Environmental Monitoring Results
This report has been submitted to ADB by KEPCO-SPC Power Corporation and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.
Loan number: 2612/7303 3rd Quarter of 2010
PHI: Visayas Base-Load Power Development Project
Prepared by KSPC Power Plant Construction Office
Philippines
For the Asian Development Bank
2 x 100 MW CEBU POWER PLANT
2010.10
KSPC Power Plant Construction Office
Environmental Monitoring Results (3
rd Quarter of 2010)
2 x 100 MW Cebu Power Plant
1
Environmental Monitoring Results
Table of Contents
I. Results of Environmental Monitoring covering the 3rd Quarter of 2010
Attachments
Attachment 1 - Certificate of Monitoring Results/Monitoring
Report conducted last September 2010 Attachment 2 - Monitoring Stations Attachment 3 - Construction Progress Photos
2 x 100 MW Cebu Power Plant
2
Environmental Monitoring Results
I. Results of Environmental Monitoring covering the 3rd Quarter of 2010
The monitoring results shown in Tables 1 to 5 covers the coverage period from July to September 2010 (3rd quarter of 2010). Basically, the environmental monitoring comprises of 3 major analyses: 1) Ambient Air (premises near the site & construction site itself), 2) Marine Water, and 3) Groundwater. 1.1. Ambient Air Monitoring (premises near the site and construction site
itself) The monitoring stations for this quarter were based on the monitoring stations of the EIS which are also those used in KSPC’s MMT Baseline Monitoring Activity. Ambient Air monitoring covers 7 monitoring stations near the construction site premises, particularly within Barangay Colon and Barangay Tangke. Five (5) parameters are being monitored (refer to Table 1). Based on the results, there were no exceedences observed with reference to DAO 14. Noise levels now don’t exceed the standard given by the National Pollution Control Commission (NPCC) compared to the previous quarter. The noise levels were however high, attributable to the construction and commissioning works near these areas, increasing vehicles passing the national road and full operations of the SPC power plant. The Total Suspended Particles (TSP) at Station 4 is also evident attributable to vehicle emissions since this station is near the National Road and public pavements. Tables 2 & 3 show the monitoring results for the TSP and Noise analyses at the Construction Site. Based on the results, there has been no exceedence observed.
1.2. Marine Water Quality Monitoring Table 4 shows the monitoring results of the marine water quality. Five (5) stations were used for this monitoring with eighteen (18) parameters analyzed. Generally, the monitoring results indicate that there have been no adverse impacts to the receiving environment. Most parameters fall within acceptable standards set by DAO 34 (Water Class SC). Furthermore, most of the current data falls around the same range to those of the previous quarters’ results including that of the MMT Baseline Monitoring Activity. The previously increasing COD values of all stations dropped this quarter though there is no prescribed standard. It is important to note that all data
2 x 100 MW Cebu Power Plant
3
Environmental Monitoring Results
gathered will be used as baseline reference for the monitoring during the operations phase of the power plant.
1.3. Groundwater Analysis Table 5 shows the monitoring results for the groundwater analysis. Four (4) stations were used for this monitoring with nineteen (19) parameters analyzed. Generally, the monitoring results indicate that groundwater stations tested are still within acceptable levels. Though some of the results are not within the standards, they are all within the range and trend of the baseline data from the EIS, the MMT, and previous monitoring results. To be noted is the Dissolved Oxygen (DO) level of the North Poblacion Deep Well station. The monitoring result indicates that the DO level is below that of the given minimum value of DENR but consistent with the baseline data showing that no significant impact was made. Supplementary to this, the Coliform level is also high indicating that this station has high bacteria thus, a high aerobic activity. All Biochemical Oxygen Demand (BOD5) values of the four stations are high and off the given standard. All except Barangay Tangke and Barangay North Poblacion stations (both exhibited their highest BOD5 values) are within the background values. The results indicate that there is also high bacterial activity in the stations, thus it is recommended that these stations be not used for drinking. The Total Dissolved Solids (TDS) levels are high compared to the standard which could have an effect on the taste of the ground water but the values are well within the baseline while the previously high value in Barangay Tangke Station dropped this quarter. This is again, as mentioned in the previous reports, attributable to the natural background of the area and the increasing temperature in this season causing increases in solubility. For the chloride levels, results are within the standard limits and MMT Baseline data range or lower.
2 x 100 MW Cebu Power Plant
4
Environmental Monitoring Results
II. Construction Progress
As of September 30, 2010, the total progress of the Cebu Power Plant project is 95.80%. Below is a table showing the breakdown of the progress rate in terms of the project’s components.
Project Component Weighted Average Actual Completion Completion Rate
(%)
Engineering 11.49 11.49 100.00
Procurement 52.65 52.65 100.00
Construction 25.16 24.53 97.50
Commissioning 10.70 7.13 66.64
TOTAL 100 95.80 95.80
III. Conclusions
Based on the environmental monitoring on the three aspects, namely, 1) Ambient Air, 2) Marine Water and 3) Groundwater, the 2x100 MW Cebu Power Plant Project has not caused any adverse or detrimental effect to the nearby surroundings. The findings in this report will be discussed in KSPC’s Multi-Partite Monitoring Team (MMT) and due recommendations will be made. It must be noted that the power plant has not yet operated so the data gathered at this part of the project, is useful as reference and baseline data for the operations period. The more results obtained, the clearer the baseline data is defined.
For the certificate of the analyses, refer to Attachment 1. For the mapping of the monitoring stations refer to Attachment 2. For the Construction Progress Photos refer to Attachment 3.
Table 1. AMBIENT AIR QUALITY (2010 2nd Quarter Monitoring Period)
Station/Location
PARAMETERS
Observations during sampling TSP,
µg/Ncm
SO2,
µg/Ncm
NO2,
µg/Ncm
Noise,
dBA
CO,
ppm
Station 1 Brgy. Tangke,
Basketball Court 22 <0.01 <0.01 71.9 0
� Time: 01:40-02:10 PM
� Wind Direction: SE to NW
� No significant activities observed
Station 2 Sitio Lower Colon,
front of Brgy. Hall 10 <0.01 <0.01 73.31 0
� Time: 02:30-03:00 PM
� Wind Direction: SE to NW
� No significant acitivities observed
Station 3 Brgy. Colon
front of Nestor Cadia Res. 28 <0.01 3 69.5 0
� Time: 09:52-10:22 AM
� Wind Direction: SW to NE
� People were observed passing by
Station 4 Along National Road
cor., Alinganga St., Near
Perimeter Fence of SPC Power
Corp.
