Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016
VIE: Central Mekong Delta Region Connectivity
Project Part 2 Annexes (pages 179-194)
Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.
NOTE
In this report, “$” refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
CDM.th Sml
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith- WSP -Yooshin Consultant JV
'?oo-./:.:......
Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881-255 ; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 C/0198
Date : 06 August 2015
To: Mr. Nguyen Van Huong
Contractor's Representative
Contract Office: No.61-Provincial Road 848, Tan Trong Village, Tan My Commune, Lap
Vo District, Dong Thap Province
Tel : (84) 043 7830856; Fax: (84) 043 7830859
Subject: Package CW1C- Environmental inspection report 04 Aug 2015
Dear Mr. Huong,
AftAr thA inRrAr.tinn in ynttr \.\1\11 r. IMnrl< r8r.I<8QP nn n4th AIIQII"'t ?n1 "' · WP Wnl llrl lii<P tn hiohlioht
SUI II!::J !::Jt IV it Ull ll i!::JII l ct l iSSU!::JS Ull yuur Bll!::J I !:!Yeti t.lltty IJUUI
environment as mentioned on the environmental inspection report in the attachment. Please follow
up our instructions/guidance in the report to take quick action and give us your response for those
issues by 121h August 2015.
By the way, we would like to mention to you some remaining issues from your CW1 C work package
which need to response on 121h August 2015, as follows:
Cc:
You need to report to us the status of fixing/repairing toilets in worker accommodation and
batching plants with suitable run-off of wastewater. The wastewater is needed for periodic
environmental monitoring quarterly. Please provide us the evidence of repairing and its
completion.
First aid kit should be available on office and worker accommodation.
The excavated soil disposing quantity should be recorded and reported to DDIS officially.
standing and quick action are highly recommended.
As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DO IS Consultant JV Office
Page 1 of 1
Attachement :
Environnemental inspection report 04 Aug
2015
....
• ·-
01,!' an n6i khu Vt,J'C trung tam Dbng song CU>u Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE
Lien danh TU' COM Smith- WSP -Yooshin To 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh fJong Thap, Nam
fJT: (84) 067-3881-255; Fax: (84) 067-3881-256
So thll' : DDIS/CW1 C/0198
Ngay : 06/08/2015
GU>i 6ng Nguyen Van Hll'&ng di$n Nha
VP: s6 61- 8U'&ng lien tlnh 848, Ap Tan Trong, Xa Tan My, Huy$n V6, Tlnh Bong Thap
8T: (84) 043 7830856 Fax: (84) 043 7830859
Chu G6i CW1 C - Bao cao tra moi trLP<Yng ngay 04/08/2015
Kinh gU>i 6ng Hll'&ng,
Sau khi kiE§m tra m6i trll'&ng g6i CW1 C vao ngay 04/08/2015, chung t6i mu6n
cho 6ng m(>t vai m6i trll'&ng c6ng trll'&ng 6ng lien quan Sl,l' kem gc;>n gang va
m6i tm&ng lam vi$c kh6ng nhll' da dU'Q'C trong bao cao dinh kem kiE§m tra moi
trll'&ng. Mong 6ng tuan thu theo nhCmg hll'&ng dan trong bao cao va nhanh chong hanh d(>ng
va !=!LYi phan hoi cho chun!=J toi vao ngay 12/08/2015.
Nhan ti$n, chung t6i cGng nh& 6ng m(>t vai m6i tm&ng van con ton dQng g6i
cua 6ng cGng c6 phan hoi vao ngay 12/08/2015 nhll' sau:
6ng bao cao tinh sU>a cac khu Vl,l'C nha v$ sinh dE§ c6 dU'&ng thoat cua nll'&c
thai sau khi dU'qc xU> ly khu vl,l'c nha & cua cong nhan va khu vl,l'c tr(>n. Nll'&c thai
cho quan m6i trll'&ng dinh ky. Mong 6ng cung cht:mg cua vi$c sU> chCPa va
trinh trang hoan thi$n sU>a chCPa.
BQ dt,.mg Ct,J SO' CLPU y te dm phai lu6n thll'&ng trl,l'C van ph6ng va nO'i & cua c6ng nhan.
Khoi ILl'Q'nR dao dU'qc d6 thai dn phai dU'O'c bao cao chi cho Tll'
chinh thuc.
nghi Nha hiE§u va trll'O'ng th l,l'C hi$n.
