Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016 VIE: Central Mekong Delta Region Connectivity Project Part 2 Annexes (pages 179-194) Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016

VIE: Central Mekong Delta Region Connectivity

Project Part 2 Annexes (pages 179-194)

Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Page 2: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

NOTE

In this report, “$” refers to US dollars.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Page 3: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

CDM.th Sml

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith- WSP -Yooshin Consultant JV

'?oo-./:.:......

Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881-255 ; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 C/0198

Date : 06 August 2015

To: Mr. Nguyen Van Huong

Contractor's Representative

Contract Office: No.61-Provincial Road 848, Tan Trong Village, Tan My Commune, Lap

Vo District, Dong Thap Province

Tel : (84) 043 7830856; Fax: (84) 043 7830859

Subject: Package CW1C- Environmental inspection report 04 Aug 2015

Dear Mr. Huong,

AftAr thA inRrAr.tinn in ynttr \.\1\11 r. IMnrl< r8r.I<8QP nn n4th AIIQII"'t ?n1 "' · WP Wnl llrl lii<P tn hiohlioht

SUI II!::J !::Jt IV it Ull ll i!::JII l ct l iSSU!::JS Ull yuur Bll!::J I !:!Yeti t.lltty IJUUI

environment as mentioned on the environmental inspection report in the attachment. Please follow

up our instructions/guidance in the report to take quick action and give us your response for those

issues by 121h August 2015.

By the way, we would like to mention to you some remaining issues from your CW1 C work package

which need to response on 121h August 2015, as follows:

Cc:

You need to report to us the status of fixing/repairing toilets in worker accommodation and

batching plants with suitable run-off of wastewater. The wastewater is needed for periodic

environmental monitoring quarterly. Please provide us the evidence of repairing and its

completion.

First aid kit should be available on office and worker accommodation.

The excavated soil disposing quantity should be recorded and reported to DDIS officially.

standing and quick action are highly recommended.

As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DO IS Consultant JV Office

Page 1 of 1

Attachement :

Environnemental inspection report 04 Aug

2015

....

• ·-

Page 4: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

01,!' an n6i khu Vt,J'C trung tam Dbng song CU>u Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE

Lien danh TU' COM Smith- WSP -Yooshin To 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh fJong Thap, Nam

fJT: (84) 067-3881-255; Fax: (84) 067-3881-256

So thll' : DDIS/CW1 C/0198

Ngay : 06/08/2015

GU>i 6ng Nguyen Van Hll'&ng di$n Nha

VP: s6 61- 8U'&ng lien tlnh 848, Ap Tan Trong, Xa Tan My, Huy$n V6, Tlnh Bong Thap

8T: (84) 043 7830856 Fax: (84) 043 7830859

Chu G6i CW1 C - Bao cao tra moi trLP<Yng ngay 04/08/2015

Kinh gU>i 6ng Hll'&ng,

Sau khi kiE§m tra m6i trll'&ng g6i CW1 C vao ngay 04/08/2015, chung t6i mu6n

cho 6ng m(>t vai m6i trll'&ng c6ng trll'&ng 6ng lien quan Sl,l' kem gc;>n gang va

m6i tm&ng lam vi$c kh6ng nhll' da dU'Q'C trong bao cao dinh kem kiE§m tra moi

trll'&ng. Mong 6ng tuan thu theo nhCmg hll'&ng dan trong bao cao va nhanh chong hanh d(>ng

va !=!LYi phan hoi cho chun!=J toi vao ngay 12/08/2015.

Nhan ti$n, chung t6i cGng nh& 6ng m(>t vai m6i tm&ng van con ton dQng g6i

cua 6ng cGng c6 phan hoi vao ngay 12/08/2015 nhll' sau:

6ng bao cao tinh sU>a cac khu Vl,l'C nha v$ sinh dE§ c6 dU'&ng thoat cua nll'&c

thai sau khi dU'qc xU> ly khu vl,l'c nha & cua cong nhan va khu vl,l'c tr(>n. Nll'&c thai

cho quan m6i trll'&ng dinh ky. Mong 6ng cung cht:mg cua vi$c sU> chCPa va

trinh trang hoan thi$n sU>a chCPa.

BQ dt,.mg Ct,J SO' CLPU y te dm phai lu6n thll'&ng trl,l'C van ph6ng va nO'i & cua c6ng nhan.

Khoi ILl'Q'nR dao dU'qc d6 thai dn phai dU'O'c bao cao chi cho Tll'

chinh thuc.

nghi Nha hiE§u va trll'O'ng th l,l'C hi$n.