234 <0.01 1 72.8 0
� Time: 09:45-10:15 PM
� Wind Direction: NE to SW
� Muddy area with approximately 16
vehicles that passed
Station 5 Naga Municipal Hall,
Plaza Area 19 <0.01 <0.01 70.1 0
� Time: 11:40-12:10 Noon
� Wind Direction: SE to NW
� No significant activities observed
Station 6 construction site,
near Pier Area 22 <0.01 <0.01 68.3 0
� Time: 01:05-01:35 PM
� Wind Direction: NE to SW
� Muddy area; some workers passing by
Station 7 Infront of Mangikis
Chapel, Sition Mangikis 44 <0.01 <0.01 699.8 0
� Time: 10:55-11:25 AM
� Wind Direction: NE to SW
� A few people passing by
Minimum Detection Limit 1 <0.01 <0.01 - 0
DENR Standard (DAO 14) 300 340 260 75
(Category D) 30
Table 2. Dust Emissions at Construction Site (2010 2nd
Quarter Monitoring Period)
Location Total Suspended
Particulate (TSP),
µg/NCM
Near Guard House/Main Gate 44
Near Administration Building 32
Left side of the plant near the Fire Fighting Pump
House 22
Back of the site near the Stack 10
DENR Standard 300
Table 3. Noise Measurements at Construction Site (2010 2nd
Quarter Monitoring Period)
Location Noise Reading,
dBA
Near Main Guard House 69.9
Left side approx. 100 m from National Road 71.3
Left side center near the fuel tank 74.1
Back left side near the perimeter fence 72.0
Center back near shoreline 70.6
Back side near shoreline and perimeter fence 59.4
Right side near office 70.7
DENR Standard (NPCC Standard, Category D) 75
Table 4. MARINE WATER QUALITY (2010 2nd
Quarter Monitoring Period)
Station/Location
PARAMETERS
pH Color
(Apparent), PCU
DO,
mg/L
BOD5,
mg/L
COD,
mg/L
TSS,
mg/L
Oil & Grease,
mg/L
TDS,
mg/L
Stn 1 Front of City Hall 8.1 2 7 4 107 54 <1 37,370
Stn 2 Front of North
Poblacion 8.2 2 7 2 136 52 <1 38,380
Stn 3 Front of Const.
Site 8.1 1 7 3 116 12 <1 39,720
Stn 4 Front of Colon
Elem. School 8.1 2 8 2 136 42 <1 36,850
Stn 5 Front of Tuyan 7.9 2 7 4 127 47 <1 38,061
DENR Standard
(DAO 34 – SC) 6.0-8.5 - 5 (min) 7 (max) - Baseline +30 3 -
Continuation…
Station/Location
PARAMETERS
Total coliform,
MPN/100mL
Cr+6
,
mg/mL
Turbidity,
NTU
Cyanide (CN),
mg/L
SO4,
mg/L
Lead(Pb),
mg/L
Iron (Fe),
mg/L
Manganese
(Mn), mg/L
Stn 1 Front of City Hall >8.0 0.011 1.1 <0.05 2,599 <0.01 <0.02 <0.003
Stn 2 Front of North
Poblacion 4.6 <0.002 0.6 <0.05 2,616 <0.01 <0.02 <0.003
Stn 3 Front of Const.
Site 8.0 <0.002 1.2 <0.05 2,619 <0.01 <0.02 <0.003
Stn 4 Front of Colon
Elem. School 1.1 0.005 1.0 <0.05 2,591 <0.01 <0.02 <0.003
Stn 5 Front of Tuyan >8.0 0.005 1.1 <0.05 2,596 <0.01 <0.02 <0.003
DENR Standard
(DAO 34 – SC) 5000 0.1 - 0.05 - 0.05 - -
Table 4. Continuation…
Station/Location
PARAMETERS
Mercury
(Hg), mg/L
NO3-N,
mg/L
Stn 1 Front of City Hall <0.0001 <0.01
Stn 2 Front of North
Poblacion <0.0001 <0.01
Stn 3 Front of Const.
Site <0.0001 <0.01
Stn 4 Front of Colon
Elem. School <0.0001 <0.01
Stn 5 Front of Tuyan <0.0001 <0.01
DENR Standard
(DAO 34 – SC) 0.002 -
Table 5. Groundwater Analysis (2010 2nd
Quarter Monitoring Period)
Station/Location
PARAMETERS
pH
Color
(Apparent),
PCU
DO,
mg/L
BOD5,
mg/L
COD,
mg/L
TSS,
mg/L
Oil & Grease,
mg/L
TDS,
mg/L
Brgy. Colon Near Brgy. Hall 7.0 1 6 3 <9 2 <1 687
Deep Well - Upper Colon 7.0 1 7 7 <9 <1 <1 590
Brgy. Tangke Deep Well 7.2 1 8 6 <9 1 <1 731
North Poblaction Deep Well 7.1 2 2 6 10 1 <1 587
PNSWD, ‘07 6.5-8.5 10 - - - - Nil 500
DAO 34 (Class AA) 6.5-8.5 15 5 (min) 1 - 25 Nil 500 Continuation…
Station/Location
PARAMETERS
Total coliform,
MPN/100mL
Cr+6
,
mg/mL
Turbidity,
NTU
Cyanide (CN),
mg/L
SO4,
mg/L
Lead(Pb),
mg/L
Iron (Fe),
mg/L
Manganese
(Mn), mg/L
Brgy. Colon Near Brgy. Hall >8.0 <0.002 0.9 <0.05 55 <0.01 <0.02 <0.003
Deep Well - Upper Colon <1.1 0.006 0.6 <0.05 44 <0.01 <0.02 <0.003
Brgy. Tangke Deep Well <1.1 0.005 0.7 <0.05 21 <0.01 <0.02 <0.003
North Poblaction Deep Well >8.0 0.002 1.2 <0.05 86 <0.01 0.05 0.026
PNSWD, ‘07 1.1 0.05 5 0.07 250 0.01 1 0.4
DAO 34 (Class AA) 50 0.05 - 0.05 - 0.5 - - Continuation…
Station/Location
PARAMETERS
Mercury (Hg),
mg/L
NO3-N,
mg/L
Chloride,
mg/L
Brgy. Colon Near Brgy. Hall <0.0001 3.58 115.3
Deep Well - Upper Colon <0.0001 4.12 86.2
Brgy. Tangke Deep Well <0.0001 4.67 40.2
North Poblaction Deep Well <0.0001 <0.01 152.8
PNSWD, ‘07 0.001 50 250
DAO 34 (Class AA) 0.002 - 250
2 x 100 MW CEBU POWER PLANT
2010.07
KSPC Power Plant Construction Office
Certificate of Analysis / Monitoring Report
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 343-6472 Fax No. (032) 343-6472 Email: [email protected]
DOOSAN HEAVY INDUSTRIES CONSTRUCTION 2 X 100 MW CEBU POWER PLANT PROJECT
SPC Compound, Colon, Naga City, Cebu
Project Owner: KEPCO SPC POWER CORP.
