7
Environmental Monitoring Report Post-Construction Environmental Audit Report (Appendixes) March 2017 Loan 2746-UZB: CAREC Corridor 2 Road Investment Program – Tranche 2 Section Km 355–Km 440 of the A380 Highway, Uzbekistan Prepared by the Construction Supervision Consultant “SAMBO Engineering Co., Ltd” (Korea) for the Republican Road Fund under the Ministry of Finance of the Republic of Uzbekistan and for the Asian Development Bank

Environmental Monitoring Report Loan 2746-UZB: … by the Construction Supervision Consultant “SAMBO Engineering Co., Ltd” (Korea) for the Republican Road Fund under the Ministry

  • Upload
    vannhu

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Environmental Monitoring Report

Post-Construction Environmental Audit Report (Appendixes) March 2017

Loan 2746-UZB: CAREC Corridor 2 Road

Investment Program – Tranche 2

Section Km 355–Km 440 of the A380 Highway, Uzbekistan

Prepared by the Construction Supervision Consultant “SAMBO Engineering Co., Ltd” (Korea) for the Republican Road Fund under the Ministry of Finance of the Republic of Uzbekistan and for the Asian Development Bank

23

APPENDIX A

24

25

26

APPENDIX B

27

APPENDIX C

28