Tran trong,

Gordon Belton Giam doc dl,l' an

{Da kyJ

Cc: Nhll' tren

- Giam d6c dl! an C§u Cao Lanh, CIPM - Nh6m qufm ly c6ng tfll'ang, CIPM

LU'u: Lien danh TVGS- DDIS

Trang 1 / 1

fHnh kem: Bao cao kiem tra m6i trll'ang ngay 04/08/2015

·.· .. ,.,

:

·-..

Page 5: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

ENVIRONMENTAL MONITORING REPORT

Work Package Km from Observers

6+200

• There was overspreading excavated soil on site without any proper storage. This soil must store in

designated area for disposal area. For reuse purpose, this soil should store in a temporary place with

barricade and notification broad.

• Access road on site and batching plant were full of dust during transport. To avoid dirty road affecting

by construction activity, Contractor must regularly spray wate r at least 6 times/day, this frequency might

need to increase for either the hot and sunny day or increase of t ransport activity.

• Bentonite bags was spreading over bentonite t anks. This bag should be organized and re-a rranged.

• Bentonite bags left empty on the side of bentonite banks. These empty bags should be stored in

hazardous waste storage on site.

• Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity

for these places and remind your worker to keep clean condition for their environment.

• Metal waste was stored next to the office and worker accommodation without a proper storage; this

material should be stored in a designatP.d <HP.a for with and (label) notification

broad as reference.

• The concrete pile head was found on site without a proper storage. Contractor must collect his concrete

le head t o dis I area as mentioned.

' 4

Page 6: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

L

•·

r

:

Page 7: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

Dirty access to botching plant Overspreading of concrete sludge under botching

..

· . ....

Page 8: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith - WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881 -255 ; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 C/0230

Date : 28 August 2015 To: Mr. Nguyen Van Huong

Contractor's Representative

Contract Office: No.61-Provincial Road 848, Tan Trang Village, Tan My Commune, Lap

Vo District, Dong Thap Province

Tel : (84) 043 7830856 ; Fax: (84) 043 7830859

Subject: Package CW1C- Environmental inspection report 24 Aug 2015

Dear Mr. Huong,

First, we would like to appreciate your corrective action and feedback on our environmental

inspection report 04 Aug 2015 on the letter No. DDIS/CW1 C/0198 dated 061h August 2015. However,

after the inspection in your area, we realized that your construction site has not improved as reported

in your response letter CW1 C/DDIS/0175 on 17th August 2015. Many environmental issues are still

not resolved as mentioned in the attachment of environmental inspection report of 24th August 2015.

Further, we would like to give some comments on your response report/corrective actions as follows:

1. The metal storage area seems more messy and disorganized after your corrective action.

This situation is due to your improper barricades and notification board as well as

disorganized metal waste inside. We suggest you to install proper barricades and notification

board labelled for "metal waste storage" and all wastes should be well-organized and

grouped as to type or use;

2. The temporary spoils disposal area was not provided with barricade and the excavated soil

was dumped spreading everywhere;

3. The concrete waste from batching plant was not attended and therefore no corrective action

has been done

4. The concrete pile heads should not be mentioned "placed in proper location" in your report.

This waste should be fully collected and transferred into the approved disposal area by local

authority under DDIS supervision by site inspector and Environment Specialist.

As above

Cao Lanh Bridge Project Manager. CIPM

Site Construction Team. CIPM

File: DDIS Consultant JV Office

Attachement :

- CW1C Environnemental inspection report 24 August 2015

Page 1 of l

Page 9: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

DI,P an n6i khu VI,PC trung tam D6ng song Ctvu Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan tr9' 0353-VIE

Lien danh TU' COM Smith- WSP -Yooshin

T6 5, Ap Tan T!ch, Xa T!nh Th&i, TP Cao Lanh, Tinh Dong Thap, Nam

DT: (84) 067-3881-255; Fax: (84) 067-3881-256

So thU' : DDIS/CW1 C/0230

Ngay : 28/08/2015 GLI'i d€m: 6ng Nguyen Van HLP&ng

di$n Nha

VP: so 61- 8LP6'ng lien tinh 848, Ap Tan Trang, Xa Tan My, Huy$n Vo, TTnh 86ng Thap

8T: (84) 043 7830856 Fax: (84) 043 7830859

Chu G6i CW1C- Bao cao tra moi trlJ'img ngay 24/08/2015

Kinh gll'i ong HLP&ng,

TrU'&c tien, chung toi muon khen ngqi vi$c thl,J'C hi$n dung theo chT dan va phan h6i cua ong vi; bao

cao kiem tra moi trLPerng ngay 04/08/2015 theo thU' cua chung toi so DDIS/CW1 C/0198 ky ngay

06/08/2015. Tuy nhien, sau khi kiem tra khu Vl,J'C thi cong cua Nha chung toi rang cong

tac thi cong CUa ong khong dU'Q'C cai thi$n nhU' trong bao cao ma ong da gLri theo thll' SO CW1C/DDIS/0175 ky ngay 17/08/2015. Con nhil;u df; moi trll'erng van chll'a dll'Q'C khik pht,Jc

dll'Q'C df; cc;tp trong bao cao kiem tra moi tm&ng ngay 24/08/2015 dinh kem theo thll' nay.