Ambient Air/ Marine Water/ Groundwater/ Soil Testing/ Dust & Noise Measurement report
(September 8-9, 2010)
Prepared by:
Ostrea 4If.~Ories, Inc. 342 V. Albano St., Mandaue City
Cebu Tell Fax: (032) 3436472
Certificate of Analysis No. 2010- 0745-C, 0746C, 0747C, 0748C, 0751C & 0752C
I I
I I
I !
I i· I·
i·
I I. 1
00
I I· I I, I I· I' I
j 1
0
i .
i ~~~~j
OSTIiE~ mlnEM~ ~~ecFt~mS, nc.
342 V. Albano St., Balikid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
1. INTRODUCTION
DOOSAN REA VY INDUSTRIES CONSTRUCTION CO. LTD. COMMISIONED OSTREA MINERAL
LABORATORIES INC. to undertake sampling and analysis for marine water, soil, ground water, ambient air, dust and noise measurements on September 6 - 7, 20lO. Sampling was conducted outside and within the vicinity of the on-going construction of a 2 x 100 MW Cebu Power Plant Project owned by KEPCO SPC POWER CORPORATION.
This report presents the results of marine water, soil, ground water, ambient air monitoring, dust and noise measurement and the procedure used for each tests.
2. OBJECTIVE OF THE MONITORING
The monitoring was conducted to check compliance with the standards set in the Department of Environment and Natural Resources Administrative Order No. 2000-81 (Implementing Rules & Regulations of the Philippine Clean Air Act of 1999), DAO 34 & 35 and the PhIl. NatIOnal Standards for Dririking Water of2007.
3. METHODOLOGY
The methods of sampling and analysis for Marine Water, Soil & Ground Water are indicated in the individual certificates of analysis while methods for ambient air, noise & dust are shown below. Total Suspended Particulate (TSP) and Sulfur Dioxide (S02) were based on the United States Environment Protection Agency (USEPA) Methods while Nitrogen Dioxide (N02) was based on the Methods for Air Sampling & Analysis 3rd Ed. Carbon Monoxide (CO) and Noise were measured by direct reading apparatus.
Table 1 Method of Sampling and Analysis
Pollutant Sampling and Analysis Procedures Total Suspended Particulate High Volume - Gravimetric; USEPA Appendix B Part 50 Sulfur Dioxide (S02) Gas Bubbler - Pararosaniline; USEP A Appendix A Part 50 Nitrogen Dioxide (N02) Gas Bubbler - Griess Saltzmann Noise Direct Reading -Sound Level Meter
I Carbon Monoxide (CO) Direct Reading - Using Electrochemical Sensors
Certificate of Analysis No. 20lO-0745C, 0746C, 0747C, 0748C, 0751C & 0752C 1
I
I I
I. I I I
1
I \
r I 1
i
I' I !
I -)
QSTriE~ mnEm~ ~~~~TRS,nC.
342 V. Albano St., Balikid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
4. RESULTS AND EVALUATION
As shown below, ambient air results meet the maximum allowable limit set by the National Ambient Air Quality Standards for Source Specific Air Pollutants from Industrial Sources / Operations of the Department of Environment and Natural Resources Administrative Order No. 2000-81 (Implementing Rules and Regulations of the Philippine Clean Air Act of 1999). Dust results are within the standards, while one station for noise is above the limit.
The laboratory test report, record of measurement sampling pictures, QAlQC & test partIcIpatIon are presente d' Ann A, B C dD III ex , , an respectIvely.
Table 2 Test Data Results Ambient Air Results
NOTE: Figures in red shows exceedance
I Station I Location TSP, SOz, NOz, Noise, CO, ppm f.tg/Ncm f.tg/Ncm f.tg/Ncm dBA
Station 1 Brgy. Tangke, 22 <0 () 1 <() () 1 71 0 ()
oaSKeWaU ,-,oun Station 2 Sitio Lower Colon- 10 <0.01 <0.01 73.31 0 Brgy. Hall Station 3 Brgy Colon(upper)-
28 <0.01 3 69.5 0 front of Nestor Cadia Res. Station 4 Along National Road cor., Aliganga St., Near 234 <0.01 1 72.8 0 perimeter fence of SPC
Station 5 Naga Municipal Hall, 19 <0.01 <0.01 70.1 0 Plaza Area
Station 6 Construction site, near 22 <0.01 <0.01 68.3 pier area
0
Station 7 Infront of Mangkikis 44 <0.01 <0.01 69.8 0 Chapel, Sitio Mangkikis
Minimum Detection Limit 1 <0.01 <0.01 - 0
DENR Standard DAO 14 300 340 260 *75 30
Note: * Category D- a section which primarily reserved as heavy industrial area, for day time standard.
Certificate of Analysis No. 2010-0745C, 0746C, 0747C, 0748C, 0751C & 0752C I
2
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032)343-6472
Table 3 - Dust Emission Construction Site
Note: figure in red showexceedance
Location Total Suspended Particulate ( TSP),
ug/Ncm
Near Guard Housel Main Gate 44
Near Admin Bldg. 32
Near Gen. Stockyard 22
Left side ofthe Plant near Ash Pond 10
DENR Standard 300
Method Gravimetric USEPA-CFR 40 Part 50 App.
B
Table 4 - Noise Measurements Construction Site
Location Noise Reading, dBA
Near Main guardhouse 69.9
Left side near approx. 100 m. from the Nat'l. road 71.3
Left side center near fuel tank 74.1
Back left side near perimeter fence 72.0
Center back, near shoreline 70.6
Back right side near shoreline & perimeter fence 59.4
Right side center near office 70.7
DENR Standard, DAD 14 75.0
Method Direct reading- Sound Level Meter
NOTE: * Category D- a section which is primarily reserved as a heavy industrial area, for daytime standard.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
I
I.
! ,.
I
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
ANNEXA
LABORATORY TEST CERTIFICATE
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
i
i
I
I
I
I I'
I
I I' i: , i I'
I I I' I. I' i'
I'; I
! J:
(
OST~~~ ml~~~~l.l.~~O~~TO~I~S,I~O. Assaying and Environmental Testing Specialist
342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I DATE
R.A. NO.
N~ 2010-0751-C
September 16, 2010
31485 DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD 2 X 100 MW Cebu PoVtler Plant Project
SPC Compound Naga City, Cebu INVOICE NO.