Tran trong,
Gordon Belton Giam doc dl,l' an
{Da kyJ
Cc: Nhll' tren
- Giam d6c dl! an C§u Cao Lanh, CIPM - Nh6m qufm ly c6ng tfll'ang, CIPM
LU'u: Lien danh TVGS- DDIS
Trang 1 / 1
fHnh kem: Bao cao kiem tra m6i trll'ang ngay 04/08/2015
·.· .. ,.,
:
·-..
ENVIRONMENTAL MONITORING REPORT
Work Package Km from Observers
6+200
• There was overspreading excavated soil on site without any proper storage. This soil must store in
designated area for disposal area. For reuse purpose, this soil should store in a temporary place with
barricade and notification broad.
• Access road on site and batching plant were full of dust during transport. To avoid dirty road affecting
by construction activity, Contractor must regularly spray wate r at least 6 times/day, this frequency might
need to increase for either the hot and sunny day or increase of t ransport activity.
• Bentonite bags was spreading over bentonite t anks. This bag should be organized and re-a rranged.
• Bentonite bags left empty on the side of bentonite banks. These empty bags should be stored in
hazardous waste storage on site.
• Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity
for these places and remind your worker to keep clean condition for their environment.
• Metal waste was stored next to the office and worker accommodation without a proper storage; this
material should be stored in a designatP.d <HP.a for with and (label) notification
broad as reference.
• The concrete pile head was found on site without a proper storage. Contractor must collect his concrete
le head t o dis I area as mentioned.
;·
' 4
L
•·
r
:
Dirty access to botching plant Overspreading of concrete sludge under botching
..
· . ....
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith - WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881 -255 ; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 C/0230
Date : 28 August 2015 To: Mr. Nguyen Van Huong
Contractor's Representative
Contract Office: No.61-Provincial Road 848, Tan Trang Village, Tan My Commune, Lap
Vo District, Dong Thap Province
Tel : (84) 043 7830856 ; Fax: (84) 043 7830859
Subject: Package CW1C- Environmental inspection report 24 Aug 2015
Dear Mr. Huong,
First, we would like to appreciate your corrective action and feedback on our environmental
inspection report 04 Aug 2015 on the letter No. DDIS/CW1 C/0198 dated 061h August 2015. However,
after the inspection in your area, we realized that your construction site has not improved as reported
in your response letter CW1 C/DDIS/0175 on 17th August 2015. Many environmental issues are still
not resolved as mentioned in the attachment of environmental inspection report of 24th August 2015.
Further, we would like to give some comments on your response report/corrective actions as follows:
1. The metal storage area seems more messy and disorganized after your corrective action.
This situation is due to your improper barricades and notification board as well as
disorganized metal waste inside. We suggest you to install proper barricades and notification
board labelled for "metal waste storage" and all wastes should be well-organized and
grouped as to type or use;
2. The temporary spoils disposal area was not provided with barricade and the excavated soil
was dumped spreading everywhere;
3. The concrete waste from batching plant was not attended and therefore no corrective action
has been done
4. The concrete pile heads should not be mentioned "placed in proper location" in your report.
This waste should be fully collected and transferred into the approved disposal area by local
authority under DDIS supervision by site inspector and Environment Specialist.
As above
Cao Lanh Bridge Project Manager. CIPM
Site Construction Team. CIPM
File: DDIS Consultant JV Office
Attachement :
- CW1C Environnemental inspection report 24 August 2015
Page 1 of l
DI,P an n6i khu VI,PC trung tam D6ng song Ctvu Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan tr9' 0353-VIE
Lien danh TU' COM Smith- WSP -Yooshin
T6 5, Ap Tan T!ch, Xa T!nh Th&i, TP Cao Lanh, Tinh Dong Thap, Nam
DT: (84) 067-3881-255; Fax: (84) 067-3881-256
So thU' : DDIS/CW1 C/0230
Ngay : 28/08/2015 GLI'i d€m: 6ng Nguyen Van HLP&ng
di$n Nha
VP: so 61- 8LP6'ng lien tinh 848, Ap Tan Trang, Xa Tan My, Huy$n Vo, TTnh 86ng Thap
8T: (84) 043 7830856 Fax: (84) 043 7830859
Chu G6i CW1C- Bao cao tra moi trlJ'img ngay 24/08/2015
Kinh gll'i ong HLP&ng,
TrU'&c tien, chung toi muon khen ngqi vi$c thl,J'C hi$n dung theo chT dan va phan h6i cua ong vi; bao
cao kiem tra moi trLPerng ngay 04/08/2015 theo thU' cua chung toi so DDIS/CW1 C/0198 ky ngay
06/08/2015. Tuy nhien, sau khi kiem tra khu Vl,J'C thi cong cua Nha chung toi rang cong
tac thi cong CUa ong khong dU'Q'C cai thi$n nhU' trong bao cao ma ong da gLri theo thll' SO CW1C/DDIS/0175 ky ngay 17/08/2015. Con nhil;u df; moi trll'erng van chll'a dll'Q'C khik pht,Jc
dll'Q'C df; cc;tp trong bao cao kiem tra moi tm&ng ngay 24/08/2015 dinh kem theo thll' nay.