Han nQ>a, chung toi c6 m(>t so y v€; bao cao phan h6i/thl,J'c hi$n dung cua ong nhU' sau:

1. Khu Vl,J'C lll'u trQ> kim dl!'erng nhU' bU>a bai va l(>n x(>n han sau khi ong thl,J'c hi$n dung.

Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap

khong dung quy d!nh. Chung toi df; nghi ong dai phan each va bang thong bao thich

hQ'p CO dan nhan "khu lll'U trQ> rae kim va mQi rae thai cung phai dll'Q'C sap gQn gang

va phan theo nh6m va ml,JC dich Slr dt,Jng;

2. Khu Vl,J'C d6 thai thai chl!'a bo tri dai phan each va dao rai vai khap nai;

3. Be tong thai tr(>n khong dll'Q'C quan tam va vi vc;ty ong van Chll'a thl,J'C hi$n tot df;

nay;

4. CQC be tong khong dU'Q'C df; cc;tp "lll'U trQ> dung nai" trong bao cao cua ong. Vc;tt li$u thai

nay nen gom toan b(> va chuyen khu d6 thai da dll'Q'C duy$t bai CO' quan dja phll'O'ng

c6 quyf;n dl!'&i Sl,J' giam sat cua Giam sat vien va Chuyen gia moi tm&ng cua Tll'

8€; nghi ong dQc ky nhQ>ng chT va hll'&ng dan cua chung toi trong bao cao dinh kem. Thai

thl,J'c hi$n dung theo chT dan nay va phan h6i cho chung toi khong qua ngay 04/09/2015.

Tran trQng,

Victoriano L.Hamlig Ky sll' thll'erng tru

{Da kyJ

Cc: - Nhll' tren - Giam doc di! an Cau Cao CIPM - Nh6m quan ly c6ng tmong, CIPM - Lll'u: Lien danh TVGS - DDIS

Dinh kern: Bao cao tra m6i tmong ngay 24/08/2015

Trang 1/1

Page 10: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

ENVIRONMENTAL MONITORING REPORT

Work Package Km from Observers

6+200

CVVlC Sunny Ms. Le Thi Phuong Loan - NES

• There was overspreading excavated soil on site without any proper storage. This soi l must store in

designated area for disposal area. For reuse purpose, this soil should store in a temporary place with

barricade and notification broad.

• Access road on site and batching plant were muddy and slippery during transport. Contractor must

regularly repair the road since this road can cause danger for transport and workers.

• Bentonite bags was spreading all over site. This bag should be collected, organized and stored in

hazardous waste area.

• Bentonite was spreading out inside and outside of construction area due to mishandling during transfer

the bentonite tanks. Contractor is requested to collect all spreading bentonite on site.

• Repairing machine on the batching plant area led to leak fuel on the ground. This area must be clean-

up.

• Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity

for these places and remind your worker to keep clean condition for their environment.

• Metal waste was stored next to the office and worker accommodation without a proper storage; the

storage was messy and poor organized.

• The concrete pile head was found on site without a proper storage. Contractor must collect his concrete

pile head to disposal area as mentioned.

• Toilets for workers were terribly dirty and smelly without sanitary supply (e.g. papers and water basket).

• The improper design of settling pond in the batching plant caused the overspreading of concrete sludge

around batching plant and the settling pond was fully covered with roughly 2 meter depth by this sludge.

• Full of dust on the public road crossing with acess road of construction site cause the low visibility for

transportation. The contractor is red to water for this area next to

Page 11: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi
Page 12: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

Full of dust on the public road crossing with acess road

construct/On s1te

Page 13: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

(ngay-th6ng-nam)

BAO cAo Kl M TRA MOl TRlfONG

Goi thau Tirkm

6+200

Ngtriti quan sat

• Bat do thai do trim lan tren cong tnr(mg khong c6 m<)t nO'i chU'a phu hc;rp. Bat nay can phai IU'u triJ

khu VI/C da dU'Q'C bo trf cho do thai. De cho mi,JC dfch tai Slt d1,1ng, dat nay can phai dU'Q'C chlra trong khu

VI/C do thai thb'i tren Cong trU'b'ng dU'Q'C ngan bCti dai ngan each va CO bang thong bao.

• DU'b'ng cong VI,J va tr<)n lay IQi va trO'n trQ't trong qua trlnh chuyen. Nha thau phai thU'b'ng xuyen

sll'a chli'a dU'b'ng vi dU'b'ng nay c6 the gay tai cho viec chuyen va cong nhan.