L Owner: KEPCO SPC PoVtler Corp. ..J PAGE __ OF_2_PAGES
CERTIFICATE OF ANALYSIS
Date Sampled Date Received Date Analyzed
pH Color (Apparent), PCU DO, mg/L
BODt" mgIL
COD, mglL TSS,mg/L
Oil & Grease, mgIL
TDS,mgIL Total Coliform, MPN/100mL Fecal Coliform, MPNnoomL
September 06, 2010 September 06, 2010 September 06 - 14, 2010
Marine Water Station 1:
Front of City Halll-'Iaza 10:45 AM
8.1 2 7
4
107 54
<1
37370 >8.0 <1.1
Chromium Hexa (Cr'l), mg/L 0.011 "Turbidity, NTU 1.1 'Cyanide (CN), mg/L <0.05 "Sulfate (So.f2), mg/L 2599 "Lead (Pb), mg/L <0.01 "Iron (Fe), mg/L <0.02 "Manganese (Mn), mg/L <0.003 "Mercury (HQ), mg/L <0.0001 "Nitrate (NOJ-N), mg/L <0.01 Note: (g) - Not more !han 30 mg/L increase. "Analyzed by OMU-Laguna.
Marine Water Marine Water Station 2: Station 3: Table 3-
Front of North Construction DA034 t"'OOlaClon :site tl-'rer Area) GlassSG 11:03AM 11:15AM
8.2 8.1 6.0-8.5 2 1 -7 7 5 (min.)
2 3 7 (max)
136 116 -52 12 (g)
<1 <1 3
38380 39720 -4.6 8.0 5000 <1.1 <1.1 -
<0.002 <0.002 0.1 0.6 1.2 -
<0.05 <0.05 0.05 2616 2619 -<0.01 <0.01 0.05 <0.02 <0.02 -<0.003 <0.003 --<0.0001 <0.0001 0.002 <0.01 <0.01 -
....OVER-
Method
Glass Electrode Visual Comoarison
lodometric Azide Modification (dilution techniQUe)
Dichromate-Open Reflux Gravimetric (dried @ 103-1 Q50C)
Gravimetric (Petroleum Ether Extraction) Gravimetric (dried @ 10ace)
MuHiple Tube Fermentation Technique
DiDhenvlcarbazide Nephelometric
SPeCIfic Ion Electrode Gravimetric Flame-MS Flame-MS Flame-MS
Cold Vapor-MS Brucine Sulfate
,0-
ANALYTICAL METHODIREMARKS: ~~"V
CERTIFIED BY: ~nila Adarna Ref. standard Methods for the Examination
~, of Water & Wastewater, 20lh Ed.
TOTAL SAMPLES 5 TOTAL ANALYSIS 90 NOTED BY: therine E. 0
N.D.= Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES. INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT. THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
~ A DENR-recognized ~! Environmental Laboratory for ~l .. ~ Department of Health analytical performance, 1,1. )' ~ 0
documentation, and ~ ~~.~.iJ Certified Laboratory related technical capability. ~ltl)a;~'!>')'t'
)
(
QSil1~~ mln~I1~~ ~~~QI1~iQI1I~S,lnC. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 X 100 MW Cebu Power Plant Project SPC Compound Naga City, Cebu
L Owner: KEPCO SPC PoVtfer Corp. -.J
DATE
R.A.NO.
September 16, 2010
31485
INVOICE NO.
PAGE_2_0F_2_PAGES
N? 2010-0751-C
CERTIFICATE OF ANALYSIS
D t S led ae amp b 06 2010 ;:,eptem er , Date Received September 06, 2010
Date Analyzed September 06 -14,2010
Marine Water Marine Water Station 4: Station 5: Table 3-Lower Kayam In; .. ~fT, n ,,,..,.
(Front of Colon ,~ .. ,~ .U.1~ un",," ... CIIIVU
Elem. School) Elem. School ClassSC
11:30 AM 11:39AM
pH 8.1 7.9 6.0-8.5 Glass Electrode Color (Apparent), PCU 2 2 -- Visual Comparison DO,mglL 8 7 5 (min.) lodometric BOD5, mg/L 2 4 7 (max) Azide Modification (dilution technique) COD, mg/L 136 127 -- Dichromate - Ooen Reflux TSS, mg/L 42 47 (g) Gravimetric (dried ®. 103-1 Q50C) Oil & Grease, mglL <1 <1 3 Gravimetric (Petroleum Ether Extraction) TDS, mg/L 36850 38061 - Gravimetric (dried ®. 1Q8OC) Total Coliform, MPN/100mL 1.1 >8.0 5000 Multiple Tube Fermentation Technique Fecal Coliform MPN/100mL <1.1 <1.1 --Chromium Hexa (Cre) mglL O.OOS 0.005 0.1 Diphenvlcarbazide "Turbidity, NTU 1.0 1.1 -- Nephelometric "Cyanide (CN), mglL <0.05 <0.05 0.05 Soecific Ion Electrode ·Sulfate (S04·2), mQIL 2591 2596 -- Gravimetric ·Lead (Pb), mg/L <0.01 <0.01 0.05 Flame-AAS "Iron (Fe), mglL <0.02 <0.02 -- Flame-AAS ·Manganese (Mn), mg/L <0.003 <0.003 -- Flame-AAS ·Mercury (HQ), mg/L <0.0001 <0.0001 0.002 Cold Vaoor-AAS "Nnrate (N03-N), mg/L <0.01 <0.01 -- Brucine Sulfate Note: (g) - Not more than 30 mQlt increase. - NOTHING FOLLOWS-"Analyzed by OMU-Laguna. The test results pertain only to Ihe samples sampled by OMLI Staff.
n ." A -: LA ~ U" /j ",IRA:
ANALYTICAL METHODIREMARKS: CERTIFIED BY: ~ila N Adarna Ref. Standard Methods for the Examination
~ of Water & Wastewater, 20lh Ed.
TOTAL SAMPLES 5 TOTAL ANALYSIS 95 NOTED BY: Ca herine E. Rave 0
N.D.: Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
~ A DENR-recognized ~fAC/Li~
....... 0:. .. - ,:~oJi Environmental Laboratory for f'<jft ""~ ~ analytical performance, '6::t .J'~ ~l ~; ~ Department of Health documentation, and ~~"!>i Certified Laboratory related technical capability. :"Jo\< ",",;,</'
ns .... s1:\
..
)
(
QSTr1E~ mlnEr1~~ ~~~Qr1~TQr1IES,lnO. Assaying and Environmental Testing Specialist
342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I
L
DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD 2 X 100 MW Cebu Power Plant Project
SPC Compound Naga City, Cebu Owner: KEPCO SPC Power Corp.
DATE
R.A.NO.
INVOICE NO.
