases

Page 15: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

15 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 7.

Rehabilitation Audit, Schlangenthal

Date: 18/12/2013

Prospect:

EPL 3540 Schlangenthal

Immediately after drilling completed 6 months after Drilling Completed

Hole ID Date Drilled Northing Easting Hole Depth (m)

Rubbish Removed

Contaminated Soil Removed

Collar Cut 50cm below surface

Hole Plug Buried & Soil Mounded

Sample Bags/Drill Spoil Removed

Access Tracks & Drill site Rehab Y/N

SCDD0001 30/07/2013 7818757 794644 49.50 Y Y Y Y Y Y

SCDD0002 5/08/2013 7818735 794661 72.00 Y Y Y Y Y Y

SCRC0020 3/06/2013 7818143 794444 18.00 Y Y Y Y Y Y

SCRC0021 3/06/2013 7818075 794484 18.00 Y Y Y Y Y Y

SCRC0022 3/06/2013 7818000 794523 18.00 Y Y Y Y Y Y

SCRC0023 3/06/2013 7817937 794562 18.00 Y Y Y Y Y Y

SCRC0024 3/06/2013 7817867 794600 18.00 Y Y Y Y Y Y

SCRC0025 3/06/2013 7817797 794644 18.00 Y Y Y Y Y Y

SCRC0026 4/06/2013 7818101 794370 18.00 Y Y Y Y Y Y

SCRC0027 4/06/2013 7818030 794414 18.00 Y Y Y Y Y Y

SCRC0028 4/06/2013 7817967 794455 18.00 Y Y Y Y Y Y

SCRC0029 4/06/2013 7817895 794494 18.00 Y Y Y Y Y Y

SCRC0030 4/06/2013 7817831 794534 18.00 Y Y Y Y Y Y

SCRC0031 5/06/2013 7817826 794442 18.00 Y Y Y Y Y Y

SCRC0032 5/06/2013 7817894 794404 18.00 Y Y Y Y Y Y

SCRC0033 5/06/2013 7817961 794357 18.00 Y Y Y Y Y Y

SCRC0034 5/06/2013 7818025 794320 18.00 Y Y Y Y Y Y

SCRC0035 7/06/2013 7818355 794785 72.00 Y Y Y Y Y Y

SCRC0036 7/06/2013 7818402 794846 40.00 Y Y Y Y Y Y

SCRC0037 10/06/2013 7818353 794921 72.00 Y Y Y Y Y Y

SCRC0038 11/06/2013 7818218 794494 72.00 Y Y Y Y Y Y

SCRC0039 12/06/2013 7818380 794865 72.00 Y Y Y Y Y Y

SCRC0040 12/06/2013 7818467 794949 72.00 Y Y Y Y Y Y

SCRC0041 13/06/2013 7818248 794885 72.00 Y Y Y Y Y Y

SCRC0042 16/06/2013 7818337 794790 120.00 Y Y Y Y Y Y

SCRC0043 19/06/2013 7818403 794665 72.00 Y Y Y Y Y Y

SCRC0044 20/06/2013 7818327 794708 78.00 Y Y Y Y Y Y

SCRC0045 21/06/2013 7818302 794726 120.00 Y Y Y Y Y Y

Page 16: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

16 Environmental Report Gazania Investments 9 EPL3540-March 2014

Table 8 Rehabilitation Audit, Guchab

REHABILITATION AUDIT

Date: 18/12/2013

Prospect: EPL 3540 Guchab

Immediately after drilling completed 6 months after Drilling Completed

Hole ID Date Drilled Northing Easting Hole Depth (m)