Han nQ>a, chung toi c6 m(>t so y v€; bao cao phan h6i/thl,J'c hi$n dung cua ong nhU' sau:
1. Khu Vl,J'C lll'u trQ> kim dl!'erng nhU' bU>a bai va l(>n x(>n han sau khi ong thl,J'c hi$n dung.
Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap
khong dung quy d!nh. Chung toi df; nghi ong dai phan each va bang thong bao thich
hQ'p CO dan nhan "khu lll'U trQ> rae kim va mQi rae thai cung phai dll'Q'C sap gQn gang
va phan theo nh6m va ml,JC dich Slr dt,Jng;
2. Khu Vl,J'C d6 thai thai chl!'a bo tri dai phan each va dao rai vai khap nai;
3. Be tong thai tr(>n khong dll'Q'C quan tam va vi vc;ty ong van Chll'a thl,J'C hi$n tot df;
nay;
4. CQC be tong khong dU'Q'C df; cc;tp "lll'U trQ> dung nai" trong bao cao cua ong. Vc;tt li$u thai
nay nen gom toan b(> va chuyen khu d6 thai da dll'Q'C duy$t bai CO' quan dja phll'O'ng
c6 quyf;n dl!'&i Sl,J' giam sat cua Giam sat vien va Chuyen gia moi tm&ng cua Tll'
8€; nghi ong dQc ky nhQ>ng chT va hll'&ng dan cua chung toi trong bao cao dinh kem. Thai
thl,J'c hi$n dung theo chT dan nay va phan h6i cho chung toi khong qua ngay 04/09/2015.
Tran trQng,
Victoriano L.Hamlig Ky sll' thll'erng tru
{Da kyJ
Cc: - Nhll' tren - Giam doc di! an Cau Cao CIPM - Nh6m quan ly c6ng tmong, CIPM - Lll'u: Lien danh TVGS - DDIS
Dinh kern: Bao cao tra m6i tmong ngay 24/08/2015
Trang 1/1
ENVIRONMENTAL MONITORING REPORT
Work Package Km from Observers
6+200
CVVlC Sunny Ms. Le Thi Phuong Loan - NES
• There was overspreading excavated soil on site without any proper storage. This soi l must store in
designated area for disposal area. For reuse purpose, this soil should store in a temporary place with
barricade and notification broad.
• Access road on site and batching plant were muddy and slippery during transport. Contractor must
regularly repair the road since this road can cause danger for transport and workers.
• Bentonite bags was spreading all over site. This bag should be collected, organized and stored in
hazardous waste area.
• Bentonite was spreading out inside and outside of construction area due to mishandling during transfer
the bentonite tanks. Contractor is requested to collect all spreading bentonite on site.
• Repairing machine on the batching plant area led to leak fuel on the ground. This area must be clean-
up.
• Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity
for these places and remind your worker to keep clean condition for their environment.
• Metal waste was stored next to the office and worker accommodation without a proper storage; the
storage was messy and poor organized.
• The concrete pile head was found on site without a proper storage. Contractor must collect his concrete
pile head to disposal area as mentioned.
• Toilets for workers were terribly dirty and smelly without sanitary supply (e.g. papers and water basket).
• The improper design of settling pond in the batching plant caused the overspreading of concrete sludge
around batching plant and the settling pond was fully covered with roughly 2 meter depth by this sludge.
• Full of dust on the public road crossing with acess road of construction site cause the low visibility for
transportation. The contractor is red to water for this area next to
Full of dust on the public road crossing with acess road
construct/On s1te
(ngay-th6ng-nam)
BAO cAo Kl M TRA MOl TRlfONG
Goi thau Tirkm
6+200
Ngtriti quan sat
• Bat do thai do trim lan tren cong tnr(mg khong c6 m<)t nO'i chU'a phu hc;rp. Bat nay can phai IU'u triJ
khu VI/C da dU'Q'C bo trf cho do thai. De cho mi,JC dfch tai Slt d1,1ng, dat nay can phai dU'Q'C chlra trong khu
VI/C do thai thb'i tren Cong trU'b'ng dU'Q'C ngan bCti dai ngan each va CO bang thong bao.