September 16, 2010
31485
PAGE __ OF_2_PAGES
N~ 2010-0752-C
CERTIFICATE OF ANALYSIS
Date Sampled Dale Received Date Analyzed
September 06,2010 September 06,2010 September 06 - 14, 2010
Brgy. Colon Deepwell
{Near tsrgy .. Hall) Lower Colon
pH 7.0 Color (Apparent), PCU 1 DO mg/L 6 BODs, mglL 3 COD, mg/L <9 TSS, mg/L 2 Oil & Grease, mglL <1 TOS, mg/L 687 Total Coliform MPNI1 OOmL >8.0 Fecal Coliform, MPN/100mL <1.1 Chromium Hexa (Cr-s), mglL <0.002 Chloride (CI). mg/l 115.3 'Turbidity, NTU 0.9 *Cyanide (CN), mglL <0.05 'Sulfate (S04·2), mglL 55 'Lead (Pb), mglL <0.01 "Iron (Fe), mg/L <0.02 *Manganese (Mn), mglL <0.003 *Mercury (Hg), mglL <0.0001 "Nitrate (NOs-N), mglL 3.58 "Analyzed by OMU-Laguna.
ANALYTICAL METHODIREMARKS: Ref. Standard Methods for the Examination of Water & Wastewater, 20th Ed.
Deepwell Brgy. upper L:OlOn
7.0 1 7 7
<9 <1 <1 500 <1.1 <1.1 0.006 86.2 0.6
<0.05 44
<0.01 <0.02 <0.003 <0.0001
4.12
TOTAL SAMPLES ____ 4 __ TOTALANALYSIS ____ 80=-__ N.D.= Element is not detected by the method employed.
Phil. National Standard for lA"+h,, ....
LJnnKlng Water, 2007 (max)
6.5-8.5 Glass Electrode 10 Visual Comparison -- lodometric - Azide Modification (dilution technique) -- Dichromate - Ooen Reflux -- Gravimetric (dried @ 103-1 ()5OC) Nil Gravimetric(Petroieum Ether Extraction) 500 Gravimetric (dried @ 10SOC) <1.1
MuHiple Tube Fermentation Technique <1.1
0.05 (total) Diphenvlcarbazide 250 Araentometric 5 Neohelometric
0.07 Soecific Ion Electrode 250 Gravimetric 0.01 Flame-AAS 1.0 Flame-AAS 0.4 Flame-AAS
0.001 Cold Vapor~AAS 50 Brucine Sulfate
CERTIFIED BY: nila N Adarna Chemist
NOTEDBY: ca~ Laboratory Head
OSTREA MINERAL LABORATORIES. INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
A DENR-recognized Environmental Laboratory for analytical performance, documentation, and related technical capability.
Department of Health Certified Laboratory
)
QSir1E~ mlnEr1~l.l.~eQr1~iQr1IES,lnO. Assaying and Environmental Testing Specialist
342 V. Albano St., Bakilid, Mandaue City
L
Telefax No.: (032) 343-6472 Email: [email protected]
-, DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 X 100 MW Cebu P01Ner Plant Project SPC Compound Naga City, Cebu Owner: KEPCO SPC P01Ner Corp.
DATE
R.A. NO.
September 16, 2010
31485
INVOICE NO.
PAGE_2_0F_2_PAGES
N~ 2010-0752-C
( CERTIFICATE OF ANALYSIS
Date Sampled September 06, 2010
Date Received September 06,2010
Date Analyzed September 06 -14,2010
Phil. National Brgy. Tangke Deepwell North Standard for Method n .1, ~' . n.· .
__ "'I" .v" """"'v'V' LJIII''''~l:l. ""'''''', 2007 (max)
pH 7.2 7.1 6.5-8.5 Glass Electrode Color (Apparent), PCU 1 2 10 Visual Comparison DO, mg/L 8 2 - lodometric BOD5, mg/L 6 6 - Azide Modification (dilution technique) COD, mg/L <9 10 - Dichromate - ()perJ' Reflux TSS, mg/L 1 1 - Gravimetric {dried @ 103-1 ()5OC) Oil & Grease, mglL <1 <1 Nil Gravimetric (Petroleum Ether Extraction) TDS,mglL 731 587 500 Gravimetric (dried ® 10BOC) Total Coliform, MPN/100mL <1.1 >8.0 <1.1
Mu~iple Tube Fermentation Technique Fecal Coliform, MPN/100mL <1.1 <1.1 <1.1 Chromium Hexa (Cr>6), mail 0.005 0.002 0.05 (total) DiDhenvlcarbazide Chloride (CI), mglL 40.2 152.8 250 Argentometric "Turbidity, NTU 0.7 1.2 5 NePhelometric "Cyanide (CN), mglL <0.05 <0.05 0.07 Specific Ion Electrode 'Sulfate (S04'2), mglL 21 86 250 Gravimetric 'Lead (Pb), mg/L <0.01 <0.01 0.01 Flame-AAS 'Iron (Fe), mgIL <0.02 0.05 1.0 Flame-AAS *Manaanese (Mn), mglL <0.003 0.026 0.4 Flame-AAS 'Mercury (Hal. maIL <0.0001 <0.0001 0.001 Cold Vaoor-AAS 'Nitrate (NOJ-N), mglL 4.67 <0.01 50 Brucine Sulfate *Analyzed by OMU-Laguna. - NOTHING FOLLOWS--
The test results pertain only to the samples sampled by OMU Staff.
() in ANALYTICAL METHODIREMARKS: CERTIFIED BY: ~""" f ila NAdarna
Ref. Standard Methods for the Examination
~ of Water & Wastewater, 20lh Ed
TOTAL SAMPLES 4 TOTAL ANALYSIS 80 NOTEDBY: Ca erine E. Ravelo
N.D.= Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES. INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
!! A DENR-recognized ~~~C/L.iJ-~~ Environmental Laboratory for 'ffii' · .. ·i~ analytical performance, ~:: >:'0 Department of Health documentation, and
o '., Certified Laboratory ? .{JI related technical capability. (If I),r-.s"
..
)
¥" ---~-.) •
(
CST~E~ ml~Er1~l.l.~~Cr1~TCr1IES, I~O. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
N~ 2010-0748-C
I I DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 x 100 MW Cebu Power Plant Project
DATE
R.A.NO.
September 15, 2010
31487
SPC Compound Naga City, Cebu INVOICE NO.
L Owner: KEPCO SPC Power Corp. -.J PAGE __ OF __ PAGES
Date Sampled Date Received Date Analyzed
CERTIFICATE OF ANALYSIS
September 07,2010 September 07,2010 September 08 - 15, 2010
S-2 New Ash
Pond Cor. Of
S-3 Construction
S-6A S-6B
Construction Beach Area Lower Colon, Method
Construction Site Near Pier Site Near Pier
Back of brgy. Hall
"Cyanide (CN), mq/kq <0.5 <0.5 <0.5 <0.5 Specific Ion Electrode "Chromium Hexa (Crt6), mglkg <0.10 <0.10 <0.10 <0.10 Diphenvlcarbazide "Cadmium (Cd), mq/kq 6.63 7.05 2.98 7.93 Flame-AAS "Copper (Cu), mglkg 59.73 135.50 1545.00 63.75 Flame-AAS "Manganese (Mn), mg/kg 283.95 297.23 160.55 284.90 Flame-AAS "Lead (Pb), mg/kg 6.60 43.33 40.38 4.60 Flame-AAS "Mercury (Hg), mg/kg 0.297 0.156 0.219 0.066 Cold Vapor-AAS "'ron (Fe), % 2.27 1.91 1.81 2.17 Flame-AAS "Sulfate (S04"2), % 0.10 0.24 0.40 0.22 Gravimetric "Analyzed by OMLI-Laguna. ..... NOTHING FOLLOWS'"
The test results pertain only to the samples sampled by OMU Staff.