Rubbish Removed

Contaminated Soil Removed

Collar Cut 50cm below surface

Hole Plug Buried & Soil Mounded

Sample Bags/Drill Spoil Removed

Access Tracks & Drill site Rehab Y/N

GCDD0013 17/01/2013 7818055 796072.01 80.1 Y Y Y Y Y N

GCDD0014 23/01/2013 7818055 796071.65 86.89 Y Y Y Y Y N

GCDD0015 24/01/2013 7818054 796071.42 90.39 Y Y Y Y Y N

GCDD0016 13/02/2013 7818052 796071.15 110.96 Y Y Y Y Y N

GCDD0017 23/02/2013 7818052 796071.04 159.36 Y Y Y Y Y N

GCDD0018 6/03/2013 7818052 796070.9 132.47 Y Y Y Y Y N

GCDD0019 15/03/2013 7818051 796070.68 153.21 Y Y Y Y Y N

GCDD0020 3/04/2013 7818052 796070.7 149.99 Y Y Y Y Y N

GCDD0021 12/04/2013 7818055 796070.59 120.34 Y Y Y Y Y N

GCDD0022 20/04/2013 7818055 796070.52 120.09 Y Y Y Y Y N

GCDD0023 2/05/2013 7818054 796070.65 120.39 Y Y Y Y Y N

GCDD0024 5/04/2013 7818051 796070.76 59.09 Y Y Y Y Y N

GCDD0025 7/05/2013 7818052 796070.56 144.33 Y Y Y Y Y N

GCDD0026 27/05/2013 7818052 796070.5 129.45 Y Y Y Y Y N

GCDD0027 3/06/2013 7818107 796083.1 38.64 Y Y Y Y Y N

GCDD0028 7/06/2013 7818110 796083.5 50.84 Y Y Y Y Y N

GCDD0029 9/06/2013 7818111 796081.7 41.69 Y Y Y Y Y N

GCDD0030 11/06/2013 7818112 796080.4 44.79 Y Y Y Y Y Y

GCDD0031 13/06/2013 7818113 796077.14 59.76 Y Y Y Y Y Y

GCDD0032 15/06/2013 7818110 796077.38 62.93 Y Y Y Y Y Y

GCDD0033 17/06/2013 7818107 796080.06 30.45 Y Y Y Y Y Y

GCDD0034 20/06/2013 7818110 796081 80.84 Y Y Y Y Y Y

GCDD0035 21/06/2013 7818110 796080.07 50 Y Y Y Y Y Y

GCDD0036 25/06/2013 7818109 796079.95 93.39 Y Y Y Y Y Y

GCDD0037 8/07/2013 7818222 795946 62.75 Y Y Y Y Y Y

GCDD0038 11/07/2013 7818221 795946 81.42 Y Y Y Y Y Y

GCDD0039 31/07/2013 7818189 795961 106.99 Y Y Y Y Y Y

GCDD0040 5/08/2013 7818187 795959.4 119.99 Y Y Y Y Y Y

GCDD0041 19/08/2013 7818140 796006 109.79 Y Y Y Y Y Y

GCDD0042 27/08/2013 7818139 796004.9 140.09 Y Y Y Y Y Y

GCDD0043 16/08/2013 7817911 796095 100.2 Y Y Y Y Y Y

GCDD0044 29/08/2013 7817911 796094.8 81.4 Y Y Y Y Y Y

GCDD0045 10/09/2013 7818156 796053 204.86 Y Y Y Y Y Y

GCDD0046 12/10/2013 7817912 796094.3 160.05 Y Y Y Y Y Y

GCDD0047 8/09/2013 7817911 796095 90.35 Y Y Y Y Y Y

GCDD0048 15/09/2013 7817910 796095.5 90.2 Y Y Y Y Y Y

GCDD0049 10/11/2013 7817907 796097.3 199.2 Y Y Y Y Y Y

GCDD0050 20/11/2013 7817939 796113 129.3 Y Y Y Y Y Y

GCDD0051 28/11/2013 7817938 796113.6 142.8 Y Y Y Y Y Y

GCDD0052 2/12/2013 7817937 796113.9 66.5 Y Y Y Y Y Y

GCDD0053 20/11/2013 7818254 795905.9 71.59 Y Y Y Y Y Y

GCDD0054 23/11/2013 7818252 795908.1 44.47 Y Y Y Y Y Y

GCDD0055 5/12/2013 7818251 795907.7 99.09 Y Y Y Y Y Y

GCDD0056 12/12/2013 7818252 795907.25 160 Y Y Y Y Y Y

Page 17: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

17 Environmental Report Gazania Investments 9 EPL3540-March 2014

Figure 7-Location of EPL 3540 showing main prospects

Page 18: ENVIRONMENTAL REPORT BI-ANNUAL REPORT FOR EPL 3540eia.met.gov.na/screening/899_environmental_report_epl_3540.pdf · BI-ANNUAL REPORT FOR EPL 3540 ... Figure5-An Atlas Copco diamond

18 Environmental Report Gazania Investments 9 EPL3540-March 2014