• Cac tui bentonite rO'i vai khap cong tnrb'ng. Tui nay nen dU'Q'C gom sap xep va IU'u triJ a khu VI/C

chU'a rae thai c6 tfnh chat nguy

• Bentonite rO'i vai ben trong va ben ngoai khu thi cong do thieu Xlt ly tot trong khi chuyen cac thung

chU'a dung dich bentonite.

• Sll'a chli'a may m6c tren khu VI/C trQn bi ro ri nhien lieu ra nen dat. Khu VI/C nay phai dU'Q'C don

se.

• Rae dU'Q'C thay Ct khap cong tnrb'ng va khu nha Ct cua cong nhan. Nha thau can yeu cau don cho

nhiJng khu VI/C nay va nhac nha cong nhan de don dep Va giiJ gin ve sinh ChO moi trU'b'ng CUa ho.

• Rae kim bao quan ke ben van phong va nha a cong nhan ma khong c6 nO'i bao quan thfch hQ'p;

bao quan bl.ra bai va sap xep kern.

• Cac dau coc be tong dU'Q'c de tran I an tren cong trU'b'ng khong c6 m<)t khu chU'a dung quy din h. Nha thau

can phai thu gom CaC dau COC be tong de khu VI/C do thai da dU'Q'C quy djnh.

• Nha ve sinh cho cong nhan rat ban va boc mui khong dU'Q'C trang bi d1,1ng Cl,l sinh {nhU' giay sinh va

gio dl,l'ng rae).

• Thiet ke be lang khong dung quy dinh tr<)n lam cho ba be tong t rc'ln lan khap tr<)n va

be lang nay phu day ba sau 2m.

• DU'b'ng cong CQng cat ngang dU'b'ng cong VI,J cong trU'b'ng day bt,Ji ban lam cho tam nhin bi che khi

ch . De n hi Nha thau tU'&i nU'&c cho khu VI/C na ke cau

Page 14: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi
Page 15: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

(dd-mm-yyyy)

sAo cAo Kl

G6i thOu Kmfrom

6+200

Ngu&i quon sat

• f)at do thai do trim lan tren cong tn.tb'ng khong co m9t nO'i chlta phu hQ'p. f)at nay can phai lltu trii

khu Vl/C da dltQ'C bo trf cho do thai. f)e cho ml,JC dfch tai Slr d1,1ng, dat nay can phai dltQ'C Chlta trong khu

Vl/C do thai thb'i tren cong trltCtng dltQ'C ngan bai dai ngan each va CO bang thong baa cho khu chlra

dat do thai thai.

• Dltb'ng cong VI,! ban va day b1,1i trong qua trlnh chuyen. f)e tranh dltb'ng ban do cac d()ng thi

cong, nha thau can phai thltb'ng xuyen phun tlt&i nlt&c it nhat 6 lan/ngay, tan xuat tlt&i can phai tang

trong tmb'ng hQ'p trb'i nong gia tang lltu lltQ'ng chuyen.

• Cac tui Bentonite de tran va 19n x9n tren cac thung cht!a dung djnh bentonite. Cac tui nay can phai

dltQ'C xep Vade ngan S<;!Ch Se.

• Cac vo baa dl!ng Bentonite de vao khe cua thung cht!a dung dich bentonite. Nhiing tui ding nay can

phai dltQ'c lltu khu vvc cht!a rae thai co tfnh chat nguy tren cong tmb'ng.

• Rae dltQ'C thay a cong trltb'ng va khu nha a cua cong nhan. Nha thau can yeu cau dQn dep cho

nhfrng khu Vl/C nay Va nha Cong nhan de dQn dep va gi fr g]n sinh cho moi trltCtng CUa hQ.

• Rae kim ian tran khu Vl/C bai due dam; nay nen dltQ'C lltu trii khu Vl/C dltQ'C thiet ke

cho rae kim v&i dai ngan each va bang thong baa.

• Cac dau CQC be tong dltQ'C de ian tran tren cong trltb'ng khong co m()t khu chlta dung quy din h. Nha thau

can hai thu m CaC dau CQC be ton de khu Vl/C do thai da dltQ'C djnh.

Page 16: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

..

•. r

Page 17: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

...

Page 18: Environmental Monitoring Report VIE: Central Mekong Delta … · Tinh nay Ia do dai phan each va bang thong bao va ca rae kim ben trong sap khong dung quy d!nh. Chung toi df; nghi

Nhi:J v€ sinh cho c6ng nhOn dO' ban va b6c mui

DU'&ng c6ng c9ng t ngang aU'&ng c6ng VIJ tqi c6ng

blJi ban

'.

·'