D _,r\ "~71 ;,
ANALYTICAL METHODIREMARKS: CERTIFIED BY: '-I!oonila N Adarna
ACID DIGESTION I USEPA 3050 B Chemist
ca~o 4 TOTAL ANALYSIS
36 NOTED BY: TOTAL SAMPLES N.D.= Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
~ A DENR-recognized ~~~~~ Environmental Laboratory for analytical performance, ~i ~~ ~a Department of Health documentation, and o ~ ~tY).l1C Certified Laboratory related technical capability. ~~~ ~~~;~
'l)a.s~
)
(
QSTF1~~ ml~~F1~~ ~~~QF1~TQF1I~S, I~O. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
N~ 2010-0745-C
""1 DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 X 100 MW Cebu Power Plant Project
DATE
R.A.NO.
September 15, 2010
31488
INVOICE NO. SPC Compound Naga City, Cebu Owner: KEPCO SPC PO\Ner Corp.
L .J PAGE __ OF_3_PAGES
CERTIFICATE OF ANALYSIS
Date Sampled Date Received Date Analyzed
AMBIENT AIR
September 06 & 0'1, 2010 September 07,2010 September 06 -13,2010
Station 1: Station 2: Brgy. Tangke Sitio Lower
Station 3: Brgy. Colon DENR
(upper) Front of Standard Basketball Court Colon Hall Nestor Cadia Res.
TSP, ~g/Ncm 22 10 28
N02, ~g/Ncm <0.01 <0.01 3
S02, ~g1Ncm <0.01 <0.01 <0.01
CO, ppm 0 0 0
Noise, dB 71.9 73.31 69.5
·Note: Category 0 - a section which IS pnmanly reserved as a heavy Industrial area, for daytime standard . ...... ·OVER··· ..
ANALYTICAL METHODIREMARKS: USEPA CFR 40, Part 50, Appendix A & B Methods of Air Sampling & Analysis. 3'd Ed.
TOTAL SAMPLES ____ 7 ___ TOTALANALYSIS ____ .:..35=--__ N.D.= Element is not detected by the method employed.
300
260
340
30
"75
CERTIFIED BY:
NOTED BY:
Method
High Volume - Gravimetric
Gas Bubbler - Greiss - Saltzman
Gas Bubbler - Pararosaniline
Direct Reading - Using Electrochemical Sensors
Direct Measurement -Using Noise Meter
Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT. THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
I! A DENR-,~og";,", ~ Environmental Laboratory for N analytical performance,
documentation, and ~ related technical capability.
Department of Health Certified Laboratory
)
(
QSi~~ mlnE~~~ ~~~Q~~iQ~IES,lnO. Assaying and Environmental Testing Specialist
342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I
L
DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD 2 X 100 MW Cebu Power Plant Project
SPC Compound Naga City, Cebu Owner: KEPCO SPC Povver Corp.
DATE
R.A. NO.
September 15, 2010
31488
INVOICE NO.
PAGE_2_0F_3_PAGES
N~ 2010·0745-C
CERTIFICATE OF ANALYSIS
Date Sampled Date Received Date Analyzed
AMBIENT AIR
September 06 & 07, 2010 September 07,2010 September 06 -13,2010
Station 4: Along National Station 5:
DENR Road Cor. Aliganga Naga Mun. Hall, Standard St., Near Perimeter Plaza Area
Fence ofSPC
TSP, ~g/Ncm 234 19
N02, ~glNcm 1 <0.01
S02, ~g/Ncm <0.01 <0.01
CO, ppm 0 0
Noise, dB 72.8 70.1
·Note: Category D - a section which IS pnmanly reserved as a heavy Industnal area, for daytime standard. ****OVER****
ANALYTICAL METHODIREMARKS: USEPA CFR 40, Part 50, Appendix A & B Methods of Air Sampling & Analysis. 3n1 Ed.
TOTAL SAMPLES ____ 7 ___ TOTAL ANALYSIS ____ 3_5 __
N.D.= Element is not detected by the method employed.
300
260
340
30
"75
CERTIFIED BY:
NOTEDBY:
Method
High Volume - Gravimetric
Gas Bubbler - Greiss - Saltzman
Gas Bubbler - Pararosaniline
Direct Reading - Using Electrochemical Sensors
Direct Measurement -Using Noise Meter
Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
A DENR-recognized Environmental Laboratory for analytical performance, documentation, and related technical capability.
Department of Health Certified Laboratory
)
(
QSiF1~~ ml~~F1~~ ~~9QF1~TQF1I~S,I~C. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
N~ 2010-0745-C
I I DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 X 100 MW Cebu PO\Nef Plant Project
DATE
R.A.NO.
September 15, 2010
31488
SPC Compound Naga City, Cebu L Owner: KEPCO SPC Power Corp. ..J
INVOICE NO.
PAGE_3_0F_3_PAGES
CERTIFICATE OF ANALYSIS
Date Sampled Date Received Date Analyzed
AMBIENT AIR
September 06 & 07, 2010 September 07,2010 September 06 -13,2010
Station 6: Station 7: Front of DENR Plantsite
Construction Area Mangkikis Chapel Standard Sitio Mangkikis
TSP, ~g/Ncm 22 44
N02, ~g1Ncm <0.01 <0.01
S02, ~g/Ncm <0.01 <0.01
CO,ppm 0 0
Noise, dB 68.3 69.8
*Note: Category D - a section which IS pnmanly reserved as a heavy Industrial area, for daytime standard.
- NOTHING FOlLOWS""""
300
260
340
30
*75
The test results pertain only to the samples sampled by OMLI Staff.
ANALYTICAL METHODIREMARKS: CERTIFIED BY: USEPA CFR 40, Part 50, AJ:l)endix A & B Methods of Air Sampling & Analysis. 3rd Ed.
TOTAL SAMPLES _____ 7 __ TOTALANALYSIS _____ 35 __ _ NOTEDBY:
N.D.= Element is not detected by the method employed.
Method
High Volume - Gravimetric
Gas Bubbler - Greiss - Saltzman
Gas Bubbler - Pararosaniline
Direct Reading - Using Electrochemical Sensors
Direct Measurement -Using Noise Meter
Laboratory Head
OSTREA MINERAL LABORATORIES. INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY. (I A DENR_go""d ~ Environmental Laboratory for
N analytical performance, documentation, and
~ related technical capability.