• DU'b'ng cong VI,J va tr<)n lay IQi va trO'n trQ't trong qua trlnh chuyen. Nha thau phai thU'b'ng xuyen
sll'a chli'a dU'b'ng vi dU'b'ng nay c6 the gay tai cho viec chuyen va cong nhan.
• Cac tui bentonite rO'i vai khap cong tnrb'ng. Tui nay nen dU'Q'C gom sap xep va IU'u triJ a khu VI/C
chU'a rae thai c6 tfnh chat nguy
• Bentonite rO'i vai ben trong va ben ngoai khu thi cong do thieu Xlt ly tot trong khi chuyen cac thung
chU'a dung dich bentonite.
• Sll'a chli'a may m6c tren khu VI/C trQn bi ro ri nhien lieu ra nen dat. Khu VI/C nay phai dU'Q'C don
se.
• Rae dU'Q'C thay Ct khap cong tnrb'ng va khu nha Ct cua cong nhan. Nha thau can yeu cau don cho
nhiJng khu VI/C nay va nhac nha cong nhan de don dep Va giiJ gin ve sinh ChO moi trU'b'ng CUa ho.
• Rae kim bao quan ke ben van phong va nha a cong nhan ma khong c6 nO'i bao quan thfch hQ'p;
bao quan bl.ra bai va sap xep kern.
• Cac dau coc be tong dU'Q'c de tran I an tren cong trU'b'ng khong c6 m<)t khu chU'a dung quy din h. Nha thau
can phai thu gom CaC dau COC be tong de khu VI/C do thai da dU'Q'C quy djnh.
• Nha ve sinh cho cong nhan rat ban va boc mui khong dU'Q'C trang bi d1,1ng Cl,l sinh {nhU' giay sinh va
gio dl,l'ng rae).
• Thiet ke be lang khong dung quy dinh tr<)n lam cho ba be tong t rc'ln lan khap tr<)n va
be lang nay phu day ba sau 2m.
• DU'b'ng cong CQng cat ngang dU'b'ng cong VI,J cong trU'b'ng day bt,Ji ban lam cho tam nhin bi che khi
ch . De n hi Nha thau tU'&i nU'&c cho khu VI/C na ke cau
(dd-mm-yyyy)
sAo cAo Kl
G6i thOu Kmfrom
6+200
Ngu&i quon sat
• f)at do thai do trim lan tren cong tn.tb'ng khong co m9t nO'i chlta phu hQ'p. f)at nay can phai lltu trii
khu Vl/C da dltQ'C bo trf cho do thai. f)e cho ml,JC dfch tai Slr d1,1ng, dat nay can phai dltQ'C Chlta trong khu
Vl/C do thai thb'i tren cong trltCtng dltQ'C ngan bai dai ngan each va CO bang thong baa cho khu chlra
dat do thai thai.
• Dltb'ng cong VI,! ban va day b1,1i trong qua trlnh chuyen. f)e tranh dltb'ng ban do cac d()ng thi
cong, nha thau can phai thltb'ng xuyen phun tlt&i nlt&c it nhat 6 lan/ngay, tan xuat tlt&i can phai tang
trong tmb'ng hQ'p trb'i nong gia tang lltu lltQ'ng chuyen.
• Cac tui Bentonite de tran va 19n x9n tren cac thung cht!a dung djnh bentonite. Cac tui nay can phai
dltQ'C xep Vade ngan S<;!Ch Se.
• Cac vo baa dl!ng Bentonite de vao khe cua thung cht!a dung dich bentonite. Nhiing tui ding nay can
phai dltQ'c lltu khu vvc cht!a rae thai co tfnh chat nguy tren cong tmb'ng.
• Rae dltQ'C thay a cong trltb'ng va khu nha a cua cong nhan. Nha thau can yeu cau dQn dep cho
nhfrng khu Vl/C nay Va nha Cong nhan de dQn dep va gi fr g]n sinh cho moi trltCtng CUa hQ.
• Rae kim ian tran khu Vl/C bai due dam; nay nen dltQ'C lltu trii khu Vl/C dltQ'C thiet ke
cho rae kim v&i dai ngan each va bang thong baa.
• Cac dau CQC be tong dltQ'C de ian tran tren cong trltb'ng khong co m()t khu chlta dung quy din h. Nha thau
can hai thu m CaC dau CQC be ton de khu Vl/C do thai da dltQ'C djnh.
l·
..
•. r
•
...
Nhi:J v€ sinh cho c6ng nhOn dO' ban va b6c mui
DU'&ng c6ng c9ng t ngang aU'&ng c6ng VIJ tqi c6ng
blJi ban
'.
·'