Department of Health Certified Laboratory
)
(
CSi~E~ ml~E~~~ ~~aC~~iC~IES,I~O. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 X 100 MW Cebu Power Plant Project SPC Compound Naga City, Cebu
DATE
R.A.NO.
INVOICE NO.
September 15, 2010
31488
L Owner: KEPCO SPC Power Corp. --.J PAGE ___ OF __ PAGES
Date Sampled Date Received Date Analyzed
CERTIFICATE OF ANALYSIS
September 07,2010 September 07,2010 September 07 -13,2010
Dust Emission Construction Site
N~ 2010-0746-C
Location Total Suspended Particulate (TSP), f.JglNcm
Near Admin Bldg. 32
Near Gen. stockyard 22
Left side of the Plant near Ash Pond 10
Near Guard House / Main Gate 44
DENR Standard 300
Method Gravimetric USEPA - CFR 40 Part 50 App.B
...... NOTHING FOLLOWS· ..... The test resuHs pertain only to the samples sampled by OMU Staff.
ANALYTICAL METHODIREMARKS: CERTIFIED BY:
USEPA CFR 40, Part 50, Appendix A & B
TOTAL SAMPLES ____ 4 ___ TOTALANALYSIS _____ 4 __ NOTED BY:
N.D.= Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
1'1 A DENR-,,,,,,,,;,,,,, ~ Environmental Laboratory for roo;;; analytical performance,
documentation, and ~ related technical capability.
Department of Health Certified Laboratory
)
I
I
I I I
I
I I
(
CSir1~~ ml~Er1~~ ~~aCr1~TCr1IES,I~O. Assaying and Environmental Testing Specialist 342 V. Albano St., Bakilid, Mandaue City Telefax No.: (032) 343-6472 Email: [email protected]
I I DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD
2 x 100 MW Cebu PO'lNer Plant Project SPC Compound Naga City, Cebu
L Owner: KEPCO SPC Power Corp. -1
DATE
R.A.NO.
INVOICE NO.
September 15, 2010
31488
PAGE ___ OF __ PAGES
CERTIFICATE OF ANALYSIS
Date Sampled Date Received Date Analyzed
September 07,2010 September 07,2010 September 07,2010
Noise Testing
Location
Station 1: Near main Quardhouse Station 2: Left side approx. 100m from Nan Road Station 3: Left side center near fuel tank Station 4: Back left side near perimeter fence Station 5: Center back near shoreline Station 6: Back side near shoreline & perimeter fence Station 7: Right side near office
DENR Standard, DAO 14
Noise, dB
69.9 71.3 74.1 72.0 70.6 59.4 70.7
*75
N~ 2010-0747-C
Method Direct Reading - Sound level meter
Note: *Class D - a section pnmanly reserved as heavy Industrial area (daytime). H'" NOTHING FOLLOWS· ... •
The test results pertain only to the samples sampled by OMU Staff.
ANALYTICAL METHODIREMARKS: USEPA CFR 40, Part 50, Appendix A & B
CERTIFIED BY:
Methods of Air Sampling & Analysis. 3rd Ed.
TOTAL SAMPLES ____ 7 ___ TOTALANALYSIS _____ 7 __ _ NOTEDBY:
N.D.= Element is not detected by the method employed. Laboratory Head
OSTREA MINERAL LABORATORIES, INC. SUBMITS THIS REPORT AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT. REPRODUCTION RIGHTS ARE RESERVED PENDING OUR WRITTEN APPROVAL AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES. SAMPLE REJECTS ARE DISPOSED OF AFTER TWO MONTHS UNLESS ADVISED TO THE CONTRARY.
A DENR-recognized Environmental Laboratory for analytical performance, documentation, and related technical capability.
Department of Health Certified Laboratory
)
I
I
I
I··
i I I.
I
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
ANNEXB
RECORD OF MEASUREMENT
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
I
I I·
I I
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
Client: DOOSAN REA VY INDUSTRIES CONSTRUCTION CO. LTD. 2 X 100 MW Cebu Power Plant Project
Location: SPC Compound Colon, Naga City, Cebu Project Owner: KEPCO SPC POWER CORP.
Record· of Measurement
Station 1 Station 2
Station 1 Location Brgy. Tangke, Basketball Court Sitio
Lower Colon, Br2Y. Hall
Parameters TSP, S{}z, N02, CO, Noise TSP, S{}z, NOz, CO, Noise
Date 1 Time of 09/06/10 09/06/10 Sampling 01:40 -02:10 PM 02:30 - 03:00 PM
Temperature, DC 32 38
Humidity, % 57 47.3
Atmospheric Pressure, 750.8 754.63
rnrnHg
Wind Direction Southeast to Northwest Southeast to Northwest
Weather Condition Sunuy Sunuy
Sampling location stationed within Sampler stationed back of Brgy. Hall of Lower
Observations the basketball court area approx. 500 m. away from SPC Power Corp.
Colon, approx. 50 m from National road. No on-
No on-going activities observed. going activities observed during sampling.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
..
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 FaxNo. (032) 343-6472
Client: DOOSAN REA VY INDUSTRIES CONSTRUCTION CO. LTD. 2 X 100 MW Cebu Power Plant Project
Location: SPC Compound Colon, Naga City, Cebu Project Owner: KEPCO SPC POWER CORP.
Record of Measurement
Station I Location
Parameters
Date / Time of Sampling
Temperature, °C
Humidity, %
Atmospheric Pressure, rom Hg
Wind Direction
Weather Condition
Observations
Station 3 Brgy. Colon ( npper) front of
Nestor Cadia res.
TSP, S~, N02, CO, Noise
09/06/10 09:52 - 10:22 AM
53
758.19
Southwest to Northeast
Partly cloudy with slight rain
Stationed along a small road where people are passing during sampling.
Station 4 Cor. Aliganga St. near perimeter
fence ofSPC
TSP, S~, N02, CO, Noise
09/07/10 09:45 -10:15 PM
55
756.92
Northeast to Southwest
Sunny
Location is near national highway, access road going to Brgy. Tangke. The
area is muddy. A total of 16 vehicles were passing during sampling.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
342 V. Albafio St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
Client: DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO. LTD. 2 X 100 MW Cebu Power Plant Project
Location: SPC Compound Colon, Naga City, Cebu Project Owner: KEPCO SPC POWER CORP.
Record of Measurement
Station 5 Station 6
Station 1 Location Naga Municipal Hall, Near Plaza Construction Site
(Pier Area)
Parameters TSP. SOz, N02, CO, Noise TSP. SOz. N02• CO, Noise
Date 1 Time of Sampling 09/06/10 09/07/10
11:40 -12:10 Noon 01:05- 01:35 PM
Temperature, °C 39 38
Humidity, % 54 48
Atmospheric Pressure, mm 757.68 755.40 Hg
Wind Direction Southeast to Northwest Northeast to Southwest
Weather Condition Sunny Sunny
Observations Sampler located on the center of the Sampler stationed construction site plaza. No on-going activities during near pier area Muddy area, some
sampling. workers were passing during sampling.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
Client: DOOSAN REA VY INDUSTRIES CONSTRUCTION CO. LTD. 2 X 100 MW Cebu Power Plant Project
Location: SPC Compound Colon, Naga City, Cebu Project Owner: KEPCO SPC POWER CORP.
Record of Measurement
Station / Location
Parameters
Date / Time of Sampling
Humidity, %
Atmospheric Pressure, nnn Hg
Wind Direction
Weather Condition
ObselVations
Station 7 Fronting Mangkikis Chapel
TSP, S{)z, N02, CO, Noise
09/06/10 10:55 -11:25 AM
38
47
757.68
Northeast to Southwest
Sunny
Stationed in front of San Roque Chapel, noise coming from people passing during sampling.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
Sampling Pictures
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
SAMPLING PICTURES: MARINE WATER
Station 1 : Front of City Hall Plaza
Station 2: Front of North Poblacion
Sampling Pictures: Ground Water
Station 1 : Brgy. Colon Deepwell ( Brgy. Hall-lower Colon)
Station 2: Upper Colon Deepwell
Soil Sampling Pictures:
Station S-2 :New Ash Pond cor. of Construction Site
Station S-3 : Construction Site Near Pier Area
Station S-6A : Construction site Near Pier Area
Station S-6B: Beach Area Lower Colon, back of Brgy. Hall ,
Ambient Sampling Pictures
Station 1 : Brgy. Tangke Basketball Court
Station 2: Sitio lo~er Colon Brgy Hall
Station 3: Brgy Upper Colon
Station 4: Along Natiomal Road, cor. Aliganga St. near perimeter fence of SPC
Noise Testing Pictues:
Station 1: Near Main Guard House JfP.
Station 2 : Left side approx 100 m. from national road
Station 5: Center back near shoreline
Station 6: Back side near shoreline & perimeter fence I !
I I
r
I
I I
I-
r
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
ANNEX C
QUALITY CONTROL
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
I I
•
I' I ,.
I.'
I· I
I I I
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
CRITERIA USED TO ASSESS QUALITY CONTROL RESULTS
VALIDITY AND RELIABILITY OF TEST RESULTS
The continuing validity and reliability of results is accomplished by monitoring a number of factors.
I. Recovery of known addition.
The recovery of known addition is used to verify the absence of matrix effect and absence of interferences. Recovery from the standards is used to verify method performance.
II. Analysis of reagent blank
Reagent blanks are used to monitor purity of reagents and the overall procedural blank. Reagent blanks are run with each batch of analysis. Unusual or out of the 'norm' results are investigated and corrective action taken before analysis of any batch is completed.
A. Sulfur Dioxide
• Analysis of control sample. The control sample was analyzed according to USEPA appendix A to Part 50 Section 8.2.10 and calculation of concentration was based on Section 8.2.10. Actual concentration is within the range of 320 to 400 ug S02/ ml. The difference between the true and analyzed values of the control standards must not be greater 1ug.
• Analysis of reagent blanks run with each batch of samples. The absorbance of the reagent blank must not exceed 0.170Absorbance @ 22°C.
• The calibration curve must have a slope equal to 0.03 ±-0.002 absorbance unitlug S02 and the correlation coefficient must be greater than 0.998.
B. Nitrogen Dioxide
• Analysis of control sample.
• Analysis of reagent blanks run with each batch of samples.
C. Total Suspended Particulate (TSP )
• Analysis of blank filter with each batch of samples.
• Filter conditioning environment is in controlled temperature at 15 to 30
0
C and controlled humidity of less than 50%.
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
OST~~ mlnE~~~ ~tmi~TRS,nC.
342 V. Albano St., Bakilid, Mandaue City Telephone Nos. (032) 3436472 Fax No. (032) 343-6472
Test Participants
• Gerva C. Borreta • Josephine Adlit • Jerson Estardo
• Alvin Gako
Client Representative • Engr. Warren Obando
Certificate of Analysis No. 2010- 0745C, 0746C, 0747C, 0748C, 0751C & 0752C
I [
I.
t·
2 x 100 MW CEBU POWER PLANT
2010.10
KSPC Power Plant Construction Office
Construction Progress Photos
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Steam Blowing out – Unit 1
(July 24, 2010)
First Coal Delivery
(August 25, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Limestone Crushing Facility – completed
(July 31, 2010)
Waste water treatment laboratory
(August 31, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Ash Handling System
(September 30, 2010)
Heavy Equipment Maintenance Shop – completed steel structure
(September 30, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Electrostatic Precipitator #2
On going installation of electrode
Electrostatic Precipitator #1
Completed erection works August 2010
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Coal Shed
(September 29, 2010)
Open coal yard
(September 29, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Warehouse & Workshop
(September 29, 2010)
Instrument Transformer for Metering Facilities
(September 29, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Settling Pond
(August 31, 2010)
Coal Handling System – TT-01 & TT-02
(August 31, 2010)
TT-01
TT-02
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Steam Turbine #1
(September 30, 2010)
Unit #1 Synchronization
(October 8, 2010)
2 x 100 MW Cebu Power Plant
Construction Progress Photos
Front View of the Cebu Power Plant from the Mountains of Brgy. Colon
(September 30, 2010)
Rear View of the Cebu Power Plant from existing jetty
(September 30, 2010)
MAP SHOWING LOCATION OF AIR SAMPLING STATIONS
CONSTRUCTION
SITE
Station 5 – Naga Municipal Hall
Station 4 – Along Nat. Rd. cor., Aliganga St.
Station 7 – Mangikis Chapel
Station 1 – Brgy. Tangke,
Basketball Court
Station 6 – Near Pier Area
Station 2 – Brgy. Hall, Colon
Station 3 – Brgy. Colon, front of Nestor Cadia
Res.
TSP Stn – Near Guard House/Main Gate
TSP Stn – Left of Guard House
TSP Stn – Approx.
30m from shoreline
TSP & Noise Stn – Near Proposed
Admin Bldg.
MAP SHOWING LOCATION OF TSP and NOISE MONITORING STATIONS
Noise Stn – 10m away
from shoreline
Noise Stn – Center, 5-10 m
From shoreline
Noise Stn – Left Side facing
the shoreline
Noise Stn – Left Corner,
10m from Nat. Rd.
Noise Stn – Center, 20m
from Nat. Rd.
Noise Stn – Right Corner, 10m from Nat. Rd.